ML030840740
ML030840740 | |
Person / Time | |
---|---|
Site: | Arkansas Nuclear |
Issue date: | 03/13/2003 |
From: | Entergy Operations |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
Download: ML030840740 (60) | |
Text
Arkansas Nuclear One - Administrative Services Document Control Thursday, March 13, 2003 Document Update Notification COPYHOLDER NO: 103 TO: GSB-NRC (EMERGENCY RESPONSE COORD.) - WASHINGTON ADDRESS: OS-DOC CNTRL DESK MAIL STOP OPI 17 WASHINGTON DC 20555-DC DOCUMENTNO: OP-1903.011 TITLE: EMERGENCY RESPONSE/
NOTIFICATIONS CHANGE NO: 027-00-0 ADDITIONAL INFO:
7(- If this box is checked, please sign, date, andreturn within 5 days.
ANO-2 Docket 50-313 Fo~hEl ANO-2 Docket 50-3 68 Signature Date SIGNATURE CONFIRMS UPDATE HAS BEEN MADE RETURN TO:
ATTN: DOCUMENT CONTROL-(N-GSB-67)
ARKANSAS NUCLEAR ONE 1448 SR 333 RUSSELLVILLE, AR 72801 I4-1
ENTERGY OPERATIONS INCORPORATED ARKANSAS NUCLEAR ONE TITLE: Emergency Response/Notifications DOCUMENT NO. CHANGE NO.
1903.011 027-00-0 WORK PLAN EXP. DATE TC EXP. DATE n/a n/a SET # /h SAFETY-RELATED IPTE M 3 IYES TEMP ALT
[INO E]YES ONO LIYES [ONO When you see these TRAPS Get these TOOLS Time Pressure Effective Communication Distractionlinterruption Questioning Attitude Multiple Tasks Placekeeping Overconfidence Self Check Vague or Interpretive Guidance Peer Check First Shift/Last Shift Knowledge Peer Pressure Procedures Change/Off Normal Job Briefing Physical Environment Coaching Mental Stress (Home or Work) Turnover VERIFIED BY DATE TIME FORM TITLE: FORM NO. CHANGE NO.
VERIFICATION COVER SHEET 1000.006A 050-00-0
ENTERGY OPERATIONS INCORPORATED ARKANSAS NUCLEAR ONE Page 1 DOCUMENT NO. CHANGE NO.
TITLE:EMERGENCY RESPONSE/NOTIFICATIONS I 1903.011 027-00-0 AFFECTED UNIT:
0D UNIT 1 0 UNIT 2 I PROCEDURE
- E WORK PLAN, Li ELECTRONIC UDLUM'N I EXP. DATE n/a i
IS
%/ r3al A-rrn YES ,[ NO
)
TYPE OF CHANGE: El DELETION
[1 NEW PC TC La ED REVISION El EZ EXP. DATE: n DOES THIS DOCUMENT: El YES El NO
- 1. Supersede or replace another procedure?
(If YES, complete 1000 006B for deleted procedure ) (0CAN058107) DYES 0NO
- 2. Alter or delete an existing regulatory commitment?
(If YES, coordinate with Licensing before implementing ) (0CNA128509)(0CAN049803) OYES EINO
- 3. Require a 50.59 review per LI-101? (See also 1000.006, Attachment 15)
(If 50 59 evaluation, OSRC review required.) DYES ONO
- 4. Cause the MTCL to be untrue? (See Step 8.5 for details)
OCAN049803)
(If YES, complete 1000 009A) (1CAN108904, 0CAN099001, OCNA128509, D YES ED NO
- 5. Create an Intent Change?
(If YES, Standard Approval Process required) DYES ONO 6 Implement or change IPTE requirements?
(If YES, complete 1000.143A. OSRC review required) DYES ONO
- 7. Implement or change a Temporary Alteration?
(If YES, then OSRC review required )
El YES 0] NO Was the Master Electronic File used as the source document?
PPROVAL PROCESS; INTERIM APPROVAL PROCESS STANDARD A nclu esreviewofAtt 13) DATE:
ORIGINATOR SIGNATURE: (Includes review of Att. 13) DATE: ORIGIN OR SIGNATURE: //_ 5--40n PHONE #. 4997 Al PHONE#: Prnnt 'n m DuAne Vhie Print and S n name RWER: DATE SUPERVISOR APPROVAL: DATE: IN EPEN
/q DATE:
DATE, ENGINEERIN 7 SRO UNIT ONE:**
DATE:
SRO UNIT TWO:** DATE: QUALITY:
UNIT SURVEILLANCE COORDIN/ TOR (0CNA490) DATE:
Interim approval allowed for non-intent changes requiring no Al1I4?
50.59 evaluation that are stopping work in progress DATE:
SECTIO LEADER Standard Approval required for intent changes or changes L' -j DATE:
requiring a 50 59 evaluation.
QUALITY ASSURANCE.
- If change not required to support work in progress, Department Head must sign DATE OTHER SECTION LEADERS If both units are affected by change, both SRO signatures 14-are required (SRO signature required for safety related DATE procedures only.) THER SECTION LEADERS. I i* DATE.
OTHER SECTION LEADERS., DATE, OTHER SECTION LEADERSI.,
DATE" OSRC C 1TECHNICAL REVIEWER (0CNA04931 ) DATE OTHER SECTION LEADERS, DATE Fl APP OV 'Date OTHER SECTION LEADERS
,/,r DATE OTHER SECTION LEADERS REQUIRED EFFECTIVE DATE* R" FORM TITLE: I FORM NO. CHANGE NO.
I1000.006B 051-00-0 PROCEDURE/WORK PLAN APPROVAL REQUEST
ENTERGY OPERATIONS INCORPORATED ARKANSAS NUCLEAR ONE TITLE:Emergency Response/Notifications DOCUMENT NO. CHANGE NO.
027-00-0 1 1903.011 NPROCEDURE El"WORK PLAN, EXP. DATE n/a PAGE 1 OF 4 El ELECTRONIC DOCUMENT TYPE OF CHANGE:
[I NEW 0l PC El TC El DELETION 0 REVISION El EZ EXP. DATE: n/a AFFECTED SECTION: DESCRIPTION OF CHANGE: (For each change made, include sufficient detail to describe (Include step # if reason for the change.)
applicable)
Table of Contents Deleted Attachments 7, 8 and 10 and Forms Y, Z, BB and CC from the list and made appropriated page number changes Section 3.4 Added a description to each commitment. Corrected the step reference in step 3.4.6 from
".section6.3.2" to "section 6.4.2.B".
Step 4.13 Changed "For purposes related to the Emergency Plan" to "For purposes of offsite notifications to the NRC, State and local governments".
Step 6.3.2 For the most part, Attachment 10 was moved to procedure 1903.01 1-Y & Z. But because step 6.3.2 was similar to the first statement under Courtesy Calls on Attachment 10, I combined these steps in step 6.3.2. The result was that I inserted "the Arkansas Department of Health (ADH)" directly after "A Courtesy Call to".
Step 6.3.3 For the most part, Attachment 10 was moved to procedure 1903.011-Y and Z. But, because step 6.3.3 was very similar to the second statement under Courtesy Calls on attachment 10, I combined these steps In step 6.3.3. The result was that I inserted 'immediately following notification to the ADH but" directly after "Notification to the NRC Operations Center shall be performed".
Section 7.0 Attachments and Forms Deleted the Attachments 7. 8 and 10 and Forms Y, Z, BB and CC from list by inserting "Deleted Rev 027-00-0" or "Deleted Rev 027-00-0 and moved to 1903.01 1-Y" or "Deleted Rev 027-00-0 and moved to 1903.011-Z" and lined through the original text.
Attachment 1 Deleted Forms 1903.011BB and 1903.011CC. These forms have been moved to Procedure 1903.011-Y and 1903.011-Z respectively.
Form 1903.011J Step 3 Divided this step up into 3 sections: Single Unit Emergency, Dual Unit Emergency and Additional Notifications Communicator is Available. This was done to make this step human factored.
Attachment 2 Deleted Forms 1903.011 BB and 1903.011CC. These forms have been moved to Procedure 1903.011-Y and 1903.01 1-Z respectively.
Form 1903.011M Step 3 Divided this step up into 3 sections: Single Unit Emergency, Dual Unit Emergency and Additional Notifications Communicator is Available. This was done to make this step human factored.
FORM NO. CHANGE NO.
FORM TITLE:
DESCRIPTION OF CHANGE 1000.006C 050-00-0
ENTERGY OPERATIONS INCORPORATED ARKANSAS NUCLEAR ONE TITLE:Emergency Response/Notifications DOCUMENT NO. CHANGE NO.
1903.011 027-00-0 NPROCEDURE [-]WORK PLAN, EXP. DATE n/a PAGE 2 OF 4
[] ELECTRONIC DOCUMENT TYPE OF CHANGE:
El NEW El PC [I TC El DELETION Z REVISION (I EZ EXP. DATE: n/a AFFECTED SECTION: DESCRIPTION OF CHANGE: (For each change made, include sufficient detail to describe (Include step # if reason for the change.)
applicable) Deleted Forms 1903.0111BB and 1903.011CC. These forms have been moved to Procedure 1903.011-Y and 1903.011-Z respectively.
Form 1903.011P Step 3 Divided this step up into 3 sections: Single Unit Emergency, Dual Unit Emergency and Additional Notifications Communicator is Available. This was done to make this step human factored.
Form 1903.011P Changed 'Instruct both units Non-Licensed Operators (NLO's)" to "Instruct both units operators Step 11.1 in the field".
Form 1903.011Q Changed "Direct the Communicator to initiate the notifications specified on Form 1903.011BB, Step 3 "Initial Notification Checklist" to "Direct the Communicator to initiate notifications using Procedure 1903.011-Y, "Emergency class Initial Notification Message".
Form 1903.011R Changed "Direct the Communicator to initiate the notifications specified on Form 1903.011 BB, Step 3 "Initial Notification Checklist" to "Direct the Communicator to initiate notifications using Procedure 1903.011-Y, *Emergency class Initial Notification Message". Deleted Attachments 7 and 8. Deleted Forms 1903.011BB and 1903.011CC from this procedure and moved them to Procedure 1903.011-Y and 1903.011-Z respectively.
Form 1903.011S Step 3 Divided this step up into 3 sections: Single Unit Emergency, Dual Unit Emergency and Additional Notifications Communicator is Available. This was done to make this step human factored Form 1903.011S Step 11 Deleted "Non-licensed" and "NLO's" from step Form 1903.01IS Added "Review PAR cnteria every 15 minutes. Notify within 15 minutes the NRC, State and Step 13 local government of PAR changes in accordance with Procedure 1903.011-Y."
Form 1903.011 T Step 3 Changed "Direct the Communicator to initiate the notifications specified on Form 1903.0111BB, "Initial Notification Checklist" to "Direct the Communicator to initiate notifications using Procedure 1903.011-Y, "Emergency class Initial Notification Message".
Form 1903.01 IT Added "Review PAR criteria every 15 minutes. Notify within 15 minutes the NRC, State and Step 12 local government of PAR changes in accordance with Procedure 1903.011 -Y."
I FORM TITLE: FORM NO. CHANGE NO.
DESCRIPTION OF CHANGE 1000.006C 1 050-00-0 DESCRIPTION OF CHANGE
ENTERGY OPERATIONS INCORPORATED ARKANSAS NUCLEAR ONE TITLE:Emergency ResponselNotifications DOCUMENT NO. CHANGE NO.
1903.011 027-00-0 NPROCEDURE L-]WORK PLAN, EXP. DATE n/a PAGE 3 OF 4 El ELECTRONIC DOCUMENT TYPE OF CHANGE:
[I NEW El PC El TC El DELETION 0 REVISION El EZ EXP. DATE: n/a AFFECTED SECTION: DESCRIPTION OF CHANGE: (For each change made, include sufficient detail to describe (Include step # if reason for the change.)
applicable)
Form 1903.011U Changed "Direct the Communicator to initiate the notifications specified on Form 1903.011 BB, Step 3 "Initial Notification Checklist" to "Direct the Communicator to initiate notifications using Procedure 1903.011 -Y, "Emergency class Initial Notification Message".
Form 1903.011U Added "Review PAR criteria every 15 minutes. Notify within 15 minutes the NRC, State and Step 5 local government of PAR changes in accordance with Procedure 1903.01 1-Y."
