ML15217A044: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
| issue date = 08/19/2015
| issue date = 08/19/2015
| title = 2015 Clinton Power Station Initial License Examination Re-Take Proposed Admin JPMs
| title = 2015 Clinton Power Station Initial License Examination Re-Take Proposed Admin JPMs
| author name = McNeil D R
| author name = Mcneil D
| author affiliation = NRC/RGN-III/DRS/OLB
| author affiliation = NRC/RGN-III/DRS/OLB
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:Retain approved Master Copy per SRRS 3D.126/3D.111 CLINTON POWER STATION Job Performance Measure Authorization of Overtime IAW 10CFR26 JPM Number: JPM461 Revision Number: 0 0 Date: 06/22/2015 Developed By:
{{#Wiki_filter:CLINTON POWER STATION Job Performance Measure Authorization of Overtime IAW 10CFR26 JPM Number: JPM461 Revision Number: 00 Date: 06/22/2015 Developed By:         W. D. Kiser                       06/22/15 Instructor                       Date Validated By:         /s Mike Antonelli                 7/17/15 SME or Instructor                 Date Reviewed By:
W. D. Kiser 06/22/15   Instructor Date Validated By:
Operations Representative         Date Approved By:
/s Mike Antonelli 7/17/15   SME or Instructor Date Reviewed By:
Training Department               Date Retain approved Master Copy per SRRS 3D.126/3D.111
Operations Representative Date Approved By:
 
Training Department Date JPM Number: Admin a Clinton Power Station Job Performance Measure (JPM)
JPM Number: Admin a Clinton Power Station Job Performance Measure (JPM)
Page 2 of 6 READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.
READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.
TASK STANDARDS
TASK STANDARDS:
Examinee determines that LS
* Examinee determines that LS-AA-119 work hour limits will be exceeded and completes Section 1 of LS-AA-119 Fatigue Management and Work Hour Limits, Attachment 1 10 CFR 26 Work Hour Limits Waiver and submits it to the Shift Manager.
-AA-119 work hour limits will be exceeded and completes Section 1 of LS-AA-119 Fatigue Management and Work Hour Limits, Attachment 1 10 CFR 26 Work Hour Limits Waiver and submits it to the Shift Manager.
TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:
TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:
None PROCEDURAL/
* None PROCEDURAL/


==REFERENCES:==
==REFERENCES:==
* OP-CL-101-102-1001, Rev. 7 CPS Minimum On-Shift Staffing Functions
* LS-AA-119, Rev. 11, Fatigue Management and Work Hour Limits
* LS-AA-119-1003, Rev 3, Calculating Work Hours EVALUATOR INSTRUCTIONS:
* Amplifying cues are provided within the JPM steps.
* All pre-job briefings are completed.
* Provide the candidate with a copy of LS-AA-119 when the student acknowledges the initiating cue.
* Provide the candidate with a copy of LS-AA-119-1003 and/or OP-CL-101-102-1001 upon request.
Page 2 of 6


OP-CL-101-102-1001, Rev. 7 CPS Minimum O n-Shift Staffing Functions  LS-AA-119, Rev. 1 1, Fatigue Management and Work Hour Limits LS-AA-119-1003, Rev 3, Calculating Work Hours EVALUATOR INSTRUCTIONS:
JPM Number: Admin a Clinton Power Station Job Performance Measure (JPM)
Amplifying cues are provided within the JPM steps.
INITIAL CONDITIONS:
All pre-job briefings are completed.
Provide the candidate with a copy of LS
-AA-119 when the student acknowledges the initiating cue. Provide the candidate with a copy of LS
-AA-119-1003 and/or OP
-CL-101-102-1001 upon request.
JPM Number: Admin a Clinton Power Station Job Performance Measure (JPM)
Page 3 of 6 INITIAL CONDITIONS:
The plant is in Mode 1.
The plant is in Mode 1.
It is Saturday, the 21st @ 0800. James Taylor, the B RO, has just left the site due to a sudden illness. The only trained and qualified person you are able to contact is Paul Simon (Employee ID: 123456), who is on his first regular day off.
It is Saturday, the 21st @ 0800. James Taylor, the B RO, has just left the site due to a sudden illness. The only trained and qualified person you are able to contact is Paul Simon (Employee ID: 123456), who is on his first regular day off.
Van Morrison (the 'A' RO) is the only remaining RO on
Van Morrison (the A RO) is the only remaining RO on-site.
-site. Paul is ready and willing to come in and work the overtime and can be there @ 0900 and work until 1500.
Paul is ready and willing to come in and work the overtime and can be there @ 0900 and work until 1500.
Paul has worked the following shifts that count towards 10CFR26 guidelines so far this week: Sunday the 15th 16 hours on days and afternoon shift (0700 - 2300) Monday the 16th 8 hours on days (0900 - 1700) Tuesday the 17th 16 hours on days and afternoon shift (0700 - 2300) Wednesday the 18th 8 hours on days (0900 - 1700) Thursday the 19 th  16 hours on days and afternoon shift (0700 - 2300) Friday the 20 th    8 hours on days (0900 - 1700) Safety-related work needs to be performed by the B RO during the shift.
Paul has worked the following shifts that count towards 10CFR26 guidelines so far this week:
Sunday the 15th         16 hours on days and afternoon shift (0700 - 2300)
Monday the 16th         8 hours on days (0900 - 1700)
Tuesday the 17th       16 hours on days and afternoon shift (0700 - 2300)
Wednesday the 18th 8 hours on days (0900 - 1700)
Thursday the 19th      16 hours on days and afternoon shift (0700 - 2300)
Friday the 20th          8 hours on days (0900 - 1700)
Safety-related work needs to be performed by the B RO during the shift.
INITIATING CUE:
INITIATING CUE:
CAUTION All pre-job briefings are completed.
CAUTION All pre-job briefings are completed.
You are the CRS.
You are the CRS.
Determine if Paul can work the overtime in accordance with LS
Determine if Paul can work the overtime in accordance with LS-AA-119 Fatigue Management and Work Hour Limits and report results to the Shift Manager.
-AA-119 Fatigue Management and Work Hour Limits and report results to the Shift Manager.
START TIME:
START TIME:
Page 3 of 6
 
JPM Number: Admin a Clinton Power Station Job Performance Measure (JPM)
PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.
PERFORMANCE STEPS LS-AA-119 Fatigue Management and Work Hour Limits Comment SAT    UNSAT STEP              ELEMENT                                STANDARD Number Determines B RO position is        Determines that B RO position IS 1
required per shift staffing        required by OP-CL-101-102-1001 CPS requirements.                      Minimum On-Shift Staffing Functions.
Evaluator Note: Examinee may know this information by memory and not refer to OP-CL-101-102-1001.
EVALUATOR NOTE: Shift staffing composition may be less than the minimum requirements for a period of time NOT to exceed two hours in order to accommodate unexpected absence of an on duty staff member provided immediate action is taken to restore the shift staff composition to within the minimum requirements.
2            Reviews procedure to determine      *5.1.1 if any overtime guidelines will    Determines that overtime would result be exceeded.                        in exceeding 72 hours in a 7-day period.
3            Reviews procedure to determine      *5.4.1 if it allows personnel who will    Determines a waiver is required to exceed 10CFR26 to work              allow personnel to exceed work hour overtime.                          limits.
Evaluator Cue: When examinee reports that a waiver is required, direct the examinee to complete Section 1 of LS-AA-119, Attachment 1 and submit to you.
Page 4 of 6


JPM Number: Admin a Clinton Power Station Job Performance Measure (JPM)
JPM Number: Admin a Clinton Power Station Job Performance Measure (JPM)
Page 4 of 6 PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.
Comment SAT    UNSAT STEP             ELEMENT                           STANDARD Number 4           Completes Section 1 of LS-AA-   *Attachment 1 119, Attachment 1.             Examinee fills in:
PERFORMANCE STEPS LS-AA-119 Fatigue Management and Work Hour Limits STEP ELEMENT STANDARD SAT UNSAT Comment Number 1 Determine s B RO position is required per shift staffing requirements.
* Name: Paul Simon
Determine s that B RO position IS required by OP-CL-101-102-1001 CPS Minimum O n-Shift Staffing Functions. Evaluator Note:
* Employee ID#: 123456
Examinee may know this information by memory and not refer to OP
* Department: Operations
-CL-101-102-1001. EVALUATOR NOTE: Shift staffing composition may be less than the minimum requirements for a period of time NOT to exceed two hours in order to accommodate unexpected absence of an on duty staff member provided immediate action is taken to restore the shift staff composition to within the minimum requirements.
* Planned Waiver Start: 0900 / 21st
2 Reviews procedure to determine if any overtime guidelines will be exceeded.
* Planned Waiver End: 1500 / 21st
*5.1.1 Determines that overtime would result in exceeding 72 hours in a 7
* Planned Waiver Duration: 6 hours
-day period. 3 Reviews procedure to determine if it allows personnel who will exceed 10CFR26 to work overtime. *5.4.1 Determines a waiver is required to allow personnel to exceed work hour limits. Evaluator Cue:
* Limits Exceeded: > 72 hours in any seven days (168 hours)
When examinee reports that a waiver is required, direct the examinee to complete Section 1 of LS
* Describe waiver work activity: B RO shift responsibilities (or equivalent)
-AA-119, Attachment 1 and submit to you.
* Circumstances that require exceeding limits: Only qualified person available on short notice (or equivalent).
JPM Number:  Admin a Clinton Power Station Job Performance Measure (JPM)
* Marks YES to question Is waiver required to address conditions adverse to safety or to maintain site security.
Page 5 of 6 STEP ELEMENT STANDARD SAT UNSAT Comment Number 4 Complete s Section 1 of LS
* Submitted by: Examinee Name, Signature, Date and Time.
-AA-119, Attachment 1
. *Attachment 1 Examinee fills in
Name: Paul Simon Employee ID#:
123456  Department: Operations Planned Waiver Start: 0900 / 21 st  Planned Waiver End: 1500 / 21 st  Planned Waiver Duration: 6 hours Limits Exceeded
: > 72 hours in any seven days (168 hours)
Describe waiver work activity: B RO shift responsibilities (or equivalent)
Circumstances that require exceeding limits: Only qualified person available on short notice (or equivalent).
Marks "YES" to question "Is waiver required to address conditions adverse to safety or to maintain site security".
Submitted by: Examinee Name, Signature, Date and Time.
TERMINATING CUES:
TERMINATING CUES:
Candidate completes Section 1 of LS-AA-119 Fatigue Management and Work Hour Limits, Attachment 1 10 CFR 26 Work Hour Limits Waiver and submits it to the Shift Manager.
Candidate completes Section 1 of LS-AA-119 Fatigue Management and Work Hour Limits, Attachment 1 10 CFR 26 Work Hour Limits Waiver and submits it to the Shift Manager.
STOP TIME:
STOP TIME:
Page 5 of 6


