|
|
(One intermediate revision by the same user not shown) |
Line 5: |
Line 5: |
| | author name = Adams A | | | author name = Adams A |
| | author affiliation = NRC/NRR/DPR/PRLB | | | author affiliation = NRC/NRR/DPR/PRLB |
| | addressee name = Frey W D | | | addressee name = Frey W |
| | addressee affiliation = Univ of California - Davis | | | addressee affiliation = Univ of California - Davis |
| | docket = 05000607 | | | docket = 05000607 |
Line 16: |
Line 16: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:March 27, 2017 | | {{#Wiki_filter:March 27, 2017 Dr. Wesley D. Frey, Reactor Director McClellan Nuclear Research Center University of California, Davis 5335 Price Avenue, Building 258 McClellan, CA 95652-2504 |
| | |
| Dr. Wesley D. Frey, Reactor Director McClellan Nuclear Research Center University of California, Davis 5335 Price Avenue, Building 258 | |
| | |
| McClellan, CA 95652-2504 | |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| UNIVERSITY OF CALIFORNIA, DAVIS - NON-POWER REACTOR CLOSEOUT OF GENERIC LETTER 2016-01, "MONITORING OF NEUTRON-ABSORBING MATERIALS IN SPENT FUEL POOLS" FOR THE UNIVERSITY OF CALIFORNIA-DAVIS MCCELLAN NUCLEAR RESEARCH CENTER, DOCKET NO. 50-607 (CAC NO. A11010) | | UNIVERSITY OF CALIFORNIA, DAVIS - NON-POWER REACTOR CLOSEOUT OF GENERIC LETTER 2016-01, MONITORING OF NEUTRON-ABSORBING MATERIALS IN SPENT FUEL POOLS FOR THE UNIVERSITY OF CALIFORNIA-DAVIS MCCELLAN NUCLEAR RESEARCH CENTER, DOCKET NO. 50-607 (CAC NO. A11010) |
| On April 7, 2016, the U.S. Nuclear Regulatory Commission (NRC) issued Generic Letter (GL) 2016-01, "Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools" (Agencywide Documents Access and Management System (ADAMS) Accession No. ML16097A169), to address the degradation of neutron-absorbing materials (NAM) in wet storage systems for reactor fuel at power and non-power reactors. | | On April 7, 2016, the U.S. Nuclear Regulatory Commission (NRC) issued Generic Letter (GL) 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools (Agencywide Documents Access and Management System (ADAMS) Accession No. ML16097A169), to address the degradation of neutron-absorbing materials (NAM) in wet storage systems for reactor fuel at power and non-power reactors. |
| | |
| For the non-power reactors, GL 2016-01 requested that licensees provide facility-specific information related to the use of NAM. This information was needed by the NRC staff to verify continued compliance through licensee implementation of effective methods for monitoring of reactor fuel in wet storage so as to detect and mitigate any degradation or deformation of NAM when credited in the facility licensing or design basis for criticality control of fuel in wet storage. | | For the non-power reactors, GL 2016-01 requested that licensees provide facility-specific information related to the use of NAM. This information was needed by the NRC staff to verify continued compliance through licensee implementation of effective methods for monitoring of reactor fuel in wet storage so as to detect and mitigate any degradation or deformation of NAM when credited in the facility licensing or design basis for criticality control of fuel in wet storage. |
| On September 7, 2016, the University of California-Davis submitted a response to GL 2016-01 (ADAMS Accession No. ML16258A147) for the McClellan Nuclear Research Center. The NRC | | On September 7, 2016, the University of California-Davis submitted a response to GL 2016-01 (ADAMS Accession No. ML16258A147) for the McClellan Nuclear Research Center. The NRC staff conducted a review of your response to GL 2016-01 and determined that your facility does not use NAM in wet fuel storage. Based upon the information you submitted in response to GL 2016-01 and the results of the NRC staff review, the NRC staff has determined that the submission addresses the information requested in GL 2016-01. No further information or action is requested regarding this matter. |
| | | Sincerely, |
| staff conducted a review of your response to GL 2016-01 and determined that your facility does not use NAM in wet fuel storage. Based upon the information you submitted in response to GL 2016-01 and the results of the NRC staff review, the NRC staff has determined that the submission addresses the information requested in GL 2016-01. No further information or action is requested regarding this matter. | | /RA/ |
