ML033510534
ML033510534 | |
Person / Time | |
---|---|
Site: | Arkansas Nuclear |
Issue date: | 12/03/2003 |
From: | Entergy Operations |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
103 OP-1903.004, Charge No. 023-01-0 | |
Download: ML033510534 (37) | |
Text
Arkansas Nuclear One - Administrative Services Document Control Wednesday, December 03, 2003 Document Update Notification COPYHOLDER NO: 103 TO: ANO-NRC (EMERGENCY RESPONSE COORD.) - WASHINGTON ADDRESS: OS-DOC CNTRL DESK MAIL STOP OP1-17 WASHINGTON DC 20555-DC DOCUMENTNO: OP-1903.004 TITLE: ADMIN. & MAINTENANCE OF THE EMERGENCY PLAN & IMPLEMENTING PROCEDURES CHANGE NO: 023-01-0 ADDITIONAL INFO:
wa If this box is checked, please sign, date, ad return within 5 days.
5 ANO-J Docket 50-313 Ti [] ANO-2 Docket 50-368 Signature Date SIGNATURE CONFIRMS UPDATE HAS BEEN MADE RETURN TO:
ATTN: DOCUMENT CONTROL-(N-ADMIN-24)
ARKANSAS NUCLEAR ONE Ab4 S 1448 SR 333 RUSSELLVILLE, AR 72801
ENTERGY OPERATIONS INCORPORATED ARKANSAS NUCLEAR ONE TITLE: ADMINISTRATION AND MAINTENANCE OF DOCUMENT NO. CHANGE NO.
THE EMERGENCY PLAN AND 1903.004 023-01-0 IMPLEMENTING PROCEDURES WORK PLAN EXP. DATE TC EXP. DATE N/A N/A SET# (o SAFETY-RELATED EYES OINO IPTE
[YES ONO TEMP ALT
_ _ _ __ __ __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _D E _ NO YE S When you see these TRAPS Get these TOOLS Time Pressure Effective Communication Distractionlnterruption Questioning Attitude Multiple Tasks Placekeeping Overconfidence Self Check Vague or Interpretive Guidance Peer Check First Shift/Last Shift Knowledge Peer Pressure Procedures Change/Off Normal Job Briefing Physical Environment Coaching Mental Stress (Home or Work) Turnover VERIFIED BY DATE TIME hARM TITLE: FORM NO. CHANGE NO.
VERIFICATION COVER SHEET 1000.006A 050-00-0
ENTERGY OPERATIONS INCORPORATED ARKANSAS NUCLEAR ONE Page 1 TITLE:ADMINISTRATION AND MAINTENANCE OF THE EMERGENCY DOCUMENT NO. CHANGE NO.
PLAN AND IMPLEMENTING PROCEDURES 1903.004 023-01-0
,FECTED UNIT: PROCEDURE 2 ELECTRONIC DOCUMENT SAFETY-RELATED 0 UNIT 1 0 UNIT 2 ll WORK PLAN, EXP. DATE N/A 0 YES El NO TYPE OF CHANGE:
El NEW ED PC El TC E DELETION El REVISION El EZ EXP. DATE: N/A DOES THIS DOCUMENT:
- 1. Supersede or replace another procedure? E YES ONO (If YES, complete 1000.006B for deleted procedure.)
- 2. Alter or delete an existing regulatory commitment? E YES 0 NO (If YES, coordinate with Licensing before Implementing.)
- 3. Require a 50.59 review per LI-101? (See also 1000.006, Attachment 15) 0 YES D NO (If 50.59 evaluation, OSRC review required.)
- 4. Cause the MTCL to be untrue? (See Step 7.5 for details.) El YES E NO (If YES, complete 1000.009A)
- 5. Create an Intent Change? E YES ONO (If YES, Standard Approval Process required.)
- 6. Implement or change IPTE requirements? E YES ONO (If YES, complete 1000.143A. OSRC review required.)
- 7. Implement or change a Temporary Alteration? a YES ONO (If YES, then OSRC review required.)
Was the Master Electronic File used as the source document? iYES ElNO INTERIM APPROVAL PROCESS STANDARD APPROVAL PROCESS
'rIGINATOR SIGNATURE: (Includes review or Att. 13) DATE: ORIGINATOR SGesrGvlewA. 13)DATE:
'A-itand Sign name: PHONE#: Print and Sign name: Robert L. Faer PHONE: 4993 SUPERVISOR APPROVAL:' INDEPENDENJ REVEWER: / DAT:
SRO UNIT ONE :' DATE: ENGINEERING: DATE:
SRO UNIT :* DATE: QUALITY: DATE:
Interim approval allowed for non-intent changes requiring no UNIT SURVEILLANCE COORDINATOR: DATE:
50.59 evaluation that are stopping work in progress. 4A Standard Approval required for intent changes or changes WION LEADE DATFE:
requiring a 50.59 evaluation. ICX
- If change not required to support work in progress, 0UALITY ASSURANCE: C DATE:
Department Head must sign. At
- If both units are affected by change, both SRO signatures OTHER SECTION LEADERS: DATE:
are required. (SRO signature required for safety related DATE procedures only.) OTHER SECTION LEADERS: DATE:
OTHER SECTION LEADERS: DATE:
OTHER SECTION LEADERS: DATE:
OURS CHAIRM IT H I AL REVIEWER: DATE: OTHER SECTION LEADERS: DATE:
-2 C I/-4-o i_3 __ _ ___._
F LAPPROV L- nDAA)
TE:z OTHER 1 SECTION LEADERS: DATE:
3ew1 A d I1125/4 UIRED EFFECTIY E AT. OTHER SECTION LEADERS: DATE:
FORM TITLE: FORM NO. CHANGE NO.
PROCEDURE/WORK PLAN APPROVAL REQUEST 1000.006B 052-00-0
ENTERGY OPERATIONS INCORPORATED ARKANSAS NUCLEAR ONE iTLE:ADMINISTRATION AND MAINTENANCE OF DOCUMENT NO. CHANGE NO.
THE EMERGENCY PLAN AND 1903.004 023-01-0 IMPLEMENTING PROCEDURES EDPROCEDURE [:WORK PLAN, EXP. DATE N/A PAGE 1 OF 1 D ELECTRONIC DOCUMENT TYPE OF CHANGE:
El NEW ED PC El TC El DELETION El REVISION El EZ EXP. DATE: N/A AFFECTED SECTION: DESCRIPTION OF CHANGE: (For each change made, include sufficient detail to describe (Include step # if reason for the change.)
applicable) 6.7.6 Added a step to require a review of the demographics of the 10-mile emergency planning zone to be done in conjunction with the evacuation time estimate. Re-numbered succeeding step as 6.7.7.
'FORM TITLE: FORM NO. CHANGE NO.
DESCRIPTION OF CHANGE 1 000.006C 050-00-0
PROCJWORK PLAN NO. PROCEDURE/WORK PLAN TITLE: PAGE: 1 of 33 1903.004 ADMIN. & MAINTENANCE OF THE EMERGENCY PLAN &
IMPLEMENTING PROCEDURES . CHANGE: 023-01-0 .
.el TABLE OF CONTENTS SECTIO] 'IS PAGE NO.
1.0 Purpose............................................................. 3 2.0 Scope............................................................... 3 3.0 References.......................................................... 3 .
4.0 Definitions......................................................... 5 5.0 Responsibility and Authority........................................ 7 6.0 Instructions ....................................................... 8 6.1 Review and Updating of the Emergency Plan and Implementing Procedures ................................................. 8 6.2. Emergency Plan Revisions/Changes. 10 6.3 Approval of Emergency Plan Revisions (As Shown in Attachment 1) shall be provided As Follows: . 10 6.4 Approval of Emergency Plan Implementing Procedure Revisions shall be provided as Follows ..................... 11 6.5 Review and Revision of the EAL Bases Document . 12 6.6 Review of Transmittals to NRC ..................... . .. .. . ... 12 6.7 Review and Updating the ANS Document/Report .. . . . ..