Clinton Power Station Job Performance Measure (JPM)
Clinton Power Station Job Performance Measure (JPM)
Page 6 of 6  INITIAL CONDITIONS:
INITIAL CONDITIONS:
The plant is in Mode 1.
The plant is in Mode 1.
It is Saturday, the 21st @ 0800. James Taylor, the B RO, has just left the site due to a sudden illness. The only trained and qualified person you are able to contact is Paul Simon (Employee ID: 123456), who is on his first regular day off.
It is Saturday, the 21st @ 0800. James Taylor, the B RO, has just left the site due to a sudden illness. The only trained and qualified person you are able to contact is Paul Simon (Employee ID: 123456), who is on his first regular day off.
Van Morrison (the 'A' RO) is the only remaining RO on
Van Morrison (the A RO) is the only remaining RO on-site.
-site. Paul is ready and willing to come in and work the overtime and can be there @ 0900 and work until 1500.
Paul is ready and willing to come in and work the overtime and can be there @ 0900 and work until 1500.
Paul has worked the following shifts that count towards 10CFR26 guidelines so far this week: Sunday the 15th 16 hours on days and afternoon shift (0700  
Paul has worked the following shifts that count towards 10CFR26 guidelines so far this week:
- 2300) Monday the 16th 8 hours on days (0900  
Sunday the 15th         16 hours on days and afternoon shift (0700 - 2300)
- 1700) Tuesday the 17th 16 hours on days and afternoon shift (0700  
Monday the 16th         8 hours on days (0900 - 1700)
- 2300) Wednesday the 18th 8 hours on days (0900  
Tuesday the 17th       16 hours on days and afternoon shift (0700 - 2300)
- 1700) Thursday the 19 th  16 hours on days and afternoon shift (0700  
Wednesday the 18th 8 hours on days (0900 - 1700)
- 2300) Friday the 20 th     8 hours on days (0900  
Thursday the 19th      16 hours on days and afternoon shift (0700 - 2300)
- 1700) Safety-related work needs to be performed by the B RO during the shift.
Friday the 20 th         8 hours on days (0900 - 1700)
Safety-related work needs to be performed by the B RO during the shift.
INITIATING CUE:
INITIATING CUE:
CAUTION All pre-job briefings are completed.
CAUTION All pre-job briefings are completed.
You are the CRS.
You are the CRS.
Determine if Paul can work the overtime in accordance with LS
Determine if Paul can work the overtime in accordance with LS-AA-119 Fatigue Management and Work Hour Limits and report results to the Shift Manager.
-AA-119 Fatigue Management and Work Hour Limits and report results to the Shift Manager.
Page 6 of 6
 
CLINTON POWER STATION Job Performance Measure Review CPS 9015.01 Standby Liquid Control System Operability JPM Number: JPM511 Revision Number: 01 Date: 6/22/2015 Developed By: W. D. Kiser                      6/22/15 Instructor                      Date Validated By: /s Mike Antonelli                7/17/15 SME or Instructor                Date Reviewed By:
Operations Representative        Date Approved By:
Training Department              Date


CLINTON POWER STATION Job Performance Measure Review CPS 9015.01 Standby Liquid Control System Operability JPM Number: JPM511 Revision Number: 0 1 Date:  6/22/2015 Developed By:
JPM Number: Admin b Clinton Power Station Job Performance Measure (JPM)
W. D. Kiser 6/22/15  Instructor Date  Validated By:
READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.
/s Mike Antonelli  7/17/15  SME or Instructor Date  Reviewed By:
TASK STANDARDS:
Operations Representative Date  Approved By:
* SRO review of CPS 9015.01 Standby Liquid Control System Operability is complete and ITS 3.1.7 has been entered.
Training Department Date JPM Number:  Admin b Clinton Power Station Job Performance Measure (JPM)
* SRO review of ESOMs log entries for CPS 9015.01 Standby Liquid Control System Operability is complete and ITS 3.1.7 error is identified.
Page 2 of 7 READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.
TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:
TASK STANDARDS
* None PROCEDURAL/
SRO review of CPS 9015.01 Standby Liquid Control System Operability is complete and ITS 3.1.7 has been entered.
SRO review of ESOMs log entries for CPS 9015.01 Standby Liquid Control System Operability is complete and ITS 3.1.7 error is identified.
TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS: None PROCEDURAL/


==REFERENCES:==
==REFERENCES:==
 
* CPS No. 9015.01, Rev 41a Standby Liquid Control System Operability
CPS No. 9015.01, Rev 41 a Standby Liquid Control System Operability CPS 9015.01D001, Rev 38a SLC Pump and Valve Data Sheet ITS 3.1.7 pg 3.1
* CPS 9015.01D001, Rev 38a SLC Pump and Valve Data Sheet
-20, Amendment No. 192 Standby Liquid Control (SLC) System EVALUATOR INSTRUCTIONS:
* ITS 3.1.7 pg 3.1-20, Amendment No. 192 Standby Liquid Control (SLC) System EVALUATOR INSTRUCTIONS:
Amplifying cues are provided within the JPM steps.
* Amplifying cues are provided within the JPM steps.
All pre-job briefings are completed.
* All pre-job briefings are completed.
Provide examinee a marked up copy of the following:
* Provide examinee a marked up copy of the following:
o CPS 9015.01 Standby Liquid Control System Operability o CPS 9015.01D001 SLC Pump and Valve Data Sheet o ESOMs log entries (attached)
o CPS 9015.01 Standby Liquid Control System Operability o CPS 9015.01D001 SLC Pump and Valve Data Sheet o ESOMs log entries (attached)
Page 2 of 7


JPM Number: Admin b Clinton Power Station Job Performance Measure (JPM)
JPM Number: Admin b Clinton Power Station Job Performance Measure (JPM)
Page 3 of 7 INITIAL CONDITIONS:
INITIAL CONDITIONS:
CPS No. 9015.01 Standby Liquid Control System Operability for SLC Pump A (sections 8.1, 8.2, and 8.4 only) is field complete, awaiting supervisory review.
CPS No. 9015.01 Standby Liquid Control System Operability for SLC Pump A (sections 8.1, 8.2, and 8.4 only) is field complete, awaiting supervisory review.
INITIATING CUE:
INITIATING CUE:
CAUTION All pre-job briefings are completed.
CAUTION All pre-job briefings are completed.
Perform the following supervisory reviews:
Perform the following supervisory reviews:
CPS No. 9015.01 Standby Liquid Control System Operability ESOMs log entries that were made during performance of the surveillance MOV Test Prep Switch operation was logged in the Short Duration Time Clock log and has already been verified for accuracy and completeness.
* CPS No. 9015.01 Standby Liquid Control System Operability
* ESOMs log entries that were made during performance of the surveillance MOV Test Prep Switch operation was logged in the Short Duration Time Clock log and has already been verified for accuracy and completeness.
Inform the Shift Manager after completing the task.
Inform the Shift Manager after completing the task.
START TIME:
START TIME:
Page 3 of 7


JPM Number: Admin b Clinton Power Station Job Performance Measure (JPM)
JPM Number: Admin b Clinton Power Station Job Performance Measure (JPM)
Page 4 of 7 PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.
PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.
PERFORMANCE STEPS CPS 9015.01 Standby Liquid Control System Operability 5.0 Reviews section 5.0 and verifies section is filled out properly.
PERFORMANCE STEPS CPS 9015.01 Standby Liquid Control System Operability 5.0   Reviews section 5.0 and verifies section is filled out properly.
Standard: Examinee verifies each step of section 5.0 is initialed, step numbers are circled and either initialed / N/A'd as appropriate, and SMngt permission obtained to perform the procedure.
Standard:           Examinee verifies each step of section 5.0 is initialed, step numbers are circled and either initialed / N/Ad as appropriate, and SMngt permission obtained to perform the procedure.
Cue: Comments In step 5.2, SLC Pump A should be marked.
Cue:
Step 5.5.2 should be N/A'd.
Comments           In step 5.2, SLC Pump A should be marked.
SAT   UNSAT   Comment Number 7.0 Reviews section 7.0 and verifies section is filled out properly.
Step 5.5.2 should be N/Ad.
Standard: Examinee verifies each step of section 7.0 is initialed.
SAT                 UNSAT                   Comment Number 7.0   Reviews section 7.0 and verifies section is filled out properly.
Cue: Comments   SAT   UNSAT   Comment Number
Standard:           Examinee verifies each step of section 7.0 is initialed.
Cue:
Comments SAT                 UNSAT                   Comment Number Page 4 of 7


