{{#Wiki_filter:0CAN081702  
{{#Wiki_filter:Entergy Operations, Inc.
 
1448 S.R. 333 Russellville, AR 72802 Tel 479-858-4704 Stephenie L. Pyle Manager, Regulatory Assurance Arkansas Nuclear One 0CAN081702 August 14, 2017 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001
August 14, 2017  
 
U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001  


==Subject:==
==Subject:==
Emergency Plan Implementing Procedure Arkansas Nuclear One - Units 1 and 2 Docket Nos. 50-313, 50-368, and 72-13 License Nos. DPR-51 and NPF-6  
Emergency Plan Implementing Procedure Arkansas Nuclear One - Units 1 and 2 Docket Nos. 50-313, 50-368, and 72-13 License Nos. DPR-51 and NPF-6


==Dear Sir or Madam:==
==Dear Sir or Madam:==


In accordance with 10 CFR 50.4(b)(5), 10 CFR 50.54(q)(5), 10 CFR 72.4, and 10 CFR 72.44(f),
In accordance with 10 CFR 50.4(b)(5), 10 CFR 50.54(q)(5), 10 CFR 72.4, and 10 CFR 72.44(f),
the Arkansas Nuclear One (ANO) Emergency Plan (EPlan) Emergency Action Level (EAL) Classification procedure has been revised and is included in attachment to this letter. The screening and/or evaluation concluded that the changes do not reduce the effectiveness of the EPlan, and the EPlan continues to meet the standards of 10 CFR 50.47(b) and 10 CFR 50, Appendix E.  
the Arkansas Nuclear One (ANO) Emergency Plan (EPlan) Emergency Action Level (EAL)
 
Classification procedure has been revised and is included in attachment to this letter. The screening and/or evaluation concluded that the changes do not reduce the effectiveness of the EPlan, and the EPlan continues to meet the standards of 10 CFR 50.47(b) and 10 CFR 50, Appendix E.
The revision affects the EAL RCB3 Basis, which is associated with the Reactor Coolant System fission product barrier Containment Building radiation monitoring indication. Currently, the high range radiation monitors are considered invalid during the first 15 minutes of a containment temperature change that could affect the monitor's output due to thermally induced current. The revision provides the flexibility to determine if the monitor is valid or invalid based on other  
The revision affects the EAL RCB3 Basis, which is associated with the Reactor Coolant System fission product barrier Containment Building radiation monitoring indication. Currently, the high range radiation monitors are considered invalid during the first 15 minutes of a containment temperature change that could affect the monitors output due to thermally induced current. The revision provides the flexibility to determine if the monitor is valid or invalid based on other parameters, buy replacing the invalidity statement with the following:
 
NRC Information Notice 97-045 Supplement 1 identifies the potential for erratic indications from the high range radiation monitors (HRRMs) as a result of thermally induced currents (TIC) which may cause the HRRM to read falsely high (for approximately 15 minutes) on a rapid temperature increase, and fail low intermittently on a rapid temperature decrease.
parameters, buy replacing the invalidity statement with the following:
Because of this phenomenon, any trends or alarms on the HRRMs should be validated by comparison to the containment low range/area radiation monitors and Air Monitoring Systems trends before actions are taken.
NRC Information Notice 97-045 Supplement 1 identifies the potential for erratic indications from the high range radiation monitors (HRRMs) as a result of thermally induced currents (TIC) which may cause the HRRM to read falsely high (for approximately 15 minutes) on a rapid temperature increase, and fail low intermittently on a rapid temperature decrease. Because of this phenomenon, any trends or alarms on the HRRM's should be validated by comparison to the containment low range/area radiation monitors and Air Monitoring Systems trends before actions are taken.  
Reference to the above NRC Information Notice is also added to Step 3.1.8 of the reference section of the procedure (administrative change only). In addition, the EAL RCB3 Basis was previously contained on two separate pages (Pages 118 and 119). In Revision 53, the EAL is now formatted to be displayed on Page 119 in its entirety. This is an administrative change only. The new basis wording for the HRRMs continues to support the determination of RCB3 applicability.
 
Reference to the above NRC Information Notice is also added to Step 3.1.8 of the reference section of the procedure (administrative change only). In addition, the EAL RCB3 Basis was previously contained on two separate pages (Pages 118 and 119). In Revision 53, the EAL is now formatted to be displayed on Page 119 in its entirety. This is an administrative change only. The new basis wording for the HRRMs continues to support the determination of RCB3  
 
applicability. Stephenie L. Pyle Manager, Regulatory Assurance Arkansas Nuclear One Entergy Operations, Inc. 1448 S.R. 333 Russellville, AR  72802 Tel 479-858-4704 0CAN081702 Page 2 of 2
 
This correspondence contains no new commitments. Should you have any questions regarding this submittal, please contact me.  


