ML15314A639: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 14: Line 14:
| page count = 17
| page count = 17
}}
}}
=Text=
{{#Wiki_filter:FPL Turkey Point Annual Post-Uprate Monitoring Report FPL-024C for Units 3 & 4 Uprate Project - August 2014                Section 2 Figure 2.3-1. TPGW-1 Water Elevations.
Figure 2.3-2. TPGW-2 Water Elevations.
2-95
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014              Section 2 Figure 2.3-3. TPGW-3 Water Elevations.
Figure 2.3-4. TPGW-4 Water Elevations.
2-96
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014              Section 2 Figure 2.3-5. TPGW-5 Water Elevations.
Figure 2.3-6. TPGW-6 Water Elevations.
2-97
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014              Section 2 Figure 2.3-7. TPGW-7 Water Elevations.
Figure 2.3-8. TPGW-8 Water Elevations.
2-98
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014              Section 2 Figure 2.3-9. TPGW-9 Water Elevations.
Figure 2.3-10. TPGW-10 Water Elevations.
2-99
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014                Section 2 Figure 2.3-11. TPGW-11 Water Elevations.
Figure 2.3-12. TPGW-12 Water Elevations.
2-100
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014                Section 2 Figure 2.3-13. TPGW-13 Water Elevations.
Figure 2.3-14. TPGW-14 Water Elevations.
2-101
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014                                                                                              Section 2 2.0 Water Elevation (ft, NAVD 88) 1.0 0.0
                                                -1.0
                                                -2.0 6/15/10  9/5/10  11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12  6/30/12 TPGW-14S        TPGW-13S      TPGW-5S        TPGW-7S Figure 2.3-15. Comparison of Time Series Groundwater Water Elevations across the Landscape at TPGW-14, TPGW-13, TPGW-5 and TPGW-7.
2-102
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014                                                                                                  Section 2 2.0 Water Elevation (ft, NAVD 88) 1.0 0.0
                                                -1.0
                                                -2.0 6/15/10  9/5/10  11/27/10 2/18/11 5/12/11 8/3/11  10/25/11 1/16/12  4/8/12  6/30/12 TPGW-14S        TPGW-9S        TPGW-4S Figure 2.3-16. Comparison of Time Series Groundwater Water Elevations across the Landscape at TPGW-14, TPGW-9 and TPGW-4.
2-103
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014                                                                                                    Section 2 2.0 Water Elevation (ft, NAVD 88) 1.0 0.0
                                                -1.0
                                                -2.0 6/15/10  9/5/10  11/27/10 2/18/11  5/12/11 8/3/11  10/25/11 1/16/12  4/8/12  6/30/12 TPGW-3S          TPGW-13S        TPGW-12S Figure 2.3-17. Comparison of Time Series Groundwater Water Elevations across the Landscape at TPGW-3, TPGW-13, and TPGW-12.
2-104
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014                                                                                                Section 2 1.5 Water Elevation (ft, NAVD 88) 0.5
                                                -0.5
                                                -1.5
                                                -2.5 6/15/10  9/5/10    11/27/10 2/18/11 5/12/11  8/3/11 10/25/11 1/16/12 4/8/12  6/30/12 TPGW-10S        TPGW-11S        TPGW-13S        TPGW-14S Figure 2.3-18. Comparison of Time Series Groundwater Water Elevations across the Landscape at TPGW-10, TPGW-11, TPGW-13, and TPGW-14.
2-105
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014                                                                                                    Section 2 1.0 Water Elevation (ft, NAVD 88) 0.0
                                                -1.0 6/15/10  9/5/10  11/27/10 2/18/11 5/12/11    8/3/11  10/25/11 1/16/12  4/8/12  6/30/12 TPGW-13S                    TPSWCCS-2B Figure 2.3-19. Comparison of Time Series Groundwater Water Elevations at TPGW-13 and TPSWCCS-2.
2-106
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014                                                                                                Section 2 1.0 Water Elevation (ft, NAVD 88) 0.0
                                                -1.0