Form 1903.011Y Deleted form and moved to procedure 1903.011-Y Form 1903.011Z Deleted form and moved to procedure 1903.011-Z Form 1903.011BB Deleted form and moved to procedure 1903.011-Y Form 1903.011 CC Deleted form and moved to procedure 1903.01 1-Z Complete redo of this attachment. Made two sections: 1. Notification via Computerized Notification System (CNS) and 2. Notification with Computerized Notification System (CNS)
Inoperable Deleted cnteria for PAR 2. Deleted reference to PAR 1 (2 mile radius and 5 miles downwind).
Page 1 Changed PAR 2 (5 mile radius and 10 mile downwind) to PAR 1. Changed PAR 3 (radiological PAR) to PAR 2. Added criteria for release outside the 10 mile EPZ and added Action I (instructions to determine protective actions outside 10 mile EPZ). Added instruction to reassess PAR every 15 minutes.
Page 2 Deleted PAR 1 (2 mile radius and 5 mile downwind)
Page 3 Changed PAR 2 to PAR 1. Added note just above step 1. Deleted all criteria for this PAR except GE declared. Changed "evacuate" to "evacuate/shelter" and gave instructions for sheltering (following table). Deleted "Recommend sheltering affected zones which cannot be evacuated prior to plume arnval (if known) and the remainder of the 10 mile EPZ" to "Recommend the remainder of the 10 mile EPZ to go indoors and listen to the emergency broadcast for this event." In table, changed "Evacuate Zones" to "Evacuate/*Shelter Zones" and "Shelter Zones" to "Recommend." Added to step 2 "and EPA Protective Action Guidelines are projected to be exceeded". Changed step 2 from "combine PAR 2 with applicable zones of PAR 3" to "combine PAR 1 with applicable zones of PAR 2". Added all of step 3. Deleted note and step referencing Attachments 7 and 8 FORM TITLE: FORM NO. CHANGE NO.
DESCRIPTION OF CHANGE 1000.006C 050-00-0
ENTERGY OPERATIONS INCORPORATED ARKANSAS NUCLEAR ONE TITLE:Emergency Response/Notifications TDOCUMENT NO.
1903.011 CHANGE NO.
027-00-0 I9PROCEDURE E--WORK PLAN, EXP. DATE n/a PAGE 4 OF 4 E] ELECTRONIC DOCUMENT TYPE OF CHANGE:
[] NEW El PC M] TC E] DELETION 0 REVISION E] EZ EXP. DATE: n/a AFFECTED SECTION: DESCRIPTION OF CHANGE: (For each change made, include sufficient detail to describe (Include step # if reason for the change.)
applicable)
Page 4 Changed PAR 3 to PAR 2 Added note "The State and local governments must be notified within 15 minutes of PAR's or changes to PAR's using Form 1903.011Y" Changed "Evacuate" to 'Evacuate/*Shelter" Changed "And Zones from PAR 1 or PAR 2 (dependent upon plant condition)" to "And Zones from PAR 1" Changed "Shelter" to "Recommend" Changed "Remainder of the 10 mile EPZ" to read "Remainder of 10 mile EPZ to go indoors" Added '*Shelter is normally recommended by the ADH. ANO will only recommend evacuation unless instructed othenrise by offsite agencies" Added "2. Protective Action Recommendations must be reassessed every 15 minutes until downgrade or recovery phase is entered" Added "Action 1"to allow the EOF, State, Federal and local government to begin discussion on Action 1 protection actions outside the 10 mile EPZ.
Attachment 7 & 8 Deleted Attachment 7 and 8 due to deleting the 2 mile radius and 5 mile downwind PAR.
Attachment 10 Deleted this attachment and moved the applicable instructions to Procedure 1903.1 1-Y and 1903.011-Z.
Form 1903.011M Changed "Inform both units' Non-Licensed Operator (NLO's)" to "Inform both units' operator in Step 3.5 the field" FORM TITLE: FORM NO. CHANGE NO.
DESCRIPTION OF CHANGE 1000.006C 050-00-0
PROCJWORK PLAN NO. PROCEDUREIWORK PLAN TITLE: PAGE: 1 of 53 1903.011 EMERGENCY RESPONSEINOTIFICATIONS CHANGE: 027-00-0 TABLE OF CONTENTS Page 1 of 1 SECTIONS PAGE NO.
1.0 Purpose ............................................................. 2 2.0 Scope ............................................................... 2 3.0 References .......................................................... 2 4.0 Definitions ......................................................... 4 5.0 Responsibility And Authority ........................................ 6 6.0 Instructions ........................................................ 7 6.1 Emergency Classification And Notifications ................. 7 6.2 Protective Action Recommendations (PARs) .................... 7 6.3 Courtesy Calls ............................................. 8 6.4 Non-Emergency/Off-Normal Events ............................ 9 6.5 Emergency Response Data System (ERDS) ....................... 10 7.0 Attachments And Forms ............................................... 10 7.1 Attachment 1 - Notification of Unusual Event ............... 12 7.2 Attachment 2 - Alert ....................................... 15 7.3 Attachment 3 - Site Area Emergency .......................... 18 7.4 Attachment 4 - General Emergency ............................ 27 7.5 Attachment 5 - Alternate ERO Notification Scheme ........... 40 7.6 Attachment 6 - Protective Action Recommendations (PAR) for General Emergency .......................................... 41 7.8 Attachment 9 - Computerized Notification System (CNS)
Instructions ............................................... 45 7.9 Attachment 11 - Non-Emergency Notifications of Off-Normal Events ..................................................... 53 7.10 Form 1903.011J - NUE Emergency Direction and Control Checklist ..................... ............................. 13 7.11 Form 1903.011M - Alert Emergency Direction and Control Checklist .................................................. 16 7.12 Form 1903.011P - SAE Emergency Direction and Control Checklist, Shift Manager ................................... 19 7.13 Form 1903.011Q - SAE Emergency Direction and Control Checklist, TSC Director .................................... 23 7.14 Form 1903.011R - SAE Emergency Direction and Control Checklist, EOF Director .................................... 26 7.15 Form 1903.011S - GE Emergency Direction and Control Checklist, Shift Manager ................................... 28 7.16 Form 1903.011T - GE Emergency Direction and Control Checklist, TSC Director .................................... 32 7.17 Form 1903.011U - GE Emergency Direction and Control Checklist, EOF Director .................................... 35 7.18 Form 1903.011AA - Courtesy Call Notification Message ....... 37 7.19 Form 1903.011DD - Courtesy Call Notification Checklist ..... 38 7.20 Electronic Form 1903.011-Y - Emergency Class Initial Notification Message 7.21 Electronic Form 1903.011-Z - Emergency Class Follow-Up Notification Message
PROCJWORK PLAN NO. PROCEDURE/WORK PLAN TITLE: PAGE: 2 of 53 1903.011 EMERGENCY RESPONSE/NOTIFICATIONS CHANGE: 027-00-0 1.0 PURPOSE This procedure establishes required emergency response actions for each of the four Emergency Classes. The required actions described in this procedure are for purposes of notification to offsite authorities and activation/response of appropriate portions of ANO's Emergency Response Organization.
2.0 SCOPE This procedure is applicable to Units 1 and 2 in all modes: It does not include specific plant casualty procedures or systems operations requirements, but rather provides administrative processes only.
This procedure describes actions for events that meet the criteria for Emergency Classes and Courtesy Calls.
3.0 REFERENCES
3.1 REFERENCES
USED IN PROCEDURE PREPARATION:
3.1.1 ANO Emergency Plan 3.1.2 ANO EAL Bases Document 3.1.3 NUREG-0654/FEMA-REP-1, Rev. 1 3.1.4 10 CFR 50 3.1.5 IE Information Notice No. 83-28: Criteria for Protective Action Recommendations for General Emergencies 3.1.6 U.S. NRC, Response Technical Manual (RTM-93) Volume 1 Revision 3.
3.1.7 Memorandum ANO-98-00352,
Subject:
ADH Courtesy Call Agreement.
3.2 REFERENCES
USED IN CONJUNCTION WITH THIS PROCEDURE:
3.2.1 Station Directive A6.202, "Public Communications" 3.2.2 1000.104, "Condition Reporting Operability and Immediate Reportability Determinations" 3.2.3 1015.007, "Fire Brigade Organization and Responsibilities" 3.2.4 1043.042, "Response to Contingency" 3.2.5 1903.010, "Emergency Action Level Classifications" 3.2.6 1903.030, "Evacuation" 3.2.7 1903.042, "Duties of the Emergency Medical Team" 3.2.8 1903.043, "Duties of the Emergency Radiation Team" 3.2.9 1903.064, "Emergency Response Facility - Control Room"
PROCJWORK PLAN NO. PROCEDURE/WORK PLAN TITLE: PAGE: 3 of 53 1903.011 EMERGENCY RESPONSEINOTIFICATIONS CHANGE: 027-00-0 3.2.10 1903.065, "Emergency Response Facility - Technical Support Center (TSC)"
3.2.11 1903.066, "Emergency Response Facility - Operational Support Center (OSC)"
3.2.12 1903.067, "Emergency Response Facility - Emergency Operations Facility" 3.2.13 ANO Security Plan/Security Procedures 3.2.14 1604.015, "Analysis of Unit Vents" 3.2.15 1604.017, "Analysis of Liquid Waste" 3.3 RELATED ANO PROCEDURES:
None 3.4 REGULATORY CORRESPONDENCE CONTAINING NRC COMMITMENTS WHICH ARE IMPLEMENTED IN THIS PROCEDURE INCLUDE: [BOLD] DENOTES COMMITMENTS 3.4.1 0CAN039701 (P-15339) - Require verbatim transmission of information from form 1903.011Y to NRC using ENS & require follow-up fax to NRC after initial ENS notification. Form 1903.011Y steps 6 and 7, 1903.011Z steps 7 and 8.
3.4.2 0CAN068104 (P-10936) - Incorporate all applicable emergency call lists into one notification procedure for the SAA to use during emergencies. Form 1903.011Y steps 4 and 6 and Form 1903.011Z steps 5 and 7.
3.4.3 TELCONDWB91006 (P-1735) - Revise and/or develop procedures to ensure ERDS is activated upon an Alert or higher emergency class. Section 6.5, Form 1903.011Y step 8 and Form 1903.011Z step 6.
3.4.4 0CAN089209 (P-3335) - Revise procedure 1903.011. Provide remedial training and aid instructions to the Emergency Plan manual on the use of CNS. Procedure 1903.011 Attachment 9 3.4.5 0CAN068503 (P-4584) - Include requirement for NRC notification immediately after state notification in Procedure 1903.010 and the Emergency Plan, Rev. 1. Form 1903.011Y note page 4, Form 1903.011Z note page 4.
3.4.6 1CAN047910 (P-7596) - Revise the ANO administrative controls manual and emergency procedure for personnel response. Form 1903.011Y step 4 and Form 19903.011Z step 5.
3.4.7 2CAN047912 (P-7706) - Ensure prompt notification of the NRC. Form 1903.011Y step 6 and 1903.011Z step 7.
3.4.8 0CAN058411 (P-9461) - Procedure 1903.011 will be revised to require an approval signature by an authorized individual.
Form 1903.011Y step 3.
3.4.9 0CAN118307 (P-9875) - EPIP 1903.010 has been revised to clarify the responsibility for making protective action recommendations. Section 6.2
PROC.IWORK PLAN NO. PROCEDURE/WORK PLAN TITLE: PAGE: 4 of 53 1903.011 EMERGENCY RESPONSEINOTIFICATIONS CHANGE: 027-00-0 3.4.10 0CAN068320 (P-10766) - Procedure 1903.032 (currently 1903.011) establishes one individual to make PAR's.
Section 6.2 3.4.11 0CAN128012 (P-10455) - Provide identification of contact positions in the emergency organization and procedures for establishing contact. Procedure 1903.011 Attachment 9.
3.4.12 0CNA108215 (P-10847) - EPIP 1903.010 revised to provide explicit recall instructions. Procedure 1903.011 Attachment 9.
3.4.13 0CAN068320 (P-10758) - EPIP 1903.010 (currently 1903.011) contains follow up message form. Form 1903.011Z.
3.4.14 0CAN059701 (P-15456) - Emergency response/notifications procedure emphasizes the Shift Superintendent (currently Shift Manager) review of the plant evacuation checklist.
Forms 1903.011(J,M,P,S) step 5 and 1903.011Y step 3.
