Line 3: Line 3:
| issue date = 08/19/2015
| issue date = 08/19/2015
| title = 2015 Clinton Power Station Initial License Examination Re-Take Proposed In-Plant JPMs
| title = 2015 Clinton Power Station Initial License Examination Re-Take Proposed In-Plant JPMs
| author name = McNeil D R
| author name = Mcneil D
| author affiliation = NRC/RGN-III/DRS/OLB
| author affiliation = NRC/RGN-III/DRS/OLB
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:CLINTON POWER STATION Job Performance Measure Manual Transfer of Distribution Panel Loads (NSPS Solenoid / RPS) from ALTERNATE POWER to INVERTER JPM Number: JPM026 Revision Number: 0 3 Date: 06/23/2015 Developed By:
{{#Wiki_filter:CLINTON POWER STATION Job Performance Measure Manual Transfer of Distribution Panel Loads (NSPS Solenoid / RPS) from ALTERNATE POWER to INVERTER JPM Number: JPM026 Revision Number: 03 Date: 06/23/2015 Developed By:   W. D. Kiser                     06/23/15 Instructor                       Date Validated By:   /s Mike Antonelli               7/17/15 SME or Instructor               Date Reviewed By:
W. D. Kiser 06/23/15   Instructor Date Validated By:
Operations Representative       Date Approved By:
/s Mike Antonelli 7/17/15   SME or Instructor Date Reviewed By:
Training Department             Date
Operations Representative Date Approved By:
 
Training Department Date JPM Number:
JPM Number: IP JPM i - rev 03 Clinton Power Station Job Performance Measure (JPM)
IP JPM i - rev 03 Clinton Power Station Job Performance Measure (JPM)
READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.
Page 2 of 7 READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.
No equipment or controls will be manipulated during this evaluation, only Simulated Actions will occur.
No equipment or controls will be manipulated during this evaluation, only Simulated Actions will occur.
TASK STANDARDS
TASK STANDARDS:
Manually Transfer of Distribution Load Panel Loads (NSPS Solenoid) (RPS) FROM Alternate Power TO the Inverter IAW CPS 3509.01, Rev 02 1, INSTRUMENT POWER SYSTEM (IP).
* Manually Transfer of Distribution Load Panel Loads (NSPS Solenoid) (RPS) FROM Alternate Power TO the Inverter IAW CPS 3509.01, Rev 021, INSTRUMENT POWER SYSTEM (IP).
TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:
TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:
None PROCEDURAL/
* None PROCEDURAL/


==REFERENCES:==
==REFERENCES:==
 
* CPS 3509.01, Rev 021, INSTRUMENT POWER SYSTEM (IP)
CPS 3509.01, Rev 02 1, INSTRUMENT POWER SYSTEM (IP)
EVALUATOR INSTRUCTIONS:
EVALUATOR INSTRUCTIONS:
Amplifying cues are provided within the JPM steps.
* Amplifying cues are provided within the JPM steps.
Provide examinee the procedure.
* Provide examinee the procedure.
Do NOT allow examinee to shine any type light into a panel.
* Do NOT allow examinee to shine any type light into a panel.
All pre-job briefings are completed.
* All pre-job briefings are completed.
Provide examinee with a marked up copy of CPS 3509.01 INSTRUMENT POWER SYSTEM (IP) showing step 8.3.6 in progress (step 8.3.6.1
* Provide examinee with a marked up copy of CPS 3509.01 INSTRUMENT POWER SYSTEM (IP) showing step 8.3.6 in progress (step 8.3.6.1, 8.3.6.2 complete and 8.3.6.3 circled).
, 8.3.6.2 complete and 8.3.6.3 circled).
Page 2 of 7


JPM Number:
JPM Number: IP JPM i - rev 03 Clinton Power Station Job Performance Measure (JPM)
IP JPM i - rev 03 Clinton Power Station Job Performance Measure (JPM)
INITIAL CONDITIONS:
Page 3 of 7 INITIAL CONDITIONS:
* Plant is in Mode 1.
Plant is in Mode 1.
* RPS Solenoid Inverter A has just been restored from a short maintenance period.
RPS Solenoid Inverter "A" has just been restored from a short maintenance period.
* The RPS Solenoid Inverter A has been energized per Section 8.3.6 steps 1 and 2.
The RPS Solenoid Inverter "A" has been energized per Section 8.3.6 steps 1 and 2.
It is now desired to transfer the Dist. Panel loads back to the inverter per step 8.3.4.
It is now desired to transfer the Dist. Panel loads back to the inverter per step 8.3.4.
MSIV solenoid currents have been verified normal (solenoids are reset).
* MSIV solenoid currents have been verified normal (solenoids are reset).
The A and B solenoids for each Control Rod have been verified energized.
* The A and B solenoids for each Control Rod have been verified energized.
INITIATING CUE:
INITIATING CUE:
CAUTION All pre-job briefings are completed.
CAUTION All pre-job briefings are completed.
No equipment or controls will be manipulated during this evaluation, only Simulated Actions will occur.
No equipment or controls will be manipulated during this evaluation, only Simulated Actions will occur.
Do NOT shine any type light into a panel.
Do NOT shine any type light into a panel.
You are directed to manually Transfer Distribution Panel loads for RPS Solenoid Bus A FROM Alternate Power TO the Inverter per 3509.01, section 8.3.4.
START TIME:
Page 3 of 7


You are directed to manually Transfer Distribution Panel loads for RPS Solenoid Bus "A" FROM Alternate Power TO the Inverter per 3509.01, section 8.3.4.
JPM Number: IP JPM i - rev 03 Clinton Power Station Job Performance Measure (JPM)
START TIME:
PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.
PERFORMANCE STEPS CPS 3509.01, Instrument Power System (IP) 8.3.4 Manual Transfer of Distribution Panel Loads (NSPS Solenoid) (RPS) FROM Alternate Power TO the Inverter 8.3.4.1  Verify LOSS OF SYNC lamp not illuminated.
Standard:          At RPS Solenoid Inverter A verifies the loss of sync lamp is not illuminated.
Cue:                If loss of sync lamp is illuminated, provide cue Loss of sync lamp is not illuminated.
Comments SAT                UNSAT                Comment Number 8.3.4.2  IF MSIVs are open, THEN Verify MSIV solenoids are reset using ammeters in NSPS Panels 1H13-P661 and P662.
Standard:           Verifies MSIV Solenoids are reset.
Cue:                If examinee request status of MSIV Solenoids from the B RO, report MSIV Solenoids are reset.
Comments            Stated in the initial conditions all solenoids were reset.
SAT                UNSAT                Comment Number Page 4 of 7