                                                -2.0 6/15/10 9/5/10  11/27/10 2/18/11  5/12/11 8/3/11  10/25/11 1/16/12  4/8/12 6/30/12 TPGW-1S        TPGW-2S        TPSWCCS-1B        TPSWCCS-3B        TPSWCCS-7B Figure 2.3-20. Comparison of Time Series Groundwater Water Elevations at TPGW-1 andTPGW-2, and CCS Surface Water Stations TPSWCCS-1, TPSWCCS-3, and TPSWCCS-7.
2-107
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014                                                                                                      Section 2 1.0 Water Elevation (ft, NAVD 88) 0.0
                                                -1.0
                                                -2.0 6/15/10  9/5/10  11/27/10 2/18/11  5/12/11    8/3/11  10/25/11 1/16/12  4/8/12  6/30/12 TPGW-11S                              TPBBSW-3B Figure 2.3-21. Comparison of Daily Average Time Series Groundwater Water Elevations in Biscayne Bay Well TPGW-11 and Biscayne Bay Surface Water Station TPBBSW-3.
2-108
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014                                                                                                      Section 2 2.0 1.0 Water Elevation (ft, NAVD 88) 0.0
                                                -1.0
                                                -2.0
                                                -3.0 6/15/10  9/5/10  11/27/10 2/18/11  5/12/11    8/3/11  10/25/11 1/16/12  4/8/12  6/30/12 Figure 2.3-22. TPBBSW-10 Water Elevations.
2-109
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014                                                                                                      Section 2 2.0 1.0 Water Elevation (ft, NAVD 88) 0.0
                                                -1.0
                                                -2.0
                                                -3.0 6/15/10  9/5/10  11/27/10 2/18/11  5/12/11    8/3/11  10/25/11 1/16/12  4/8/12  6/30/12 Figure 2.3-23. TPBBSW-3 Water Elevations.
2-110
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014                                                                                                      Section 2 2.0 1.0 Water Elevation (ft, NAVD 88) 0.0
                                                -1.0
                                                -2.0
                                                -3.0 6/15/10  9/5/10  11/27/10 2/18/11  5/12/11    8/3/11  10/25/11 1/16/12  4/8/12  6/30/12 Figure 2.3-24. TPBBSW-14 Water Elevations.
2-111
FPL Turkey Point Annual Post-Uprate Monitoring Report FPL-024C for Units 3 & 4 Uprate Project - August 2014                Section 2 Figure 2.3-1. TPGW-1 Water Elevations.
Figure 2.3-2. TPGW-2 Water Elevations.
2-95
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014              Section 2 Figure 2.3-3. TPGW-3 Water Elevations.
Figure 2.3-4. TPGW-4 Water Elevations.
2-96
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014              Section 2 Figure 2.3-5. TPGW-5 Water Elevations.
Figure 2.3-6. TPGW-6 Water Elevations.
2-97
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014              Section 2 Figure 2.3-7. TPGW-7 Water Elevations.
Figure 2.3-8. TPGW-8 Water Elevations.
2-98
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014              Section 2 Figure 2.3-9. TPGW-9 Water Elevations.
Figure 2.3-10. TPGW-10 Water Elevations.
2-99
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014                Section 2 Figure 2.3-11. TPGW-11 Water Elevations.
Figure 2.3-12. TPGW-12 Water Elevations.
2-100
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014                Section 2 Figure 2.3-13. TPGW-13 Water Elevations.
Figure 2.3-14. TPGW-14 Water Elevations.
2-101
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014                                                                                              Section 2 2.0 Water Elevation (ft, NAVD 88) 1.0 0.0
                                                -1.0
                                                -2.0 6/15/10  9/5/10  11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12  6/30/12 TPGW-14S        TPGW-13S      TPGW-5S        TPGW-7S Figure 2.3-15. Comparison of Time Series Groundwater Water Elevations across the Landscape at TPGW-14, TPGW-13, TPGW-5 and TPGW-7.
2-102
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014                                                                                                  Section 2 2.0 Water Elevation (ft, NAVD 88) 1.0 0.0
                                                -1.0
                                                -2.0 6/15/10  9/5/10  11/27/10 2/18/11 5/12/11 8/3/11  10/25/11 1/16/12  4/8/12  6/30/12 TPGW-14S        TPGW-9S        TPGW-4S Figure 2.3-16. Comparison of Time Series Groundwater Water Elevations across the Landscape at TPGW-14, TPGW-9 and TPGW-4.