. ... 12 7.0 Drills and Exercises................................. . .. .. . ... 13 7.1 Scenario Development ........................ . .. .. . ... 13 7.2 Conducting Drills and Exercises ............. ... .. .. ... 14 7.3 Documentation of Drills ..................... . .. .. . ... 17 8.0 Communications....................................... . .. .. . ... 17 9.0 Emergency Response Personnel........................ . .. .. . 17 10.0 Facilities and Equipment............................. . .. .. . ... 18 11.0 Dedicated Emergency Response Vehicle................. .. . . . ..
. ... 18 12.0 Offsite Support Organizations........................ . .. .. . ... 18 13.0 Training............................................. . .. .. . ... 19 13.1 Training for Emergency Planning Staff ....... . .. .. . ... 19
PROCWORK PLAN NO. PROCEDUREIWORK PLAN TITLE: PAGE: 2 of 33 1903.004 ADMIN. & MAINTENANCE OF THE EMERGENCY PLAN &
IMPLEMENTING PROCEDURES CHANGE: 023-01-0 TABLE OF CONTENTS (Cont.)
SECTIONS PAGE NO.
13.2 Offsite Training ........................................... 19 13.3 Training for ANO Emergency Response Organization (ERO)
Members . ................................................... 20 14.0 Attachments and Forms .. 20 14.1 Attachments 14.1.1 Attachment 1, Emergency Plan and Implementing Procedures Review ................................. 22 14.1.2 Attachment 2, Description of Offsite Training .... 23 14.1.3 Attachment 3, "Significant Change" to an Alert and Notification System (ANS) .... ............... 24 14.1.4 Attachment 4, Alert and Notification System (ANS) Monitoring Requirements .25 14.2 Forms 14.2.1 Form 1903.004A - "Emergency Planning Evaluation/Action Request" .26 14.2.2 Form 1903.004C - "Quarterly Emergency Telephone Directory Review" .27 14.2.3 Form 1903.004D - "EAL Bases Document Review" 29 14.2.4 Form 1903.00'._-"EAL State and Local Agreement".. 30 14.2.5 Form 1903.0041 - "Annual Review of ANS Document and.Offsite Plans"............ . 31 14.2.6 Form 1903.004J - "Changes to the ANS Document/Report" .................... 32 14.2.7 Form 1903.004K - "Alert and Notification System Oversight Activity".................... 33
PROCJWORK PLAN NO. PROCEDURE/WORK PLAN TITLE: PAGE: 3 of 33 1903.004 ADMIN. & MAINTENANCE OF THE EMERGENCY PLAN &
IMPLEMENTING PROCEDURES CHANGE: 023-01-0 1.0 PURPOSE The purpose of this procedure is to describe the methods for administration and maintenance of the Emergency Plan and associated procedures and provide guidance for the review of changes as required by 10CFR50.54(q).
2.0 SCOPE 2.1 This procedure describes the responsibilities of the ANO Emergency Planning Staff in regard to the reviews, as required by 10CFR50.54(q),
administration and maintenance of the Emergency Plan and Implementing Procedures.
2.2 This procedure provides guidelines for management of the Emergency Plan and the Emergency Plan Implementing Procedures.
2.3 This procedure provides guidelines for maintenance of emergency facilities and equipment.
2.4 This procedure provides guidelines for the performance and documentation of the Quarterly Emergency Telephone Directory review.
2.5 This procedure outlines audit requirements of the Emergency Planning Program as outlined in 10CFR50.54(t).
2.6 This procedure provides guidelines for drills and-exercises.
3.0 REFERENCES
3.1 REFERENCES
USED IN PROCEDURE PREPARATION 3.1.1 Emergency Plan 3.1.2 10CFR50.54, Conditions of Licenses, 10CFR50.54(q),
IOCFR50.54(t) 3.1.3 10CFR50.47, Emergency Plans 3.1.4 10CFR50, Appendix E, Emergency Planning and Preparedness for Production and Utilization Facilities 3.1.5 NUREG-0654, Rev. 1, "Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants" 3.1.6 1000.006, "Procedure Review, Approval, and Revision Control" 3.1.7 NUREG 0660, "NRC Action Plan Developed as a Result of the TMI-2 Accident" 3.1.8 Memorandum ANO-81-9510 (as amended by the SRC November 16, 1981)
PROCJWORK PLAN NO. PROCEDURE/WORK PLAN TITLE: PAGE: 4 of 33 1903.004 ADMIN. & MAINTENANCE OF THE EMERGENCY PLAN &
IMPLEMENTING PROCEDURES CHANGE: 023-01-0 3.1.9 Nuclear Management Manual Policy LI-102, Corrective Action 11- Process 3.1.10 Nuclear Management Manual Procedure LI-101, 10CFR50.59 Review Program 3.1.11 NRC Inspection. Procedure 71151 3.1.12 Nuclear Management Manual Procedure EP-305, 10CFR50.54(q)
3.2 REFERENCES
USED IN CONJUNCTION WITH THIS PROCEDURE:
3.2.1 1000.150, "Licensing Document Maintenance" 3.2.2 Nuclear Management Manual Procedure LI-101, "10CFR50.59 Review Program" 3.2.3 1903.002, "Assignment of Plant Emergency Team/Group Members" 3.2.4 1903.003, "Assignment of Personnel to the Emergency Response Organization" 3.2.5 1903.010, "Emergency Action Level Classification" 3.2.6 1903.062, "Communications System Operating Procedure" 3.2.7 Nuclear Management Manual Procedure TQ-110, "Emergency Preparedness Training Program" 3.3 RELATED ANO PROCEDURES INCLUDE:
3.3.1 1903 Series Procedures, "Emergency Plan Implementing Procedures" 3.3.2 1904 Series Procedures, "Offsite Dose Projections" 3.3.3 1905 Series Procedures, "Emergency Radiation Protection Procedures" 3.4 REGULATORY CORRESPONDENCE CONTAINING NRC COMMITMENTS WHICH ARE IMPLEMENTED IN THIS PROCEDURE INCLUDE: BOLD] DENOTES COMMITMENTS 3.4.1 OCAN068320 (P-10767) Section 6.1.1H 3.4.2 OCAN048205 (P-10843) Section 11.0 3.4.3 OCAN128211 (P-10861) Section 5.5, Form 1903.004A 3.4.4 OCAN128211 (P-10863) Section 9.1.4 3.4.5 10CFR50. APP E.V. (P-14145), Attachment 1
PROCJWORK PLAN NO. PROCEDURE/WORK PLAN TITLE: PAGE: 5 of 33 1903.004 ADMIN. & MAINTENANCE OFTHE EMERGENCY PLAN &
IMPLEMENTING PROCEDURES CHANGE: 023-01-0 3.4.6 OCAN058203 (P-10833) A method for assuring that an annual review of the EAL's is performed with the State of Arkansas will be established. Section 13.2.2 A 3.4.7 OCAN128211 (P-10860) Emergency Planning Coordinators shall attend, as available, at least one training session concerning emergency preparedness annually. Section 13.1.1 3.4.8 OCAN068320 (P-10769) Plan does not indicate if on-the-spot (coaching) correction of erroneous performance will be made by the drill instructor (controllers). Section 7.2.1.B 3.4.9 OCAN068320 (P-10770) Health Physics drills do not include the analysis of in-plant liquid samples with actual elevated radiation levels on an annual basis. Sections 7.2.3(C, D, E) 3.4.10 OCAN068320 (P-10771) Radiation Monitoring Drills do not include provisions for communications (reporting of results to proper ERO position) and record keeping. Section 7.2.3.C 3.4.11 OCAN068320 (P-10772) Conduct Exercises in accordance with NRC and FEMA rules. Section 7.2.2 3.4.12 OCAN128305 (P-4109) Demonstrating communications and record' keeping capabilities. Section 7.2.3.C 3.4.13 OCAN128305 (P-4175) Annual training of Off-Site Personnel.