JPM Number: Admin b Clinton Power Station Job Performance Measure (JPM)
JPM Number: Admin b Clinton Power Station Job Performance Measure (JPM) 8.1 Reviews section 8.1 and verifies section 8.1 is filled out properly.
Page 5 of 7 8.1 Reviews section 8.1 and verifies section 8.1 is filled out properly.
Standard:     Examinee verifies steps 8.1.1 through 8.1.8 is initialed or N/Ad as appropriate.
Standard: Examinee verifies steps 8.1.
Cue:
1 through 8.1.8 is initialed or N/A'd as appropriate.
Comments SAT               UNSAT                   Comment Number 8.2 Reviews section 8.2 and verifies section 8.2 is filled out properly.
Cue: Comments   SAT   UNSAT   Comment Number 8.2 Reviews section 8.2 and verifies section 8.2 is filled out properly.
Standard:     Examinee verifies steps 8.2.1 through 8.2.24 is initialed or N/Ad as appropriate.
Standard: Examinee verifies steps 8.2.
Cue:
1 through 8.2.24 is initialed or N/A'd as appropriate.
Comments SAT               UNSAT                   Comment Number 8.3 Reviews section 8.3 and verifies section 8.3 is filled out properly.
Cue: Comments   SAT   UNSAT   Comment Number 8.3 Reviews section 8.3 and verifies section 8.3 is filled out properly.
Standard:     Examinee verifies all steps in section 8.3 are N/Ad.
Standard: Examinee verifies all steps in section 8.3 are N/A'd.
Cue:
Cue: Comments Section 8.3 is NA (not testing SLC Pump B per the cue).
Comments     Section 8.3 is NA (not testing SLC Pump B per the cue).
SAT   UNSAT   Comment Number
SAT               UNSAT                   Comment Number Page 5 of 7


Clinton Power Station Job Performance Measure (JPM)
Clinton Power Station Job Performance Measure (JPM) 8.4 Reviews section 8.4 and verifies section 8.4 is filled out properly.
Page 6 of 7  8.4 Reviews section 8.4 and verifies section 8.4 is filled out properly.
Standard:     Examinee verifies steps 8.4.1 through 8.4.9 is initialed or N/Ad as appropriate.
Standard: Examinee verifies steps 8.4.
Cue:
1 through 8.4.9 is initialed or N/A'd as appropriate.
Comments SAT               UNSAT                   Comment Number 8.5 Reviews section 8.5 and verifies section 8.5 is filled out properly.
Cue: Comments   SAT   UNSAT   Comment Number 8.5 Reviews section 8.5 and verifies section 8.5 is filled out properly.
Standard:     Examinee verifies step 8.5 is initialed and date/time of completion recorded.
Standard: Examinee verifies step 8.5 is initialed and date/time of completion recorded.
Cue:
Cue: Comments   SAT   UNSAT   Comment Number
Comments SAT               UNSAT                   Comment Number
  *1 Examinee reviews 9015.01D001 SLC Pump & Valve Operability Data Sheet and discovers that Qr has been calculated incorrectly (should be 39.86 gpm).
          *1 Examinee reviews 9015.01D001 SLC Pump & Valve Operability Data Sheet and discovers that Qr has been calculated incorrectly (should be 39.86 gpm).
Standard: Examinee determines actual Qr is < 41.2 gpm and enters ITS LCO 3.1.7 A.1 Restore SLC subsystem to OPERABLE status within 7 days.
Standard:     Examinee determines actual Qr is < 41.2 gpm and enters ITS LCO 3.1.7 A.1 Restore SLC subsystem to OPERABLE status within 7 days.
Cue: If the examinee wants to stop after finding the datasheet error, cue him/her to finish surveillance and log entry review.
Cue:         If the examinee wants to stop after finding the datasheet error, cue him/her to finish surveillance and log entry review.
Comments The actual Qr is as follows (from formula at step 8.2.11.8)  
Comments     The actual Qr is as follows (from formula at step 8.2.11.8) - (16 x 4.9 x 60) / 118
- (16" x 4.9 x 60) / 118 = 39.86 gpm.
              = 39.86 gpm.
SAT   UNSAT   Comment Number
SAT               UNSAT                   Comment Number Page 6 of 7


Clinton Power Station Job Performance Measure (JPM)
Clinton Power Station Job Performance Measure (JPM)
Page 7 of 7 *2 Examinee reviews attached ESOMs log entries and determines that ITS LCO 3.1.7 A.1 was not entered for the B SLC subsystem and that LCO 3.1.7 B.1 was not entered for two inoperable SLC subsystems during performance of step 8.1.4.
              *2   Examinee reviews attached ESOMs log entries and determines that ITS LCO 3.1.7 A.1 was not entered for the B SLC subsystem and that LCO 3.1.7 B.1 was not entered for two inoperable SLC subsystems during performance of step 8.1.4.
Standard: Examinee determines that ITS LCO 3.1.7 A.1 was not entered for the B SLC subsystem and that LCO 3.1.7 B.1 was not entered for two inoperable SLC subsystems during performance of step 8.1.4.
Standard:       Examinee determines that ITS LCO 3.1.7 A.1 was not entered for the B SLC subsystem and that LCO 3.1.7 B.1 was not entered for two inoperable SLC subsystems during performance of step 8.1.4.
Cue: If the examinee wants to stop after finding the logging error, cue him/her to finish surveillance and log entry review.
Cue:             If the examinee wants to stop after finding the logging error, cue him/her to finish surveillance and log entry review.
Comments   SAT   UNSAT   Comment Number
Comments SAT                 UNSAT               Comment Number TERMINATING CUES:
*SRO review of CPS 9015.01 Standby Liquid Control System Operability is complete and ITS 3.1.7 has been entered.
*SRO review of ESOMs log entries for CPS 9015.01 Standby Liquid Control System Operability is complete and ITS 3.1.7 error is identified.
STOP TIME:
Page 7 of 7


TERMINATING CUES:
CLINTON POWER STATION Job Performance Measure Determine PRA / Online Risk JPM Number: JPM462 Revision Number: 00 Date: 6/22/2015 Developed By: W. D. Kiser                      6/22/15 Instructor                      Date Validated By: /s Mike Antonelli                7/17/15 SME or Instructor                Date Reviewed By:
SRO review of CPS 9015.01 Standby Liquid Control System Operability is complete and ITS 3.1.7 has been entered.
Operations Representative        Date Approved By:
SRO review of ESOMs log entries for CPS 9015.01 Standby Liquid Control System Operability is complete and ITS 3.1.7 error is identified.
Training Department              Date
STOP TIME: 


CLINTON POWER STATION Job Performance Measure Determine PRA / Online Risk JPM Number:  JPM462 Revision Number: 0 0 Date:  6/22/2015 Developed By:
Clinton Power Station Job Performance Measure (JPM)
W. D. Kiser 6/22/15  Instructor Date  Validated By:
READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.
/s Mike Antonelli 7/17/15  SME or Instructor Date  Reviewed By:
TASK STANDARDS:
Operations Representative Date  Approved By:
* Examinee has determined that risk level changes from Green to YELLOW when 1A RHR Pump is declared inoperable and unavailable.
Training Department Date Clinton Power Station Job Performance Measure (JPM)
* Examinee has determined that risk level remains YELLOW when 1A RHR Pump is declared inoperable and unavailable concurrent with a Severe Thunderstorm Warning declared for Dewitt County.
Page 2 of 5 READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.
TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:
TASK STANDARDS
* Computer terminal with access to PARAGON PROCEDURAL/
Examinee has determined that risk level changes from Green to YELLOW when 1A RHR Pump is declared inoperable and unavailable.
Examinee has determined that risk level remains YELLOW when 1A RHR Pump is declared inoperable and unavailable concurrent with a Severe Thunderstorm Warning declared for Dewitt County. TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:
Computer terminal with access to PARAGON PROCEDURAL/


==REFERENCES:==
==REFERENCES:==
 
* ER-AA-600-1042 On-Line Risk Management Rev. 9
ER-AA-600-1042 On-Line Risk Management Rev.
* CPS 4302.01 Tornado/High Winds Rev 21C EVALUATOR INSTRUCTIONS:
CPS 4302.01 Tornado/High Winds Rev 21C EVALUATOR INSTRUCTIONS:
* Amplifying cues are provided within the JPM steps.
Amplifying cues are provided within the JPM steps.
* All pre-job briefings are completed.
All pre-job briefings are completed.
Page 2 of 5


Clinton Power Station Job Performance Measure (JPM)
Clinton Power Station Job Performance Measure (JPM)
Page 3 of 5 INITIAL CONDITIONS:
INITIAL CONDITIONS:
You are the Control Room Supervisor; CPS is operating at 912 MWe.
You are the Control Room Supervisor; CPS is operating at 912 MWe.
There are no LCOs in effect.
There are no LCOs in effect.
Line 199: Line 216:
The Shift Manager has agreed to take the 1A RHR Pump out of service.
The Shift Manager has agreed to take the 1A RHR Pump out of service.
INITIATING CUE:
INITIATING CUE:
CAUTION All pre-job briefings are completed.
CAUTION All pre-job briefings are completed.
Determine any change in On-Line Risk and report to the Shift Manager.
START TIME:
Page 3 of 5


