ML17228B436: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(4 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 03/21/1996
| issue date = 03/21/1996
| title = Forwards St Lucie Nuclear Plant Status Meeting for Units 1 & 2.
| title = Forwards St Lucie Nuclear Plant Status Meeting for Units 1 & 2.
| author name = BOHLKE W H
| author name = Bohlke W
| author affiliation = FLORIDA POWER & LIGHT CO.
| author affiliation = FLORIDA POWER & LIGHT CO.
| addressee name =  
| addressee name =  
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:.CATEGORY1REGUD)(Ti~i'N(rORMATIONDISTRIBUTIONOYSTEM(RIDS)DOCKET0500033505000389
{{#Wiki_filter:.CATEGORY 1 r                    REGUD)(Ti~i'N(rORMATION DISTRIBUTIONOYSTEM (RIDS)
ACCESSION NBR:9603270303          DOC.DATE:  96/03/21    NOTARIZED: NO                  DOCKET FACIL:50-335 St. Lucie Plant, Unit 3., Florida Power              &  Light  Co.          05000335 50-389 St. Lucre Plant, Unit 2, Florida Power              a  Light  Co.          05000389 AUTH. NAME          AUTHOR'AFFILIATION BOHLKE,W.H.          Florida Power 6 Light Co.
RECIP.NAME          RECIPIENT AFFILIATION Document Control Branch (Document            Control  Desk)~~


==SUBJECT:==
==SUBJECT:==
Forwards"SSLucreNuclearPlantStatusMeetingforUnits1a2."rACCESSIONNBR:9603270303DOC.DATE:96/03/21NOTARIZED:NOFACIL:50-335St.LuciePlant,Unit3.,FloridaPower&LightCo.50-389St.LucrePlant,Unit2,FloridaPoweraLightCo.AUTH.NAMEAUTHOR'AFFILIATIONBOHLKE,W.H.FloridaPower6LightCo.RECIP.NAMERECIPIENTAFFILIATIONDocumentControlBranch(DocumentControlDesk)~~DISTRIBUTIONCODE:A001DCOPIESRECEIVED:LTRiENCLITITLE:ORSubmittal:GeneralDistributionNOTES:SIZE:I+:TEeRECIPIENTIDCODE/PAMEPD2-1LANORRISEJINTERNAL:ACRSNRR/DE/EMCBNRR/DSSA/SPLBNUDOCS-ABSTRACTEXTERNAL:NOACCOPIESLTTRENCI11116611111RECIPIENTIDCODE/NAMEPD2-1PDLECENTER0NRRDRCH+HCBNRR/DSSA/SRXBOGC/HDS3NRCPDRCOPIES'TTRENCL1111111110110CUNOTETOALLMRZDSMRECIPIENTS'!"PLEASEHELPUSTOREDUCEWASTEICONTACTTHEDOCUMENTCONTROLDESKIROOMOWFNSD-S(EXT,41S"2083)TOELIMINATEYOURNAMEFROMDISTRIBUTIONLISTSFORDOCUMENTSYOUDON'TNEEDlTOTALNUMBEROFCOPIESREQUIRED:LTTR18ENCL17 March21,1996L-96-7610CFR50.4U.S.NuclearRegulatoryCommissionAttn:DocumentControlDeskWashington,DC20555RE:St.LucieUnits1and2DocketNos.50-335and50-389DuringaNovember1995meetingwiththeNRC,FloridaPowerandLightCompany(FPL)reviewedtheprogressmadeincompletingactivitiesoutlinedintheSt.LuciePlantoImproveOperationalPerformance.FPLstatedthatmeetingstoreviewperformancewouldbeheldmonthlyandwouldincludeadetailedreviewoftheplant'skeyperformanceindicators.IntheNovembermeeting,FPLcommittedtoprovidethemonthlyreviewmaterialstotheNRC.AttachedisacopyofthematerialsreviewedduringtheMarch15,1996,FPLManagementReviewMeetingincludingthekeyperformanceindicatorsforSt.LuciePlant.WelookforwardtoNRCpresenceandfeedbackatthesemonthlymeetings.Ifyouhaveanyquestionsonthismaterial,pleasecontactus.Verytrulyyours,W.H.BohlkeVicePresidentSt.LuciePlantWHB/GRMCC'tewartD.Ebneter,RegionalAdministrator,USNRC,RegionIIEllisW.Merschoff,Director,DRP,USNRC,RegionIIKerryD.Landis,BranchChief,USNRC,RegionIISeniorResidentInspector,USNRC,St.LuciePlantJanNorris,SeniorProjectManager,USNRC,NRR~tngh)9603270303960321PDRADQCK05000335PDR0anFPLGroupcompany 0II\1l  
Forwards     "SS  Lucre Nuclear Plant Status Meeting          for Units      1 a  2."
}}
DISTRIBUTION CODE:A001D        COPIES RECEIVED:LTR      i  ENCL    I  SIZE:   I    +:
TITLE: OR  Submittal: General Distribution                                                      T NOTES:                                                                                             E e
RECIPIENT          COPIES            RECIPIENT            COPIES ID CODE/PAME        LTTR ENCI        ID  CODE/NAME                ENCL
                                                                                      'TTR PD2-1 LA                  1    1      PD2-1 PD                  1      1                0 NORRISEJ                  1    1 INTERNAL: ACRS                        6    6        LE CENTER    0        1      1 NRR/DE/EMCB              1    1      NRR DRCH+H CB            1      1 NRR/DSSA/SPLB                  1      NRR/DSSA/SRXB            1      1 NUDOCS-ABSTRACT                      OGC/HDS3                  1      0 EXTERNAL: NOAC                        1    1      NRC PDR                  1      1 C
U NOTE TO ALL MRZDSM RECIPIENTS'!"
PLEASE HELP US TO REDUCE WASTEI CONTACT THE DOCUMENT CONTROL DESKI ROOM OWFN SD-S(EXT, 41S"2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEEDl TOTAL NUMBER OF COPIES REQUIRED: LTTR            18  ENCL    17
 