Sections 13.2 3.4.14 OCAN098106 (P-4822) Practical training sessions for monitoring team members. Section 7.2.3 3.4.15 OCAN058203 (P-10872) Training for individuals who are assigned responsibility for emergency preparedness is necessary for effective emergency planning. Section 13.1 4.0 DEFINITIONS 4.1 Annual - For the purposes of this procedure, annual is defined as that period between January 1st and December 31st of each year.
4.2 Alert and Notification System.(ANS) - The Alert and Notification System is a mixture of sirens and NOAA tone alert radios (TAR) designed to notify the public in the 10-mile EPZ of recommendations made by the State of Arkansas in accordance with section E of NREG-0654.
4.3 ANS Document/Report - The Alert and Notification System Document/Report is the document that details the design and specifications for the Alert and Notification System which provides early warning to the general public in the 10 mile EPZ. It is a living document that is maintained (IAW 44 CFR 350 Part 14 and FEMA REP 10). It is not a licensed based document for ANO.
PROCJWORK PLAN NO. PROCEDURE/WORK PLAN TITLE: PAGE: 6of33 1903.004 ADMIN. & MAINTENANCE OF THE EMERGENCY PLAN &
IMPLEMENTING PROCEDURES CHANGE: 023-01-0 The ANS Document/Report is maintained by ANO Emergency Planning and reviewed and approved by FEMA as a part of the offsite state emergency plan requirements.
4.4 Drill - An activity aimed at developing, maintaining and testing skills in a particular portion of the Emergency Response Organization where on the spot corrections are made.
4.5 EAL Bases Document - The document that provides the technical bases for initiating conditions used to classify plant related emergencies.
4.6 Emergency Plan - A document required by 10CFR50, Appendix E which outlines the method of compliance with the standards described in IOCFR50.47b and NUREG 0654. Purpose of this document is to control and direct the response of Emergency Response Organizations to a plant emergency condition as directed in the plan.
4.7 Emergency Response Organization (ERO) - The organization which is composed of the IRS, the EOF staff, the TSC staff, the OSC staff, and the Emergency Team members. It has the capability to provide manpower and other resources necessary for immediate and long-term response to an emergency situation.
4.8 Exercise - An activity aimed at testing the integrated capability and a major portion of the basic elements of the Emergency Planning and Response Organizations. An exercise involves a major portion of the Emergency Response Organization and is evaluated by the NRC.
4.9 Implementing Procedures - Emergency plan procedures provide detailed direction for the Emergency Response Organization and implement actions directed by the Emergency Plan.
4.10 Initial Response Staff (IRS) - The emergency organization primarily composed of plant personnel who must be able to augment the onsite plant personnel in accordance with Table B-1 of the ANO Emergency Plan.
4.11 Letter Of Assignment - A memorandum of notification from the General Manager, Plant Operations to an individual which documents the assignment of the individual to an ERO position.
4.12 Letter Of Reinstatement - A memorandum of notification from the General Manager, Plant Operations to a suspended ERO individual which documents the reinstatement of the individual to their previous ERO position upon completion of the procedural training requirements.
4.13 Letter Of Selection - A memorandum of notification from the Manager, Emergency Planning to an individual which documents their selection for a proposed assignment to an ERO position. This letter also informs the individual that Emergency Planning will contact them to arrange the appropriate training.
4.14 Letter Of Suspension - A memorandum of notification from the General Manager, Plant Operations to an ERO individual which documents the
PROCJWORK PLAN NO. PROCEDUREIWORK PLAN TITLE: PAGE: 7 of33 1903.004 ADMIN. & MAINTENANCE OF THE EMERGENCY PLAN &
IMPLEMENTING PROCEDURES CHANGE: 023-01-0 suspension of an assigned individual who failed to meet the procedural training requirements.
4.15 Letter Of Termination - A memorandum of notification from the General Manager, Plant Operations to an ERO individual which documents the permanent termination of the individual from their ERO assignment.
4.16 Offsite E-Plans - Are documents required by 10CFR50, Appendix E which outlines the method of compliance with the standards described in 10CFR50.47b and NUREG 0654. Purposes of the documents are to control and direct personnel to assist ANO in case of ERO activation. For the purpose of this procedure, offsite E-Plans include State as well as County E-Plans.
4.17 Plan Change - A minor change or informal change to the Emergency Plan.
4.18 Plan Revision - The formal revision of the Emergency Plan which may incorporate one or more approved plan changes.
4.19 Position Workbook - A workbook prepared for a specific ERO position.
These workbooks may be used in place of classroom instruction in requalification training.
4.20 Table Top Drill - A training activity designed to develop and maintain an individual's knowledge of their assigned ERO duties. The Table Top Drill will include discussion of ERO member's response to simulated emergencies.
4.21 Training Session - An activity designed to develop or maintain skills.
(This may include classroom training, computer-based training, practical drills or any other type of session, excluding the biennial Emergency Preparedness Exercise, which meets these criteria. Any of these activities may be conducted in one or more segments.)
4.22 Walk-Through - A training activity designed to develop and maintain an individual's knowledge of their assigned ERO duties. The walkthrough is normally conducted in the emergency response facility, and includes discussion or demonstration of the appropriate facility activation, staffing, and organizational responsibilities for the individual's assigned ERO position.
5.0 RESPONSIBILITY AND AUTHORITY 5.1 Director, Nuclear Safety Assurance The Director, Nuclear Safety Assurance is responsible for the overall implementation of the requirements set forth in this procedure.
The Director, Nuclear Safety Assurance is responsible for ensuring that changes which require prior NRC approval are submitted to the NRC and ensuring that periodic 10CFR50.54 submittals are made in accordance with the regulatory requirements.
PROCJWORK PLAN NO. PROCEDURE/WORK PLAN TITLE: PAGE: 8of33 1903.004 ADMIN. & MAINTENANCE OF THE EMERGENCY PLAN &
IMPLEMENTING PROCEDURES CHANGE: 023-01-0 5.2 Manager, Emergency Planning The Manager, Emergency Planning shall be responsible for:
- The maintenance of ANO Emergency Preparedness.
- Responsible for implementing the requirements set forth in this procedure.
- IOCFR50.54(q) and NUREG-0654 reviews of changes to the Emergency Plan
- Evaluation of drill/exercise results
- Identifying the training requirements for personnel assigned to the Emergency Response Organization.
- Distributing revisions to the Emergency Plan or implementing procedures to the NRC within 30 days of their implementation, as specified in 10CFR50.54(q) and 10CFR50, Appendix E.
- Ensure that decisions from the monthly State meetings that impact the Emergency Plan or ANS Document/Report are incorporated into procedure/document/Report.
5.3 Emergency Planner The Emergency Planner shall perform:
- Those tasks assigned by this procedure
- Shall coordinate activities to assure consistency between the Emergency Plan and Implementing Procedures.
- Assure that the administrative program elements are addressed
- Schedule initial training and re-qualification training
- Collect and forward to the ANO records management system appropriate training documentation and for providing training to personnel in the Emergency Response Organization.