JPM Number:
JPM Number: IP JPM i - rev 03 Clinton Power Station Job Performance Measure (JPM) 8.3.4.3 Check A and B solenoids for each control rod to ensure they are energized prior to transferring sources (provided adequate time is available for the check).
IP JPM i - rev 03 Clinton Power Station Job Performance Measure (JPM)
Standard:      Ensures all control rods A and B solenoids are energized.
Page 4 of 7 PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.
Cue:
PERFORMANCE STEPS CPS 3509.01, Instrument Power System (IP) 8.3.4 Manual Transfer of Distribution Panel Loads (NSPS Solenoid) (RPS) FROM Alternate Power TO the Inverter 8.3.4.1  Verify LOSS OF SYNC lamp not illuminated.
Comments        Stated in the initial conditions all solenoids were energized.
Standard:
SAT                UNSAT                Comment Number
At RPS Solenoid Inverter "A" verifies the loss of sync lamp is not illuminated.
      *8.3.4.4 Place TRANSFER SWITCH to INVERTER.
Cue: If loss of sync lamp is illuminated, provide cue "Loss of sync lamp is not illuminated
Standard:       At RPS Solenoid Inverter A, rotates Transfer Switch to INVERTER position.
". Comments   SAT   UNSAT   Comment Number 8.3.4.2 IF MSIVs are open, THEN Verify MSIV solenoids are reset using ammeters in NSPS Panels 1H13
Cue:           Component is in the position youve described.
-P661 and P662.
Comments SAT                 UNSAT                 Comment Number 8.3.4.5 Push and then release Power Monitor RESET push-button.
Standard:
Standard:       At RPS Solenoid Inverter A, pushes then releases Power Monitor Reset push button.
Verifies MSIV Solenoids are reset.
Cue:           Component is in the position youve described.
Cue: If examinee request status of MSIV Solenoids from the B RO, report "MSIV Solenoids are reset
Comments SAT                 UNSAT                 Comment Number Page 5 of 7
". Comments Stated in the initial conditions all solenoids were reset.
SAT   UNSAT   Comment Number


JPM Number:
JPM Number: IP JPM i - rev 03 Clinton Power Station Job Performance Measure (JPM) 8.3.4.6 Verify power monitor alarms are out.
IP JPM i - rev 03 Clinton Power Station Job Performance Measure (JPM)
Standard:       At RPS Solenoid Inverter A power monitor, verifies alarms are out (Over/Under Freq and Over/Under Voltage lights).
Page 5 of 7 8.3.4.3 Check A and B solenoids for each control rod to ensure they are energized prior to transferring sources (provided adequate time is available for the check).
Cue:           If power monitor lights are illuminated, provide cue Over/Under Freq and/or Over/Under Voltage lights are not illuminated.
Standard:
Comments SAT               UNSAT                 Comment Number
Ensures all control rods A and B solenoids are energized.
      *8.3.4.7 Place 120 VAC OUTPUT BKR, CB-3 to ON.
Cue: Comments Stated in the initial conditions all solenoids were energized.
Standard:       At RPS Solenoid Inverter A, places 120 vac Output Bkr, CB-3, to ON.
SAT   UNSAT   Comment Number
Cue:           Component is in the position youve described.
  *8.3.4.4 Place TRANSFER SWITCH to INVERTER.
Comments SAT               UNSAT                 Comment Number 8.3.4.8 IF SMngt or NSED recommends, THEN At 1C71-S005A(B), NSPS Sol Pwr Bypass Regul Xfmr: Place AC INPUT (POWER) Bkr to OFF (down).
Standard:
Standard:       Leaves the Bypass Regul Transformer energized and in standby or asks the MCR for direction on what status to leave the Bypass Regul Transformer in.
At RPS Solenoid Inverter "A", rotates Transfer Switch to INVERTER position. Cue: Component is in the position you've described
Cue:           If requested, as the MCR direct the operator to leave the Bypass Regul Transformer energized and in standby. DO NOT turn the AC Input Bkr to OFF.
. Comments   SAT   UNSAT   Comment Number 8.3.4.5 Push and then release Power Monitor RESET push
Comments SAT               UNSAT                 Comment Number Page 6 of 7
-button. Standard:
At RPS Solenoid Inverter "A", pushes then releases Power Monitor Reset push button. Cue: Component is in the position you've described
. Comments   SAT   UNSAT   Comment Number


JPM Number:
JPM Number: IP JPM i - rev 03 Clinton Power Station Job Performance Measure (JPM)
IP JPM i - rev 03 Clinton Power Station Job Performance Measure (JPM)
TERMINATING CUES:
Page 6 of 7 8.3.4.6 Verify power monitor alarms are out.
CPS 3509.01, Instrument Power System (IP), Section 8.3.4 complete.
Standard:
STOP TIME:
At RPS Solenoid Inverter "A" power monitor, verifies alarms are out (Over/Under Freq and Over/Under Voltage lights)
Page 7 of 7
. Cue: If power monitor lights are illuminated, provide cue "Over/Under Freq
" and/or "Over/Under Voltage lights are not illuminated".
Comments  SAT  UNSAT    Comment Number 
  *8.3.4.7 Place 120 VAC OUTPUT BKR, CB
-3 to ON. Standard:
At RPS Solenoid Inverter "A", places 120 vac Output Bkr, CB
-3, to ON.
Cue: Component is in the position you've described
. Comments  SAT  UNSAT    Comment Number 8.3.4.8 IF SMngt or NSED recommends, THEN At 1C71-S005A(B), NSPS Sol Pwr Bypass Regul Xfmr:
Place AC INPUT (POWER) Bkr to OFF (down). Standard:
Leaves the Bypass Regul Transformer energized and in standby or asks the MCR for direction on what status to leave the Bypass Regul Transformer in.
Cue: If requested, as the MCR direct the operator to leave the Bypass Regul Transformer energized and in standby.
DO NOT turn the AC Input Bkr to OFF.
Comments  SAT  UNSAT    Comment Number 