2-103
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014                                                                                                    Section 2 2.0 Water Elevation (ft, NAVD 88) 1.0 0.0
                                                -1.0
                                                -2.0 6/15/10  9/5/10  11/27/10 2/18/11  5/12/11 8/3/11  10/25/11 1/16/12  4/8/12  6/30/12 TPGW-3S          TPGW-13S        TPGW-12S Figure 2.3-17. Comparison of Time Series Groundwater Water Elevations across the Landscape at TPGW-3, TPGW-13, and TPGW-12.
2-104
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014                                                                                                Section 2 1.5 Water Elevation (ft, NAVD 88) 0.5
                                                -0.5
                                                -1.5
                                                -2.5 6/15/10  9/5/10    11/27/10 2/18/11 5/12/11  8/3/11 10/25/11 1/16/12 4/8/12  6/30/12 TPGW-10S        TPGW-11S        TPGW-13S        TPGW-14S Figure 2.3-18. Comparison of Time Series Groundwater Water Elevations across the Landscape at TPGW-10, TPGW-11, TPGW-13, and TPGW-14.
2-105
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014                                                                                                    Section 2 1.0 Water Elevation (ft, NAVD 88) 0.0
                                                -1.0 6/15/10  9/5/10  11/27/10 2/18/11 5/12/11    8/3/11  10/25/11 1/16/12  4/8/12  6/30/12 TPGW-13S                    TPSWCCS-2B Figure 2.3-19. Comparison of Time Series Groundwater Water Elevations at TPGW-13 and TPSWCCS-2.
2-106
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014                                                                                                Section 2 1.0 Water Elevation (ft, NAVD 88) 0.0
                                                -1.0
                                                -2.0 6/15/10 9/5/10  11/27/10 2/18/11  5/12/11 8/3/11  10/25/11 1/16/12  4/8/12 6/30/12 TPGW-1S        TPGW-2S        TPSWCCS-1B        TPSWCCS-3B        TPSWCCS-7B Figure 2.3-20. Comparison of Time Series Groundwater Water Elevations at TPGW-1 andTPGW-2, and CCS Surface Water Stations TPSWCCS-1, TPSWCCS-3, and TPSWCCS-7.
2-107
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014                                                                                                      Section 2 1.0 Water Elevation (ft, NAVD 88) 0.0
                                                -1.0
                                                -2.0 6/15/10  9/5/10  11/27/10 2/18/11  5/12/11    8/3/11  10/25/11 1/16/12  4/8/12  6/30/12 TPGW-11S                              TPBBSW-3B Figure 2.3-21. Comparison of Daily Average Time Series Groundwater Water Elevations in Biscayne Bay Well TPGW-11 and Biscayne Bay Surface Water Station TPBBSW-3.
2-108
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014                                                                                                      Section 2 2.0 1.0 Water Elevation (ft, NAVD 88) 0.0
                                                -1.0
                                                -2.0
                                                -3.0 6/15/10  9/5/10  11/27/10 2/18/11  5/12/11    8/3/11  10/25/11 1/16/12  4/8/12  6/30/12 Figure 2.3-22. TPBBSW-10 Water Elevations.
2-109
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014                                                                                                      Section 2 2.0 1.0 Water Elevation (ft, NAVD 88) 0.0
                                                -1.0
                                                -2.0
                                                -3.0 6/15/10  9/5/10  11/27/10 2/18/11  5/12/11    8/3/11  10/25/11 1/16/12  4/8/12  6/30/12 Figure 2.3-23. TPBBSW-3 Water Elevations.
2-110
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014                                                                                                      Section 2 2.0 1.0 Water Elevation (ft, NAVD 88) 0.0
                                                -1.0
                                                -2.0
                                                -3.0 6/15/10  9/5/10  11/27/10 2/18/11  5/12/11    8/3/11  10/25/11 1/16/12  4/8/12  6/30/12 Figure 2.3-24. TPBBSW-14 Water Elevations.
2-111}}