| | | Alexander Adams Jr., Chief Research and Test Reactors Licensing Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation cc: See next page |
| Sincerely, | |
| /RA/ Alexander Adams Jr., Chief Research and Test Reactors Licensing Branch
| |
| | |
| Division of Policy and Rulemaking Office of Nuclear Reactor Regulation | |
| | |
| cc: See next page University of California-Davis Docket No. 50-607 | |
| | |
| cc: David Reap, Radiation Safety Officer 5335 Price Avenue, Bldg. 258
| |
| | |
| McClellan, CA 95652-2504
| |
| | |
| Mr. Walter Steingass, Reactor Supervisor 5335 Price Avenue, Bldg. 258 McClellan, CA 95652-2504
| |
| | |
| California Energy Commission
| |
| | |
| 1516 Ninth Street, MS-34 Sacramento, CA 95814
| |
| | |
| Radiological Health Branch California Department of Public Health P.O. Box 997414, MS 7610 Sacramento, CA 95899-7414
| |
| | |
| Test, Research and Training
| |
|
| |
|
| Reactor Newsletter P.O. Box 118300 University of Florida Gainesville, FL 32611 | | University of California-Davis Docket No. 50-607 cc: |
| | David Reap, Radiation Safety Officer 5335 Price Avenue, Bldg. 258 McClellan, CA 95652-2504 Mr. Walter Steingass, Reactor Supervisor 5335 Price Avenue, Bldg. 258 McClellan, CA 95652-2504 California Energy Commission 1516 Ninth Street, MS-34 Sacramento, CA 95814 Radiological Health Branch California Department of Public Health P.O. Box 997414, MS 7610 Sacramento, CA 95899-7414 Test, Research and Training Reactor Newsletter P.O. Box 118300 University of Florida Gainesville, FL 32611 |
|
| |
|
| ML17067A363; *concurred via email OFFICE NRR/DPR/PRLB/PM NRR/DPR/PRLB/LA*NRR/DPR/PGCB/BC NRR/DPR/PRLB/BCNAME LTran NParker SStuchell AAdams DATE 3/22/17 3/20/17 3/27/17 3/27/17}} | | ML17067A363; *concurred via email OFFICE NRR/DPR/PRLB/PM NRR/DPR/PRLB/LA* NRR/DPR/PGCB/BC NRR/DPR/PRLB/BC NAME LTran NParker SStuchell AAdams DATE 3/22/17 3/20/17 3/27/17 3/27/17}} |
|
---|
Category:Letter
MONTHYEARML24169A3302024-06-17017 June 2024 UC Davis MNRC Change in Address of Level 1 Management ML24143A1422024-05-22022 May 2024 University of California-Davis Mcclellan Nuclear Research Center - 2023 Annual Report (Cover Letter) ML24094A0682024-04-0404 April 2024 University of California-Davis Mcclellan - Change of Facility Backup Project Manager IR 05000607/20242012024-03-28028 March 2024 University of California-Davis - U.S. Nuclear Regulatory Commission Routine Inspection Report No. 05000607/2024201 ML24032A1352024-02-0101 February 2024 Examination Confirmation Letter No. 50-607/OL-24-01, University of California-Davis ML23332A7062023-11-27027 November 2023 University of California, Davis Mcclellan Nuclear Research Center (MNRC) License Holder Appointment ML23263A9762023-09-22022 September 2023 Regents of the Ucd Issuance of Amendment No. 10 to Renewed Facility Operating License R-130 ML23262B5202023-09-19019 September 2023 University of California Davis Mcclellan Nuclear Research Center (Mnrc), Docket Number 50-607, License Number R-130, Supplement to License Amendment Request 2023-02 ML23258A2422023-09-15015 September 2023 University of California Davis Mcclellan Nuclear Research Center (Mnrc), Docket Number 50-607, License Number R-130, License Amendment Request 2023-02 ML23222A1872023-08-10010 August 2023 Univ. of California, Davis, 14-Day Written Follow-up to Call Made to the HOO (EM 56643) on July 28th 2023 ML23095A0652023-03-14014 March 2023 American Nuclear Insurers, Notice of Cancellation Rescinded ML23045A0452023-03-0202 March 2023 Regents of the University of California - Issuance of Amendment No. 9 to Renewed Facility Operating License No. R-130 to Amend the Technical Specifications for the University of California - Davis/Mcclellan Nuclear Research Center ML23073A3992023-03-0101 March 2023 University of California Davis Mcclellan Nuclear Research Center (MNRC) License Holder Appointment IR 05000607/20232012023-02-23023 February 2023 University of California - Davis – U.S. Nuclear Regulatory Commission Routine Inspection Report 05000607/2023201 ML23045A3202023-02-14014 February 2023 14 Day Notification to Document Control Desk of Event 56331 Made to NRC Operations Center by UC Davis MNRC on February 1st at 1651 Est ML23039A2072023-02-0808 February 2023 University of California Davis Mcclellan Nuclear Research Center (Mnrc), Docket Number 50-607, License Number R-130, License