3.4.15 0CAN098206 (P-9466) - Provide adequate assurance of prompt response time under normal circumstances. Form 1903.011Y step 4 and Form 1903.011Z step 5.
3.4.16 ICAN088308 (P-9589) - Revise procedure to delineate responsibilities for report preparation and submittal of unusual events. Procedure 1903.011 Attachment 1.
3.4.17 0CAN108213 (P-10823) - Provide adequate assurance of prompt response time. Form 1903.011Y step 4 and Form 1903.011Z step 5.
4.0 DEFINITIONS 4.1 Alert - Events are in progress or have occurred which involve an actual or potential substantial degradation of the level of safety of the plant. Any releases are expected to be limited to small fractions of the EPA Protective Action Guideline exposure levels.
4.2 Courtesy Call - A notification to the Arkansas Department of Health and follow-up notification to the NRC for conditions/events other than those constituting an Emergency Class as listed in procedure 1903.011, "Emergency Response/Notifications", Section 6.3.
4.3 Emergency Action Level - A plant or onsite condition which has exceeded pre-determined limits which would categorize the situation into one of the following four Emergency Classes:
Notification of Unusual Event Alert Site Area Emergency General Emergency
PROC WORK PLAN NO. PROCEDUREIWORK PLAN TITLE: PAGE: 5 of 53 1903.011 EMERGENCY RESPONSE/NOTIFICATIONS CHANGE: 027-00-0 4.4 Emergency Direction and Control - Overall direction of facility response which must include the non-delegable responsibilities for the decision to notify and to recommend protective actions to Arkansas Department of Health personnel and other authorities responsible for offsite emergency measures. With activation of the EOF, the EOF Director typically assumes the responsibility for Emergency Direction and Control. The management of on-site facility activities to mitigate accident consequences remains with the TSC Director in the Technical Support Center. The Shift Manager retains responsibility for the Control Room and plant systems operation.
4.5 Emergency Operations Facility (EOF) - A near-site emergency response facility located approximately 0.65 miles northeast of the reactor buildings (the ANO Training Center).
4.6 Emergency Planning Zone (EPZ) - The EPZ considered by this procedure is the inhalation zone, that area within approximately a 10-mile radius of ANO.
4.7 Emergency Response Data System (ERDS) - A channel over which the raw reactor parametric data, i.e., SPDS information, is transmitted from the site to the NRC Operations Center (NRCOC). This system is activated from the RDACS terminal located in either Control Room or in the Technical Support Center and should be activated within one hour of an ALERT or higher emergency class declaration.
4.8 Emergency Response Organization (ERO) - The organization which is composed of the Initial Response Staff (IRS), the EOF staff, the TSC staff, the OSC staff, and the Emergency Team members. It has the capability to provide manpower and other resources necessary for immediate and long-term response to an emergency situation.
4.9 Evacuation Routes - Routes used by ANO personnel that may be used to exit the plant site in the event of a plant or exclusion area evacuation, defined as follows:
4.9.1 Evacuation Route 1 - From the main guard station, proceed East along the intake canal to May Road, then North to State Road 333.
4.9.2 Evacuation Route 2 - From the main guard station, proceed West, then North past the cooling tower and then sally port, using the North access road to State Road 333.
4.9.3 Evacuation Route 3 - From the main guard station, proceed West, then continue West along the West access road to Flatwood Road, and continue on Flatwood Road North to State Road 333.
4.10 General Emergency - Events are in progress or have occurred which involve actual or imminent substantial core degradation or melting with the potential for loss of containment integrity. Releases can be reasonably expected to exceed EPA Protective Action Guideline exposure levels off site for more than the immediate site area.
PROC./WORK PLAN NO. PROCEDUREIWORK PLAN TITLE: PAGE: 6 of 53 1903.011 EMERGENCY RESPONSEINOTIFICATIONS CHANGE: 027-00-0 4.11 Initial Response Staff (IRS) - The emergency organization primarily composed of plant personnel which must be able to augment the onsite plant personnel in accordance with Table B-I of the Emergency Plan.
4.12 Offsite - Those areas outside the Exclusion Area boundary.
4.13 Offsite Release - For purposes of offsite notifications to the NRC, State and local governments, an offsite release will be defined as a release due to the event which exceeds the ODCM release limits.
4.14 Onsite - The area within the Exclusion Area Boundary.
4.15 Operational Support Center - Emergency response center within the ANO maintenance facility where support is coordinated for the following functions: Onsite Radiological Monitoring, Maintenance, Nuclear Chemistry, Emergency Medical Support and Fire Fighting Support. The OSC serves as the assembly point and briefing area for recovery/reentry teams and is located in the maintenance facility.
4.16 Notification of Unusual Event - Unusual events are in progress or have occurred which indicate a potential degradation of the level of safety of the plant. No releases of radioactive material requiring offsite response or monitoring are expected unless further degradation of safety systems occurs.
4.17 REAM (Radiological/Environmental Assessment Manager) - Responsible for managing radiological dose assessment and field monitoring activities.
Provides offsite Protective Action Recommendations (PAR) to the EOF Director. Coordinates the ANO offsite radiological monitoring effort with the Arkansas Department of Health (ADH) and the NRC. The EOF HP Supervisor and the Dose Assessment Supervisor report to the REAM.
4.18 Site Area Emergency - Events are in progress or have occurred which involve actual or likely major failures of plant functions needed for protection of the public. Any releases are not expected to exceed EPA Protective Action Guideline exposure levels except near the site boundary.
4.19 Technical Support Center - The location within the ANO Plant Administration Building equipped with instrumentation and communication systems and facilities useful in monitoring the course of an accident.
5.0 RESPONSIBILITY AND AUTHORITY 5.1 SHIFT MANAGER Has responsibility for implementation of response actions described in this procedure until relieved by the Technical Support Center Director or Emergency Operations Facility Director.
5.2 TECHNICAL SUPPORT CENTER DIRECTOR (TSC DIRECTOR)
Upon assumption of responsibility for Emergency Direction and Control the TSC Director is responsible for implementation of the response actions described in this procedure.
PROCJWORK PLAN NO. PROCEDURE/WORK PLAN TITLE: PAGE: 7 of 53 1903.011 EMERGENCY RESPONSEINOTIFICATIONS CHANGE: 027-00-0 5.3 EMERGENCY OPERATIONS FACILITY DIRECTOR (EOF DIRECTOR)
Upon assumption of responsibility for Emergency Direction and Control the Emergency Operations Facility Director is responsible for implementation of the response actions described in this procedure.
5.4 COMMUNICATORS Communicators are responsible for performing emergency response notifications/communications.
5.5 EMERGENCY RESPONSE ORGANIZATION (ERO)
Members of the ERO are responsible to ensure completion of notifications as denoted on Attachment 5, " Alternate ERO Notification Scheme" if the ERO cannot be activated by the Computerized Notification System.
6.0 INSTRUCTIONS 6.1 EMERGENCY CLASSIFICATION AND NOTIFICATIONS 6.1.1 Implement the appropriate sections of this procedure whenever an emergency classification has been declared, escalated, or de-escalated as per 1903.010, "Emergency Action Level Classifications".
A. Notification of Unusual Event, perform the actions as described in Attachment 1.
B. Alert, perform the actions as described in Attachment 2.
C. Site Area Emergency, perform the actions as described in Attachment 3.
D. General Emergency, perform the actions as described in Attachment 4.
6.1.2 At the termination of the event, provide summaries to the Nuclear Regulatory Commission (NRC) and Arkansas Department of Health (ADH). Notify both parties of the event termination using Form 1903.011Y.
6.2 [PROTECTIVE ACTION RECOMMENDATIONS (PARs) 6.2.1 The Shift Manager shall be responsible for issuing PARs to offsite authorities until relieved of Emergency Direction and Control by the TSC Director/EOF Director. The Shift Manager should rely on Nuclear Chemistry for the formulation of PARs based on radiological conditions and the Operations staff for the formulation of PARs based on plant conditions.
PROC.WORK PLAN NO. PROCEDURE/WORK PLAN TITLE: PAGE: 8 of 53 1903.011 EMERGENCY RESPONSE/NOTIFICATIONS CHANGE: 027-00-0 6.2.2 The TSC Director, after assuming Emergency Direction and Control, is responsible for issuing PARs to offsite authorities until relieved by the EOF Director. The TSC Director should rely on the REAM for the formulation of PARs based on radiological conditions and the Operations/TSC staffs for the formulation of PARs based on plant conditions.
6.2.3 The EOF Director, after assuming Emergency Direction and Control, is responsible for issuing PARs to offsite authorities. The EOF Director should rely on the REAM for the formulation of PARs based on radiological conditions and the TSC Director for the formulation of PARs based on plant conditions.]
6.3 COURTESY CALLS 6.3.1 ANO has agreed to notify the STATE OF ARKANSAS for the following non-Emergency Class events:
A. An UNPLANNED release of radioactive material has occurred OR may occur. (Refer to procedures 1604.015 or 1604.017 for definition of "unplanned release".)
B. An UNPLANNED reactor trip from power has occurred.
C. An event has occurred for which a news release is planned (refer to Station Directive A6.202, "Public Communications", Attachment 1). Potential Public Interest events, which will not require a news release, do not require a Courtesy Call (excluding Steps A and B above). The on-call EOF Director and Communications Manager should decide upon the initiation of a news release and inform the Shift Manager.
D. A notification has been made OR will be made to other government agencies for events that have impacted OR will impact the public health and safety.
6.3.2 A Courtesy Call to the Arkansas Department of Health (ADH) should be made as soon as practicable following the event but no later than 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> following the event.
6.3.3 Notification to the NRC Operations Center shall be performed immediately following notification to the ADH but no later than 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> following the event.
6.3.4 Complete Form 1903.011DD, "Courtesy Call Notification Checklist". Proceed to section 6.4 upon completion of checklist.
PROC /WORK PLAN NO. PROCEDURE/WORK PLAN TITLE: PAGE: 9 of 53 1903.011 EMERGENCY RESPONSE/NOTIFICATIONS CHANGE: 027-00-0 6.4 NON-EMERGENCY OFF-NORMAL EVENT NOTIFICATIONS 6.4.1 IF the off-normal event does not require an emergency class declaration, THEN an "Information Only" notification to the following may be warranted:
Designated Entergy Management Representatives NRC Resident Inspector Arkansas Department of Health (in some cases) 6.4.2 A non-emergency off normal event notification should be performed if any of the following conditions exits:
A. A Courtesy Call is required per the above section.
[B. An NRC Reportable Non-Emergency Event has occurred NRC Reportable Non-Emergency Event are events which are reportable in accordance with 10CFR50.72 but which do NOT meet the criteria for emergency class declaration as delineated in Procedure 1903.010, "Emergency Action Level Classification."
The "information only" notification described in this section is supplemental to the immediate notification required by regulations which are determined in accordance with Procedure 1000.104, "Condition Reporting Operability and Immediate Reportability Determinations."]
C. Shift Manager's Discretion Any off-normal event for which the Shift Manager determines that notification to Entergy management representatives and the NRC Resident Inspector is prudent.
Examples for consideration include:
- 1. Bomb threats / security threats
- 2. Unplanned power changes Ž 15%
- 3. Forced plant shutdown
- 4. Entry into Technical Specification 3.0.3
- 5. Unplanned entry into Technical Specification action statements
- 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />
- 6. Exceeding Technical Specification LCO out of service times
- 7. Industrial accidents in RCA resulting in transport by ambulance
- 8. Entry into any AOP except 1203.025 for severe thunderstorm warning 6.4.3 The Shift Engineer (from either unit) should notify the appropriate parties using Attachment 11.
PROCJWORK PLAN NO. PROCEDUREIWORK PLAN TITLE: PAGE: 10 of 53 1903.011 EMERGENCY RESPONSEINOTIFICATIONS CHANGE: 027-00-0
[6.5 EMERGENCY RESPONSE DATA SYSTEM (ERDS) 6.5.1 The ERDS system is activated within one hour of an ALERT or higher emergency class classification. ERDS may be activated using the RDACS computer terminals located in either Control Room or in the Technical Support Center.
