{{#Wiki_filter:LGS UFSAR | {{#Wiki_filter:LGS UFSAR CHAPTER 17 - QUALITY ASSURANCE TABLE OF CONTENTS 17.1 QUALITY ASSURANCE DURING DESIGN AND CONSTRUCTION 17.2 QUALITY ASSURANCE DURING THE OPERATIONS PHASE APPENDIX 17.2B - Deleted. | ||
APPENDIX 17.2.I - Deleted. | |||
TABLE OF CONTENTS 17.1 | |||
17.2 | |||
APPENDIX 17.2B - Deleted. | |||
APPENDIX 17.2.I - Deleted. | |||
APPENDIX 17.2.II - Deleted. | APPENDIX 17.2.II - Deleted. | ||
CHAPTER 17 17-i REV. 13, SEPTEMBER 2006 | |||
LGS UFSAR | LGS UFSAR CHAPTER 17 - QUALITY ASSURANCE 17.1 QUALITY ASSURANCE DURING DESIGN AND CONSTRUCTION This section is not applicable to the LGS UFSAR. | ||
17.2 QUALITY ASSURANCE DURING THE OPERATIONS PHASE The licensee is responsible for the operation and maintenance of Limerick Generating Station (LGS). These activities are presently conducted in accordance with the NRC approved Quality Assurance Topical Report (QATR) which describes the formal and comprehensive control methods established to assure compliance with 10CFR50, Appendix B. | |||
17.1 QUALITY ASSURANCE DURING DESIGN AND CONSTRUCTION | The QATR describes how the Quality Assurance Program is to be functionally implemented with due regard to the safety and health of the public and the personnel on site. The LGS Quality Assurance Program as described by the QATR is incorporated herein by reference. | ||
CHAPTER 17 17.2-1 REV. 13, SEPTEMBER 2006}} | |||
This section is not applicable to the LGS UFSAR. | |||
17.2 QUALITY ASSURANCE DURING THE OPERATIONS PHASE | |||
The licensee is responsible for the operation and maintenance of Limerick Generating Station (LGS). These activities are presently conducted in accordance with the NRC approved Quality | |||
Assurance Topical Report (QATR) which | |||
The QATR describes how the Quality Assurance | |||
Assurance Program as described by the |
Latest revision as of 11:01, 30 October 2019
ML16357A151 | |
Person / Time | |
---|---|
Site: | Limerick |
Issue date: | 09/19/2016 |
From: | Exelon Generation Co |
To: | Office of Nuclear Reactor Regulation |
Shared Package | |
ML16357A167 | List:
|
References | |
Download: ML16357A151 (2) | |
Text
LGS UFSAR CHAPTER 17 - QUALITY ASSURANCE TABLE OF CONTENTS 17.1 QUALITY ASSURANCE DURING DESIGN AND CONSTRUCTION 17.2 QUALITY ASSURANCE DURING THE OPERATIONS PHASE APPENDIX 17.2B - Deleted.
APPENDIX 17.2.I - Deleted.
APPENDIX 17.2.II - Deleted.
CHAPTER 17 17-i REV. 13, SEPTEMBER 2006
LGS UFSAR CHAPTER 17 - QUALITY ASSURANCE 17.1 QUALITY ASSURANCE DURING DESIGN AND CONSTRUCTION This section is not applicable to the LGS UFSAR.
17.2 QUALITY ASSURANCE DURING THE OPERATIONS PHASE The licensee is responsible for the operation and maintenance of Limerick Generating Station (LGS). These activities are presently conducted in accordance with the NRC approved Quality Assurance Topical Report (QATR) which describes the formal and comprehensive control methods established to assure compliance with 10CFR50, Appendix B.
The QATR describes how the Quality Assurance Program is to be functionally implemented with due regard to the safety and health of the public and the personnel on site. The LGS Quality Assurance Program as described by the QATR is incorporated herein by reference.
CHAPTER 17 17.2-1 REV. 13, SEPTEMBER 2006