March 21, 1996 L-96-76 10 CFR  50.4 U. S.     Nuclear Regulatory Commission Attn:       Document Control Desk Washington,         DC  20555 RE:       St. Lucie Units      1 and 2 Docket Nos. 50-335 and 50-389 During a November 1995 meeting with the NRC, Florida Power and Light        Company (FPL) reviewed the progress made in completing activities outlined in the St. Lucie Plan to Improve Operational Performance.           FPL stated that meetings to review performance would be held monthly and would include a detailed review of the plant's key performance indicators. In the November meeting, FPL committed to provide the monthly review materials to the NRC.
Attached        is a copy of the materials reviewed during the March 15, 1996, FPL Management Review Meeting including the key performance indicators for St. Lucie Plant.
We look forward to NRC presence              and feedback at these monthly meetings.
contact us.
If  you have  any questions on this  material, please Very      truly    yours, W. H.     Bohlke Vice President St. Lucie Plant WHB/GRM CC'tewart D.
Ellis      W.
Ebneter, Regional Administrator, USNRC, Region Merschoff, Director, DRP, USNRC, Region II II Kerry D. Landis, Branch Chief, USNRC, Region II Senior Resident Inspector, USNRC, St. Lucie Plant Jan Norris, Senior Project Manager, USNRC, NRR 9603270303 960321
                            ~tngh )
PDR      ADQCK 05000335 PDR                                              0 an FPL Group company
 
0  II \
1l}}

Latest revision as of 22:01, 29 October 2019

Forwards St Lucie Nuclear Plant Status Meeting for Units 1 & 2.
ML17228B436
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 03/21/1996
From: Bohlke W
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17228B437 List:
References
L-96-76, NUDOCS 9603270303
Download: ML17228B436 (3)


Text

.CATEGORY 1 r REGUD)(Ti~i'N(rORMATION DISTRIBUTIONOYSTEM (RIDS)

ACCESSION NBR:9603270303 DOC.DATE: 96/03/21 NOTARIZED: NO DOCKET FACIL:50-335 St. Lucie Plant, Unit 3., Florida Power & Light Co. 05000335 50-389 St. Lucre Plant, Unit 2, Florida Power a Light Co. 05000389 AUTH. NAME AUTHOR'AFFILIATION BOHLKE,W.H. Florida Power 6 Light Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)~~

SUBJECT:

Forwards "SS Lucre Nuclear Plant Status Meeting for Units 1 a 2."

DISTRIBUTION CODE:A001D COPIES RECEIVED:LTR i ENCL I SIZE: I +:

TITLE: OR Submittal: General Distribution T NOTES: E e

RECIPIENT COPIES RECIPIENT COPIES ID CODE/PAME LTTR ENCI ID CODE/NAME ENCL

'TTR PD2-1 LA 1 1 PD2-1 PD 1 1 0 NORRISEJ 1 1 INTERNAL: ACRS 6 6 LE CENTER 0 1 1 NRR/DE/EMCB 1 1 NRR DRCH+H CB 1 1 NRR/DSSA/SPLB 1 NRR/DSSA/SRXB 1 1 NUDOCS-ABSTRACT OGC/HDS3 1 0 EXTERNAL: NOAC 1 1 NRC PDR 1 1 C

U NOTE TO ALL MRZDSM RECIPIENTS'!"

PLEASE HELP US TO REDUCE WASTEI CONTACT THE DOCUMENT CONTROL DESKI ROOM OWFN SD-S(EXT, 41S"2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEEDl TOTAL NUMBER OF COPIES REQUIRED: LTTR 18 ENCL 17

March 21, 1996 L-96-76 10 CFR 50.4 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 RE: St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 During a November 1995 meeting with the NRC, Florida Power and Light Company (FPL) reviewed the progress made in completing activities outlined in the St. Lucie Plan to Improve Operational Performance. FPL stated that meetings to review performance would be held monthly and would include a detailed review of the plant's key performance indicators. In the November meeting, FPL committed to provide the monthly review materials to the NRC.

Attached is a copy of the materials reviewed during the March 15, 1996, FPL Management Review Meeting including the key performance indicators for St. Lucie Plant.

We look forward to NRC presence and feedback at these monthly meetings.

contact us.

If you have any questions on this material, please Very truly yours, W. H. Bohlke Vice President St. Lucie Plant WHB/GRM CC'tewart D.

Ellis W.

Ebneter, Regional Administrator, USNRC, Region Merschoff, Director, DRP, USNRC, Region II II Kerry D. Landis, Branch Chief, USNRC, Region II Senior Resident Inspector, USNRC, St. Lucie Plant Jan Norris, Senior Project Manager, USNRC, NRR 9603270303 960321

~tngh )

PDR ADQCK 05000335 PDR 0 an FPL Group company

0 II \

1l