JPM Number:
CLINTON POWER STATION Job Performance Measure RSP - Div 2 LPCI Operation JPM Number: JPM533 Revision Number: 00 Date: 06/23/2015 Developed By: W. D. Kiser                      06/23/15 Instructor                      Date Validated By: /s Mike Antonelli                7/17/15 SME or Instructor                Date Reviewed By:
IP JPM i - rev 03  Clinton Power Station Job Performance Measure (JPM)
Operations Representative        Date Approved By:
Page 7 of 7 TERMINATING CUES:
Training Department              Date
CPS 3509.01, Instrument Power System (IP), Section 8.3.4 complete.
STOP TIME:


CLINTON POWER STATION Job Performance Measure RSP - Div 2 LPCI Operation JPM Number:  JPM533 Revision Number: 0 0 Date:  06/23/2015 Developed By:
JPM Number: IP JPM j - rev 00 Clinton Power Station Job Performance Measure (JPM)
W. D. Kiser 06/23/15  Instructor Date  Validated By:
READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.
/s Mike Antonelli 7/17/15  SME or Instructor Date  Reviewed By:
Operations Representative Date  Approved By:
Training Department Date JPM Number: IP JPM j - rev 00 Clinton Power Station Job Performance Measure (JPM)
Page 2 of 7 READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.
No equipment or controls will be manipulated during this evaluation, only Simulated Actions will occur.
No equipment or controls will be manipulated during this evaluation, only Simulated Actions will occur.
TASK STANDARDS
TASK STANDARDS:
Div 2 LPCI is injecting to the RPV.
* Div 2 LPCI is injecting to the RPV.
TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:
TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:
None PROCEDURAL/
* None PROCEDURAL/


==REFERENCES:==
==REFERENCES:==
* CPS No. 4003.01C011, Rev 1a RSP - Div 2 LPCI Operation EVALUATOR INSTRUCTIONS:
* Amplifying cues are provided within the JPM steps.
* Provide examinee the procedure.
* Do NOT allow examinee to shine any type light into a panel.
* All pre-job briefings are completed.
Page 2 of 7


CPS No. 4003.01C011, Rev 1a RSP
JPM Number: IP JPM j - rev 00 Clinton Power Station Job Performance Measure (JPM)
- Div 2 LPCI Operation EVALUATOR INSTRUCTIONS:
INITIAL CONDITIONS:
Amplifying cues are provided within the JPM steps.
Provide examinee the procedure.
Do NOT allow examinee to shine any type light into a panel.
All pre-job briefings are completed.
 
JPM Number: IP JPM j - rev 00 Clinton Power Station Job Performance Measure (JPM)
Page 3 of 7 INITIAL CONDITIONS:
A plant transient has occurred.
A plant transient has occurred.
The plant is shutdown with High Pressure Core Spray and Reactor Core Isolation Cooling inoperable. 4160V Bus 1A1 has de
The plant is shutdown with High Pressure Core Spray and Reactor Core Isolation Cooling inoperable. 4160V Bus 1A1 has de-energized due to a fault. Automatic Depressurization System was activated due to Reactor Coolant leak into the Secondary Containment. The Main Control Room had to be abandoned due to a major fire.
-energized due to a fault. Automatic Depressurization System was activated due to Reactor Coolant leak into the Secondary Containment.
You are an Extra Operator.
The Main Control Room had to be abandon ed due to a major fire.
INITIATING CUE:
You are an Extra Operator
CAUTION All pre-job briefings are completed.
. INITIATING CUE:
CAUTION All pre-job briefings are completed.
No equipment or controls will be manipulated during this evaluation, only Simulated Actions will occur.
No equipment or controls will be manipulated during this evaluation, only Simulated Actions will occur.
Do NOT shine any type light into a panel.
Do NOT shine any type light into a panel.
Inject into the RPV using CPS 4003.01C011, RSP  
Inject into the RPV using CPS 4003.01C011, RSP - Div 2 LPCI Operation Section 4.0, DIV 2 LPCI STARTUP.
- Div 2 LPCI Operation Section 4.0, DIV 2 LPCI STARTUP. The Remote Shutdown Panel (RSP) is manned and an additional Operator has been dispatched to AB 707' to support you as required.
The Remote Shutdown Panel (RSP) is manned and an additional Operator has been dispatched to AB 707 to support you as required.
 
Report to the CRS when Div 2 LPCI is injecting to the RPV.
Report to the CRS when Div 2 LPCI is injecting to the RPV.
START TIME:
START TIME:
Page 3 of 7


JPM Number: IP JPM j - rev 00 Clinton Power Station Job Performance Measure (JPM)
JPM Number: IP JPM j - rev 00 Clinton Power Station Job Performance Measure (JPM)
Page 4 of 7 PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.
PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.
PERFORMANCE STEPS CPS 4003.01C0 11, Rev 1a RSP - Div 2 LPCI Operation EVALUATOR NOTE: Do NOT allow the Examinee to remove items from the RSP supply podium. Cue the examinee that required items are in the examinee's possession.
PERFORMANCE STEPS CPS 4003.01C011, Rev 1a RSP - Div 2 LPCI Operation EVALUATOR NOTE: Do NOT allow the Examinee to remove items from the RSP supply podium.
STEP ELEMENT STANDARD SAT UNSAT Comment Number 1 Open 1E12
Cue the examinee that required items are in the examinees possession.
-F004B, RHR PUMP 1B SUCT VLV.
Comment SAT    UNSAT STEP                 ELEMENT                           STANDARD Number Open 1E12-F004B, RHR         *4.1 1
*4.1 At AB MCC 1B2 Cub 5C (1AP76E5C), AB 781' West, Examinee moves the key operated switch for 1E12
PUMP 1B SUCT VLV.             At AB MCC 1B2 Cub 5C (1AP76E5C), AB 781 West, Examinee moves the key operated switch for 1E12-F004B, RHR PUMP 1B SUCT VLV to OPEN.
-F004B, RHR PUMP 1B SUCT VLV to "OPEN". 2 Start RHR PUMP 1B, 1E12-C002B. *4.2 At 4160V Bus 1B1 Cub D (1AP09ED), AB 781' West, Examinee moves the REMOTE SHUTDOWN CIRCUIT BREAKER CONTROL handswitch to "CLOSE". EVALUATOR NOTE: For the following steps, cues will be provided when requested from the Operator who was dispatched to AB 707'.
Start RHR PUMP 1B,           *4.2 2
Steps 4.4.1 and 4.4.2 may be performed more than once.
1E12-C002B.                   At 4160V Bus 1B1 Cub D (1AP09ED), AB 781 West, Examinee moves the REMOTE SHUTDOWN CIRCUIT BREAKER CONTROL handswitch to CLOSE.
EVALUATOR NOTE: For the following steps, cues will be provided when requested from the Operator who was dispatched to AB 707. Steps 4.4.1 and 4.4.2 may be performed more than once.
Page 4 of 7