Sincerely,   ORIGINAL SIGNED BY STEPHENIE L. PYLE SLP/dbb
0CAN081702 Page 2 of 2 This correspondence contains no new commitments. Should you have any questions regarding this submittal, please contact me.
Sincerely, ORIGINAL SIGNED BY STEPHENIE L. PYLE SLP/dbb


==Attachment:==
==Attachment:==
OP-1903.010, Emergency Action Level Classification  
OP-1903.010, Emergency Action Level Classification cc:     Mr. Scott Morris Acting Regional Administrator U. S. Nuclear Regulatory Commission RGN-IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 NRC Senior Resident Inspector Arkansas Nuclear One P. O. Box 310 London, AR 72847 U. S. Nuclear Regulatory Commission Attn: Mr. Thomas Wengert MS O-8B1 One White Flint North 11555 Rockville Pike Rockville, MD 20852 Mr. Michael Laylon Director, Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards U. S. Nuclear Regulatory Commission Washington D. C. 20555 Mr. Paul Elkmann NRC Region IV (Senior Emergency Preparedness Inspector)
 
Division of Reactor Safety 1600 East Lamar Blvd Arlington, TX 76011-4125 Mr. Bernard R. Bevill Arkansas Department of Health Radiation Control Section 4815 West Markham Street Slot #30 Little Rock, AR 72205}}
cc: Mr. Scott Morris Acting Regional Administrator U. S. Nuclear Regulatory Commission RGN-IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 NRC Senior Resident Inspector  
 
Arkansas Nuclear One P. O. Box 310 London, AR 72847 U. S. Nuclear Regulatory Commission Attn: Mr. Thomas Wengert MS O-8B1 One White Flint North 11555 Rockville Pike Rockville, MD 20852 Mr. Michael Laylon Director, Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards U. S. Nuclear Regulatory Commission Washington D. C. 20555 Mr. Paul Elkmann NRC Region IV (Senior Emergency Preparedness Inspector)  
 
Division of Reactor Safety 1600 East Lamar Blvd Arlington, TX 76011-4125 Mr. Bernard R. Bevill  
 
Arkansas Department of Health Radiation Control Section 4815 West Markham Street  
 
Slot #30 Little Rock, AR 72205}}

Latest revision as of 22:31, 29 October 2019

Submittal of Emergency Plan Implementing Procedure, OP-1903.010, Emergency Action Level Classification
ML17226A163
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 08/14/2017
From: Pyle S
Entergy Operations
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
References
0CAN081702
Download: ML17226A163 (2)


Text

Entergy Operations, Inc.

1448 S.R. 333 Russellville, AR 72802 Tel 479-858-4704 Stephenie L. Pyle Manager, Regulatory Assurance Arkansas Nuclear One 0CAN081702 August 14, 2017 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

Subject:

Emergency Plan Implementing Procedure Arkansas Nuclear One - Units 1 and 2 Docket Nos. 50-313, 50-368, and 72-13 License Nos. DPR-51 and NPF-6

Dear Sir or Madam:

In accordance with 10 CFR 50.4(b)(5), 10 CFR 50.54(q)(5), 10 CFR 72.4, and 10 CFR 72.44(f),

the Arkansas Nuclear One (ANO) Emergency Plan (EPlan) Emergency Action Level (EAL)

Classification procedure has been revised and is included in attachment to this letter. The screening and/or evaluation concluded that the changes do not reduce the effectiveness of the EPlan, and the EPlan continues to meet the standards of 10 CFR 50.47(b) and 10 CFR 50, Appendix E.

The revision affects the EAL RCB3 Basis, which is associated with the Reactor Coolant System fission product barrier Containment Building radiation monitoring indication. Currently, the high range radiation monitors are considered invalid during the first 15 minutes of a containment temperature change that could affect the monitors output due to thermally induced current. The revision provides the flexibility to determine if the monitor is valid or invalid based on other parameters, buy replacing the invalidity statement with the following:

NRC Information Notice 97-045 Supplement 1 identifies the potential for erratic indications from the high range radiation monitors (HRRMs) as a result of thermally induced currents (TIC) which may cause the HRRM to read falsely high (for approximately 15 minutes) on a rapid temperature increase, and fail low intermittently on a rapid temperature decrease.

Because of this phenomenon, any trends or alarms on the HRRMs should be validated by comparison to the containment low range/area radiation monitors and Air Monitoring Systems trends before actions are taken.

Reference to the above NRC Information Notice is also added to Step 3.1.8 of the reference section of the procedure (administrative change only). In addition, the EAL RCB3 Basis was previously contained on two separate pages (Pages 118 and 119). In Revision 53, the EAL is now formatted to be displayed on Page 119 in its entirety. This is an administrative change only. The new basis wording for the HRRMs continues to support the determination of RCB3 applicability.

0CAN081702 Page 2 of 2 This correspondence contains no new commitments. Should you have any questions regarding this submittal, please contact me.

Sincerely, ORIGINAL SIGNED BY STEPHENIE L. PYLE SLP/dbb

Attachment:

OP-1903.010, Emergency Action Level Classification cc: Mr. Scott Morris Acting Regional Administrator U. S. Nuclear Regulatory Commission RGN-IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 NRC Senior Resident Inspector Arkansas Nuclear One P. O. Box 310 London, AR 72847 U. S. Nuclear Regulatory Commission Attn: Mr. Thomas Wengert MS O-8B1 One White Flint North 11555 Rockville Pike Rockville, MD 20852 Mr. Michael Laylon Director, Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards U. S. Nuclear Regulatory Commission Washington D. C. 20555 Mr. Paul Elkmann NRC Region IV (Senior Emergency Preparedness Inspector)

Division of Reactor Safety 1600 East Lamar Blvd Arlington, TX 76011-4125 Mr. Bernard R. Bevill Arkansas Department of Health Radiation Control Section 4815 West Markham Street Slot #30 Little Rock, AR 72205