A. On the RDACS terminal, exit System Status Screen (F1O).
B. Select option 9 - ERDS subsystem on the Main Menu.
C. To start ERDS on Unit 1, select option 1.
D. To start ERDS on Unit 2, select option 3.
E. When emergency is over, select option 2 to stop ERDS on Unit 1, or select option 4 to stop ERDS on Unit 2.]
7.0 ATTACHMENTS AND FOIRMS 7.1 Attachment 1 - Notification of Unusual Event 7.2 Attachment 2 - Alert 7.3 Attachment 3 - Site Area Emergency 7.4 Attachment 4 - General Emergency 7.5 Attachment 5 - Alternate ERO Notification Scheme 7.6 Attachment 6 - Protective Action Recommendations (PAR) for General Emergency 7.7 Deleted Rev 027-00-0 Attachment 7 GCer Fu*l Damage Ase......nt, Unit i~
7.8 Deleted Rev 027-00-0 Attachment 8 C.r. Fuel Dam.age As....ar.nt, Unit 7.9 Attachment 9 - Computerized Notification System (CNS) Instructions 7.10 Deleted Rev 027-00-0 and moved to 1903.011-Y & Z Attachmcnt 10 Emereenecv Class Netifieaticr. Instruetirens 7.11 Attachment 11 Non-Emergency Notifications of Off-Normal Events 7.12 Form 1903.011J NUE Emergency Direction and Control Checklist 7.13 Form 1903.011M Alert Emergency Direction and Control Checklist 7.14 Form 1903.011P SAE Emergency Direction and Control Checklist, Shift Manager 7.15 Form 1903.011Q SAE Emergency Direction and Control Checklist, TSC Director 7.16 Form 1903.011R - SAE Emergency Direction and Control Checklist, EOF Director
PROC.WORK PLAN NO. PROCEDUREIWORK PLAN TITLE: PAGE: 11 of 53 1903.011 EMERGENCY RESPONSEINOTIFICATIONS CHANGE: 027-00-0 7.17 Form 1903.011S - GE Emergency Direction and Control Checklist, Shift Manager 7.18 Form 1903.011T - GE Emergency Direction and Control Checklist, TSC Director 7.19 Form 1903.011U - GE Emergency Direction and Control Checklist, EOF Director 7.20 Deleted Rev 027-00-0 and moved to Procedure 1903.011-Y -Fermf 1902.011Y Ernoergeney Class !nitool: Notificotior, Message 7.21 Deleted Rev 027-00-0 and moved to Procedure 1903.011-Z -Form 1903.011Z Efnergornoy Glass Follow up Notifleatior. Message 7.22 Form 1903.011AA -Courtesy Call Notification Message 7.23 Deleted Rev 027-00-0 and moved to Procedure 1903.011-Y -Form 1903.011BB lnitiol Netifleatien Cheeklist 7.24 Deleted Rev 027-00-0 and moved to Procedure 1903.011-Z -Form 1903.011CC Follow-up Notificatiorn Checklist 7.25 Form 1903.011DD -Courtesy Call Notification Checklist
PROC.IWORK PLAN NO. PROCEDUREIWORK PLAN TITLE: PAGE: 12 of 53 1903.011 EMERGENCY RESPONSEINOTIFICATIONS CHANGE: 027-00-0
[ATTACHMENT 1 NOTIFICATION OF UNUSUAL EVENT]
Upon declaration of a Notification of Unusual Event, the person with the responsibility for Emergency Direction and Control shall:
"* Complete the Emergency Direction and Control Checklist indicated below. Any steps that are not appropriate for the event may be marked 'Not Applicable' (N/A).
"* Issue appropriate offsite protective action recommendations.
"* Ensure that notifications are completed in accordance with the required time limits.
At the termination of the event, the Shift Manager/TSC Director/EOF Director should forward all forms and other pertinent documents to Emergency Planning.
Forms used for NUE notification and response are as follows:
Form 1903.011J, "NUE Emergency Direction and Control Checklist" Electronic Form 1903.011-Y, "Emergency Class Initial Notification Message" Electronic Form 1903.011-Z, "Emergency Class Follow-up Notification Message"
Page 13 of 53 Page 1 of 2 NUE This form is intended to be used by the person with Emergency Direction and Control when a Notification of Unusual Event has been declared.
Ml. Notification of Unusual Event declared:
Unit Time Date
- EMERGENCY CLASSIFICATION ANNOUNCEMENT SHOULD BE MADE WITHIN 15 MINUTES OF THE DECLARATION**
[]2. EAL No.
Description:
M3. Notification Communicator E]3.1 Single Unit Emergency El. Direct the affected unit SE to activate CNS (if not already performed for an NUE emergency class) in accordance with Attachment 9 of this procedure.
[-]2. Direct the opposite unit SE to perform notifications using Form 1903.011-Y, Emergency Class Initial Notification Message.
E]3.2 Dual Unit Emergency
[]l. Direct the Unit 2 SE to activate CNS (if not already performed for an NUE emergency class) in accordance with Attachment 9 of this procedure.
[]2. Direct the Unit 1 SE to perform notifications using Form 1903.011-Y, Emergency Class Initial Notification Message.
E]3.3 Additional Notification Communicator is Available IF a Notification Communicator is available, THEN request the Notification Communicator to perform notifications in accordance with Form 1903.011-Y, Emergency Class Initial Notification Message.
L13.4 Inform the Control Room staff of the Emergency Class declaration.
L14. Make the following announcement over the plant paging system (dial 197):
"Attention all personnel. Attention all personnel. A Notification of Unusual Event has been declared on Unit (One/Two). All personnel continue normal activities unless instructed otherwise."
[]4.1 Make the above announcement over the EOF Public Address System (dial 199 and pause approximately 15 seconds).
FORM TITLE- FORM NO REV.
NUE EMERGENCY DIRECTION AND CONTROL CHECKLIST 1903.011J 027-00-0
Page 14 of 53 Page 2 of 2 E]5. [IF on-site personnel hazards exist, THEN direct implementation of protective actions as necessary.
n15.1 Refer to Form 1903.030C, "Localized Evaluation Checklist", to determine if a localized evacuation will be performed.]
[:6. IF an approach route to the plant site should be avoided, THEN instruct Security to direct incoming traffic. (Examples of this include security situations in which onsite/offsite personnel are directed to the EOF, radiological releases that prohibit entry to the site via either guard station, etc.)
[]7. Direct Chemistry personnel (Initial Dose Assessor) to implement procedure 1904.002, "Offsite Dose Projection - RDACS Computer Method".
Performed by:
FORM TITLE. FORM NO REV NUE EMERGENCY DIRECTION AND CONTROL CHECKLIST I1903.011J 027-00-0
PROCJWORK PLAN NO. PROCEDURE/WORK PLAN TITLE: PAGE: 15 of 53 1903.011 EMERGENCY RESPONSE/NOTIFICATIONS CHANGE: 027-00-0 ATTACHMENT 2 ALERT Upon declaration of an Alert, the person with the responsibility for Emergency Direction and Control shall:
"* Complete the appropriate Emergency Direction and Control Checklist indicated below. Any steps that are not appropriate for the event may be marked 'Not Applicable' (N/A).
"* Issue appropriate offsite protective action recommendations.
"* Ensure that notifications are completed in accordance with the required time limits.
At the termination of the event, the Shift Manager/TSC Director/EOF Director should forward all forms and other pertinent documents to Emergency Planning.
Forms used for Alert notification and response are as follows:
Form 1903.011M, "Alert Emergency Direction and Control Checklist" Electronic Form 1903.011-Y, "Emergency Class Initial Notification Message" Electronic Form 1903.011-Z, "Emergency Class Follow-up Notification Message"'
Attachment 5, Alternate ERO Notification Scheme
Page 16 of 53 Page 1 of 2 ALERT This form is intended to be used by the person with Emergency Direction and Control when an Alert has been declared.
[El. Alert declared: Unit Time Date
- EMERGENCY CLASSIFICATION ANNOUNCEMENT SHOULD BE MADE WITHIN 15 MINUTES OF THE DECLARATION**
E12. Conditions warranting declaration of an Alert:
EAL No.
Description:
E]3. Notification Communicator r13.1 Single Unit Emergency Ml. Direct affected unit SE to activate CNS (if not already performed for an Alert or higher emergency class) in accordance with Attachment 9 of this procedure.
[]2. Direct the opposite unit SE to perform notifications using Form 1903.011-Y, Emergency Class Initial Notification Message.
[E3.2 Dual Unit Emergency
[]l. Direct the Unit 2 SE to activate CNS (if not already performed for an Alert or higher emergency class) in accordance with Attachment 9 of this procedure.
E]2. Direct the Unit 1 SE to perform notifications using Form 1903.011Y of Form 1903.011-Y, Emergency Class Initial Notification Message.
E]3.3 Additional Notification Communicator is Available E IF a Notification Communicator is available, THEN request the Notification Communicator to perform notifications in accordance with Form 1903.011-Y, Emergency Class Initial Notification Message.
E3.4 Inform the Control Room staff of the Emergency Class declaration.
E3.5 Inform both units' operators in the field to log onto the Emergency RWP.
F14. Make the following announcement over the plant paging system (dial 197):
"Attention all personnel. Attention all personnel. An Alert Emergency Class has been declared on Unit (One/Two). Emergency response personnel report to your designated assembly areas. All other personnel continue normal activities unless instructed otherwise."
E4.1 Make the above announcement over the EOF Public Address System (dial 199 and pause approximately 15 sec.)
FORM TITLE: FORM NO REV ALERT EMERGENCY DIRECTION AND CONTROL CHECKLIST 1903.011M 027-00-0
Page 17 of 53 Page 2 of 2 E]5. [IF on-site personnel hazards exits, THEN direct implementation of protective actions as necessary.
n5.1 Refer to Form 1903.030C, "Localized Evacuation Checklist", to determine if a localized evacuation will be performed.]
E]6. IF an approach route to the plant site should be avoided, THEN instruct Security to direct incoming traffic. (Examples of this include security situations in which onsite/offsite personnel are directed to the EOF, radiological releases that prohibit entry to the site via either guard station, etc.)
F17. Direct Chemistry personnel (Initial Dose Assessor) to the Control Room to implement procedure 1904.002, "Offsite Dose Projection RDACS Computer Method".
Performed by:
FORM TITLE FORM NO REV ALERT EMERGENCY DIRECTION AND CONTROL CHECKLIST 1903.011M 027-00-0 I
PROC.IWORK PLAN NO PROCEDUREJWORK PLAN TITLE: PAGE: 18 of 53 1903.011 EMERGENCY RESPONSE/NOTIFICATIONS CHANGE: 027-00-0 ATTACHMENT 3 SITE AREA EMERGENCY Upon declaration of a Site Area Emergency, the person with the responsibility for Emergency Direction and Control shall:
"* Complete the appropriate Emergency Direction and Control Checklist indicated below for your position (i.e. SM, TSC Director, or EOF Director). Any steps that are not appropriate for the event may be marked 'Not Applicable' (N/A).
"* Issue appropriate offsite protective action recommendations.
"* Ensure that notifications are completed in accordance with the required time limits.
At the termination of the event, the Shift Manager/TSC Director/EOF Director should forward all forms and other pertinent documents to Emergency Planning.
Forms used for Site Area Emergency notification and response are as follows:
Form 1903.011P, "SAE Emergency Direction and Control Checklist, Shift Manager" (Shift Manager Only)
Form 1903.011Q, "SAE Emergency Direction and Control Checklist, TSC Director" (TSC Director Only)
Form 1903.011R, "SAE Emergency Direction and Control Checklist, EOF Director" (EOF Director Only)
Electronic Form 1903.011-Y, "Emergency Class Initial Notification Message" Electronic Form 1903.011-Z, "Emergency Class Follow-up Notification Message" Attachment 5, Alternate ERO Notification Scheme
Page 19 of 53 Page 1 of 4 SAE This form is intended to be used by the SHIFT MANAGER when a Site Area Emergency has been declared and the Shift Manager has the responsibility for Emergency Direction and Control.
E]l. Site Area Emergency declared:
Unit Time Date
"**EMERGENCY CLASSIFICATION / PLANT EVACUATION ANNOUNCEMENT SHOULD BE MADE WITHIN 15 MINUTES OF THE DECLARATION**
E]2. EAL No..
Description:
L13. Notification Communicator E]3.1 Single Unit Emergency L]i. Direct affected unit SE to activate CNS (if not already performed for an Alert or higher emergency class) in accordance with Attachment 9 of this procedure.
[]2. Direct the opposite unit SE to perform notifications using Form 1903.011-Y, Emergency Class Initial Notification Message.