Amendment Request 2023-01 IR 05000607/20222022022-12-28028 December 2022 University of California-Davis - Us Nuclear Regulatory Commission Routine Inspection Report No. 05000607/2022202 ML22214B8292022-11-21021 November 2022 Letter to Ucd with Renewed Facility Operating License ML22213A1622022-10-18018 October 2022 FRN Re UCD-MNRC Environment Assessment ML22213A1692022-10-18018 October 2022 Regents of the University of California - Environmental Assessment and Finding of No Significant Impact Regarding Renewal of Facility Operating License No. R-130 for the University of California - Davis/Mcclellan Nuclear Research Center ML22193A2532022-07-12012 July 2022 Univ. of California-Davis - Summary of the Analysis of Changes Made to the MNRC Emergency Plan Under the Provisions of 10 CFR 50.54q ML22181B0822022-06-30030 June 2022 University of California-Davis/McClellan Nuclear Research Center, Response to NRC Request for Additional Information Letter Dated June 24th, 2022 Regarding License Renewal Application ML22174A2932022-06-28028 June 2022 Regents of the University of California - Report on the Regulatory Audit License Renewal Application for the University of California - Davis/Mcclellan ML22173A2092022-06-24024 June 2022 Regents of the University of California; Request for Additional Information Regarding License Renewal Application for the University of California ML22174A4222022-06-23023 June 2022 Additional Response to NRC Request for Additional Information Letter Dated June 3rd 2022 Regarding License Renewal Application for the University of California-Davis/McClellan Nuclear Research Center ML22173A2022022-06-22022 June 2022 Response to NRC Request for Additional Information Letter Dated June 3rd 2022 Regarding License Renew Al Application for the University of California - Davis/Mcclellan Nuclear Research Center ML22172A1982022-06-21021 June 2022 UC Davis MNRC Submission of Technical Specification in Support of License Renewal Application ML22154A5442022-06-0303 June 2022 Univ. of CA - Davis, MNRC Submittal of Technical Specification in Support of License Renewal Application ML22146A1942022-06-0303 June 2022 Regents of the University of California - RAI Regarding License Renewal Application for the University of California - Davis/Mccellan Nuclear Research Center ML22154A5482022-06-0303 June 2022 University of California - Davis, Submittal of MNRC 2021 Annual Report ML22137A2602022-05-26026 May 2022 University of California - Davis - Closure of Confirmatory Action Letter No. NRR 02 002 on the Site-Specific Compensatory Measures Implementation Plan IR 05000607/20222012022-05-26026 May 2022 University of California-Davis U.S. Nuclear Regulatory Commission Routine Inspection Report No 05000607/2022201 ML23142A3032022-05-22022 May 2022 Univ. of California - Davis, Submittal of MNRC 2022 Annual Report ML22109A1042022-05-0303 May 2022 Regents of the Univ. of CA - Review of the Physical Security Plan in Support of License Renewal Application for the Univ. of CA-Davis/McCellan Nuclear Research Center ML22089A1582022-03-30030 March 2022 UC Davis MNRC Response to NRC Staff Request for Additional Information Regarding Licensing Renewal Application Letter Issued February 8th, 2022 ML22041A3782022-02-28028 February 2022 Regents of the University of California - Determination of Acceptability and Sufficiency for Docketing and Opportunity for Hearing Regarding the License Renewal Application for the University of California - Davis/Mcclellan Nuclear Research ML22038A1402022-02-0808 February 2022 Regents of the University of California - Request for Additional Information Regarding License Renewal Application for the University of California - Davis/Mcclellan Nuclear Research Center ML22026A2862022-02-0202 February 2022 Regents of the University of California - Regulatory Audit Re License Renewal Application for the University of California - Davis/Mcclellan Nuclear Research Center Training, Research, Isotope, General Atomics Nuclear Reactor ML22014A1272022-01-11011 January 2022 50 .54P Submittal of the Ucd/Mnrc Physical Security Plan for University of California, Davis Mcclellan Nuclear Research Center (Ucd/Mnrc), Docket No. 50-607, Facility Operating License No. R-130 the ML21300A3922021-12-23023 December 2021 University of California-Davis U.S. Nuclear Regulatory Commission Routine Inspection Report No. 05000607/2021202 