Latest revision as of 04:39, 31 October 2019

FPL-024C - Turkey Point Plant; Annual Post-Uprate Monitoring Report, Units 3&4 Uprate Project (August 2014) - Pages 2-95 to 2-111
ML15314A639
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 08/31/2014
From:
Florida Power & Light Co
To:
Atomic Safety and Licensing Board Panel
SECY RAS
References
50-250-LA, 50-251-LA, ASLBP 15-935-02-LA-BD01, RAS 28503
Download: ML15314A639 (17)


Text

FPL Turkey Point Annual Post-Uprate Monitoring Report FPL-024C for Units 3 & 4 Uprate Project - August 2014 Section 2 Figure 2.3-1. TPGW-1 Water Elevations.

Figure 2.3-2. TPGW-2 Water Elevations.

2-95

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 Figure 2.3-3. TPGW-3 Water Elevations.

Figure 2.3-4. TPGW-4 Water Elevations.

2-96

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 Figure 2.3-5. TPGW-5 Water Elevations.

Figure 2.3-6. TPGW-6 Water Elevations.

2-97

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 Figure 2.3-7. TPGW-7 Water Elevations.

Figure 2.3-8. TPGW-8 Water Elevations.

2-98

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 Figure 2.3-9. TPGW-9 Water Elevations.

Figure 2.3-10. TPGW-10 Water Elevations.

2-99

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 Figure 2.3-11. TPGW-11 Water Elevations.

Figure 2.3-12. TPGW-12 Water Elevations.

2-100

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 Figure 2.3-13. TPGW-13 Water Elevations.

Figure 2.3-14. TPGW-14 Water Elevations.

2-101

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2.0 Water Elevation (ft, NAVD 88) 1.0 0.0

-1.0

-2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 TPGW-14S TPGW-13S TPGW-5S TPGW-7S Figure 2.3-15. Comparison of Time Series Groundwater Water Elevations across the Landscape at TPGW-14, TPGW-13, TPGW-5 and TPGW-7.

2-102

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2.0 Water Elevation (ft, NAVD 88) 1.0 0.0

-1.0

-2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 TPGW-14S TPGW-9S TPGW-4S Figure 2.3-16. Comparison of Time Series Groundwater Water Elevations across the Landscape at TPGW-14, TPGW-9 and TPGW-4.

2-103

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2.0 Water Elevation (ft, NAVD 88) 1.0 0.0

-1.0

-2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 TPGW-3S TPGW-13S TPGW-12S Figure 2.3-17. Comparison of Time Series Groundwater Water Elevations across the Landscape at TPGW-3, TPGW-13, and TPGW-12.

2-104

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 1.5 Water Elevation (ft, NAVD 88) 0.5

-0.5

-1.5

-2.5 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 TPGW-10S TPGW-11S TPGW-13S TPGW-14S Figure 2.3-18. Comparison of Time Series Groundwater Water Elevations across the Landscape at TPGW-10, TPGW-11, TPGW-13, and TPGW-14.

2-105

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 1.0 Water Elevation (ft, NAVD 88) 0.0

-1.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 TPGW-13S TPSWCCS-2B Figure 2.3-19. Comparison of Time Series Groundwater Water Elevations at TPGW-13 and TPSWCCS-2.

2-106

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 1.0 Water Elevation (ft, NAVD 88) 0.0

-1.0

-2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 TPGW-1S TPGW-2S TPSWCCS-1B TPSWCCS-3B TPSWCCS-7B Figure 2.3-20. Comparison of Time Series Groundwater Water Elevations at TPGW-1 andTPGW-2, and CCS Surface Water Stations TPSWCCS-1, TPSWCCS-3, and TPSWCCS-7.

2-107

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 1.0 Water Elevation (ft, NAVD 88) 0.0

-1.0

-2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 TPGW-11S TPBBSW-3B Figure 2.3-21. Comparison of Daily Average Time Series Groundwater Water Elevations in Biscayne Bay Well TPGW-11 and Biscayne Bay Surface Water Station TPBBSW-3.

2-108

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2.0 1.0 Water Elevation (ft, NAVD 88) 0.0

-1.0

-2.0

-3.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Figure 2.3-22. TPBBSW-10 Water Elevations.

2-109

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2.0 1.0 Water Elevation (ft, NAVD 88) 0.0

-1.0

-2.0

-3.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Figure 2.3-23. TPBBSW-3 Water Elevations.