Determine any change in On
Clinton Power Station Job Performance Measure (JPM)
-Line Risk and report to the Shift Manager
PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.
. START TIME: 
PERFORMANCE STEPS Paragon STEP                                                                                                      Comment SAT      UNSAT ELEMENT                              STANDARD Number 1      Candidate accesses the              PARAGON program accessed PARAGON program                      Cue: If requested, cue the examinee that the Paragon login is the examinees LAN login; no password is required.
2      Enter 1A RHR Pump unavailable        *On-Line Risk determined to be in PARAGON                          YELLOW for the unavailable 1A RHR Pump Cue: Acknowledge report and inform the candidate that the National Weather Service has issued a Severe Thunderstorm Warning for Dewitt County. Ask the candidate to determine any change in On-Line Risk.
Page 4 of 5


Clinton Power Station Job Performance Measure (JPM)
Clinton Power Station Job Performance Measure (JPM)
Page 4 of 5 PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.
CPS 4302.01 Tornado/High Winds, Attachment 1: Guidance for Online Risk Assessment During Severe Weather Conditions STEP                                                                                                   Comment SAT      UNSAT ELEMENT                           STANDARD Number 3     Enters Yes for Loss of Offsite   *On-Line Risk determined to Power high risk evolution          remain YELLOW for a Dewitt (HRE).                              County Severe Thunderstorm Warning declaration TERMINATING CUES:
PERFORMANCE STEPS Paragon STEP ELEMENT STANDARD SAT UNSAT Comment Number 1 Candidate accesses the PARAGON program PARAGON program accessed Cue: If requested, cue the examinee that the Paragon login is the examinee's LAN login; no password is required.
2 Enter 1A RHR Pump unavailable in PARAGON
*On-Line Risk determined to be YELLOW for the unavailable 1A RHR Pump Cue: Acknowledge report and inform the candidate that the National Weather Service has issued a Severe Thunderstorm Warning for Dewitt County.
Ask the candidate to determine any change in On
-Line Risk.
Clinton Power Station Job Performance Measure (JPM)
Page 5 of 5 CPS 4302.01 Tornado/High Winds, Attachment 1: Guidance for Online Risk Assessment During Severe Weather Conditions STEP ELEMENT STANDARD SAT UNSAT Comment Number 3 Enters "Yes" for "Loss of Offsite Power" high risk evolution (HRE). *On-Line Risk determined to remain YELLOW for a Dewitt County Severe Thunderstorm Warning declaration TERMINATING CUES:
On-line risk levels have been evaluated for unavailability of 1A RHR Pump concurrent with a Severe Thunderstorm Warning declared for Dewitt County.
On-line risk levels have been evaluated for unavailability of 1A RHR Pump concurrent with a Severe Thunderstorm Warning declared for Dewitt County.
STOP TIME:
STOP TIME:
Page 5 of 5
 
CLINTON POWER STATION Job Performance Measure Authorize an Emergency Dose for a Life Saving Operation JPM Number: JPM450 Revision Number: 00 Date: 08/8/2014 Developed By:          Tony Jennings                    7/16/15 Instructor                        Date Validated By:        /s Mike Antonelli                7/17/15 SME or Instructor                Date Reviewed By:
Operations Representative        Date Approved By:
Training Department              Date Retain approved Master Copy per SRRS 3D.126/3D.111


Retain approved Master Copy per SRRS 3D.126/3D.111 CLINTON POWER STATION Job Performance Measure Authorize an Emergency Dose for a Life Saving Operation JPM Number:  JPM450 Revision Number: 0 0 Date:  08/8/2014 Developed By:
JPM Admin d.
Tony Jennings 7/16/15  Instructor Date  Validated By:
Clinton Power Station Job Performance Measure (JPM)
/s Mike Antonelli 7/17/15  SME or Instructor Date  Reviewed By:
READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.
Operations Representative Date  Approved By:
TASK STANDARDS:
Training Department Date JPM Admin d. Clinton Power Station Job Performance Measure (JPM)
The life saving operation is authorized per EP-AA-113, Personnel Protective Actions and EP-AA-113-F-02, Authorization for Emergency Exposure.
Page 2 of 6 READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.
TASK STANDARDS
: The life saving operation is authorized per EP
-AA-113, Personnel Protective Actions and EP
-AA-113-F-02, Authorization for Emergency Exposure.
TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:
TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:
None PROCEDURAL/
* None PROCEDURAL/


==REFERENCES:==
==REFERENCES:==
* EP-AA-113, Rev. 12, Personnel Protective Actions
* EP-AA-113-F-02, Rev B, Authorization for Emergency Exposure EVALUATOR INSTRUCTIONS:
* Amplifying cues are provided within the JPM steps.
* Supply the examinee the partially filled out EP-AA-113-F-02 as the volunteer (form is provided with this JPM).
* You as the evaluator will play the part of the volunteer who has not yet been briefed.
* Supply the operator with a copy of EP-AA-113, Personnel Protective Actions when the examinee retrieves the procedure or states he would obtain procedure from EDMS.
Page 2 of 6


EP-AA-113 , Re v. 1 2 , Personnel Protective Actions EP-AA-113-F-02 , Rev B, Authorization for Emergency Exposure EVALUATOR INSTRUCTIONS:
JPM Admin d.
Amplifying cues are provided within the JPM steps.
Clinton Power Station Job Performance Measure (JPM)
Supply the examinee the partially filled out EP
INITIAL CONDITIONS:
-AA-113-F-02 as the volunteer (form is provided with this JPM). You as the evaluator will play the part of the volunteer who has not yet been briefed.
An emergency life-saving operation must be performed. The operation will take approximately 15 minutes in a 200 Rem/hr field. A volunteer, age 45, comes for your approval to perform the life-saving operation.
Supply the operator with a copy of EP
-AA-113, Personnel Protective Actions when the examinee retrieves the procedure or states he would obtain procedure from EDMS
.
JPM  Admin d. Clinton Power Station Job Performance Measure (JPM)
Page 3 of 6  INITIAL CONDITIONS:
An emergency life
-saving operation must be performed. The operation will take approximately 15 minutes in a 200 Rem/hr field. A volunteer, age 45, comes for your approval to perform the life-saving operation.
INITIATING CUE:
INITIATING CUE:
CAUTION All pre-job briefings are completed.
CAUTION All pre-job briefings are completed.
As the Acting Station Emergency Director, take the actions needed to authorize the life-saving operation.
START TIME:
Page 3 of 6


As the Acting Station Emergency Director
JPM Admin d.
, take the actions needed to authorize the life
Clinton Power Station Job Performance Measure (JPM)
-saving operation.
PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.
START TIME:
PERFORMANCE STEPS EP-AA-113-F-02
*1.                Determines volunteer will receive greater than 25 Rem TEDE.
Standard            25 Rem TEDE (Authorized to receive greater than 25 Rem TEDE) should be checked.
CUE                Hand the partially filled out EP-AA-113-F-02 to the examinee as the volunteer.
Comments            .
SAT              UNSAT                  Comment Number
: 2.                  Determines volunteer has not signed form for briefing.
Standard            Determines volunteer has not been briefed.
CUE                I was told you would perform the brief.
Comments SAT              UNSAT                  Comment Number Page 4 of 6


JPM Admin d. Clinton Power Station Job Performance Measure (JPM)
JPM Admin d.
Page 4 of 6 PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.
Clinton Power Station Job Performance Measure (JPM)
PERFORMANCE STEPS EP-AA-113-F-02  *1. Determines volunteer will receive greater than 25 Rem TEDE
*3.     Brief volunteer IAW 4.3.2. At a minimum, this will include possible health effects (and approximate cancer risk) at the anticipated exposure level/appropriate age (using Attachment 1 of EP-AA-113).
. Standard  "25 Rem TEDE (Authorized to receive greater than 25 Rem TEDE)" should be checked.
Standard Examinee briefs the following information from EP-AA-113 ATTACHMENT 1 EMERGENCY WORKER EXPOSURE LIMITS AND ASSOCIATED RISKS with the volunteer:
CUE  Hand the partially filled out EP
50 rad will result in 2% of population affected by prodromal effects.
-AA-113-F-02 to the examinee as the volunteer.
Comments . SAT  UNSAT    Comment Number
: 2. Determines volunteer has not signed form for briefing.
Standard  Determines volunteer has not been briefed.
CUE  I was told you would perform the brief.
Comments  SAT  UNSAT    Comment Number 
 