JPM Number: IP JPM j - rev 00 Clinton Power Station Job Performance Measure (JPM)
JPM Number: IP JPM j - rev 00 Clinton Power Station Job Performance Measure (JPM)
Page 5 of 7 STEP ELEMENT STANDARD SAT UNSAT Comment Number 3 Verify RHR PUMP ROOM 1B SUPPLY FAN, 1VY06C starts.
Comment SAT    UNSAT STEP             ELEMENT                       STANDARD Number 3       Verify RHR PUMP           4.3 ROOM 1B SUPPLY FAN,       Examinee contacts the Operator in AB 1VY06C starts.            707 and requests status of 1VY06C.
4.3 Examinee contacts the Operator in AB 707' and requests status of 1VY06C.
Cue: 1VY06C is running.
4        Monitor pump/system      4.4.1 parameters.              Examinee contacts the Operator in AB 707 and requests RHR B pump P.
Cue: RHR pump P is 374 psid.
4.4.2 Examinee determines proper operation of 1E12-F064B, RHR PUMP 1B MIN FLOW VLV indication (red light ON, green light OFF).
Cue: If requested, red light is ON and green light is OFF.
EVALUATOR NOTE: For the following step, cue for RPV pressure will be provided when requested from the Operator at the RSP.
Page 5 of 7


Cue: 1VY06C is running
JPM Number: IP JPM j - rev 00 Clinton Power Station Job Performance Measure (JPM)
. 4 Monitor pump/system parameters.
Comment SAT    UNSAT STEP        ELEMENT                      STANDARD Number 5    WHEN RPV pressure <    *4.5 472 psig, THEN Open    Examinee contacts the Operator at the 1E12-F042B, RHR PUMP  RSP and requests RPV pressure.
4.4.1 Examinee contacts the Operator in AB 707' and requests RHR B pump P. Cue: RHR pump P is 374 psid. 4.4.2 Examinee determines proper operation of 1E12-F064B, RHR PUMP 1B MIN FLOW VLV indication (red light ON, green light OFF)
1B LPCI CNMT VLV.
. Cue: If requested, red light is ON and green light is OFF
Cue: RPV pressure is 250 psig and lowering.
. EVALUATOR NOTE: For the following step, cue for RPV pressure will be provided when requested from the Operator at the RSP.
At AB MCC 1B3 Cub 8C (1AP77E8C), AB 781 West, Examinee moves the switch for 1E12-F042B, RHR PUMP 1B LPCI CNMT VLV to OPEN.
Cue: Red light is ON and green light is OFF.
Page 6 of 7


JPM Number: IP JPM j - rev 00 Clinton Power Station Job Performance Measure (JPM)
JPM Number: IP JPM j - rev 00 Clinton Power Station Job Performance Measure (JPM)
Page 6 of 7 STEP ELEMENT STANDARD SAT UNSAT Comment Number 5 WHEN RPV pressure < 472 psig, THEN Open 1E12-F042B, RHR PUMP 1B LPCI CNMT VLV.
TERMINATING CUES:
*4.5 Examinee contacts the Operator at the RSP and requests RPV pressure
Div 2 LPCI is injecting to the RPV IAW CPS No. 4003.01C011 RSP - Div 2 LPCI Operation.
. Cue: RPV pressure is 250 psig and lowering. At AB MCC 1B3 Cub 8C (1AP77E8C), AB 781' West, Examinee moves the switch for 1E12-F042B, RHR PUMP 1B LPCI CNMT VLV to "OPEN".
STOP TIME:
Cue: Red light is ON and green light is OFF.
Page 7 of 7
JPM Number: IP JPM j - rev 00  Clinton Power Station Job Performance Measure (JPM)
 
Page 7 of 7 TERMINATING CUES:
JPM Number: IP JPM k - rev 01 Clinton Power Station Job Performance Measure (JPM)
Div 2 LPCI is injecting to the RPV IAW CPS No. 4003.01C011 RSP - Div 2 LPCI Operation
CLINTON POWER STATION Job Performance Measure Place an IA Ring Header Automatic Isolation Valve Into Service JPM Number: JPM428 Revision Number: 01 Date: 06/23/2015 Developed By: W. D. Kiser                            06/23/15 Instructor                            Date Validated By:  /s Mike Antonelli                      7/17/15 SME or Instructor                      Date Reviewed By:
. STOP TIME:
Operations Representative              Date Approved By:
Training Department                    Date