- The Emergency Planner(s) shall coordinate and issue changes to the Emergency Plan and the Emergency Plan Implementing Procedures.
- The Emergency Planner(s) are responsible for preparing the 10CFR50.54 evaluation by researching appropriate reference material and documenting the answers to the questions on the appropriate review form.
- The Emergency Planner(s) shall coordinate and issue changes to the ANS Document/Report as necessary.
5.4 Revisions to the Emergency Plan and Implementing Procedures shall be approved in accordance with Sections 6.2 and 6.3 of this procedure.
(P-10861) 5.5 [Suggestions for improvement of the Emergency Plan and Implementing Procedures may be made at any time by the plant staff using Form 1903.004A.]
6.0 INSTRUCTIONS 6.1 Review and Updating of the Emergency Plan and Implementing Procedures
PROCJWORK PLAN NO. PROCEDURE/WORK PLAN TITLE: PAGE: 9 of 33 1903.004 ADMIN. & MAINTENANCE OF THE EMERGENCY PLAN &
IMPLEMENTING PROCEDURES CHANGE: 023-01-0 6.1.1 The review and updating of the Emergency Plan and Implementing Procedures shall include the following actions by the Emergency Planning Manager or designee:
A. Provide for continuing review of the Emergency Plan and Implementing Procedures concerning ANO response.
B. Notify affected site departments of Plan and Procedure changes.
C. Notify affected site based ERO members of Plan and Procedures changes, as necessary.
D. Process requests for improvements submitted on Form 1903.004A.
E. Annually, review the Plan and Procedures in their entirety to verify that changes that have occurred which impact the Plan and/or procedures have been incorporated.
F. At the conclusion of drills and/or exercises involving site ERO members, or at the conclusion of an incident which required implementation of the Plan, provide for a critique and evaluation by participants and revise the Plan and Procedures where appropriate.
G. Evaluate feedback from Emergency Plan Training (including feedback from class critiques) and incorporate changes and improvements into the Emergency Plan and Procedures as necessary.
(P-10767) [H. Quarterly, ensure that the Emergency Telephone Directory is complete and current for emergency response personnel and that related sections of Procedures 1903.010 correspond to the Emergency Telephone Directory. Document the review on Form 1903.004C.]
I. Coordinate approval of the Emergency Plan changes in accordance with Section 6.2 of this procedure.
J. Coordinate approval of the Emergency Plan Implementing Procedure changes in accordance with Section 6.4 of this procedure.
K. Respond to QA/INPO audits and NRC inspections of emergency planning activities.
L. Ensure that the Emergency Response Duty Roster and guidelines are updated and distributed annually.
PROCJWORK PLAN NO. PROCEDUREIWORK PLAN TITLE: PAGE: 10 of 33 1903.004 ADMIN. & MAINTENANCE OF THE EMERGENCY PLAN &
IMPLEMENTING PROCEDURES CHANGE: 023-01-0 M. Annually, review the ANS Document/Report, State and County E-Plans to verify that changes that have occurred which impact the Plan and/or procedures have been incorporated, Form 1903.004I.
6.2 Emergency Plan Revisions/Changes 6.2.1 Plan changes may be requested by any person within Entergy, State, Local, or Federal Emergency Response Agencies (e.g.
Nuclear Regulatory Commission) by notifying the Manager,.
Emergency Preparedness at the applicable site.
6.2.2 Before initiating revisions to the Emergency Plan, an evaluation is conducted of proposed changes to ensure compliance with the requirements of 10CFR50. The evaluation is documented on Form EP-305, "10CFR50.54(q)
Evaluation," (Nuclear Management Manual, Emergency Preparedness).
6.2.3 Before initiating revisions to the Emergency Plan; areview of the ANS document/Report and State and County E-Plans shall be performed. Proposed changes that impact the State and County E-Plans should be discussed with State officials for concurrence and to allow update of offsite plan.
6.2.4 Revisions to the Emergency Plan may be made without prior NRC approval provided that:
A. There is no decrease in the effectiveness of the Emergency Plan, B. The Emergency Plan continues to meet the requirements of 10CFR50.
6.2.5 Proposed changes that decrease the effectiveness of the approved Emergency Plan shall not be implemented without prior NRC approval.
6.3 Approval of Emergency Plan Revisions/Changes (as shown in Attachment
- 1) shall be provided as follows:
6.3.1 Revisions to the Emergency Plan shall be coordinated by the Emergency Planner(s).
6.3.2 The Emergency Planner(s) shall perform an independent review of the Emergency Plan revision.
6.3.3 The Emergency Planner(s) shall perform a 50.54(q) review for all Emergency Plan revisions (EP-305).
6.3.4 The Emergency Plan revision approval process will be conducted in accordance with Licensing Document Maintenance Procedure.
6.3.5 The Emergency Plan revision shall be reviewed with the State prior to implementation.
PROCJWORK PLAN NO. PROCEDUREMWORK PLAN TiTLE: PAGE: 11 of 33 1903.004 ADMIN. & MAINTENANCE OF THE EMERGENCY PLAN &
IMPLEMENTING PROCEDURES CHANGE: 023-01-0 6.3.6 The approved plan revision shall be distributed in accordance with established document control procedures.
6.3.7 A record of each change to the Emergency Plan made without prior approval by the NRC, shall be retained for three*
years from the date of the change.
6.3.8 The Emergency Plan and records of any changes to the Emergency Plan that decrease the effectiveness of the Plan, shall be retained until the NRC terminates the license for both ANO units.
6.3.9 The Emergency Planning Program, as described and implemented by the ANO Emergency Plan and. Implementing Procedures shall be audited once per 12 months by persons who have no direct responsibility for implementation of the Emergency Planning Program.
6.4 Approval of Emergency Plan Implementing Procedure Revisions/Changes shall be provided as follows:
6.4.1. Revisions/Changes to the Emergency Plan Implementing Procedures shall be coordinated by the Emergency Planner(s).
6.4.2 The Emergency Planner(s) may perform an independent review of the Emergency Plan Implementing Procedure, revision/change.
6.4.3 Revisions/Changes to Procedure 1903.010, "Emergency Action Level Classification", shall be independently reviewed by the Unit One and/or Unit Two Operations Manager.
6.4.4 The Emergency Planner(s) shall perform a 50.54(q) review for any of the following:
A. Revisions/Changes to the Emergency Action Levels (EALs) contained in Procedure 1903.010, "Emergency Action Level Classification" B. Revisions/Changes to any implementing procedure that affects the Emergency Plan or procedure 1903.010, "Emergency Action Level Classification".
6.4.5 The Emergency Planner(s) shall review any revisions/changes to Procedure 1903.010, "Emergency Action Levels" with the State and local government authorities prior to approval.
6.4.6 The Emergency Plan Implementing Procedures revision/change approval process will follow the requirements of Procedure 1000.006, "Procedure Control".
6.4.7 The approved procedure revision/change shall be distributed in accordance with established document control procedures.
PROCJWORK PLAN NO. PROCEDUREIWORK PLAN TITLE: PAGE: 12 of 33 1903.004 ADMIN. & MAINTENANCE OF THE EMERGENCY PLAN &
IMPLEMENTING PROCEDURES CHANGE: 023-01-0 6.5 Review and Revision of the EAL Bases Document 6.5.1 The review and revision of the EAL Bases Document will be coordinated by Emergency Planning.
6.5.2 The following directors/managers shall ensure that proposed changes to the document are reviewed for technical accuracy and/or applicability as emergency classification criteria.
A. Operations Managers B. Director, Design Engineering C. Superintendent, Radiation Protection and Chemistry D. Director, Nuclear Safety Assurance 6.5.3 Reviews will be documented on Form 1903.004D. Procedure revisions resulting from changes to the EAL Bases Document will be reviewed and approved as described in Section 6.3.