JPM  Admin d. Clinton Power Station Job Performance Measure (JPM)
Page 5 of 6 *3. Brief volunteer IAW 4.3.2. At a minimum, this will include possible health effects (and approximate cancer risk) at the anticipated exposure level/appropriate age (using Attachment 1 of EP
-AA-113). Standard   Examinee briefs the following information from EP
-AA-113 ATTACHMENT 1 "EMERGENCY WORKER EXPOSURE LIMITS AND ASSOCIATED RISKSwith the volunteer: 50 rad will result in 2% of population affected by prodromal effects.
Risk of premature death (deaths per 1000 persons exposed) 5.3%
Risk of premature death (deaths per 1000 persons exposed) 5.3%
Average years of life lost if premature death occurs: 15 (years)
Average years of life lost if premature death occurs: 15 (years)
Cue:   Comments Sign form after briefing is completed.
Cue:
SAT   UNSAT   Comment Number
Comments Sign form after briefing is completed.
  *4. Obtain Radiation Protection Management Review Signature
SAT               UNSAT               Comment Number
. Standard   Form is signed. Cue: When asked by examinee
*4.     Obtain Radiation Protection Management Review Signature.
; sign, date and put current time as a RP Manager.
Standard Form is signed.
Comments   SAT   UNSAT   Comment Number
Cue:     When asked by examinee; sign, date and put current time as a RP Manager.
Comments SAT               UNSAT               Comment Number Page 5 of 6


JPM Admin d. Clinton Power Station Job Performance Measure (JPM)
JPM Admin d.
Page 6 of 6 *5. Authorizes the exposure.
Clinton Power Station Job Performance Measure (JPM)
Standard   Signs for approval.
  *5.               Authorizes the exposure.
Cue: Comments   SAT   UNSAT   Comment Number TERMINATING CUES:
Standard           Signs for approval.
Cue:
Comments SAT               UNSAT             Comment Number TERMINATING CUES:
The life-saving operation is authorized.
The life-saving operation is authorized.
STOP TIME:
STOP TIME:
Page 6 of 6


CLINTON POWER STATION Job Performance Measure EAL Determination with NARS JPM Number: JPM018 Revision Number: 0 3 Date: 6/22/2015 Developed By:
CLINTON POWER STATION Job Performance Measure EAL Determination with NARS JPM Number: JPM018 Revision Number: 03 Date: 6/22/2015 Developed By: W. D. Kiser                     6/22/15 Instructor                       Date Validated By: /s Mike Antonelli               7/17/15 SME or Instructor               Date Reviewed By:
W. D. Kiser 6/22/15   Instructor Date Validated By:
Operations Representative       Date Approved By:
/s Mike Antonelli 7/17/15   SME or Instructor Date Reviewed By:
Training Department             Date
Operations Representative Date Approved By:
 
Training Department Date Admin JPM e Clinton Power Station Job Performance Measure (JPM)
Admin JPM e Clinton Power Station Job Performance Measure (JPM)
Page 2 of 6 READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.
READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.
TASK STANDARDS
TASK STANDARDS:
An Unusual Event is determined IAW EP
* An Unusual Event is determined IAW EP-AA-1003, Radiological Emergency Plan Annex for Clinton Station procedure, and the NARS form is completed per EP-MW-114-100, Midwest Region Offsite Notifications, and ready to transmit.
-AA-1003, Radiological Emergency Plan Annex for Clinton Station procedure, and the NARS form is completed per EP
-MW-114-100, Midwest Region Offsite Notifications, and ready to transmit.
TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:
TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:
None PROCEDURAL/
* None PROCEDURAL/


==REFERENCES:==
==REFERENCES:==
 
* OP-CL-108-101-1003-F-05, Rev 4, - Shift Manager (SED) - EAL Guide
OP-CL-108-101-1003-F-05, Rev 4 , - Shift Manager (SED)  
* EP-AA-1003, Rev. 25, Radiological Emergency Plan Annex for Clinton Station
- EAL Guide EP-AA-1003, Rev. 25, Radiological Emergency Plan Annex for Clinton Station EP-AA-112-100-F-01, Rev. U, Shift Emergency Director Checklist EP-AA-112-F-09, Rev. E, Emergency Public Address Announcement s  EP-MW-114-100, Rev. 01 6, Midwest Region Offsite Notifications EP-MW-114-100-F-01, Rev. H, Nuclear Accident Reporting System (NARS) Form CPS 5067.03, Rev 32c, Alarm Panel Annunciators  
* EP-AA-112-100-F-01, Rev. U, Shift Emergency Director Checklist
- Row 3 (Page 11 of 11 ONLY) EVALUATOR INSTRUCTIONS:
* EP-AA-112-F-09, Rev. E, Emergency Public Address Announcements
Amplifying cues are provided within the JPM steps.
* EP-MW-114-100, Rev. 016, Midwest Region Offsite Notifications
All pre-job briefings are completed.
* EP-MW-114-100-F-01, Rev. H, Nuclear Accident Reporting System (NARS) Form
* CPS 5067.03, Rev 32c, Alarm Panel Annunciators - Row 3 (Page 11 of 11 ONLY)
EVALUATOR INSTRUCTIONS:
* Amplifying cues are provided within the JPM steps.
* All pre-job briefings are completed.
Page 2 of 6


Admin JPM e Clinton Power Station Job Performance Measure (JPM)
Admin JPM e Clinton Power Station Job Performance Measure (JPM)
Page 3 of 6 INITIAL CONDITIONS:
INITIAL CONDITIONS:
Refueling operations are in progress.
Refueling operations are in progress.
Division 1 AC and DC Bus outages are in progress.
* Division 1 AC and DC Bus outages are in progress.
The Division 2 Battery Charger recently tripped and the voltage on the Division 2 DC bus has been 105 VDC for 15 minutes.
* The Division 2 Battery Charger recently tripped and the voltage on the Division 2 DC bus has been 105 VDC for 15 minutes.
A RO reports  
A RO reports - Hi-Hi Level Drywell Sump Equip/Floor Drain Annunciator (5067-3L).
- Hi-Hi Level Drywell Sump Equip/Floor Drain Annunciator (5067
INITIATING CUE:
-3L). INITIATING CUE:
CAUTION All pre-job briefings are completed.
CAUTION All pre-job briefings are completed.
This JPM is time critical.
This JPM is time critical.
You are to determine the appropriate Emergency Classification for these plant conditions and complete the NARS form. Activation/notification of the ERO is not required.
You are to determine the appropriate Emergency Classification for these plant conditions and complete the NARS form. Activation/notification of the ERO is not required.
Submit NARS Form to ERO Communicator when completed.
Submit NARS Form to ERO Communicator when completed.
START TIME:
START TIME:
Page 3 of 6


Admin JPM e Clinton Power Station Job Performance Measure (JPM)
Admin JPM e Clinton Power Station Job Performance Measure (JPM)
Page 4 of 6 PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.
PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.
PERFORMANCE STEPS
PERFORMANCE STEPS
  *1. Determine applicable EAL(s)
              *1. Determine applicable EAL(s)
  *CU3 UNPLANNED loss of required DC power for greater than 15 minutes Standard: Unusual Event (CU3) determined per EP
                    *CU3 UNPLANNED loss of required DC power for greater than 15 minutes Standard:           Unusual Event (CU3) determined per EP-AA-1003, Radiological Emergency Plan Annex for Clinton Station within 15 minutes. The examinee must determine that the unit is in Mode 5 and to be in the Cold Shutdown/Refueling Matrix. In addition, the examinee also has to determine that an Unplanned Loss of RCS Inventory (CU7) would not be applicable due to RPV level is known.
-AA-1003, Radiological Emergency Plan Annex for Clinton Station within 15 minutes. The examinee must determine that the unit is in Mode 5 and to be in the Cold Shutdown/Refueling Matrix. In addition, the examinee also has to determine that an Unplanned Loss of RCS Inventory (CU7) would not be applicable due to RPV level is known.
Cue:               If requested, provide CPS 5067-3L.
Cue: If requested, provide CPS 5067
If asked about RPV level, report - There is no indication of RPV Level change.
-3L. If asked about RPV level, report  
If requested, provide the following items:
- "There is no indication of RPV Level change".
* DW Equipment Drain Sump Pump - Red Light OFF, Green Light ON
If requested, provide the following items: DW Equipment Drain Sump Pump  
* DW Floor Drain Sump Pump - Red Light ON, Green Light OFF
- Red Light OFF, Green Light ON DW Floor Drain Sump Pump  
* Computer Point RE-BC402 Value = 0.0
- Red Light ON, Green Light OFF Computer Point RE
* Computer Point RF-BC402 Value = 1.0 Comments           A 15-minute clock to declare the EAL starts as soon as the initiating cue is read and acknowledged via 3-part communication. Record the time the classification was made.
-BC402 Value = 0.0 Computer Point RF
-BC402 Value = 1.0 Comments A 15-minute clock to declare the EAL starts as soon as the initiating cue is read and acknowledged via 3
-part communication. Record the time the classification was made.
TIME____________________
TIME____________________
SAT   UNSAT   Comment Number
SAT               UNSAT                 Comment Number Page 4 of 6