JPM Number: IP JPM k - rev 01 Clinton Power Station Job Performance Measure (JPM)
JPM Number: IP JPM k - rev 01 Clinton Power Station Job Performance Measure (JPM)
CLINTON POWER STATION Job Performance Measure Place an IA Ring Header Automatic Isolation Valve Into Service JPM Number:  JPM428 Revision Number: 0 1 Date:  06/23/2015 Developed By:
READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.
W. D. Kiser 06/23/15  Instructor Date  Validated By:
/s Mike Antonelli 7/17/15  SME or Instructor Date  Reviewed By:
Operations Representative Date  Approved By:
Training Department Date JPM Number:  IP JPM k - rev 01  Clinton Power Station Job Performance Measure (JPM)
Page 2 of 6 READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.
No equipment or controls will be manipulated during this evaluation, only Simulated Actions will occur.
No equipment or controls will be manipulated during this evaluation, only Simulated Actions will occur.
TASK STANDARDS
TASK STANDARDS:
Place an IA Ring Header Automatic Isolation Valve Into Service IAW CPS No. 3214.01 rev.
* Place an IA Ring Header Automatic Isolation Valve Into Service IAW CPS No. 3214.01 rev.
26d, PLANT AIR (IA & SA).
26d, PLANT AIR (IA & SA).
TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:
TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:
None PROCEDURAL/
* None PROCEDURAL/


==REFERENCES:==
==REFERENCES:==
 
* CPS No. 3214.01 rev. 26d, PLANT AIR (IA & SA).
CPS No. 3214.01 rev. 26d, PLANT AIR (IA & SA).
EVALUATOR INSTRUCTIONS:
EVALUATOR INSTRUCTIONS:
Amplifying cues are provided within the JPM steps.
* Amplifying cues are provided within the JPM steps.
Provide examinee the procedure.
* Provide examinee the procedure.
All pre-job briefings are completed.
* All pre-job briefings are completed.
Page 2 of 6


JPM Number: IP JPM k - rev 01 Clinton Power Station Job Performance Measure (JPM)
JPM Number: IP JPM k - rev 01 Clinton Power Station Job Performance Measure (JPM)
Page 3 of 6 INITIAL CONDITIONS:
INITIAL CONDITIONS:
You are an extra Operator.
You are an extra Operator.
The Control Building IA ring header has automatically isolated due to a leak on the Radwaste Building ring header. The leak has been subsequently repaired.
The Control Building IA ring header has automatically isolated due to a leak on the Radwaste Building ring header. The leak has been subsequently repaired.
INITIATING CUE:
INITIATING CUE:
CAUTION All pre-job briefings are completed.
CAUTION All pre-job briefings are completed.
No equipment or controls will be manipulated during this evaluation, only Simulated Actions will occur.
No equipment or controls will be manipulated during this evaluation, only Simulated Actions will occur.
Restore the Control Building IA ring header to service in accordance with CPS No. 3214.01, PLANT AIR (IA & SA), section 8.2.1.5, by supplying air from the Aux/Fuel Building IA Ring Header.
Restore the Control Building IA ring header to service in accordance with CPS No. 3214.01, PLANT AIR (IA & SA), section 8.2.1.5, by supplying air from the Aux/Fuel Building IA Ring Header.
Inform the MCR when the task is complete.
Inform the MCR when the task is complete.
START TIME:
START TIME:
Page 3 of 6


JPM Number: IP JPM k - rev 01 Clinton Power Station Job Performance Measure (JPM)
JPM Number: IP JPM k - rev 01 Clinton Power Station Job Performance Measure (JPM)
Page 4 of 6 PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.
PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.
PERFORMANCE STEPS CPS 3214.01, PLANT AIR (IA & SA) 8.2.1.5 Repressurizing the Isolated Ring Header (Refer to Table 2, pg 29 and Figure 1, pg 30) *8.2.1.5.1 Slowly open one or both of the auto isolation valve bypasses as necessary, and slowly repressurize the ring header.
PERFORMANCE STEPS CPS 3214.01, PLANT AIR (IA & SA) 8.2.1.5     Repressurizing the Isolated Ring Header (Refer to Table 2, pg 29 and Figure 1, pg 30)
Standard:
          *8.2.1.5.1   Slowly open one or both of the auto isolation valve bypasses as necessary, and slowly repressurize the ring header.
Locates and simulates operating (slowly per caution) 1IA024, Auto Isolation Bypass. Turns handwheel in the CCW direction until resistance is felt in the open position.
Standard:           Locates and simulates operating (slowly per caution) 1IA024, Auto Isolation Bypass. Turns handwheel in the CCW direction until resistance is felt in the open position.
Cue: Pressure indicator 1PI
Cue:               Pressure indicator 1PI-IA055 shows an increasing pressure (1PI-IA055 is on left hand side if facing the Aux Bldg).
-IA055 shows an increasing pressure (1PI
Comments           1IA024 and 1IA022 are just west of the CCW Expansion Tank.
-IA055 is on left hand side if facing the Aux Bldg).
SAT               UNSAT                 Comment Number 8.2.1.5.2   Wait until the isolated ring header pressure is 70 psig or above and equalized across the auto isolation valves.
Comments 1IA024 and 1IA022 are just west of the CCW Expansion Tank.
Standard:           Operator locates pressure gages and verifies pressure has equalized.
SAT   UNSAT   Comment Number 8.2.1.5.2 Wait until the isolated ring header pressure is 70 psig or above and equalized across the auto isolation valves.
Cue:
Standard:
* After several seconds - 1PI-IA055 reads nearly the same pressure as indicated on 1PI-IA054.
Operator locates pressure gage s and verifies pressure ha s equalized.
* If requested, flow noise has died off to near nothing.
Cue: After several seconds  
* If requested, Low Pressure Control Building IA Ring Header annunciator has cleared.
- 1PI-IA055 reads nearly the same pressure as indicated on 1PI-IA054. If requested, flow noise has died off to near nothing.
Comments SAT               UNSAT                 Comment Number Page 4 of 6
If requested, Low Pressure Control Building IA Ring Header annunciator has cleared. Comments   SAT   UNSAT Comment Number