6.6 Review of Transmittals to NRC 6.6.1 All correspondence to the Nuclear Regulatory Commission that originates in the Emergency Planning Section shall be submitted to Licensing for review prior to transmittal to the Nuclear Regulatory Commission.
6.7 Review and Updating the ANS Document/Report 6.7.1 The ANS Document/Report shall be maintained as a living document AW 44 CFR 350 Part 14b and FEMA REP 10.
6.7.2 For any planned changes to ANS equipment/processes which will cause the ANS Document/Report to be changed the, Arkansas Department of Health Nuclear Planning and Response Program shall be notified.
6.7.3 FEMA Region VI shall be notified via email (if expeditious approval is required) and/or by formal letter of any planned changes.
6.7.4 Significant changes.(see Attachment 3 for examples), as described in 44 CFR 350, will require a revision to the document and be submitted to FEMA Region VI for review and approval prior to the actual change. This level of change may require an independent Quality Assurance engineering review (normally paid for by FEMA) and may require additional verification measures as described in FEMA REP 10 to validate the change effectiveness. This determination is made by FEMA.
PROCJWORK PLAN NO. PROCEDURE/WORK PLAN TITLE: PAGE: 13 of 33 1903.004 ADMIN. & MAINTENANCE OF THE EMERGENCY PLAN &
IMPLEMENTING PROCEDURES CHANGE: 023-01-0 6.7.5 Minor changes (telephone number changes, typo corrections etc.) shall be submitted to FEMA.Region VI, but do not require the level of evaluation mentioned above.
6.7.6 In conjunction with the Evacuation Time Estimate (which is normally performed after decennial Census data is available), review the demographics of the EPZ to determine if the effectiveness of the ANS has been reduced and if changes to the ANS are required.
Examples of situations that may warrant a demographic review of the EPZ at times other than the Evacuation Time Estimate.
update include: Major roadway changes, addition of major subdivisions, addition of major industries or employment centers, etc.
6.7.7 Use 1903.004J to document changes to ANS Document/Report.
7.0 DRILLS AND EXERCISES 7.1 Scenario Development 7.1.1 The Emergency Planner(s) shall coordinate to develop scenarios for emergency preparedness drills and the biennial emergency preparedness exercise in accordance with the Emergency Plan.
7.1.2 The Emergency Planner(s) shall:
A. Submit a copy of the biennial emergency preparedness exercise scenario manual to the NRC regional office approximately 30 days prior to the exercise date in accordance with NRC Inspection Procedure 71151.
B. Submit a copy of the drill scenario to the NRC Resident Inspector approximately 14 days prior to the drill date.
C. Publish a schedule of emergency preparedness drills for the upcoming year during the last quarter of the current year.
D. Schedule a critique at the conclusion of each exercise/drill to evaluate the ability of the members of the ERO to respond as required by the Emergency Plan and Implementing Procedures.
E. Submit documentation of each emergency preparedness practice drill/exercise to ANO Records Management System. This documentation as a minimum shall include the following:
- 1. Narrative Summary
PROCJWORK PLAN NO. PROCEDUREIWORK PLAN TITLE: PAGE: 14 of 33 1903.004 ADMIN. & MAINTENANCE OF THE EMERGENCY PLAN &
IMPLEMENTING PROCEDURES CHANGE: 023-01-0
- 2. Objectives
- 3. Attendance roster (maintained in training database)
- 4. Corrective Actions (maintained in corrective actions database as CRs and WTs)
- 5. Emergency Planning should maintain a master copy
-of each full scale drill or exercise scenario.
F. Provide the Vice President, Operations - ANO with a report of findings and recommended corrective actions, resulting from.the exercise critiques.
7.2 Conducting Drills and Exercises 7.2.1 Drills and Exercises should be conducted in the following manner:
A. A scenario shall be prepared prior to the drill or exercise. The scenario should be as realistic as possible and should include the following items:
- 1. Objective(s)
- 2. Participating organizations
- 3. Chronology of events
- 4. A time schedule of real and simulated initiating events
- 5. A narrative summary describing the simulated events and the appropriate responses and actions
- 6. Arrangements for drill controllers and evaluators (P-10769) B. Evaluators shall be assigned to view and critique the drill or exercise. [The evaluators shall make on-the-spot corrections of any erroneous performance identified (drills only).] Their critique shall be conducted as soon as practical after the drill or exercise.
C. A review/evaluation should result from the exercise and drill critique. The review should include an evaluation of any weaknesses identified and recommended corrective actions.
D. Appropriate action shall be taken to make improvements, as necessary.
PROCJWORK PLAN NO. PROCEDURE/WORK PLAN TITLE: PAGE: 15 of 33 1903.004 ADMIN. & MAINTENANCE OF THE EMERGENCY PLAN &
IMPLEMENTING PROCEDURES CHANGE: 023-01-0 E. Table Top Drills may include any or all of the components recommended in items A-D above. Table Top Drills typically include a scenario-based situation to which ERO personnel can respond, and which provides opportunities for them to interact with other personnel in their Emergency Response Facility. In addition, improper responses can be corrected at the time they are made, and may be evaluated to determine if they are programmatic in nature.
(P-10772) [7.2.2 Exercises At least biennially, local and state agencies shall be invited to participate in an exercise with the ANO staff.
The scenarios for exercises shall be varied such that the major elements of the Emergency Plan and emergency response organizations are tested within a six- (6) year period.
The exercise will attempt to include mobilization of state and local personnel and resources adequate to verify the capability to respond to the accident scenario, as required. Provisions shall be made to start an exercise between 6.p.m. and 4 a.m. once every six- (6) years.]
(P-10872) [7.2.3 Drills The following types of drills shall be conducted (in addition to the biennial exercise) at the indicated frequency:
A. Fire Emergency (Fire Brigade) - Fire Brigade Drills are conducted in accordance with 1063.020, "Fire Brigade Training Program".
B. Medical Emergency (ANNUALLY) - This drill requires activation of the Emergency Medical Team and, if feasible, transportation by the Pope County Emergency Medical Service of a simulated injured individual to the offsite medical treatment facility and activation of the offsite medical treatment facility. The offsite portions of the medical drill may be performed as part of an exercise.
(P-10770,P-10771 (P-4019) C. Radiological Monitoring Drills - Reference NUREG-0654 II.N.d - These drills may be done independently or they may be included in any of the regularly scheduled ERO Drills.
- 1. Environmental Monitoring Drills (ANNUALLY) -
These drills include collecting environmental samples, actual analysis of the samples and documentation of analysis results for water, soil, vegetation and air samples.
PROCJWORK PLAN N
O. PROCEDURE
WORK PLAN TITLE: PAGE: 16 of 33 1903.004 ADMIN. & MAINTENANCE OF THE EMERGENCY PLAN &
IMPLEMENTING PROCEDURES CHANGE: 023-01-0
- 2. In-plant Monitoring Drills (ANNUALLY) - These drills include detection and measurement of simulated inplant radiological conditions. These measurements of simulated elevated radioactive releases are reported to the appropriate person, the results are evaluated and appropriate protective/corrective actions are recommended.]
(P-10770) [D. Health Physics Drills - Reference NUREG-0654 II.N.e -
These drills may be done independently or they may be included in any of the regularly scheduled ERO Drills.
- 1. Field Monitoring Drills (SEMI-ANNUAL) - These drills include assessment of simulated elevated radiological releases to the environment and response to radiological conditions. Direct radiation readings and air samples of a simulated radioactive releases offsite are taken, results are reported to the appropriate ERO position, the results are evaluated and appropriate protective/corrective actions are recommended.