Admin JPM e Clinton Power Station Job Performance Measure (JPM)
Admin JPM e Clinton Power Station Job Performance Measure (JPM)
Page 5 of 6 *2. EP-AA-112-100-F-01 Step 1.1.G Initiate required State/Local notifications within 15 minutes of the event classification.
          *2. EP-AA-112-100-F-01 Step 1.1.G Initiate required State/Local notifications within 15 minutes of the event classification.
Standard: Examinee records the following information on EP-MW-114-100-F-01, Nuclear Accident Reporting System (NARS) Form
Standard:     Examinee records the following information on EP-MW-114-100-F-01, Nuclear Accident Reporting System (NARS) Form:
:    4.2.1. UTILITY MESSAGE NO: 1 4.2.2. STATE MESSAGE NO: N/A
4.2.1. UTILITY MESSAGE NO: 1 4.2.2. STATE MESSAGE NO: N/A
*4.2.3. Block 1: (B) Drill/Exercise
              *4.2.3. Block 1: (B) Drill/Exercise
*4.2.4. Block 2: (C) Clinton
              *4.2.4. Block 2: (C) Clinton
*4.2.5. Block 3: (A) Unusual Event
              *4.2.5. Block 3: (A) Unusual Event
*4.2.6. Block 4:
              *4.2.6. Block 4:
Accident Classified Time must be <=15 minutes from time recorded in step 1 Date: Today's date EAL #: CU3 4.2.7. Accident Terminated Time: N/A Date: N/A *4.2.8. Block 5: (A) None 4.2.9. Block 6: (A) Not Applicable
* Accident Classified Time must be <=15 minutes from time recorded in step 1
*4.2.10.3. Block 7: 89 degrees (or value from PPDS)
* Date: Todays date
*4.2.10.4. Block 8:
* EAL #: CU3 4.2.7. Accident Terminated
(A) METERS/SEC: N/A (or value from PPDS)
* Time: N/A
(B) MILES/HR: 12 (or value from PPDS)
* Date: N/A
*4.2.11. Block 9: (A) None 4.2.12. Block 10:
              *4.2.8. Block 5: (A) None 4.2.9. Block 6: (A) Not Applicable
Additional information: None 4.2.14. Approval Block Approval signature complete Verified with: N/A
              *4.2.10.3. Block 7: 89 degrees (or value from PPDS)
              *4.2.10.4. Block 8:
                      * (A) METERS/SEC: N/A (or value from PPDS)
                      * (B) MILES/HR: 12 (or value from PPDS)
              *4.2.11. Block 9: (A) None 4.2.12. Block 10:
* Additional information: None 4.2.14. Approval Block
* Approval signature complete
* Verified with: N/A Page 5 of 6


Admin JPM e Clinton Power Station Job Performance Measure (JPM)
Admin JPM e Clinton Power Station Job Performance Measure (JPM)
Page 6 of 6 Cue: 1. Provide the following when needed to the examin ee if asked:
Cue:             1. Provide the following when needed to the examinee if asked:
Block 7: 89 degrees Block 8: 12 mph
Block 7: 89 degrees Block 8: 12 mph
: 2. If asked, state: "There is no upward trend on PPDS Total Noble Gas Release Rate.3. If requested, state: "A verifier is not available."
: 2. If asked, state: There is no upward trend on PPDS Total Noble Gas Release Rate.
Comments Only those portions of the form that are bolded above are critical. Evaluator Note: A 13
: 3. If requested, state: A verifier is not available.
-minute clock to determine PARs and provide the NARS form for transmittal starts as soon as the EAL declaration has been made. Record the time of the declaration below. The time declared must be no more than 15 minutes from the START TIME.
Comments         Only those portions of the form that are bolded above are critical.
Evaluator Note: A 13-minute clock to determine PARs and provide the NARS form for transmittal starts as soon as the EAL declaration has been made. Record the time of the declaration below. The time declared must be no more than 15 minutes from the START TIME.
Record Time EAL Declared (from page 6) ___________
Record Time EAL Declared (from page 6) ___________
Record Time NARS form provided to the State Communicator for transmittal (JPM Step 3 item 14) ___________
Record Time NARS form provided to the State Communicator for transmittal (JPM Step 3 item 14) ___________
NOT longer than 13 minutes between the time EAL Declared and Time NARS form provided to the State Communicator for transmittal:
NOT longer than 13 minutes between the time EAL Declared and Time NARS form provided to the State Communicator for transmittal:
 
YES / NO SAT                 UNSAT                 Comment Number TERMINATING CUES:
YES / NO SAT   UNSAT   Comment Number TERMINATING CUES:
EAL thresholds evaluated and NARS form provided to the State Communicator for transmittal.
EAL thresholds evaluated and NARS form provided to the State Communicator for transmittal
STOP TIME:
. STOP TIME:}}
Page 6 of 6}}

Latest revision as of 09:27, 31 October 2019

2015 Clinton Power Station Initial License Examination Re-Take Proposed Admin JPMs
ML15217A044
Person / Time
Site: Clinton Constellation icon.png
Issue date: 08/19/2015
From: Mcneil D
NRC/RGN-III/DRS/OLB
To:
Exelon Generation Co
Shared Package
ML15216A595 List:
References
Download: ML15217A044 (30)


Text

CLINTON POWER STATION Job Performance Measure Authorization of Overtime IAW 10CFR26 JPM Number: JPM461 Revision Number: 00 Date: 06/22/2015 Developed By: W. D. Kiser 06/22/15 Instructor Date Validated By: /s Mike Antonelli 7/17/15 SME or Instructor Date Reviewed By:

Operations Representative Date Approved By:

Training Department Date Retain approved Master Copy per SRRS 3D.126/3D.111

JPM Number: Admin a Clinton Power Station Job Performance Measure (JPM)

READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.

TASK STANDARDS:

  • Examinee determines that LS-AA-119 work hour limits will be exceeded and completes Section 1 of LS-AA-119 Fatigue Management and Work Hour Limits, Attachment 1 10 CFR 26 Work Hour Limits Waiver and submits it to the Shift Manager.

TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:

  • None PROCEDURAL/

REFERENCES:

  • OP-CL-101-102-1001, Rev. 7 CPS Minimum On-Shift Staffing Functions
  • LS-AA-119, Rev. 11, Fatigue Management and Work Hour Limits
  • Amplifying cues are provided within the JPM steps.
  • All pre-job briefings are completed.
  • Provide the candidate with a copy of LS-AA-119 when the student acknowledges the initiating cue.
  • Provide the candidate with a copy of LS-AA-119-1003 and/or OP-CL-101-102-1001 upon request.

Page 2 of 6

JPM Number: Admin a Clinton Power Station Job Performance Measure (JPM)

INITIAL CONDITIONS:

The plant is in Mode 1.

It is Saturday, the 21st @ 0800. James Taylor, the B RO, has just left the site due to a sudden illness. The only trained and qualified person you are able to contact is Paul Simon (Employee ID: 123456), who is on his first regular day off.

Van Morrison (the A RO) is the only remaining RO on-site.

Paul is ready and willing to come in and work the overtime and can be there @ 0900 and work until 1500.

Paul has worked the following shifts that count towards 10CFR26 guidelines so far this week:

Sunday the 15th 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> on days and afternoon shift (0700 - 2300)

Monday the 16th 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> on days (0900 - 1700)

Tuesday the 17th 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> on days and afternoon shift (0700 - 2300)

Wednesday the 18th 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> on days (0900 - 1700)

Thursday the 19th 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> on days and afternoon shift (0700 - 2300)

Friday the 20th 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> on days (0900 - 1700)

Safety-related work needs to be performed by the B RO during the shift.

INITIATING CUE:

CAUTION All pre-job briefings are completed.

You are the CRS.

Determine if Paul can work the overtime in accordance with LS-AA-119 Fatigue Management and Work Hour Limits and report results to the Shift Manager.

START TIME:

Page 3 of 6

JPM Number: Admin a Clinton Power Station Job Performance Measure (JPM)

PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.

PERFORMANCE STEPS LS-AA-119 Fatigue Management and Work Hour Limits Comment SAT UNSAT STEP ELEMENT STANDARD Number Determines B RO position is Determines that B RO position IS 1

required per shift staffing required by OP-CL-101-102-1001 CPS requirements. Minimum On-Shift Staffing Functions.

Evaluator Note: Examinee may know this information by memory and not refer to OP-CL-101-102-1001.

EVALUATOR NOTE: Shift staffing composition may be less than the minimum requirements for a period of time NOT to exceed two hours in order to accommodate unexpected absence of an on duty staff member provided immediate action is taken to restore the shift staff composition to within the minimum requirements.

2 Reviews procedure to determine *5.1.1 if any overtime guidelines will Determines that overtime would result be exceeded. in exceeding 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> in a 7-day period.

3 Reviews procedure to determine *5.4.1 if it allows personnel who will Determines a waiver is required to exceed 10CFR26 to work allow personnel to exceed work hour overtime. limits.

Evaluator Cue: When examinee reports that a waiver is required, direct the examinee to complete Section 1 of LS-AA-119, Attachment 1 and submit to you.

Page 4 of 6

JPM Number: Admin a Clinton Power Station Job Performance Measure (JPM)

Comment SAT UNSAT STEP ELEMENT STANDARD Number 4 Completes Section 1 of LS-AA- *Attachment 1 119, Attachment 1. Examinee fills in:

  • Name: Paul Simon
  • Employee ID#: 123456
  • Department: Operations
  • Planned Waiver Start: 0900 / 21st
  • Planned Waiver End: 1500 / 21st
  • Planned Waiver Duration: 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />
  • Limits Exceeded: > 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> in any seven days (168 hours0.00194 days <br />0.0467 hours <br />2.777778e-4 weeks <br />6.3924e-5 months <br />)
  • Describe waiver work activity: B RO shift responsibilities (or equivalent)
  • Circumstances that require exceeding limits: Only qualified person available on short notice (or equivalent).
  • Marks YES to question Is waiver required to address conditions adverse to safety or to maintain site security.
  • Submitted by: Examinee Name, Signature, Date and Time.

TERMINATING CUES:

Candidate completes Section 1 of LS-AA-119 Fatigue Management and Work Hour Limits, Attachment 1 10 CFR 26 Work Hour Limits Waiver and submits it to the Shift Manager.