2-110

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2.0 1.0 Water Elevation (ft, NAVD 88) 0.0

-1.0

-2.0

-3.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Figure 2.3-24. TPBBSW-14 Water Elevations.

2-111

FPL Turkey Point Annual Post-Uprate Monitoring Report FPL-024C for Units 3 & 4 Uprate Project - August 2014 Section 2 Figure 2.3-1. TPGW-1 Water Elevations.

Figure 2.3-2. TPGW-2 Water Elevations.

2-95

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 Figure 2.3-3. TPGW-3 Water Elevations.

Figure 2.3-4. TPGW-4 Water Elevations.

2-96

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 Figure 2.3-5. TPGW-5 Water Elevations.

Figure 2.3-6. TPGW-6 Water Elevations.

2-97

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 Figure 2.3-7. TPGW-7 Water Elevations.

Figure 2.3-8. TPGW-8 Water Elevations.

2-98

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 Figure 2.3-9. TPGW-9 Water Elevations.

Figure 2.3-10. TPGW-10 Water Elevations.

2-99

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 Figure 2.3-11. TPGW-11 Water Elevations.

Figure 2.3-12. TPGW-12 Water Elevations.

2-100

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 Figure 2.3-13. TPGW-13 Water Elevations.

Figure 2.3-14. TPGW-14 Water Elevations.

2-101

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2.0 Water Elevation (ft, NAVD 88) 1.0 0.0

-1.0

-2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 TPGW-14S TPGW-13S TPGW-5S TPGW-7S Figure 2.3-15. Comparison of Time Series Groundwater Water Elevations across the Landscape at TPGW-14, TPGW-13, TPGW-5 and TPGW-7.

2-102

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2.0 Water Elevation (ft, NAVD 88) 1.0 0.0

-1.0

-2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 TPGW-14S TPGW-9S TPGW-4S Figure 2.3-16. Comparison of Time Series Groundwater Water Elevations across the Landscape at TPGW-14, TPGW-9 and TPGW-4.

2-103

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2.0 Water Elevation (ft, NAVD 88) 1.0 0.0

-1.0

-2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 TPGW-3S TPGW-13S TPGW-12S Figure 2.3-17. Comparison of Time Series Groundwater Water Elevations across the Landscape at TPGW-3, TPGW-13, and TPGW-12.

2-104

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 1.5 Water Elevation (ft, NAVD 88) 0.5

-0.5

-1.5

-2.5 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 TPGW-10S TPGW-11S TPGW-13S TPGW-14S Figure 2.3-18. Comparison of Time Series Groundwater Water Elevations across the Landscape at TPGW-10, TPGW-11, TPGW-13, and TPGW-14.

2-105

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 1.0 Water Elevation (ft, NAVD 88) 0.0

-1.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 TPGW-13S TPSWCCS-2B Figure 2.3-19. Comparison of Time Series Groundwater Water Elevations at TPGW-13 and TPSWCCS-2.

2-106

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 1.0 Water Elevation (ft, NAVD 88) 0.0

-1.0

-2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 TPGW-1S TPGW-2S TPSWCCS-1B TPSWCCS-3B TPSWCCS-7B Figure 2.3-20. Comparison of Time Series Groundwater Water Elevations at TPGW-1 andTPGW-2, and CCS Surface Water Stations TPSWCCS-1, TPSWCCS-3, and TPSWCCS-7.

2-107

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 1.0 Water Elevation (ft, NAVD 88) 0.0

-1.0

-2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 TPGW-11S TPBBSW-3B Figure 2.3-21. Comparison of Daily Average Time Series Groundwater Water Elevations in Biscayne Bay Well TPGW-11 and Biscayne Bay Surface Water Station TPBBSW-3.

2-108

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2.0 1.0 Water Elevation (ft, NAVD 88) 0.0

-1.0

-2.0

-3.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Figure 2.3-22. TPBBSW-10 Water Elevations.

2-109

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2.0 1.0 Water Elevation (ft, NAVD 88) 0.0

-1.0

-2.0

-3.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Figure 2.3-23. TPBBSW-3 Water Elevations.

2-110

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2.0 1.0 Water Elevation (ft, NAVD 88) 0.0

-1.0

-2.0

-3.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Figure 2.3-24. TPBBSW-14 Water Elevations.

2-111