- 2. Post Accident Sampling Drills (ANNUALLY) - These drills include sampling and analysis of inplant liquid with actual elevated radiation levels.
RCS samples may be used as the actual elevated sample. The samples are taken, results are reported to the appropriate ERO position, the results are evaluated and appropriate actions are recommended.]
(P-10770) [E. Radiological Dose Assessment Drill (ANNUALLY) - A radiological dose assessment drill utilizing simulated field monitoring data shall be conducted annually.
The drill may be in conjunction with a health physics drill and will address dose projection calculations and offsite Protective Action Recommendations.
- 1. Dose Assessment activities will be included in the full-scale Emergency Response Organization Drills for the purpose of providing Dose Assessment Team members and Dose Assessment Supervisors with practical applications of Dose Assessment skills. These activities will be in addition to the scheduled exercises.]
F. Communication - Communication drills shall be conducted in the following areas along with the corresponding time frames.
- 1. Monthly - With the state and local governments within the plume exposure pathway emergency planning zone.
PROCJWORK PLAN NO. PROCEDURE/WORK PLAN TITLE: PAGE: 17 of 33 1903.004 ADMIN. & MAINTENANCE OF.THE EMERGENCY PLAN &
IMPLEMENTING PROCEDURES CHANGE: 023-01-0
- 2. Quarterly - With federal emergency response.
organizations and states within the ingestion pathway.
- 3. Annually - Between the nuclear facility, state and local emergency operations centers, and field assessment teams.
G. Emergency Response Organization Drills may be conducted as individual drills or as an integrated part of a larger scope drill-activity. EP shall schedule and conduct Drills to ensure ERO personnel achieve initial qualification and maintain proficiency in accordance with Nuclear Management Manual Procedure TQ-110, "Emergency Preparedness Training Program."
7.3 Documentation of Drills 7.3.1 Documentation for emergency response offsite training (Non-ANO personnel) is maintained by the Arkansas Department of Health's Nuclear Planning and Response Program Office.
7.3.2 Documentation of fire emergency (fire brigade) drills will be in accordance with 1063.020, "Fire Brigade Training Program".
(P-10771, P-4109)
[7.3.3 Documentation for the following drills is the responsibility of the Manager, Emergency Planning. Records of these drills are entered on the ANO Records Management System.
A. Medical Emergency B. [Radiological Monitoring]
C. Semi-annual Health Physics D. Radiological Dose Assessment E. Communications]
8.0 COMMUNICATIONS 8.1 The Emergency Planner(s) shall:
8.1.1 Perform the designated quarterly communications test and phone number verification per Procedure 1903.062, "Communications System Operating Procedure".
8.1.2 Perform the designated monthly test and quarterly phone number verification per Procedure 1903.062, "Communications System Operating Procedure".
PROCJWORK PLAN NO. PROCEDURE/WORK PLAN TITLE: PAGE: 18 of 33 1903.004 ADMIN. & MAINTENANCE OF THE EMERGENCY PLAN &
IMPLEMENTING PROCEDURES CHANGE: 023-01-0 8.1.3 Perform annual communications tests between ANO and the county EOC's.
9.0 EMERGENCY RESPONSE PERSONNEL 9.1 The ANO Emergency Planner(s) shall:
9.1.1 Issue and update letters of assignment, suspension, re-instatement and termination for ERO personnel as required by Procedures 1903.002 and 1903.003.
9.1.2 Determine staffing adequacy when a letter of termination/
suspension is issued.
(P-10863) 9.1.3 [Ensure that the Emergency Telephone Directory and the Computerized Notification System (CNS) data base are updated on a quarterly basis.]
9.1.4 Perform a critique process to identify strengths, weaknesses and improvement items on all emergency classifications and medical emergencies where the Emergency Medical Team has been activated. The results of the critique should then be published and distributed as a training aid for the other team members. The critique process will be similar to the critique process used for Drills and Exercises. This process is described in the ANO Emergency Planning Drill/Exercise Manual.
10.0 FACILITIES AND EQUIPMENT 10.1 The Emergency Planner(s) shall:
10.1.1 Ensure that periodic inventories of the emergency kits located at ANO, the EOF and St. Mary's Hospital are completed per Procedure 1903.060, "Emergency Supplies and Equipment" and that inventories are maintained.
11.0 [DEDICATED EMERGENCY RESPONSE VEHICLE (P-10843) 11.1 A vehicle has been dedicated for use as an ANO emergency response vehicle. This vehicle, a four-wheel-drive Chevrolet Blazer, is normally parked in the parking lot West of discharge canal near the entrance to the Administration Building.
11.2 The offsite monitoring section of the Emergency Radiation Team has priority use of this vehicle to conduct field surveys in the event of a radiological release at ANO.
11.3 Keys for this vehicle are located in the red key box outside of Room 110 of the EOF and in the emergency kit in the OSC.
11.4 In the event that the four-wheel drive vehicle becomes unavailable, the Manager of Emergency Planning will designate another ANO vehicle for emergency response use.]
PROCJWORK PLAN NO. PROCEDURE/WORK PLAN TITLE: PAGE: 19 of 33 1903.004 ADMIN. & MAINTENANCE OF THE EMERGENCY PLAN &
IMPLEMENTING PROCEDURES CHANGE: 023-01-0 12.0 OFFSITE SUPPORT ORGANIZATIONS 12.1 The Manager, Emergency Planning, or his/her designee, shall provide the Nuclear Planning and Response Program with appropriate information involving Emergency Plan and Implementing Procedures revisions.
-12.2 The Manager, Emergency Planning, or his/her designee, shall maintain liaison between ANO and the Arkansas Department of Health and other appropriate support organizations.
12.3 The Manager, Emergency Planning, or his/her designee, shall coordinate to ensure that letters of agreement with offsite support organizations are reviewed every two years and updated if necessary.
12.4 The Manager, Emergency Planning, or his/her designee, shall coordinate the ANS oversight monitoring requirements as described in Attachment 4 and the documentation of all oversight activities on form 1903.004K.
13.0 TRAINING 13.1 Training For Emergency Planning Staff (P-10860) [13.1.1 The Manager, Emergency Planning and Emergency Planners shall attend, as available, at least one annual training session for professional development to enhance emergency planning skills.]
13.1.2 Individuals assigned to a position in the Emergency Response Organization and who also teach Emergency Response Training are allowed attendance credit for classes that they teach. These trainers are not required to take any associated examinations.
(P-4175)
[13.2 Offsite Training 13.2.1 Training for offsite (non-ANO personnel) emergency response personnel is conducted primarily by the Arkansas Department of Health's Nuclear Planning and Response Program staff.
This training is described in Attachment 2, "Description of Offsite Training." The following documentation is kept on file in their office:
A. Attendance Rosters B. Training Course Curriculum 13.2.2 In addition to Attachment 2, offsite emergency response personnel (i.e. local government officials and Arkansas Department of Health officials) should receive the following training:
(P-10833) A. [Annual review of the Emergency Action Levels.]
PROCJWORK PLAN NO. PROCEDURE/WORK PLAN TITLE: PAGE: 20 of 33 1903.004 ADMIN. & MAINTENANCE OF THE EMERGENCY PLAN &
IMPLEMENTING PROCEDURES CHANGE: 023-01-0 B. Annual review of applicable implementing procedures (to include procedures for notification and, where applicable, site access procedures and identification of coordination personnel).]
[13.2.3 The Pope County Emergency Medical Service and London Fire Department will be invited to participate in site specific emergency response training sessions provided by ANO personnel. These training sessions should include:
A. Procedures for notifications B. Basic radiation protection C. Site Access procedures D. Emergency Response functions]
(13.2.4 The following training shall be conducted:
A. Professional medical consultants shall receive training in the treatment of patients that are contaminated and/ or overexposed.