STOP TIME:

Page 5 of 6

Clinton Power Station Job Performance Measure (JPM)

INITIAL CONDITIONS:

The plant is in Mode 1.

It is Saturday, the 21st @ 0800. James Taylor, the B RO, has just left the site due to a sudden illness. The only trained and qualified person you are able to contact is Paul Simon (Employee ID: 123456), who is on his first regular day off.

Van Morrison (the A RO) is the only remaining RO on-site.

Paul is ready and willing to come in and work the overtime and can be there @ 0900 and work until 1500.

Paul has worked the following shifts that count towards 10CFR26 guidelines so far this week:

Sunday the 15th 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> on days and afternoon shift (0700 - 2300)

Monday the 16th 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> on days (0900 - 1700)

Tuesday the 17th 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> on days and afternoon shift (0700 - 2300)

Wednesday the 18th 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> on days (0900 - 1700)

Thursday the 19th 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> on days and afternoon shift (0700 - 2300)

Friday the 20 th 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> on days (0900 - 1700)

Safety-related work needs to be performed by the B RO during the shift.

INITIATING CUE:

CAUTION All pre-job briefings are completed.

You are the CRS.

Determine if Paul can work the overtime in accordance with LS-AA-119 Fatigue Management and Work Hour Limits and report results to the Shift Manager.

Page 6 of 6

CLINTON POWER STATION Job Performance Measure Review CPS 9015.01 Standby Liquid Control System Operability JPM Number: JPM511 Revision Number: 01 Date: 6/22/2015 Developed By: W. D. Kiser 6/22/15 Instructor Date Validated By: /s Mike Antonelli 7/17/15 SME or Instructor Date Reviewed By:

Operations Representative Date Approved By:

Training Department Date

JPM Number: Admin b Clinton Power Station Job Performance Measure (JPM)

READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.

TASK STANDARDS:

TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:

  • None PROCEDURAL/

REFERENCES:

  • CPS 9015.01D001, Rev 38a SLC Pump and Valve Data Sheet
  • Amplifying cues are provided within the JPM steps.
  • All pre-job briefings are completed.
  • Provide examinee a marked up copy of the following:

o CPS 9015.01 Standby Liquid Control System Operability o CPS 9015.01D001 SLC Pump and Valve Data Sheet o ESOMs log entries (attached)

Page 2 of 7

JPM Number: Admin b Clinton Power Station Job Performance Measure (JPM)

INITIAL CONDITIONS:

CPS No. 9015.01 Standby Liquid Control System Operability for SLC Pump A (sections 8.1, 8.2, and 8.4 only) is field complete, awaiting supervisory review.

INITIATING CUE:

CAUTION All pre-job briefings are completed.

Perform the following supervisory reviews:

  • ESOMs log entries that were made during performance of the surveillance MOV Test Prep Switch operation was logged in the Short Duration Time Clock log and has already been verified for accuracy and completeness.

Inform the Shift Manager after completing the task.

START TIME:

Page 3 of 7

JPM Number: Admin b Clinton Power Station Job Performance Measure (JPM)

PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.

PERFORMANCE STEPS CPS 9015.01 Standby Liquid Control System Operability 5.0 Reviews section 5.0 and verifies section is filled out properly.

Standard: Examinee verifies each step of section 5.0 is initialed, step numbers are circled and either initialed / N/Ad as appropriate, and SMngt permission obtained to perform the procedure.

Cue:

Comments In step 5.2, SLC Pump A should be marked.

Step 5.5.2 should be N/Ad.

SAT UNSAT Comment Number 7.0 Reviews section 7.0 and verifies section is filled out properly.

Standard: Examinee verifies each step of section 7.0 is initialed.

Cue:

Comments SAT UNSAT Comment Number Page 4 of 7

JPM Number: Admin b Clinton Power Station Job Performance Measure (JPM) 8.1 Reviews section 8.1 and verifies section 8.1 is filled out properly.

Standard: Examinee verifies steps 8.1.1 through 8.1.8 is initialed or N/Ad as appropriate.

Cue:

Comments SAT UNSAT Comment Number 8.2 Reviews section 8.2 and verifies section 8.2 is filled out properly.

Standard: Examinee verifies steps 8.2.1 through 8.2.24 is initialed or N/Ad as appropriate.

Cue:

Comments SAT UNSAT Comment Number 8.3 Reviews section 8.3 and verifies section 8.3 is filled out properly.

Standard: Examinee verifies all steps in section 8.3 are N/Ad.

Cue:

Comments Section 8.3 is NA (not testing SLC Pump B per the cue).

SAT UNSAT Comment Number Page 5 of 7

Clinton Power Station Job Performance Measure (JPM) 8.4 Reviews section 8.4 and verifies section 8.4 is filled out properly.

Standard: Examinee verifies steps 8.4.1 through 8.4.9 is initialed or N/Ad as appropriate.

Cue:

Comments SAT UNSAT Comment Number 8.5 Reviews section 8.5 and verifies section 8.5 is filled out properly.

Standard: Examinee verifies step 8.5 is initialed and date/time of completion recorded.

Cue:

Comments SAT UNSAT Comment Number

  • 1 Examinee reviews 9015.01D001 SLC Pump & Valve Operability Data Sheet and discovers that Qr has been calculated incorrectly (should be 39.86 gpm).

Standard: Examinee determines actual Qr is < 41.2 gpm and enters ITS LCO 3.1.7 A.1 Restore SLC subsystem to OPERABLE status within 7 days.

Cue: If the examinee wants to stop after finding the datasheet error, cue him/her to finish surveillance and log entry review.

Comments The actual Qr is as follows (from formula at step 8.2.11.8) - (16 x 4.9 x 60) / 118

= 39.86 gpm.

SAT UNSAT Comment Number Page 6 of 7

Clinton Power Station Job Performance Measure (JPM)

  • 2 Examinee reviews attached ESOMs log entries and determines that ITS LCO 3.1.7 A.1 was not entered for the B SLC subsystem and that LCO 3.1.7 B.1 was not entered for two inoperable SLC subsystems during performance of step 8.1.4.

Standard: Examinee determines that ITS LCO 3.1.7 A.1 was not entered for the B SLC subsystem and that LCO 3.1.7 B.1 was not entered for two inoperable SLC subsystems during performance of step 8.1.4.

Cue: If the examinee wants to stop after finding the logging error, cue him/her to finish surveillance and log entry review.

Comments SAT UNSAT Comment Number TERMINATING CUES:

STOP TIME:

Page 7 of 7

CLINTON POWER STATION Job Performance Measure Determine PRA / Online Risk JPM Number: JPM462 Revision Number: 00 Date: 6/22/2015 Developed By: W. D. Kiser 6/22/15 Instructor Date Validated By: /s Mike Antonelli 7/17/15 SME or Instructor Date Reviewed By:

Operations Representative Date Approved By:

Training Department Date

Clinton Power Station Job Performance Measure (JPM)

READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.

TASK STANDARDS:

  • Examinee has determined that risk level changes from Green to YELLOW when 1A RHR Pump is declared inoperable and unavailable.
  • Examinee has determined that risk level remains YELLOW when 1A RHR Pump is declared inoperable and unavailable concurrent with a Severe Thunderstorm Warning declared for Dewitt County.

TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:

  • Computer terminal with access to PARAGON PROCEDURAL/

REFERENCES:

  • CPS 4302.01 Tornado/High Winds Rev 21C EVALUATOR INSTRUCTIONS:
  • Amplifying cues are provided within the JPM steps.
  • All pre-job briefings are completed.

Page 2 of 5

Clinton Power Station Job Performance Measure (JPM)

INITIAL CONDITIONS:

You are the Control Room Supervisor; CPS is operating at 912 MWe.

There are no LCOs in effect.

On-Line Risk is GREEN.

You have just been informed by the System Engineer that the latest oil samples on the 1A RHR pump motor indicate serious bearing degradation.

The Shift Manager has agreed to take the 1A RHR Pump out of service.

INITIATING CUE:

CAUTION All pre-job briefings are completed.

Determine any change in On-Line Risk and report to the Shift Manager.

START TIME:

Page 3 of 5

Clinton Power Station Job Performance Measure (JPM)

PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.

PERFORMANCE STEPS Paragon STEP Comment SAT UNSAT ELEMENT STANDARD Number 1 Candidate accesses the PARAGON program accessed PARAGON program Cue: If requested, cue the examinee that the Paragon login is the examinees LAN login; no password is required.

2 Enter 1A RHR Pump unavailable *On-Line Risk determined to be in PARAGON YELLOW for the unavailable 1A RHR Pump Cue: Acknowledge report and inform the candidate that the National Weather Service has issued a Severe Thunderstorm Warning for Dewitt County. Ask the candidate to determine any change in On-Line Risk.

Page 4 of 5

Clinton Power Station Job Performance Measure (JPM)

CPS 4302.01 Tornado/High Winds, Attachment 1: Guidance for Online Risk Assessment During Severe Weather Conditions STEP Comment SAT UNSAT ELEMENT STANDARD Number 3 Enters Yes for Loss of Offsite *On-Line Risk determined to Power high risk evolution remain YELLOW for a Dewitt (HRE). County Severe Thunderstorm Warning declaration TERMINATING CUES:

On-line risk levels have been evaluated for unavailability of 1A RHR Pump concurrent with a Severe Thunderstorm Warning declared for Dewitt County.

