| number = ML16357A151
| number = ML16357A151
| issue date = 09/19/2016
| issue date = 09/19/2016
| title = Limerick Generating Station, Units 1 & 2, Revision 18 to Updated Final Safety Analysis Report, Chapter 17, Quality Assurance
| title = Revision 18 to Updated Final Safety Analysis Report, Chapter 17, Quality Assurance
| author name =  
| author name =  
| author affiliation = Exelon Generation Co, LLC
| author affiliation = Exelon Generation Co, LLC
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:LGS UFSAR CHAPTER 17 17-i REV. 13, SEPTEMBER 2006 CHAPTER 17 - QUALITY ASSURANCE TABLE OF CONTENTS   17.1 QUALITY ASSURANCE DURING DESIGN AND CONSTRUCTION 17.2 QUALITY ASSURANCE DURING THE OPERATIONS PHASE  
{{#Wiki_filter:LGS UFSAR CHAPTER 17 - QUALITY ASSURANCE TABLE OF CONTENTS 17.1       QUALITY ASSURANCE DURING DESIGN AND CONSTRUCTION 17.2       QUALITY ASSURANCE DURING THE OPERATIONS PHASE APPENDIX 17.2B - Deleted.
 
APPENDIX 17.2.I - Deleted.
APPENDIX 17.2B - Deleted.  
 
APPENDIX 17.2.I - Deleted.  
 
APPENDIX 17.2.II - Deleted.
APPENDIX 17.2.II - Deleted.
LGS UFSAR  CHAPTER 17 17.2-1 REV. 13, SEPTEMBER 2006 CHAPTER 17 - QUALITY ASSURANCE 
CHAPTER 17                             17-i              REV. 13, SEPTEMBER 2006
 
17.1 QUALITY ASSURANCE DURING DESIGN AND CONSTRUCTION This section is not applicable to the LGS UFSAR.


17.2 QUALITY ASSURANCE DURING THE OPERATIONS PHASE The licensee is responsible for the operation and maintenance of Limerick Generating Station (LGS). These activities are presently conducted in accordance with the NRC approved Quality Assurance Topical Report (QATR) which describes the formal and comprehensive control methods established to assure compliance with 10CFR50, Appendix B.  
LGS UFSAR CHAPTER 17 - QUALITY ASSURANCE 17.1    QUALITY ASSURANCE DURING DESIGN AND CONSTRUCTION This section is not applicable to the LGS UFSAR.
 
17.2   QUALITY ASSURANCE DURING THE OPERATIONS PHASE The licensee is responsible for the operation and maintenance of Limerick Generating Station (LGS). These activities are presently conducted in accordance with the NRC approved Quality Assurance Topical Report (QATR) which describes the formal and comprehensive control methods established to assure compliance with 10CFR50, Appendix B.
The QATR describes how the Quality Assurance Program is to be functionally implemented with due regard to the safety and health of the public and the personnel on site. The LGS Quality Assurance Program as described by the QATR is incorporated herein by reference.  
The QATR describes how the Quality Assurance Program is to be functionally implemented with due regard to the safety and health of the public and the personnel on site. The LGS Quality Assurance Program as described by the QATR is incorporated herein by reference.
}}
CHAPTER 17                                17.2-1                  REV. 13, SEPTEMBER 2006}}

Latest revision as of 11:01, 30 October 2019

Revision 18 to Updated Final Safety Analysis Report, Chapter 17, Quality Assurance
ML16357A151
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 09/19/2016
From:
Exelon Generation Co
To:
Office of Nuclear Reactor Regulation
Shared Package
ML16357A167 List:
References
Download: ML16357A151 (2)


Text

LGS UFSAR CHAPTER 17 - QUALITY ASSURANCE TABLE OF CONTENTS 17.1 QUALITY ASSURANCE DURING DESIGN AND CONSTRUCTION 17.2 QUALITY ASSURANCE DURING THE OPERATIONS PHASE APPENDIX 17.2B - Deleted.

APPENDIX 17.2.I - Deleted.

APPENDIX 17.2.II - Deleted.

CHAPTER 17 17-i REV. 13, SEPTEMBER 2006

LGS UFSAR CHAPTER 17 - QUALITY ASSURANCE 17.1 QUALITY ASSURANCE DURING DESIGN AND CONSTRUCTION This section is not applicable to the LGS UFSAR.

17.2 QUALITY ASSURANCE DURING THE OPERATIONS PHASE The licensee is responsible for the operation and maintenance of Limerick Generating Station (LGS). These activities are presently conducted in accordance with the NRC approved Quality Assurance Topical Report (QATR) which describes the formal and comprehensive control methods established to assure compliance with 10CFR50, Appendix B.

The QATR describes how the Quality Assurance Program is to be functionally implemented with due regard to the safety and health of the public and the personnel on site. The LGS Quality Assurance Program as described by the QATR is incorporated herein by reference.

CHAPTER 17 17.2-1 REV. 13, SEPTEMBER 2006