B. London Fire Department personnel shall be invited annually to participate in a fire emergency drill.]
[13.2.5 General Public A. Training of the public on how they should respond in the event of an emergency at ANO is primarily conducted by the state and local governments.
B. ANO shall assist in these efforts by providing information, as agreed upon by ANO, the State and regulators, to the Nuclear Planning and Response Program for dissemination to the population within approximately 10 miles of ANO regarding how they will be notified and what their actions should be in an emergency. This information includes the following:
- 1. Educational information on.radiation,
- 2. Sheltering,
- 3. Evacuation routes, and
- 4. Contact for additional information.]
[13.2.6 News Media A program shall be conducted annually to acquaint the media with the Emergency Plan, information concerning radiation, and points of contact for release of public information in the event of an emergency.]
PROCJWORK PLAN NO. PROCEDURE/WORK PLAN TITLE: PAGE: 21 of 33
-1903.004 ADMIN. & MAINTENANCE OF THE EMERGENCY PLAN &
IMPLEMENTING PROCEDURES CHANGE: 023-01-0 13.3 Training for ANO Emergency Response Organization (ERO) Members The ANO ERO members are trained and qualified in accordance with NMM Procedure TQ-110, "Emergency Preparedness Training Program."
14.0 ATTACHMENTS AND FORMS 14.1 ATTACHMENTS 14.1.1 Attachment 1 - "Emeraencv Plan and Implementing Procedure s.
Review" 14.1.2 Attachment 2 - "Description of Offsite Training" 14.1.3 Attachment 3 - "Significant Change" to an Alert Notification System (ANS)"
14.1.4 Attachment 4 - "Alert and Notification System (ANS) Monitoring Requirements" 14.2 FORMS 14.2.1 Form 1903.004A - "Emergency Planning Evaluation/Action Request" 14.2.2 Form 1903.004C - "Quarterly Emergency Telephone Directory Review" 14.2.3 Form 1903.004D - EAL Bases Document Review" 14.2.4 Form 1903.004G -"EAL State and Local Agreement" 14.2.5 Form 1903.0041 - "Annual Review of ANS Document and Offsite Plans" 14.2.6 Form 1903.004J - "Changes to the ANS Document/Report" 14.2.7 Form 1903.004K - "Alert and Notification System Oversight Activity
PROCJWORK PLAN NO. PROCEDURE)WORK PLAN TITLE: PAGE: 22 of 33 1903.004 ADMIN. & MAINTENANCE OF THE EMERGENCY PLAN &
IMPLEMENTING PROCEDURES CHANGE: 023-01-0 ATTACHMENT (P-14145 Complete Attachment)
EMERGENCY PLAN AND IMPLEMENTING PROCEDURES REVIEW Emergency Plan and/
or Procedure Revision!
Change Originated I
Perform draft of proposed changes Perfrom a 10CFR50.59 Determination in accordance with Corporate Procedure LI-102 Other Implementing Procedure NO t sn 1903 .010
^ a< 1903.010 or other Plan Requires approval In Requires State and Requires reviews and accordance with local government
_ approval in accordance procedure 1000.150, review prior to with procedure
'Licensing Document approval. Form 1000.006 Maintenance 1903.004G Yes checke NO
< either step 2A or 213?
Yes Approved Revision/
Change Perform a 10CFR50.54(q) NRC Approval required Evaluation. Procedure prior to change EP-305 Doe~~sed Emergency Plan Revisions/Changes rehngeredce Re will be submitted to the NRC within 30 days in accordance with 10CFR50.4 Yes
PROCJWORK PLAN N
O. PROCEDURE
IWORK PLAN TITLE: PAGE: 23 of 33 1903.004 ADMIN. & MAINTENANCE OF THE EMERGENCY PLAN &
IMPLEMENTING PROCEDURES CHANGE: 023-01-0 ATTACHMENT 2 DESCRIPTION OF.OFFSITE TRAINING Radiological Monitoring Course - The Radiological Monitoring Course conducted in support of the offsite radiological emergency response plans is a modified version of the standard 12-hour FEMA approved Radiological Monitoring Course. Three additional hours were added to include subject matter pertaining to the radiological emergency response plans, emergency response, environmental surveillance, public information, care centers and hot-line procedures. The course is presented primarily to law enforcement, fire departments and volunteer groups.
Management of Persons Contaminated with Radioactive Material - This training course is approximately 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> in duration and is presented to the hospital emergency room staff members and ambulance services who may have a direct support.function in the event of an incident at Arkansas Nuclear One. The course includes information concerning emergency response plans, warning system, basic concepts of radiation protection, nuclear radiation, contamination vs. exposure, units and standards, nuclear power plants, personnel dosimetry, radiological detection equipment, dress out techniques, hot-line procedures, decontamination procedures, disposal of contaminated material and emergency handling of radiation accident cases.
Radiological Monitoring (Refresher Training) - The refresher training program is a four (4) hour training program. The program is a review of the Radiological Monitoring Course program with emphasis on radiological detection equipment and area and personnel monitoring.
Management of Persons Contaminated with Radioactive Material (Refresher Training) -
The refresher training program is a four (4) hour training program. The program is a review of the 16-hour program with emphasis on changes to emergency response plans, radiological detection equipment, hot-line procedures and decontamination procedures.
School Presentations - A video presentation is made for the purpose of showing students what they should do in the event of an emergency evacuation.
Congregate Lodging Facilities: (Care Center) the Congregate Lodging Facility Training Program is eight (8) hours in duration and is presented to the Care Center Managers and Staff. The course includes information concerning the establishment and operations of a lodging facility for potential evacuees around ANO. The standard American Red Cross material plus FEMA approved material is used in the conduct of this course. In addition to the congregate lodging facility management procedures additional information concerning radiation, decontamination and hot line procedures are included.
Informational Programs on the Nuclear Planning and Response Program (NP&RP) - The length of program is adjusted according to the needs of the audience. The program is designed to inform the public on the off-site activities of NP&RP. Includes information on the emergency plans, warning systems, environmental surveillance,
PROCJWORK PLAN NO. PROCEDUREfWORK PLAN TITLE: PAGE: 24 of 33 1903.004 ADMIN. & MAINTENANCE OF THE EMERGENCY PLAN &
IMPLEMENTING PROCEDURES CHANGE: 023-01-0 ATTACHMENT 3 "Significant Change" to an Alert and Notification System (ANS)
FEMA Rule 44 CFR 350 establishes the policy and procedures for review and approval by FEMA of state and local emergency plans and preparedness for offsite effects of a radiological emergency that may occur at a commercial nuclear power facility. 44 CFR 350.5 requires that "the means to provide early notification to the populace.
within the plume exposure pathway Emergency Planning Zone (EPZ) have been established." In accordance with 44 CFR 350.14, a "significant change" involves any change to State and local plans and preparedness that may affect its adequacy to protect public health and safety and must be processed and reviewed in the same manner as an initial plan submission.
As it relates to an ANS system, a "significant change" includes:
- A change in EPZ boundaries requiring the addition of new alerting devices or changes the number of local governments that must be involved in alert and notification.
- Substituting one form of alerting for another (e.g., sirens for special alerting devices).
- Addition to or upgrading of alerting devices based on evidence of inadequate ANS system coverage.
- A change to maintenance methods that is not addressed in the design report.
- A change to testing methods that is not addressed in the design report.
- A loss of administrative control of special alerting devices that brings into question whether affected populations(s) can be notified ina timely manner.