STOP TIME:

Page 5 of 5

CLINTON POWER STATION Job Performance Measure Authorize an Emergency Dose for a Life Saving Operation JPM Number: JPM450 Revision Number: 00 Date: 08/8/2014 Developed By: Tony Jennings 7/16/15 Instructor Date Validated By: /s Mike Antonelli 7/17/15 SME or Instructor Date Reviewed By:

Operations Representative Date Approved By:

Training Department Date Retain approved Master Copy per SRRS 3D.126/3D.111

JPM Admin d.

Clinton Power Station Job Performance Measure (JPM)

READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.

TASK STANDARDS:

The life saving operation is authorized per EP-AA-113, Personnel Protective Actions and EP-AA-113-F-02, Authorization for Emergency Exposure.

TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:

  • None PROCEDURAL/

REFERENCES:

  • EP-AA-113, Rev. 12, Personnel Protective Actions
  • EP-AA-113-F-02, Rev B, Authorization for Emergency Exposure EVALUATOR INSTRUCTIONS:
  • Amplifying cues are provided within the JPM steps.
  • Supply the examinee the partially filled out EP-AA-113-F-02 as the volunteer (form is provided with this JPM).
  • You as the evaluator will play the part of the volunteer who has not yet been briefed.
  • Supply the operator with a copy of EP-AA-113, Personnel Protective Actions when the examinee retrieves the procedure or states he would obtain procedure from EDMS.

Page 2 of 6

JPM Admin d.

Clinton Power Station Job Performance Measure (JPM)

INITIAL CONDITIONS:

An emergency life-saving operation must be performed. The operation will take approximately 15 minutes in a 200 Rem/hr field. A volunteer, age 45, comes for your approval to perform the life-saving operation.

INITIATING CUE:

CAUTION All pre-job briefings are completed.

As the Acting Station Emergency Director, take the actions needed to authorize the life-saving operation.

START TIME:

Page 3 of 6

JPM Admin d.

Clinton Power Station Job Performance Measure (JPM)

PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.

PERFORMANCE STEPS EP-AA-113-F-02

  • 1. Determines volunteer will receive greater than 25 Rem TEDE.

Standard 25 Rem TEDE (Authorized to receive greater than 25 Rem TEDE) should be checked.

CUE Hand the partially filled out EP-AA-113-F-02 to the examinee as the volunteer.

Comments .

SAT UNSAT Comment Number

2. Determines volunteer has not signed form for briefing.

Standard Determines volunteer has not been briefed.

CUE I was told you would perform the brief.

Comments SAT UNSAT Comment Number Page 4 of 6

JPM Admin d.

Clinton Power Station Job Performance Measure (JPM)

  • 3. Brief volunteer IAW 4.3.2. At a minimum, this will include possible health effects (and approximate cancer risk) at the anticipated exposure level/appropriate age (using Attachment 1 of EP-AA-113).

Standard Examinee briefs the following information from EP-AA-113 ATTACHMENT 1 EMERGENCY WORKER EXPOSURE LIMITS AND ASSOCIATED RISKS with the volunteer:

50 rad will result in 2% of population affected by prodromal effects.

Risk of premature death (deaths per 1000 persons exposed) 5.3%

Average years of life lost if premature death occurs: 15 (years)

Cue:

Comments Sign form after briefing is completed.

SAT UNSAT Comment Number

  • 4. Obtain Radiation Protection Management Review Signature.

Standard Form is signed.

Cue: When asked by examinee; sign, date and put current time as a RP Manager.

Comments SAT UNSAT Comment Number Page 5 of 6

JPM Admin d.

Clinton Power Station Job Performance Measure (JPM)

  • 5. Authorizes the exposure.

Standard Signs for approval.

Cue:

Comments SAT UNSAT Comment Number TERMINATING CUES:

The life-saving operation is authorized.

STOP TIME:

Page 6 of 6

CLINTON POWER STATION Job Performance Measure EAL Determination with NARS JPM Number: JPM018 Revision Number: 03 Date: 6/22/2015 Developed By: W. D. Kiser 6/22/15 Instructor Date Validated By: /s Mike Antonelli 7/17/15 SME or Instructor Date Reviewed By:

Operations Representative Date Approved By:

Training Department Date

Admin JPM e Clinton Power Station Job Performance Measure (JPM)

READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.

TASK STANDARDS:

  • An Unusual Event is determined IAW EP-AA-1003, Radiological Emergency Plan Annex for Clinton Station procedure, and the NARS form is completed per EP-MW-114-100, Midwest Region Offsite Notifications, and ready to transmit.

TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:

  • None PROCEDURAL/

REFERENCES:

  • OP-CL-108-101-1003-F-05, Rev 4, - Shift Manager (SED) - EAL Guide
  • EP-AA-112-100-F-01, Rev. U, Shift Emergency Director Checklist
  • EP-AA-112-F-09, Rev. E, Emergency Public Address Announcements
  • CPS 5067.03, Rev 32c, Alarm Panel Annunciators - Row 3 (Page 11 of 11 ONLY)

EVALUATOR INSTRUCTIONS:

  • Amplifying cues are provided within the JPM steps.
  • All pre-job briefings are completed.

Page 2 of 6

Admin JPM e Clinton Power Station Job Performance Measure (JPM)

INITIAL CONDITIONS:

Refueling operations are in progress.

  • Division 1 AC and DC Bus outages are in progress.
  • The Division 2 Battery Charger recently tripped and the voltage on the Division 2 DC bus has been 105 VDC for 15 minutes.

A RO reports - Hi-Hi Level Drywell Sump Equip/Floor Drain Annunciator (5067-3L).

INITIATING CUE:

CAUTION All pre-job briefings are completed.

This JPM is time critical.

You are to determine the appropriate Emergency Classification for these plant conditions and complete the NARS form. Activation/notification of the ERO is not required.

Submit NARS Form to ERO Communicator when completed.

START TIME:

Page 3 of 6

Admin JPM e Clinton Power Station Job Performance Measure (JPM)

PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.

PERFORMANCE STEPS

  • 1. Determine applicable EAL(s)
  • CU3 UNPLANNED loss of required DC power for greater than 15 minutes Standard: Unusual Event (CU3) determined per EP-AA-1003, Radiological Emergency Plan Annex for Clinton Station within 15 minutes. The examinee must determine that the unit is in Mode 5 and to be in the Cold Shutdown/Refueling Matrix. In addition, the examinee also has to determine that an Unplanned Loss of RCS Inventory (CU7) would not be applicable due to RPV level is known.

Cue: If requested, provide CPS 5067-3L.

If asked about RPV level, report - There is no indication of RPV Level change.

If requested, provide the following items:

  • DW Equipment Drain Sump Pump - Red Light OFF, Green Light ON
  • DW Floor Drain Sump Pump - Red Light ON, Green Light OFF
  • Computer Point RE-BC402 Value = 0.0
  • Computer Point RF-BC402 Value = 1.0 Comments A 15-minute clock to declare the EAL starts as soon as the initiating cue is read and acknowledged via 3-part communication. Record the time the classification was made.

TIME____________________

SAT UNSAT Comment Number Page 4 of 6

Admin JPM e Clinton Power Station Job Performance Measure (JPM)

  • 2. EP-AA-112-100-F-01 Step 1.1.G Initiate required State/Local notifications within 15 minutes of the event classification.

Standard: Examinee records the following information on EP-MW-114-100-F-01, Nuclear Accident Reporting System (NARS) Form:

4.2.1. UTILITY MESSAGE NO: 1 4.2.2. STATE MESSAGE NO: N/A

  • 4.2.3. Block 1: (B) Drill/Exercise
  • 4.2.4. Block 2: (C) Clinton
  • 4.2.5. Block 3: (A) Unusual Event
  • 4.2.6. Block 4:
  • Accident Classified Time must be <=15 minutes from time recorded in step 1
  • Date: Todays date
  • EAL #: CU3 4.2.7. Accident Terminated
  • Time: N/A
  • Date: N/A
  • 4.2.8. Block 5: (A) None 4.2.9. Block 6: (A) Not Applicable
  • 4.2.10.3. Block 7: 89 degrees (or value from PPDS)
  • 4.2.10.4. Block 8:
  • (A) METERS/SEC: N/A (or value from PPDS)
  • (B) MILES/HR: 12 (or value from PPDS)
  • 4.2.11. Block 9: (A) None 4.2.12. Block 10:
  • Additional information: None 4.2.14. Approval Block
  • Approval signature complete
  • Verified with: N/A Page 5 of 6

Admin JPM e Clinton Power Station Job Performance Measure (JPM)

Cue: 1. Provide the following when needed to the examinee if asked:

Block 7: 89 degrees Block 8: 12 mph

2. If asked, state: There is no upward trend on PPDS Total Noble Gas Release Rate.
3. If requested, state: A verifier is not available.

Comments Only those portions of the form that are bolded above are critical.

Evaluator Note: A 13-minute clock to determine PARs and provide the NARS form for transmittal starts as soon as the EAL declaration has been made. Record the time of the declaration below. The time declared must be no more than 15 minutes from the START TIME.

Record Time EAL Declared (from page 6) ___________

Record Time NARS form provided to the State Communicator for transmittal (JPM Step 3 item 14) ___________

NOT longer than 13 minutes between the time EAL Declared and Time NARS form provided to the State Communicator for transmittal:

YES / NO SAT UNSAT Comment Number TERMINATING CUES:

EAL thresholds evaluated and NARS form provided to the State Communicator for transmittal.

STOP TIME:

Page 6 of 6