[]3.2 Dual Unit Emergency LI. Direct the Unit 2 SE to activate CNS (if not already performed for an Alert or higher emergency class) in accordance with Attachment 9 of this procedure.
L2. Direct the Unit 1 SE to perform notifications using Form 1903.011-Y, Emergency Class Initial Notification Message.
E3.3 Additional Notification Communicator is Available L1 IF a Notification Communicator is available, THEN request the Notification Communicator to perform notifications in accordance with Form 1903.011-Y, Emergency Class Initial Notification Message.
n3.4 Inform the Control Room staff of the Emergency Class declaration.
FORM TITLE FORM NO REV.
SAE EMERGENCY DIRECTION AND CONTROL CHECKLIST 1903.011P 027-00-0 1 SHIFT MANAGER
Page 20 of 53 Page 2 of 4 E]4. Has a plant evacuation been performed?
El NO - GO TO step 5.
E] YES - THEN perform the following aninouncement:
E]A. Dial 197
[]B. Make the following announcement:
"Attention all personnel, Attention all personnel. A Site Area Emergency has been declared on Unit (One/Two). Emergency response personnel report to your designated assembly areas."
ElC. Repeat the above announcement using the EOF public address system by dialing 199 and pausing approximately 15 seconds before making the announcement.
RD. GO TO step 12.
Plant Evacuation Section E]5. Determine the appropriate evacuation routes:
lJ5.1 DOES a radiological or toxic gas release exist or is a release suspected, which is originating from the plant?
El YES - THEN determine the available routes from the chart below using wind direction.
IF wind direction is From: THEN use Evacuation Routes 150 to 225 degrees El 1 and 3 226 to 325 degrees El 2 and 3 326 to 45 degrees El 1, 2 and 3 46 to 149 degrees [] 1 El NO - THEN use routes 1, 2 and 3 or any combination of routes.
E]5.2 Check the appropriate routes in the plant announcement, step 9 below.
El6. Determine any areas of the plant to avoid during evacuation or special protective measures to be taken by plant evacuees.
E]7. Direct Security to perform the following (ext. 3388, 3108 or 3109):
n17.1 If necessary, open and man the secondary guard station (if radiological conditions allow).
[7.2 Perform initial accountability by (Time)
(30 minutes from SAE declaration)
FORM TITLE FORM NO REV SAE EMERGENCY DIRECTION AND CONTROL CHECKLIST 1903.011P 027-00-0 SHIFT MANAGER F N
Page 21 of 53 Page 3 of 4
[:]8. Contact Radiation Protection (CAl - 5166 or CA2 - 3018):
[n8.1 Request Health Physics coverage at the plant exit portal monitors.
[1]8.2 Instruct Health Physics personnel at the controlled access exit point to relax decontamination and radiation protection measures as necessary in order to expedite evacuation of the controlled access area.
[E]9. [Make the following announcement using the plant paging system (dial 197):
"Attention all personnel. Attention all personnel. A Site Area Emergency has been declared on Unit (One/Two). Emergency response and emergency standby personnel report to your designated assembly areas and perform initial accountability. All other personnel evacuate the plant using evacuation route(s) [] 1 [] 2 [] 3 and proceed to the Atkins Emergency Worker Center."
If necessary, include in the announcement any plant areas to avoid, or special protective actions to be taken by plant evacuees:
[=]9.1 Sound the evacuation alarm for approximately 10 seconds.
n9.2 Repeat the announcement at least 2 times, alternating the announcement with the plant evacuation alarm.]
E110. Make the following announcement using the EOF public address system (dial 199 and pause approximately 15 seconds).
"Attention all personnel. Attention all personnel. A Site Area Emergency has been declared on Unit (One/Two). Emergency response personnel report to your designated assembly areas."
nEl. Instruct all Control Room personnel (operators, chemists, RP, etc.) to log into the designated security card reader using "0000".
[:]11.1 Instruct both units' operators in the field to log into the nearest security card reader using "0000" and log onto the emergency RWP.
[111.2 Inform the opposite unit Control Room personnel to log into the designated security card reader using "0000".
FORM TITLE: FORM NO REV SAE EMERGENCY DIRECTION AND CONTROL CHECKLIST 1903.011P 027-00-0 SHIFT MANAGER
Page 22 of 53 Page 4 of 4
[]12. IF the incident extends into the Exclusion Area, THEN consider an Exclusion Area Evacuation. Perform the following if an Exclusion Area Evacuation is deemed necessary:
[112.1 Request that the U.S. Army Corps of Engineers (telephone number located in Emergency Telephone Directory) control boat access to the portions of Lake Dardanelle within the exclusion area.
[]12.2 Direct Security to evacuate the Generation Support Building (GSB) and all buildings outside the security fence but within the exclusion area.
Plant Evacuation Section Ends
[n13. Direct Chemistry personnel (Initial Dose Assessor) to the Control Room to implement procedure 1904.002, "Offsite Dose Pro3ection - RDACS Computer Method".
-]14. IF an approach route to the plant site should be avoided, THEN instruct Security to direct incoming traffic. (Examples of this include security situations in which onsite/offsite personnel are directed to the EOF, radiological releases that prohibit entry to the site via either guard station, etc.)
Performed by:
Shift Manager FORM TITLE: FORM NO REV SAE EMERGENCY DIRECTION AND CONTROL CHECKLIST 1903.011P 027-00-0 SHIFT MANAGER
Page 23 of 53 Page 1 of 3 SAE This form is intended to be used by the TSC DIRECTOR when a Site Area Emergency has been declared and the TSC Director has the responsibility for Emergency Direction and Control.
L*i. Site Area Emergency declared:
Unit Time Date
"**EMERGENCY CLASSIFICATION / PLANT EVACUATION ANNOUNCEMENT SHOULD BE MADE WITHIN 15 MINUTES OF THE DECLARATION**
R12. EAL No.
Description:
L]3. Direct the Communicator to initiate notifications using Form 1903.011-Y, "Emergency Class Initial Notification Message".
3.1 Assign additional personnel to assist as necessary.
E]4. Has a plant evacuation been performed?
El NO - THEN proceed to step 5.
[ YES - THEN perform the following announcement:
MIA. Dial 197 MIB. Make the following announcement:
"Attention all personnel. Attention all personnel. A Site Area Emergency has been declared on Unit (One/Two). Emergency response personnel report to your designated assembly areas."
LIC. Repeat the above announcement using the EOF public address system by dialing 199 and pausing approximately 15 seconds before making the announcement.
[]D. GO TO step 11.
FORM TITLE FORM NO REV.
SAE EMERGENCY DIRECTION AND CONTROL CHECKLIST TSC DIRECTOR 1903.011Q 027-00-0
Page 24 of 53 Page 2 of 3 Plant Evacuation Section E]5. Determine the appropriate evacuation routes:
DOES a radiological or toxic gas release exist or is a release suspected, which is originating from the plant?
El YES - THEN determine the available routes from the chart below using wind direction.
IF wind direction is From: THEN use Evacuation Routes 150 to 225 degrees nl 1 and 3 226 to 325 degrees El 2 and 3 326 to 45 degrees nl 1, 2 and 3 46 to 149 degrees El 1 El NO - THEN use routes 1,2 and 3 or any combination of routes.
nl6. Determine any areas of the plant to avoid during evacuation or special protective measures to be taken by plant evacuees.
El7. Direct Security to perform the following (ext. 3388, 3108 or 3109):
El7.1 If necessary, open and man the secondary guard station (if radiological conditions allow).
E]7.2 Perform initial accountability by (Time)
(30 minutes from SAE declaration) nl8. Contact Radiation Protection (CAl ext. 5166 or CA2 ext. 3018):
E18.1 Request Health Physics coverage at the plant exit portal monitors.
E]8.2 Instruct Health Physics personnel at the controlled access exit point to relax decontamination and radiation protection measures as necessary in order to expedite evacuation of the controlled access area.
El9. Direct the Shift Manager of the affected unit to perform the Emergency Class and plant evacuation announcement using Form 1903.011P, "SAE Emergency Direction and Control Checklist Shift Manager" steps 9, 10 and 11 of this procedure.
El9.1 Inform the Shift Manager of the site evacuation routes determined in step 5.
E]9.2 Inform the Shift Manager of any plant areas to avoid during the plant evacuation and any special protective measures to be taken by plant evacuees.
n1I0. Instruct the TSC/OSC personnel to log into the designated security card reader using "0000".
FORM TITLE: FORM NO REV SAE EMERGENCY DIRECTION AND CONTROL CHECKLIST TSC DIRECTOR 11903.011 Q 027-00-0
Page 25 of 53 Page 3 of 3
[]11. IF the incident extends into the Exclusion Area, THEN consider an Exclusion Area Evacuation. Perform the following if an Exclusion Area Evacuation is deemed necessary:
E]1.1 Request that the U.S. Army corps of Engineers (telephone number located in Emergency Telephone Directory) control boat access to the portions of Lake Dardanelle within the exclusion area.
-]11.2 Direct Security to evacuate the Generation Support Building (GSB) and all buildings outside the security fence but within the exclusion area.
Plant Evacuation Section Ends E112. Direct Chemistry personnel (Initial Dose Assessor) to the Control Room to implement procedure 1904.002, "Offsite Dose Projection - RDACS Computer Method".
E]13. IF an approach route to the plant site should be avoided, THEN instruct Security to direct incoming traffic.
Performed by :
Technical Support Center Director FORM TITLE: FORM NO REV.
SAE EMERGENCY DIRECTION AND CONTROL CHECKLIST TSC DIRECTOR 1903.011Q 027-00-0
Page 26 of 53 Page 1 of 1 SAE This form is intended to be used by the EOF DIRECTOR when a Site Area Emergency has been declared and the EOF Director has the responsibility for Emergency Direction and Control.
Mul. Site Area Emergency declared: Unit Time Date
- EMERGENCY CLASSIFICATION / PLANT EVACUATION ANNOUNCEMENT SHOULD BE MADE WITHIN 15 MINUTES OF THE DECLARATION**
M12. Has a plant evacuation been performed?
F1 NO - THEN immediately request the TSC Director to perform the Plant Evacuation Section of Form 1903.011Q, "SAE Emergency Direction And Control Checklist TSC Director." If the TSC Director is not available then request the Shift Manager to perform the Plant Evacuation Section of Form 1903.011P, "SAE Emergency Direction And Control Checklist Shift Manager." Go to step 3.
E1 YES - THEN perform the following:
MIA. Dial 199 MIB. Make the following announcement:
"Attention all personnel. Attention all personnel. A Site Area Emergency has been declared on Unit (One/Two). Emergency response personnel report to your designated assembly areas."
EIC. Repeat the above announcement using the plant public address system by dialing 197 and pausing approximately 15 seconds before making the announcement.
[1]3. Direct the Communicator to initiate notifications using Form 1903.011-Y, "Emergency Class Initial Notification Message."
M3.1 Assign additional personnel to assist as necessary.
M4. Conditions warranting declaration of a Site Area Emergency:
EAL NO.
Description:
M5. Announce emergency class declaration to the EOF staff.
[:6. Request the TSC Director to evaluate the need for an Exclusion Area Evacuation in accordance with Form 1903.011Q, "SAE Emergency Direction And Control Checklist TSC Director" step 11.
E]7. Direct Chemistry personnel (Initial Dose Assessor) to the Control Room to implement procedure 1904.002, "Offsite Dose Projection - RDACS Computer Method".
Performed by:
Emergency Operations Facility Director FORM TITLE ]RFORM NO REV SAE EMERGENCY DIRECTION AND CONTROL CHECKLIST EOF DIRECTOR 1903.OIIR 027-00-0
PROC.WORK PLAN NO. PROCEDURE)WORK PLAN TITLE: PAGE: 27 of 53 1903.011 EMERGENCY RESPONSE/NOTIFICATIONS CHANGE: 027-00-0 ATTACHMENT 4 GENERAL EMERGENCY Upon declaration of a General Emergency, the person with the responsibility for Emergency Direction and Control shall:
"* Complete the appropriate Emergency Direction and Control Checklist indicated below for your position (i.e. SM, TSC Director, or EOF Director). Any steps that are not appropriate for the event may be marked 'Not Applicable' (N/A).
"* Issue appropriate offsite protective action recommendations.
"* Ensure that notifications are completed in accordance with the required time limits.
At the termination of the event, the Shift Manager/TSC Director/EOF Director should forward all forms and other pertinent documents to Emergency Planning.