JPM Number: IP JPM k - rev 01 Clinton Power Station Job Performance Measure (JPM)
JPM Number: IP JPM k - rev 01 Clinton Power Station Job Performance Measure (JPM)
Page 5 of 6 *8.2.1.5.3 Return the Latch/Unlatch lever arm to the Latch Position.
      *8.2.1.5.3 Return the Latch/Unlatch lever arm to the Latch Position.
Standard:
Standard:       Operator locates and simulates moving the lever to the latch position for 1IA022.
Operator locates and simulates moving the lever to the latch position for 1IA022.
Cue:             Lever arm is latched and holding.
Cue: Lever arm is latched and holding.
Comments SAT               UNSAT               Comment Number 8.2.1.5.4 Verify the auto isolation valve opens.
Comments   SAT   UNSAT   Comment Number 8.2.1.5.4 Verify the auto isolation valve opens.
Standard:       Operator locates 1IA022 and observes valve position indication to verify open.
Standard:
Cue:             Component is in the position described.
Operator locates 1IA022 and observes valve position indication to verify open
Comments SAT               UNSAT               Comment Number
. Cue: Component is in the position described.
  *8.2.1.5.5   Close or check closed the auto isolation valve bypasses.
Comments   SAT   UNSAT   Comment Number
Standard:       Operator locates and simulates turning 1IA024 handwheel clockwise until it stops turning.
  *8.2.1.5.5 Close or check closed the auto isolation valve bypasses.
Cue:             1IA024 handwheel stops moving.
Standard:
Comments SAT               UNSAT               Comment Number Page 5 of 6
Operator locates and simulates turning 1IA024 handwheel clockwise until it stops turning. Cue: 1IA024 handwheel stops moving.
Comments   SAT   UNSAT   Comment Number


JPM Number: IP JPM k - rev 01 Clinton Power Station Job Performance Measure (JPM)
JPM Number: IP JPM k - rev 01 Clinton Power Station Job Performance Measure (JPM) 8.2.1.5.6   Restore air loads as necessary.
Page 6 of 6 8.2.1.5.6 Restore air loads as necessary.
Standard:         Operator inquires if there are any loads that need to be restored at this time.
Standard:
Cue:             No further loads are required to be placed in service.
Operator inquires if there are any loads that need to be restored at this time.
Comments SAT               UNSAT                 Comment Number TERMINATING CUES:
Cue: No further loads are required to be placed in service.
The Control Building IA ring header is being supplied by air from the Aux/Fuel Building IA Ring Header.
Comments   SAT   UNSAT   Comment Number TERMINATING CUES:
STOP TIME:
The Control Building IA ring header is being supplied by air from the Aux/Fuel Building IA Ring Header. STOP TIME:}}
Page 6 of 6}}

Latest revision as of 09:26, 31 October 2019

2015 Clinton Power Station Initial License Examination Re-Take Proposed In-Plant JPMs
ML15217A048
Person / Time
Site: Clinton Constellation icon.png
Issue date: 08/19/2015
From: Mcneil D
NRC/RGN-III/DRS/OLB
To:
Exelon Generation Co
Shared Package
ML15216A595 List:
References
Download: ML15217A048 (20)


Text

CLINTON POWER STATION Job Performance Measure Manual Transfer of Distribution Panel Loads (NSPS Solenoid / RPS) from ALTERNATE POWER to INVERTER JPM Number: JPM026 Revision Number: 03 Date: 06/23/2015 Developed By: W. D. Kiser 06/23/15 Instructor Date Validated By: /s Mike Antonelli 7/17/15 SME or Instructor Date Reviewed By:

Operations Representative Date Approved By:

Training Department Date

JPM Number: IP JPM i - rev 03 Clinton Power Station Job Performance Measure (JPM)

READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.

No equipment or controls will be manipulated during this evaluation, only Simulated Actions will occur.

TASK STANDARDS:

  • Manually Transfer of Distribution Load Panel Loads (NSPS Solenoid) (RPS) FROM Alternate Power TO the Inverter IAW CPS 3509.01, Rev 021, INSTRUMENT POWER SYSTEM (IP).

TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:

  • None PROCEDURAL/

REFERENCES:

  • CPS 3509.01, Rev 021, INSTRUMENT POWER SYSTEM (IP)

EVALUATOR INSTRUCTIONS:

  • Amplifying cues are provided within the JPM steps.
  • Provide examinee the procedure.
  • Do NOT allow examinee to shine any type light into a panel.
  • All pre-job briefings are completed.
  • Provide examinee with a marked up copy of CPS 3509.01 INSTRUMENT POWER SYSTEM (IP) showing step 8.3.6 in progress (step 8.3.6.1, 8.3.6.2 complete and 8.3.6.3 circled).

Page 2 of 7

JPM Number: IP JPM i - rev 03 Clinton Power Station Job Performance Measure (JPM)

INITIAL CONDITIONS:

  • Plant is in Mode 1.
  • RPS Solenoid Inverter A has just been restored from a short maintenance period.
  • The RPS Solenoid Inverter A has been energized per Section 8.3.6 steps 1 and 2.

It is now desired to transfer the Dist. Panel loads back to the inverter per step 8.3.4.

  • MSIV solenoid currents have been verified normal (solenoids are reset).
  • The A and B solenoids for each Control Rod have been verified energized.

INITIATING CUE:

CAUTION All pre-job briefings are completed.

No equipment or controls will be manipulated during this evaluation, only Simulated Actions will occur.

Do NOT shine any type light into a panel.

You are directed to manually Transfer Distribution Panel loads for RPS Solenoid Bus A FROM Alternate Power TO the Inverter per 3509.01, section 8.3.4.

START TIME:

Page 3 of 7

JPM Number: IP JPM i - rev 03 Clinton Power Station Job Performance Measure (JPM)

PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.

PERFORMANCE STEPS CPS 3509.01, Instrument Power System (IP) 8.3.4 Manual Transfer of Distribution Panel Loads (NSPS Solenoid) (RPS) FROM Alternate Power TO the Inverter 8.3.4.1 Verify LOSS OF SYNC lamp not illuminated.

Standard: At RPS Solenoid Inverter A verifies the loss of sync lamp is not illuminated.

Cue: If loss of sync lamp is illuminated, provide cue Loss of sync lamp is not illuminated.

Comments SAT UNSAT Comment Number 8.3.4.2 IF MSIVs are open, THEN Verify MSIV solenoids are reset using ammeters in NSPS Panels 1H13-P661 and P662.

Standard: Verifies MSIV Solenoids are reset.

Cue: If examinee request status of MSIV Solenoids from the B RO, report MSIV Solenoids are reset.

Comments Stated in the initial conditions all solenoids were reset.