- A change in siren locations and/or ratings not explicitly considered as acceptable by the FEMA technical evaluation.
- A change to the siren control system that is not addressed in the design report.
- Any change that-can reasonably be expected to reduce siren sound coverage.
Such changes include:
o Degradation in sirens output below that assumed in the design report due to design due to installation or maintenance practices; o Substitution using a siren with a lower sound rating; o Substitution using directional siren for an omni-directional siren; o Increasing the siren operating frequency; o Siren control system design, configuration control or software quality assurance problems identified during system operation and maintenance that can be reasonably expected to cause more that 10t of the sirens not being actuated in an actual emergency unless the ANS system is modified; or o Addition of-buildings or man-made changes in topographical features that can be reasonably expected to result in "shadowing" of sound from nearby siren(s) not previously accounted for.
- Any other item that brings into question the ability of the ANS system to perform in the way it was described in the Design Report. This can be based on NRC inspection findings or significance determination, emergency exercise results, telephone survey results or the FEMA Regional Assistance Committee (RAC) chair judgment.
PROCJWORK PLAN N
O. PROCEDURE
AWORK PLAN TITLE: PAGE: 25 of 33 1903.004 ADMIN. & MAINTENANCE OF THE EMERGENCY PLAN &
IMPLEMENTING PROCEDURES CHANGE: 023-01-0 Attachment 4 Alert and Notification System (ANS)
Monitoring Requirements This attachment provides the instructions for monitoring various activities related to the ANS that are performed by the Arkansas Department of Health (ADH) Nuclear Planning and Response Program (NP&RP).
A. At least once per calendar year, Emergency Planning will review each of the following activities.
The results of these reviews are documented on Form 1903.004K, "Alert and Notification System Oversight Activity".
- 1. Administration of the NOAA radio distribution and activation process
- Review ADH activation records
- Ensure monthly new resident report is generated and transmitted to ADH
- Ensure monthly new resident letters are being sent to residents
- Monitor execution of the siren test procedure
- Perform independent verification of siren activation and compare to independent contractor reports of verification
- 4. Review siren maintenance records.
B. At least once per calendar year, Emergency Planning will review the administration of the Alert and Notification System against.the requirements of NRC Inspection Module 71114.02, "Alert and Notification System Testing."
This review is also documented on Form 1903.004K, "Alert and Notification System Oversight Activity."
Page 26 of 33
[P-10861 Complete Form]
CR/WT NO:____ _
Entered By:
INSTRUCTIONS: Initiator should complete.steps 1-4, then forward to Emergency Planning.
Emergency Planning Evaluation/Action Request
- 1. Date
- 2. Description Of Problem/Improvement (Be specific; use additional pages if necessary.)
- 3. Written By 4. Department
- 5. Reviewed By Emergency Planning 6. Recommend Action: O YES NO
- 7. If "NO" is checked in step 6, state reason:
- 8. Action Assigned To: _9. Due Date:
- 10. Action Taken
- 11. Action Complete By: Date:
FORM TITLE: FORM NO. ICHANGE
[EMERGENCY PLANNING EVALUATION/ACTION REQUEST] 1903.004A 023-01-0
Page 27 of 33 Page 1 of 2
- 1. ERO Positions Check A. Assigned individuals are listed correctly B. Assigned telephone, pager and radio numbers correct
- 2. ERO Personnel A. Assigned personnel are listed correctly.
B. Assigned telephone and pager numbers correct
- 3. Emergency Response Centers A. Assigned telephone numbers are correct
- 4. Emergency Teams/Groups A. Assigned members are listed correctly B. Telephone numbers are correct
- 5. Technical Assistants/Communicators/EAL Reviewers A. Assigned members are listed correctly B. Telephone numbers are correct
- 6. Federal Contacts A. Federal Contact listing is complete B. Telephone numbers are correct
- 7. Industry Contacts A. Industrial Contact listing is complete B. Telephone numbers are correct
- 8. State and Local contacts A. Applicable agencies are listed B. Telephone numbers are correct
- 9. TOCC Phone Directory A. TOCC-Telephone numbers are listed correctly FORM TITLE: FORM NO. CHANGE QUARTERLY EMERGENCY TELEPHONE DIRECTORY REVIEW 1903.004C 023-01-0
Page 28 of 33 Page 2 of 2
- 10. Pager Assignments Check A. Assigned individuals are listed correctly B. Pager number assignments are correct
- 11. Entergy Corporation Contacts A. Assigned individual listing is correct B. Telephone numbers are correct
- 12. Procedure Verification A. Related sections of Procedures 1903.011 correspond to the _
Emergency Telephone Directory Listing.
- 13. The entries in the Computerized Notification System (CNS) database.
have been compared to those in the Emergency Telephone Directory and changes made as necessary.
Comments:
Performed by Date Reviewed by Date FORM TITLE: FORM NO. CHANGE QUARTERLY EMERGENCY TELEPHONE DIRECTORY REVIEW 1903.004C 023-01-0
Page 29 of 33 This document provides technical bases which explain the ANO Emergency Action Level criteria.found in Procedure 1903.010, "Emergency Action Level Classification". This document is intended for use as a writers guide for procedure 1903.010, a resource for training program development, as a self-study guide, and as a reference for use in audits and inspections.
The following individuals (or their designee's) have reviewed proposed changes.
to revision of this document for technical accuracy and applicability as emergency classification criteria.
Manager, Operations Unit One /
Signature Date Manager, Operations Unit Two /
Signature Date Director, Design Engineering *S Signature Date-
-Superintendent, Rad Protection & Chemistry Signature Date Director, Nuclear Safety Assurance Signature Date FORM TITLE: FORM NO. CHANGE EAL BASES DOCUMENT REVIEW 1903.004D 023-01-0
Page 30 of 33 The following individuals (or their designee's) have reviewed the changes to procedure 1903.010, "Emergency Action Levels".
1903.010 Rev.#
Ark. State Dept. of Health (NP&RP):
DATE Conway County DATE Johnson Count y:
DATE Logan County:
DATE Pope County:
DATE Yell County:
DATE FORM TITLE: FORM NO. CHANGE EAL STATE AND LOCAL AGREEMENT 1903.004G 023-01-0
Page 31 of 33 Annual Review of ANS Document/Report and Offsite Plans Document REV or date last Signature Date approved ANS Document/Report State E-Plan Conway County E-Plan Johnson County E-Plan Pope County E-Plan Logan County E-Plan Yell County E-Plan l FORM TITLE: FORM NO. CHANGE ANNUAL REVIEW OF ANS DOCUMENT/REPORT AND OFFSITE PLANS 1903.0041 023-01-0 l
Page 32 of 33 Changes to the ANS Document/Report
Date Completed Signature
Date Completed Signature
Date Completed Signature
- 4. FEMA notifies the state of the approval or changes necessary.
Date Completed Signature
- 5. Once FEMA approval is granted, ANO EP transmits.a copy of the ANS Document/Report and FEMA approval to the NRC.
Date Completed -Signature
- 6. All correspondence on the change with FEMA shall be entered into station permanent records along with this form.
Date Completed Signature FORM TITLE: FORM NO. CHANGE Changes to the ANS Document/Report 1903.004J 023-01-0
Page 33 of 33 This form is used to document the performance of oversight activities related to the administration of the Alert and Notification System (ANS) for Arkansas Nuclear One.
Items for review are found in Attachment 4.
Activity observed or reviewed:
Documents reviewed in support of the above activity:
Results of review: (attach additional pages as necessary)
FORM TITLE: _ FORM NO. CHANGE:
I ALERT AND NOTIFICATION SYSTEM OVERSIGHT ACTIVITY 1903.004K 023-01-0