Forms used for General Emergency notification and response are as follows:
Form 1903.011S, "GE Emergency Direction and Control Checklist, Shift Manager" (Shift Manager Only)
Form 1903.011T, "GE Emergency Direction and Control Checklist, TSC Director" (TSC Director Only)
Form 1903.011U, "GE Emergency Direction and Control Checklist, EOF Director" (EOF Director Only)
Electronic Form 1903.011-Y, "Emergency Class Initial Notification Message" Electronic Form 1903.011-Z, "Emergency Class Follow-up Notification Message" Attachment 5, Alternate ERO Notification Scheme Attachment 6, Protective Action Recommendations (PAR) for General Emergency
Page 28 of 53 Page 1 of 4 GE This form is intended to be used by the SHIFT MANAGER when a General Emergency has been declared and the Shift Manager has the responsibility for emergency Direction and Control.
El1. General Emergency declared:
Unit Time Date
"**EMERGENCY CLASSIFICATION / PLANT EVACUATION ANNOUNCEMENT SHOULD BE MADE WITHIN 15 MINUTES OF THE DECLARATION**
E]2. Conditions warranting declaration of a General Emergency:
EAL No.
Description:
E]3. Notification Communicator E]3.1 Single Unit Emergency El. Direct the affected unit SE to activate CNS (if not already performed for an Alert or higher emergency class) in accordance with Attachment 9 of this procedure.
[]2. Direct the opposite unit SE to perform notifications using Form 1903.011-Y, "Emergency Class Initial Notification Message."
n3.2 Dual Unit Emergency
[]l. Direct the Unit 2 SE to activate CNS (if not already performed for an Alert or higher emergency class) in accordance with Attachment 9 of this procedure.
[2. Direct the Unit 1 SE to perform notifications using Form 1903.011-Y, "Emergency Class Initial Notification Message."
n3.3 Additional Notification Communicator is Available E1 IF a Notification Communicator is available, THEN request the Notification Communicator to perform notifications in accordance with Form 1903.011-Y, "Emergency Class Initial Notification Message."
E]3.4 Inform the Control Room staff of the Emergency Class declaration.
FORM TITLE FORM NO REV.
GE EMERGENCY DIRECTION AND CONTROL CHECKLIST 1903.011S 027-00-0 SHIFT MANAGER
Page 29 of 53 Page 2 of 4 E]4. Has a plant evacuation been performed, E] NO - GO TO Step 5 El YES - THEN perform the following:
LA. Dial 197 FIB. Make the following announcement:
"Attention all personnel. Attention all personnel. A General Emergency has been declared on Unit (One/Two). Emergency response personnel report to your designated assembly areas."
[LC. Repeat the above announcement using the EOF public address system by dialing 199 and pausing approximately 15 seconds before making the announcement.
[LD. GO TO step 12.
Plant Evacuation Section nI5. Determine the appropriate evacuation routes:
[]5.1 DOES a radiological or toxic gas release exist or is a release suspected, which is originating from the plant?
[] YES - THEN determine the available routes from the chart below using wind direction.
IF wind direction is From: THEN use Evacuation Routes 150 to 225 degrees L 1 and 3 226 to 325 degrees L 2 and 3 326 to 45 degrees L] 1, 2 and 3 46 to 149 degrees ML1
[] NO - THEN use routes 1,2 and 3 or any combination of routes.
LI15.2 Check the appropriate routes in the plant announcement, step 9 below.
[:]6. Determine any areas of the plant to avoid during evacuation and/or special protective measures to be taken by plant evacuees. List these instructions in evacuation announcement step 9.
E]7. Direct Security to perform the following (ext. 3388, 3108 or 3109):
n7.1 If necessary, open and man the secondary guard station (if radiological conditions allow).
C]7.2 Perform initial accountability by (Time)
(30 minutes from GE declaration)
FORM TITLE FORM NO REV.
GE EMERGENCY DIRECTION AND CONTROL CHECKLIST 1903.011S 027-00-0 SHIFT MANAGER F
Page 30 of 53 Page 3 of 4 E8. Contact Radiation Protection (CAl - 5166 or CA2 - 3018):
[]8.l Request Health Physics coverage at the plant exit portal monitors.
Ml8.2 Instruct Health Physics personnel at the controlled access exit point to relax decontamination and radiation protection measures as necessary in order to expedite evacuation of the controlled access area.
[]9. [Make the following announcement using the plant paging system (dial 197):
"Attention all personnel. Attention all personnel. A General Emergency has been declared on Unit (One/Two). Emergency response and emergency standby personnel report to your designated assembly areas and perform initial accountability. All other personnel evacuate the plant using evacuation route(s) EJ 1 El 2 0l 3 and proceed to the Atkins Emergency Worker Center."
If necessary, include in the announcement any plant areas to avoid, or special protective actions to be taken by plant evacuees:
M9.1 Sound the evacuation alarm for approximately 10 seconds.
Ml9.2 Repeat the announcement at least 2 times, alternating the announcement with the plant evacuation alarm.]
E]10. Make the following announcement using the EOF public address system (dial 199 and pause approximately 15 seconds).
"Attention all personnel. Attention all personnel. A General Emergency has been declared on Unit (One/Two). Emergency response personnel report to your designated assembly areas."
011. Instruct all Control Room personnel (operators, chemists, RP, etc.) to log into the designated security card reader using "0000".
E]I1.1 Instruct both units' operators in the field to log into the nearest security card reader using "0000" and log onto the emergency RWP.
E]11.2 Inform the opposite unit Control Room personnel to log into the designated security card reader using "0000".
FORM TITLE FORM NO REV.
GE EMERGENCY DIRECTION AND CONTROL CHECKLIST 1903.011S 027-00-0 1 SHIFT MANAGER
Page 31 of 53 Page 4 of 4 E]12. Has an exclusion area evacuation been performed?
El YES - GO TO Step 13.
El NO - THEN perform the following:
[] Request that the U.S. Army Corps of Engineers (telephone number located in Emergency Telephone Directory) control boat access to the portions of Lake Dardanelle within the exclusion area.
E] Direct Security to evacuate the Generation Support Building (GSB) and all buildings outside the security fence but within the exclusion area.
Plant Evacuation Section Ends F113. Determine the appropriate Protective Action Recommendation using Attachment 6, "Protective Action Recommendations (PAR) for General Emergency".
PAR No.
Review PAR criteria every 15 minutes. Notify within 15 minutes the NRC, State and local government of PAR changes in accordance with Form 1903.011-Y, "Emergency Class Initial Notification Message."
n-114. Direct Chemistry personnel (Initial Dose Assessor) to the Control Room to implement procedure 1904.002, "Offsite Dose Projection - RDACS Computer Method".
[-]15. IF an approach route to the plant site should be avoided, THEN instruct Security to direct incoming traffic. (Examples of this include security situations in which onsite/offsite personnel are directed to the EOF, radiological releases which prohibit entry to the site via either guard station, etc.)
Performed by :
Shift Manager FORM TITLE: FORM NO REV.
GE EMERGENCY DIRECTION AND CONTROL CHECKLIST 1903.011S 027-00-0 1 SHIFT MANAGER
Page 32 of 53 Page 1 of 3 GE This form is intended to be used by the TSC DIRECTOR when a General Emergency has been declared and the TSC Director has the responsibility for Emergency Direction and Control.
El. General Emergency declared:
Unit Time Date
"**EMERGENCY CLASSIFICATION / PLANT EVACUATION ANNOUNCEMENT SHOULD BE MADE WITHIN 15 MINUTES OF THE DECLARATION**
[]2. Conditions warranting declaration of a General Emergency:
EAL No.
Description:
E3. Direct the Communicator to initiate notifications using Form 1903.011-Y, "Emergency Class Initial Notification Message".
F113.1 Assign additional personnel to assist as necessary.
F14. Has a plant evacuation been performed?
LNO - Go To step 5 LI YES - perform the following:
LA. Dial 197 LB. Make the following announcement:
"Attention all personnel. Attention all personnel. A General Emergency has been declared on Unit (One/Two). Emergency response personnel report to your designated assembly areas."
0C. Repeat the above announcement using the EOF public address system by dialing 199 and pausing approximately 15 seconds before making the announcement.
MD. GO TO step 11.
FORM TITLE' FORM NO REV GE EMERGENCY DIRECTION AND CONTROL CHECKLIST TSC DIRECTOR 1903.011T 027-00-0
Page 33 of 53 Page 2 of 3 Plant Evacuation Section
[:5. Determine the appropriate evacuation routes:
DOES a radiological or toxic gas release exist or is a release suspected, which is originating from the plant?
El YES - THEN determine the available routes from the chart below using wind direction.
IF wind direction is From: THEN use Evacuation Routes 150 to 225 degrees [] 1 and 3 226 to 325 degrees [] 2 and 3 326 to 45 degrees [] 1, 2 and 3 46 to 149 degrees E] 1 E] NO - THEN use routes 1,2 and 3 or any combination of routes.
[]6. Determine any areas of the plant to avoid during evacuation or special protective measures to be taken by plant evacuees.
E]7. Direct Security to perform the following (ext. 3388, 3108 or 3109):
[r17.1 If necessary, open and man the secondary guard station (if radiological conditions allow).
[F17.2 Perform initial accountability by (Time)
(30 minutes from GE declaration)
[18. Contact Radiation Protection (CAl - 5166 or CA2 - 3018):
[1]8.1 Request Health Physics coverage at the plant exit portal monitors.
1]8.2 Instruct Health Physics personnel at the controlled access exit point to relax decontamination and radiation protection measures as necessary in order to expedite evacuation of the controlled access area.
[E9. Direct the Shift Manager of the affected unit to perform the Emergency Class and plant evacuation announcement using Form 1903.011S, "GE Emergency Direction and Control Checklist Shift Manager" steps 9, 10 and 11 of this procedure.
F19.1 Inform the Shift Manager of the site evacuation routes determined in step 5.
E]9.2 Inform the Shift Manager of any plant areas to avoid during the plant evacuation and any special protective measures to be taken by plant evacuees.
[I]0. Instruct the TSC/OSC personnel to log into the designated security card reader using "0000".
FORM TITLE FORM NO i REV.
GE EMERGENCY DIRECTION AND CONTROL CHECKLIST TSC DIRECTOR 1903.011T 027-00-0
Page 34 of 53 Page 3 of 3 E11i. Has an Exclusion Area evacuation been performed?
LI YES - Go To Step 12 LI NO - THEN perform the following:
LI Request that the U.S. Army corps of Engineers (Emergency Telephone Directory, section 6) to control boat access to the portions of Lake Dardanelle within the exclusion area.
F1 Direct Security to evacuate the Generation Support Building (GSB) and all buildings outside the security fence but within the exclusion area.
Plant Evacuation Section Ends
[]12. Determine the appropriate Protective Action Recommendation using Attachment 6, "Protective Action Recommendations (PAR) for General Emergency".
PAR No.
Review PAR criteria every 15 minutes. Notify within 15 minutes the NRC, State and local government of PAR changes in accordance with Form 1903.011-Y, "Emergency Class Initial Notification Message."
1713. Direct Chemistry personnel (Initial Dose Assessor) to the Control Room to implement procedure 1904.002, "Offsite Dose Pro3ection - RDACS Computer Method".
n114. IF an approach route to the plant site should be avoided, THEN instruct Security to direct incoming traffic.
Performed by:
Technical Support Center Director FORM TITLE FORM NO REV.
GE EMERGENCY DIRECTION AND CONTROL CHECKLIST TSC DIRECTOR 1903.011T 027-00-0
Page 35 of 53 Page 1 of 2 GE This form is intended to be used by the EOF DIRECTOR when a General Emergency has been declared and the EOF Director has the responsibility for Emergency Direction and Control.
E-l. General Emergency declared:
Unit Time Date
- EMERGENCY CLASSIFICATION AND PLANT EVACUATION ANNOUNCEMENT SHOULD BE MADE WITHIN 15 MINUTES OF THE DECLARATION**
E]2. Has a plant evacuation been performed?
El NO - THEN immediately request the TSC Director to perform the Plant Evacuation Section of Form 1903.011T of this procedure. If the TSC Director is not available then request the Shift Manager to perform the Plant Evacuation Section of Form 1903.011S. Go to step 3.