SAT UNSAT Comment Number Page 4 of 7

JPM Number: IP JPM i - rev 03 Clinton Power Station Job Performance Measure (JPM) 8.3.4.3 Check A and B solenoids for each control rod to ensure they are energized prior to transferring sources (provided adequate time is available for the check).

Standard: Ensures all control rods A and B solenoids are energized.

Cue:

Comments Stated in the initial conditions all solenoids were energized.

SAT UNSAT Comment Number

  • 8.3.4.4 Place TRANSFER SWITCH to INVERTER.

Standard: At RPS Solenoid Inverter A, rotates Transfer Switch to INVERTER position.

Cue: Component is in the position youve described.

Comments SAT UNSAT Comment Number 8.3.4.5 Push and then release Power Monitor RESET push-button.

Standard: At RPS Solenoid Inverter A, pushes then releases Power Monitor Reset push button.

Cue: Component is in the position youve described.

Comments SAT UNSAT Comment Number Page 5 of 7

JPM Number: IP JPM i - rev 03 Clinton Power Station Job Performance Measure (JPM) 8.3.4.6 Verify power monitor alarms are out.

Standard: At RPS Solenoid Inverter A power monitor, verifies alarms are out (Over/Under Freq and Over/Under Voltage lights).

Cue: If power monitor lights are illuminated, provide cue Over/Under Freq and/or Over/Under Voltage lights are not illuminated.

Comments SAT UNSAT Comment Number

  • 8.3.4.7 Place 120 VAC OUTPUT BKR, CB-3 to ON.

Standard: At RPS Solenoid Inverter A, places 120 vac Output Bkr, CB-3, to ON.

Cue: Component is in the position youve described.

Comments SAT UNSAT Comment Number 8.3.4.8 IF SMngt or NSED recommends, THEN At 1C71-S005A(B), NSPS Sol Pwr Bypass Regul Xfmr: Place AC INPUT (POWER) Bkr to OFF (down).

Standard: Leaves the Bypass Regul Transformer energized and in standby or asks the MCR for direction on what status to leave the Bypass Regul Transformer in.

Cue: If requested, as the MCR direct the operator to leave the Bypass Regul Transformer energized and in standby. DO NOT turn the AC Input Bkr to OFF.

Comments SAT UNSAT Comment Number Page 6 of 7

JPM Number: IP JPM i - rev 03 Clinton Power Station Job Performance Measure (JPM)

TERMINATING CUES:

CPS 3509.01, Instrument Power System (IP), Section 8.3.4 complete.

STOP TIME:

Page 7 of 7

CLINTON POWER STATION Job Performance Measure RSP - Div 2 LPCI Operation JPM Number: JPM533 Revision Number: 00 Date: 06/23/2015 Developed By: W. D. Kiser 06/23/15 Instructor Date Validated By: /s Mike Antonelli 7/17/15 SME or Instructor Date Reviewed By:

Operations Representative Date Approved By:

Training Department Date

JPM Number: IP JPM j - rev 00 Clinton Power Station Job Performance Measure (JPM)

READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.

No equipment or controls will be manipulated during this evaluation, only Simulated Actions will occur.

TASK STANDARDS:

  • Div 2 LPCI is injecting to the RPV.

TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:

  • None PROCEDURAL/

REFERENCES:

  • CPS No. 4003.01C011, Rev 1a RSP - Div 2 LPCI Operation EVALUATOR INSTRUCTIONS:
  • Amplifying cues are provided within the JPM steps.
  • Provide examinee the procedure.
  • Do NOT allow examinee to shine any type light into a panel.
  • All pre-job briefings are completed.

Page 2 of 7

JPM Number: IP JPM j - rev 00 Clinton Power Station Job Performance Measure (JPM)

INITIAL CONDITIONS:

A plant transient has occurred.

The plant is shutdown with High Pressure Core Spray and Reactor Core Isolation Cooling inoperable. 4160V Bus 1A1 has de-energized due to a fault. Automatic Depressurization System was activated due to Reactor Coolant leak into the Secondary Containment. The Main Control Room had to be abandoned due to a major fire.

You are an Extra Operator.

INITIATING CUE:

CAUTION All pre-job briefings are completed.

No equipment or controls will be manipulated during this evaluation, only Simulated Actions will occur.

Do NOT shine any type light into a panel.

Inject into the RPV using CPS 4003.01C011, RSP - Div 2 LPCI Operation Section 4.0, DIV 2 LPCI STARTUP.

The Remote Shutdown Panel (RSP) is manned and an additional Operator has been dispatched to AB 707 to support you as required.

Report to the CRS when Div 2 LPCI is injecting to the RPV.

START TIME:

Page 3 of 7

JPM Number: IP JPM j - rev 00 Clinton Power Station Job Performance Measure (JPM)

PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.

PERFORMANCE STEPS CPS 4003.01C011, Rev 1a RSP - Div 2 LPCI Operation EVALUATOR NOTE: Do NOT allow the Examinee to remove items from the RSP supply podium.

Cue the examinee that required items are in the examinees possession.

Comment SAT UNSAT STEP ELEMENT STANDARD Number Open 1E12-F004B, RHR *4.1 1

PUMP 1B SUCT VLV. At AB MCC 1B2 Cub 5C (1AP76E5C), AB 781 West, Examinee moves the key operated switch for 1E12-F004B, RHR PUMP 1B SUCT VLV to OPEN.

Start RHR PUMP 1B, *4.2 2

1E12-C002B. At 4160V Bus 1B1 Cub D (1AP09ED), AB 781 West, Examinee moves the REMOTE SHUTDOWN CIRCUIT BREAKER CONTROL handswitch to CLOSE.

EVALUATOR NOTE: For the following steps, cues will be provided when requested from the Operator who was dispatched to AB 707. Steps 4.4.1 and 4.4.2 may be performed more than once.

Page 4 of 7

JPM Number: IP JPM j - rev 00 Clinton Power Station Job Performance Measure (JPM)

Comment SAT UNSAT STEP ELEMENT STANDARD Number 3 Verify RHR PUMP 4.3 ROOM 1B SUPPLY FAN, Examinee contacts the Operator in AB 1VY06C starts. 707 and requests status of 1VY06C.