ML21351A3172021-12-17017 December 2021 UC Davis MNRC Response to NRC Staff Request for Additional Information Regarding Licensing Renewal Application Letter Issued November 30th, 2021 IR 05000607/20212022021-12-0606 December 2021 University of California-Davis - Nuclear Regulatory Commission Security Inspection Report No. 05000607/2021202 Cover Letter ML21316A1162021-11-30030 November 2021 Regents of the University of California - Request for Additional Information Regarding License Renewal Application for the University of California-Davis Mccellan Nuclear Research Center ML21252A7572021-10-0505 October 2021 University of California-Davis/MCCLELLAN - Approval of the Revised Nuclear Radiation Center Selection and Training Plan ML21265A5412021-09-22022 September 2021 UC Davis MNRC Cover Letter for Response to Request for Supplemental Information ML21250A3662021-09-14014 September 2021 Regents of the University of California Report on the Regulatory Audit License Renewal Application for the University of California Davis/Mcclellan Nuclear Research Center Triga Nuclear Reactor ML21175A3342021-06-22022 June 2021 Transmittal of University of California, Davis, MNRC 2020 Annual Report IR 05000607/20212012021-05-0707 May 2021 University of California-Davis - U. S. Nuclear Regulatory Commission Routine Inspection Report No. 05000607/2021201 ML21029A1472021-01-25025 January 2021 UC Davis Mcclellan Nuclear Research Center - 50.54P Submittal of the Ucd/Mnrc Physical Security Plan ML20338A2622020-12-10010 December 2020 NRR-106 University of California Davis License Renewal - Regulatory Audit Letter and Plan 2024-06-17
[Table view] |
Text
March 27, 2017 Dr. Wesley D. Frey, Reactor Director McClellan Nuclear Research Center University of California, Davis 5335 Price Avenue, Building 258 McClellan, CA 95652-2504
SUBJECT:
UNIVERSITY OF CALIFORNIA, DAVIS - NON-POWER REACTOR CLOSEOUT OF GENERIC LETTER 2016-01, MONITORING OF NEUTRON-ABSORBING MATERIALS IN SPENT FUEL POOLS FOR THE UNIVERSITY OF CALIFORNIA-DAVIS MCCELLAN NUCLEAR RESEARCH CENTER, DOCKET NO. 50-607 (CAC NO. A11010)
On April 7, 2016, the U.S. Nuclear Regulatory Commission (NRC) issued Generic Letter (GL) 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools (Agencywide Documents Access and Management System (ADAMS) Accession No. ML16097A169), to address the degradation of neutron-absorbing materials (NAM) in wet storage systems for reactor fuel at power and non-power reactors.
For the non-power reactors, GL 2016-01 requested that licensees provide facility-specific information related to the use of NAM. This information was needed by the NRC staff to verify continued compliance through licensee implementation of effective methods for monitoring of reactor fuel in wet storage so as to detect and mitigate any degradation or deformation of NAM when credited in the facility licensing or design basis for criticality control of fuel in wet storage.
On September 7, 2016, the University of California-Davis submitted a response to GL 2016-01 (ADAMS Accession No. ML16258A147) for the McClellan Nuclear Research Center. The NRC staff conducted a review of your response to GL 2016-01 and determined that your facility does not use NAM in wet fuel storage. Based upon the information you submitted in response to GL 2016-01 and the results of the NRC staff review, the NRC staff has determined that the submission addresses the information requested in GL 2016-01. No further information or action is requested regarding this matter.
Sincerely,
/RA/
Alexander Adams Jr., Chief Research and Test Reactors Licensing Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation cc: See next page
University of California-Davis Docket No. 50-607 cc:
David Reap, Radiation Safety Officer 5335 Price Avenue, Bldg. 258 McClellan, CA 95652-2504 Mr. Walter Steingass, Reactor Supervisor 5335 Price Avenue, Bldg. 258 McClellan, CA 95652-2504 California Energy Commission 1516 Ninth Street, MS-34 Sacramento, CA 95814 Radiological Health Branch California Department of Public Health P.O. Box 997414, MS 7610 Sacramento, CA 95899-7414 Test, Research and Training Reactor Newsletter P.O. Box 118300 University of Florida Gainesville, FL 32611
ML17067A363; *concurred via email OFFICE NRR/DPR/PRLB/PM NRR/DPR/PRLB/LA* NRR/DPR/PGCB/BC NRR/DPR/PRLB/BC NAME LTran NParker SStuchell AAdams DATE 3/22/17 3/20/17 3/27/17 3/27/17