E] YES - Perform the following:
LA. Dial 199 LB. Make the following announcement:
"Attention all personnel. Attention all personnel. A General Emergency has been declared on Unit (One/Two). Emergency response personnel report to your designated assembly areas."
L C. Repeat the above announcement using the plant public address system by dialing 197 and pausing approximately 15 seconds before making the announcement.
L]3. Direct the Communicator to initiate notifications using Form 1903.011-Y, "Emergency Class Initial Notification Message".
L3.1 Assign additional personnel to assist as necessary.
L14. Conditions warranting declaration of a General Emergency:
EAL No.
Description:
L-5. Determine the appropriate Protective Action Recommendation using Attachment 6, "Protective Action Recommendations (PAR) for General Emergency".
PAR No. REAM Review:
Review PAR criteria every 15 minutes. Notify within 15 minutes the NRC, State and local government of PAR changes in accordance with Form 1903.011-Y, "Emergency Class Initial Notification Message."
L]6. Announce emergency class declaration to the EOF staff.
FORMTITLE: FORM NO REV.
GE EMERGENCY DIRECTION AND CONTROL CHECKLIST EOF DIRECTOR 1903.011U 027-00-0
Page 36 of 53 Page 2 of 2
[17. Request the TSC Director to perform an exclusion area evacuation if the evacuation has not already been performed in accordance with Form 1903.011T,"GE Emergency Direction and Control Checklist TSC Director", step 11.
F18. Direct Chemistry personnel (Initial Dose Assessor) to the Control Room to implement procedure 1904.002, "Offsite Dose Pro3ection - RDACS Computer Method".
Performed by:
Emergency Operations Facility Director FORM TITLE: FORM NO REV GE EMERGENCY DIRECTION AND CONTROL CHECKLIST EOF DIRECTOR 1903.011U 027-00-0
Page 37 of 53 Page 1 of 1 COURTESY CALL NOTIFICATION MESSAGE Use for COURTESY CALLS MESSAGE:
This is at Arkansas Nuclear One. My
((Communicator's name) phone number is (479) 858 This COURTESY CALL is being made because:
[] An UNPLANNED release of radioactive material has occurred OR may occur.
E] An UNPLANNED reactor trip from power has occurred.
E] An event has occurred for which a news release is planned.
fl A notification has been made or will be made to other government agencies for events that have impacted or will impact the public health and safety.
At on Mace_
Lcaa~eJ the following event(s)occurred on
- timeJ
[] UNIT 1 Fl UNIT 2 Rl The ANO Site (describe event):
APPROVED:
Shift Manager FORM TITLE FORM NO REV.
1903.011AA 027-00-0 I COURTESY CALL NOTIFICATION MESSAGE
Page 38 of 53 Page 1 of 2 Actions for Courtesy Calls NOTE Courtesy Calls are required for the following NON-Emergency Class events:
"* An UNPLANNED release of radioactive material has occurred OR may occur.
"* An UNPLANNED reactor trip from power has occurred.
"* An event has occurred for which a news release is planned.
"* A notification has been made or will be made to other government agencies for events that have impacted or will impact the public health and safety.
NOTE I Notification to the ADH and the NRC Sf0IT= be made as soon as practical but NOT later than four hours followina the event.
INSTRUCTIONS CONTINGENCY ACTIONS
- 1. Complete 1903.011AA. 1. None NOTE Use of DEM Emergency Action Authenticator may be required when contacting agencies by non-dedicated phone.
- 2.Use non-dedicated fax to send 1903.011AA 2.Call ADH at *9-1-501-661-2136* and to ADH at *9-1-501-671-1406*. verbally provide the information from 1903.011AA.
Time: Date:
Time: Date:
IF ADH cannot be contacted by phone, T*-EN contact DEM by phone at *9-1-501 737J9750* or by radio (Channel 6 unscrambled) and request them to relay notification to ADH.
- 3.Confirm fax receipt by calling ADH at *9 3. IF ADH cannot be contacted by phone, 1-501-661-2136*. (Alternate number *9-1 THEN contact DEM by phone at *9-1-501 800-633-1735*) 73--9750* or by radio (Channel 6 unscrambled) and request them to relay notification to ADH.
Person Contacted Time
- 4.Start CNS using Att. 9, Section 3 4.Perform Att. 11, step 4
- 5.Complete the NRC Event Notification 5.None Worksheet (NRC Form 361).
- 6.Use ENS phone to transmit information 6.Use commercial phone at *9-1-301-816 from NRC Form 361 to NRC. 5100* to transmit information from NRC Form 361 to NRC.
Person Contacted Time Person Contacted Time FORM TITLE FORM NO REV.
1903.011DD 027-00-0 I COURTESY CALL NOTIFICATION CHECKLIST
Page 39 of 53 Page 2 of 2 7.Fax NRC Form 361 to the NRC Operations 7. None Center at *9-1-301-816-5151".
Actions performed by:
(name) (d-a-te) (time)
NOTE The material contained within the symbols (*)-s proprietary or private information.
Upon termination of event, copies of Notification Forms, Checklists and other related documentation should be forwarded to Emergency Planning.
Originals should be submitted to ANO records.
FORM TITLE: FORM NO I REV 1903.011DD 027-00-0 I COURTESY CALL NOTIFICATION CHECKLIST
PROC.WORK PLAN NO. PROCEDUREIWORK PLAN TITLE: PAGE: 40 of 53 1903.011 EMERGENCY RESPONSE/NOTIFICATIONS CHANGE: 027-00-0 ATTACHMENT 5 ERO NOTIFICATION SCHEME Notification via Computerized Notification System (CNS)
The Control Room Shift Engineer or a Notification Communicator will initiate CNS for an Alert or higher emergency classification in accordance with Attachment 9.
Once CNS is activated, the following notifications steps are performed:
- 2. CNS will call individual ERO personnel based on priority assigned by Emergency Planning by: first calling individuals pager (if ERO member carries a pager), second CNS will call the ERO members office telephone and home telephone (during normal working hours office telephone is called first and during off hours home telephone will be called first).
Notification with Computerized Notification System (CNS) Inoperable If CNS is inoperable, then the Control Room Shift Engineer or Notification Communicator will initiate call out using the pager system and a set of codes to inform the ERO of the site emergency status in accordance with Attachment 9:
"1111" for a Unit 1 Alert or higher emergency class.
"2222" for a Unit 2 Alert or higher emergency class.
"333" or "444" for a Unit 1 or Unit 2 respectively Alert or higher emergency class during drills/exercises.
The following ERO positions are required to call ERO support personnel in the event CNS is inoperable because these personnel do not carry pagers or are not notified by the local pager service.
EOF Director - notifies Corporate Emergency Center (CEC) Manager EOF HP Supervisor - notifies Emergency Radiation Team members OSC Director - notifies Medical Team leader which in turn notifies Medical Team members Dose Assessment Supervisor - notifies Dose Assessment Team members EOF Support Superintendent - notifies Administrative Services personnel Radiation Protection & Radwaste Manager - notifies HP technicians OSC HP Supervisor - notifies HP technicians OSC I&C Supervisor - notifies I&C technicians EOF Offsite Monitoring Supervisor - notifies Emergency Response Team members EOF Communication Manager - notifies ENC Coordinator, Corporate Liaison, Local Government Communicator, Rumor Control personnel and Site Media Coordinator
PROCJWORK PLAN NO. PROCEDURE/WORK PLAN TITLE: PAGE: 41 of 53 1903.011 EMERGENCY RESPONSEINOTIFICATIONS CHANGE: 027-00-0 Page 1 of 4 ATTACHMENT 6 PROTECTIVE ACTION RECOMMENDATIONS (PAR) FOR GENERAL EMERGENCY This flowchart is to be used as a guide for determining PAR's. Actual PAR's are listed on the following pages of Attachment 6.
General Emergency I
Declared Yes _> No Are EPA Protective Action PAR 1 Guidelines projected to be exceeded? No
>0 Make Notifications to State (obtain from dose assessment) 1 REM TEDE and local governments OR immediately.
5 REM Child Thyroid CDE I Yes Combine PAR 1 and PAR 2 0 every 15 minutes R e-evaluate PAR criteria Make Notifications to State and local governments immediately.
Are EPA Protective Action Guidelines projected to be exceeded outside the 10 mile EPZ? No (Obtain from dose assessment) 1 REM TEDE OR I PERFORM 5 REM Child Thyroid CDE ACTION I Yes
PROC.IWORK PLAN NO. PROCEDUREIWORK PLAN TITLE: PAGE: 42 of 53 1903.011 EMERGENCY RESPONSE/NOTIFICATIONS CHANGE: 027-00-0 Page 2 of 4 ATTACHMENT 6 PROTECTIVE ACTION RECOMMENDATIONS (PAR)
FOR GENERAL EMERGENCY PAR No. 1 NOTE The State and local governments must be notified within 15 minutes of Protective Action Recommendations or changes to Protective Action Recommendations using Form 1903.011-Y.
- 1. General Emergency Declared Recommend evacuating/*sheltering a 5 mile radius and 10 miles downwind. Recommend the remainder of the 10 mile EPZ to go indoors and listen to the emergency broadcast for this event. Determine the affected zones for the PAR from the chart given below.
Wind Direction Evacuate/*Shelter (from) Zones Recommend 348.75 to 11.25 G H K N 0 R S T U Remainder of EPZ to go indoors 11.25 to 33.75 G H K N 0 Q R S U Remainder of EPZ to go indoors 33.75 to 56.25 G H K N 0 Q R S U Remainder of EPZ to go indoors 56.25 to 78.75 G H K N 0 Q R S U Remainder of EPZ to go indoors 78.75 to 101.25 G H K N 0 P Q R U Remainder of EPZ to go indoors 101.25 to 123.75 G H K N 0 P Q R U Remainder of EPZ to go indoors 123.75 to 146.25 G H K MN 0 P R U Remainder of EPZ to go indoors 146.25 to 168.75 G H K MN 0 P R U Remainder of EPZ to go indoors 168.75 to 191.25 G H K M N 0 P R U Remainder of EPZ to go indoors 191.25 to 213.75 G H K L M N 0 R U Remainder of EPZ to go indoors 213.75 to 236.25 G H J K L MN 0 R U Remainder of EPZ to go indoors 236.25 to 258.75 G H I J K L MN 0 R U Remainder of EPZ to go indoors 258.75 to 281.25 G H I J K L N 0 R U Remainder of EPZ to go indoors 281.25 to 303.75 G H I J K N 0 R U Remainder of EPZ to go indoors 303.75 to 326.25 G H I J K N 0 R S T U Remainder of EPZ to go indoors 326.25 to 348.75 G H I K N 0 R S T U Remainder of EPZ to go indoors
- Shelter is normally recommended by the Arkansas Department of Health. ANO will only recommend Evacuation unless instructed otherwise by offsite agencies.
- 2. IF there is a radiological release associated with this event and EPA Protective A--tion Guidelines are pro3ected to be exceeded (IREM TEDE, 5 REM Child Thyroid),
THEN combine zones of PAR 1 with applicable zones of PAR 2.
- 3. Protective Action recommendations must be reassessed every 15 minutes until downgrade or recovery phase is entered.
PROCJWORK PLAN NO. PROCEDURE/WORK PLAN TITLE: PAGE: 43 of 53 1903.011 EMERGENCY RESPONSEINOTIFICATIONS CHANGE: 027-00-0 Page 3 of 4 ATTACHMENT 6 PROTECTIVE ACTION RECOMMENDATIONS (PAR)
FOR GENERAL EMERGENCY PAR No. 2 NOTE The State and local governments must be notified within 15 minutes of Protective Action Recommendations or changes to Protective Action Recommendations using Form 1903.011-Y.
- 1. IF plant conditions meet the following criteria:
"* General Emergency declared AND
"* EPA Protective Action Guidelines are projected to be exceeded.
1 Rem TEDE OR 5 Rem Child Thyroid CDE THEN Recommend the following Protective Action Recommendation.
EVACUATE/*SHELTER: **Zones projected to exceed the EPA Protective Action Guidelines (obtain from dose assessment)
AND Zones from PAR 1 RECOMMEND: Remainder of the 10 mile EPZ to go indoors and listen to the Emergency Broadcasts
- Shelter is normally recommended by the Arkansas Department of Health. ANO will only recommend Evacuation unless instructed otherwise by offsite agencies.
- 2. Protective Action Recommendations must be reassessed every 15 minutes until downgrade or recovery phase is entered.