Cue: 1VY06C is running.

4 Monitor pump/system 4.4.1 parameters. Examinee contacts the Operator in AB 707 and requests RHR B pump P.

Cue: RHR pump P is 374 psid.

4.4.2 Examinee determines proper operation of 1E12-F064B, RHR PUMP 1B MIN FLOW VLV indication (red light ON, green light OFF).

Cue: If requested, red light is ON and green light is OFF.

EVALUATOR NOTE: For the following step, cue for RPV pressure will be provided when requested from the Operator at the RSP.

Page 5 of 7

JPM Number: IP JPM j - rev 00 Clinton Power Station Job Performance Measure (JPM)

Comment SAT UNSAT STEP ELEMENT STANDARD Number 5 WHEN RPV pressure < *4.5 472 psig, THEN Open Examinee contacts the Operator at the 1E12-F042B, RHR PUMP RSP and requests RPV pressure.

1B LPCI CNMT VLV.

Cue: RPV pressure is 250 psig and lowering.

At AB MCC 1B3 Cub 8C (1AP77E8C), AB 781 West, Examinee moves the switch for 1E12-F042B, RHR PUMP 1B LPCI CNMT VLV to OPEN.

Cue: Red light is ON and green light is OFF.

Page 6 of 7

JPM Number: IP JPM j - rev 00 Clinton Power Station Job Performance Measure (JPM)

TERMINATING CUES:

Div 2 LPCI is injecting to the RPV IAW CPS No. 4003.01C011 RSP - Div 2 LPCI Operation.

STOP TIME:

Page 7 of 7

JPM Number: IP JPM k - rev 01 Clinton Power Station Job Performance Measure (JPM)

CLINTON POWER STATION Job Performance Measure Place an IA Ring Header Automatic Isolation Valve Into Service JPM Number: JPM428 Revision Number: 01 Date: 06/23/2015 Developed By: W. D. Kiser 06/23/15 Instructor Date Validated By: /s Mike Antonelli 7/17/15 SME or Instructor Date Reviewed By:

Operations Representative Date Approved By:

Training Department Date

JPM Number: IP JPM k - rev 01 Clinton Power Station Job Performance Measure (JPM)

READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.

No equipment or controls will be manipulated during this evaluation, only Simulated Actions will occur.

TASK STANDARDS:

  • Place an IA Ring Header Automatic Isolation Valve Into Service IAW CPS No. 3214.01 rev.

26d, PLANT AIR (IA & SA).

TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:

  • None PROCEDURAL/

REFERENCES:

  • CPS No. 3214.01 rev. 26d, PLANT AIR (IA & SA).

EVALUATOR INSTRUCTIONS:

  • Amplifying cues are provided within the JPM steps.
  • Provide examinee the procedure.
  • All pre-job briefings are completed.

Page 2 of 6

JPM Number: IP JPM k - rev 01 Clinton Power Station Job Performance Measure (JPM)

INITIAL CONDITIONS:

You are an extra Operator.

The Control Building IA ring header has automatically isolated due to a leak on the Radwaste Building ring header. The leak has been subsequently repaired.

INITIATING CUE:

CAUTION All pre-job briefings are completed.

No equipment or controls will be manipulated during this evaluation, only Simulated Actions will occur.

Restore the Control Building IA ring header to service in accordance with CPS No. 3214.01, PLANT AIR (IA & SA), section 8.2.1.5, by supplying air from the Aux/Fuel Building IA Ring Header.

Inform the MCR when the task is complete.

START TIME:

Page 3 of 6

JPM Number: IP JPM k - rev 01 Clinton Power Station Job Performance Measure (JPM)

PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.

PERFORMANCE STEPS CPS 3214.01, PLANT AIR (IA & SA) 8.2.1.5 Repressurizing the Isolated Ring Header (Refer to Table 2, pg 29 and Figure 1, pg 30)

  • 8.2.1.5.1 Slowly open one or both of the auto isolation valve bypasses as necessary, and slowly repressurize the ring header.

Standard: Locates and simulates operating (slowly per caution) 1IA024, Auto Isolation Bypass. Turns handwheel in the CCW direction until resistance is felt in the open position.

Cue: Pressure indicator 1PI-IA055 shows an increasing pressure (1PI-IA055 is on left hand side if facing the Aux Bldg).

Comments 1IA024 and 1IA022 are just west of the CCW Expansion Tank.

SAT UNSAT Comment Number 8.2.1.5.2 Wait until the isolated ring header pressure is 70 psig or above and equalized across the auto isolation valves.

Standard: Operator locates pressure gages and verifies pressure has equalized.

Cue:

  • After several seconds - 1PI-IA055 reads nearly the same pressure as indicated on 1PI-IA054.
  • If requested, flow noise has died off to near nothing.

Comments SAT UNSAT Comment Number Page 4 of 6

JPM Number: IP JPM k - rev 01 Clinton Power Station Job Performance Measure (JPM)

  • 8.2.1.5.3 Return the Latch/Unlatch lever arm to the Latch Position.

Standard: Operator locates and simulates moving the lever to the latch position for 1IA022.

Cue: Lever arm is latched and holding.

Comments SAT UNSAT Comment Number 8.2.1.5.4 Verify the auto isolation valve opens.

Standard: Operator locates 1IA022 and observes valve position indication to verify open.

Cue: Component is in the position described.

Comments SAT UNSAT Comment Number

  • 8.2.1.5.5 Close or check closed the auto isolation valve bypasses.

Standard: Operator locates and simulates turning 1IA024 handwheel clockwise until it stops turning.

Cue: 1IA024 handwheel stops moving.

Comments SAT UNSAT Comment Number Page 5 of 6

JPM Number: IP JPM k - rev 01 Clinton Power Station Job Performance Measure (JPM) 8.2.1.5.6 Restore air loads as necessary.

Standard: Operator inquires if there are any loads that need to be restored at this time.

Cue: No further loads are required to be placed in service.

Comments SAT UNSAT Comment Number TERMINATING CUES:

The Control Building IA ring header is being supplied by air from the Aux/Fuel Building IA Ring Header.

STOP TIME:

Page 6 of 6