PROCJWORK PLAN NO. PROCEDURE/WORK PLAN TITLE: PAGE: 44 of 53 1903.011 EMERGENCY RESPONSEINOTIFICATIONS CHANGE: 027-00-0 Page 4 of 4 ATTACHMENT 6 PROTECTIVE ACTION RECOMMENDATIONS (PAR)
FOR GENERAL EMERGENCY Action 1 IF plant conditions meet the following criteria:
"* General Emergency declared AND
"* EPA Protective Action Guidelines are pro3ected to be exceeded beyond the 10 mile EPZ.
1 Rem TEDE OR 5 Rem Child Thyroid CDE THEN begin to investigate ad hoc protective action recommendations with the State and local governments for the general public located in the affected areas.
PROC WORK PLAN NO. PROCEDURE/WORK PLAN TITLE: PAGE: 45 of 53 1903.011 EMERGENCY RESPONSEINOTIFICATIONS CHANGE: 027-00-0 Page 1 of 8
[ATTACHMENT 9]
[Computerized Notification System (CNS) Instructions]
Section 1: Emergency Class Notification Using the CNS Section 2: Post-trip Notification Using the CNS Section 3: Non-Emergency/Off-Normal Notification Using the CNS Section 4: Confirming CNS Operation Section 5: Stopping a Scenario Section 6: Returning the CNS to Standby Section 7: Emergency Class Notification Backup Method (Telephone)
NOTE Upon loss of off-site power, Unit 2 would have to start CNS from the Unit 1 Terminal.
Section 1 Emergency Class Notification Using the CNS
- 1. IF CNS fails to activate for any reason while performing the following steps, THEN immediately implement section 7, "Emergency Class Notification Backup Method (Telephone)" of this attachment.
- 2. The CNS terminal has an automatic screen-blanking feature. If the screen is blank, press any key to restore the screen. Turn up the contrast or brightness if necessary.
- 3. At the Application: Communicator: Password Entry screen, type "0002".
- 4. Press [Enter].
- 5. At the Application: Communicator: Main Menu screen, highlight "Execution" using the right or left arrow keys.
- 6. Press [Enter].
- 7. Using the up or down arrow keys, highlight "Scenario Control".
- 8. Press [Enter].
- 9. At the Application: Communicator: Scenario Activation Control screen, highlight the appropriate scenario using the up or down arrow keys.
- 10. Press [Enter].
- 11. A list of options will appear. Using the up or down arrow keys, highlight the option "Start this scenario".
- 12. Press [Enter].
PROC.WORK PLAN NO. PROCEDUREIWORK PLAN TITLE: PAGE: 46 of 53 1903.011 EMERGENCY RESPONSE/NOTIFICATIONS CHANGE: 027-00-0 Page 2 of 8
[ATTACHMENT 9]
(Section 1 Cont.)
- 13. At the prompt "Confirm Scenario start? (Y/N): N ", enter "Y".
- 14. Press [Enter] to start the scenario.
- 15. Observe the Application: Communicator: Scenario Activation Control screen. Check that the scenario status changes to "Active".
- 16. The scenario will run until all positions are filled, the scenario duration elapses or it is stopped by the operator.
- 17. If you want to confirm CNS operation, go to Section 4 of this attachment.
PROCJWORK PLAN NO. PROCEDURE/WORK PLAN TITLE: PAGE: 47 of 53 1903.011 EMERGENCY RESPONSEINOTIFICATIONS CHANGE: 027-00-0 Page 3 of 8
[ATTACHMENT 9]
Section 2 Post-Trip Notification Using the CNS NOTE The CNS terminal has an automatic screen-blanking feature. If the screen is blank, press any key to restore the screen.
- 1. At the Application: Communicator: Password Entry screen, type "0002".
- 2. Press [Enter].
- 3. At the Application: Communicator: Main Menu screen, highlight "Execution" using the right or left arrow keys.
- 4. Press [Enter].
- 5. Using the up or down arrow keys, highlight "Scenario Control".
- 6. Press [Enter].
- 7. At the Application: Communicator: Scenario Activation Control screen, highlight the appropriate scenario using the up or down arrow keys.
- 8. Press [Enter].
- 9. A list of options will appear. Using the up or down arrow keys, highlight the option "Start this scenario".
- 10. Press [Enter].
- 11. At the prompt "Confirm scenario start? (YIN): N ," enter "Y".
- 12. Press [Enter] to start the scenario.
- 13. Observe the Application: Communicator: Scenario Activation Control Screen.
Check that the scenario status changes to "Active."
- 14. The scenario will run until all positions are filled, the scenario duration elapses or it is stopped by the operator.
- 15. If you want to confirm CNS operation, go to Section 4 of this attachment.
PROCJ.WORK PLAN NO. PROCEDUREWORK PLAN TITLE: PAGE: 48 of 53 1903.011 EMERGENCY RESPONSE/NOTIFICATIONS CHANGE: 027-00-0 Page 4 of 8
[ATTACHMENT 9]
Section 3 Non-Emergency/Off-Normal Notification Using the CNS NOTE The CNS terminal has an automatic screen-blanking feature. If the screen is blank press any key to restore the screen.
You must use the phone to start the scenarios covered by this section.
- 1. Dial 3683 from any touch-tone phone. While the system is speaking the "Hello" segment, enter 0002 followed by the pound sign (#).
- 2. You will hear, "Enter your scenario number followed by the pound sign."
- 3. Enter the scenario number (100 for Unit 1 or 200 for Unit 2) followed by the pound sign (#).
- 4. You will hear, "You entered (scenario number). Is that correct? Press 9 for YES or 6 for NO."
- 5. Press 9 for YES or 6 for NO. If you press 9 the system will continue scenario activation. If you press 6 the system will repeat the prompt for the scenario number.
- 6. After pressing 9 for YES you will hear, "The scenario will be queued as a(n)
(Emergency, Drill, or Test). When you are ready to record your message, please press the star and the pound keys on your phone."
- 7. When you are ready to record your message, press the star (*) and the pound (#) keys.
- 8. You will hear, "Record your message at the tone. Push the pound key when you are finished."
- 9. Record the message. Press [#] when you are done.
- 10. You will hear, "You said ... (the system will speak your recorded message). Is that correct? Press 9 for YES or 6 for NO."
- 11. If you press 9 for YES the system will continue scenario activation. If you press 6 for NO the system will repeat the prompt to record the message.
- 12. After pressing 9 for YES you will hear, "Your selected scenario, (scenario number) will now be sent. Are you sure this is what you want to do? Press 9 for YES or 6 for NO."
- 13. If you press 9 for YES the system will continue scenario activation. If you press 6 for NO you will hear, "Thank you. Goodbye." The system will end the call without starting the scenario.
- 14. After pressing 9 for YES, you will hear, "Thank you. Goodbye." The system will end the call and start the scenario.
15.Any further scenario control functions must be performed at the keyboard.
- 16. If you want to confirm CNS operation, go to Section 4 of this attachment.
PROCJWORK PLAN NO. PROCEDUREIWORK PLAN TITLE: PAGE: 49 of 53 1903.011 EMERGENCY RESPONSEINOTIFICATIONS CHANGE: 027-00-0 Page 5 of 8
[ATTACHMENT 9]
Section 4 Confirming CNS Operation Using the Scenario Monitor:
- 1. IF you are at the Application: Communicator: Scenario Activation Control screen, THEN perform the following
- a. Press [Esc]
- b. Go to step 6.
- 2. At the Application: Communicator: Password Entry screen enter '0002'.
- 3. Press [Enter].
- 4. At the Application: Communicator: Main Menu screen highlight "Execution" using the left or right arrow keys.
- 5. Press [Enter).
- 6. Highlight "Scenario Monitor" using the up or down arrow keys.
- 7. Press [Enter].
- 8. The Scenario Monitor will show the status of the scenario that is currently running or that has most recently been run.
- 9. Observe the Scenario Monitor screen. Check that the system is attempting to contact personnel.
- 10. Press [Esc) to exit the Scenario Monitor.
Using the Reports
- 1. The system will print a report every 5 minutes.
- 2. Check the reports to see that personnel are responding to the CNS.
Using the Status Screen:
- 1. At any screen press [Ctrl 2]. You must use the number pad.
- 2. The Status Screen will show the phone lines.
- 3. Observe the Status screen. Check that the system is making and receiving calls.
- 4. Press [Ctrl 1] (using the number pad) to return to the system operation screens.
PROC./WORK PLAN NO. PROCEDURE/WORK PLAN TITLE: PAGE: 50 of 53 1903.011 EMERGENCY RESPONSEINOTIFICATIONS CHANGE: 027-00-0 Page 6 of 8
[ATTACHMENT 9]
Section 5 Stopping a Scenario
- 1. At the Application: Communicator: Main Menu screen, highlight "Scenario Control" (if not already highlighted) using the up or down arrows.
- 2. Press [Enter].
- 3. Using the up or down arrow keys, highlight the scenario to be stopped.
- 4. Press [Enter].
- 5. A list options will appear. Highlight the option "Stop this scenario."
- 6. Press [Enter].
- 7. At the prompt "Confirm scenario stop? (YIN): N " enter "Y".
- 8. Press [Enter].
- 9. Observe the Application: Communicator: Scenario Activation Control screen.
Check that the scenario status changes to "Completed".
PROC./WORK PLAN NO. PROCEDURE/WORK PLAN TITLE: PAGE: 51 of 53 1903.011 EMERGENCY RESPONSE/NOTIFICATIONS CHANGE: 027-00-0 Page 7 of 8
[ATTACHMENT 9]
Section 6 Returning the CNS to Standby
- 1. Press [Esc] as many times as necessary to return to the Application:
Communicator: Main Menu.
- 2. At the Application: Communicator: Main Menu highlight "Exit" using the left or right arrow keys.
- 3. Press [Enter].
- 4. At the prompt "Exit to system" press [Enter].
- 5. The system should return to the Application: Communicator: Password Entry screen.
PROCJWORK PLAN NO. PROCEDURE/WORK PLAN TITLE: PAGE: 52 of 53 1903.011 EMERGENCY RESPONSEINOTIFICATIONS CHANGE: 027-00-0 Page 8 of 8
[ATTACHMENT 9]
Section 7 Emergency Class Notification Backup Method (Telephone)
For NUE Notifications NOTE The following positions will be notified of an NUE:
EOF Director TSC Director Vice President, Operations General Manager, Plant Operations Unit 1 and 2 Plant Managers Unit 1 and 2 Operations Managers Communications Manager NRC Resident Inspector CEC Manager Duty Emergency Planner
- 1. Dial *9-964-1644*
- 2. When asked for password, enter "1234".
- 3. When asked for the phone number, enter "0001" for a Unit 1 event OR "0002" for a Unit 2 event.
For ALERT or higher Notifications:
- 1. Dial *9-964-1645*
A. When asked for password, enter "1234".
B. When asked for the phone number, enter "1111" (for drills enter "333") for a Unit 1 event OR "2222" (for drills enter "444") for a Unit 2 event.
- 2. Dial *9-964-6411*
A. When asked for password, enter "1234".
B. When asked for the phone number, enter "1111" (for drills enter "333") for a Unit 1 event OR "2222" (for drills enter "444") for a Unit 2 event.
PROCJWORK PLAN NO. PROCEDUREIWORK PLAN TITLE: PAGE: 53 of 53 1903.011 EMERGENCY RESPONSEINOTIFICATIONS CHANGE: 027-00-0 ATTACHMENT 11 Non-Emergency Notifications of Off-Normal Events When directed by the Shift Manager to complete this attachment, perform the following steps:
- 1. For Courtesy Calls and other Non-Emergency/Off-Normal Events, activate the appropriate "Non-Emergency/Off-Normal Event" scenario using the Computerized Notification System" (CNS) to notify designated Entergy management and the NRC Resident Inspector. Refer to CNS instructions on Attachment 9, Section 3.
- 3. IF CNS falls, THEN provide notification to the following Entergy and NRC representatives via telephone. You should attempt to notify all of the representatives listed below. Some individuals may be unavailable,; however, this is a courtesy notification for information only and not a requirement:
Operations Manager of the affected unit(s)
Plant Manager of the affected unit(s)
General Manager Plant Operations Vice President, Operations EOF Director TSC Director NRC Resident Inspector Communications Manager CEC Manager Duty Emergency Planner If this method is used, document successful contacts in the station log.
- 4. Report to the Shift Manager when the above actions have been completed.