{{#Wiki_filter:.CATEGORY 1 REGUD)(Ti~i'N(rORMATION DISTRIBUTIONOYSTEM (RIDS)DOCKET 05000335 05000389  
{{#Wiki_filter:.CATEGORY 1 r                    REGUD)(Ti~i'N(rORMATION DISTRIBUTIONOYSTEM (RIDS)
ACCESSION NBR:9603270303          DOC.DATE:  96/03/21    NOTARIZED: NO                  DOCKET FACIL:50-335 St. Lucie Plant, Unit 3., Florida Power              &  Light  Co.          05000335 50-389 St. Lucre Plant, Unit 2, Florida Power              a  Light  Co.          05000389 AUTH. NAME          AUTHOR'AFFILIATION BOHLKE,W.H.          Florida Power 6 Light Co.
RECIP.NAME          RECIPIENT AFFILIATION Document Control Branch (Document            Control  Desk)~~


==SUBJECT:==
==SUBJECT:==
Forwards"SS Lucre Nuclear Plant Status Meeting for Units 1 a 2." r ACCESSION NBR:9603270303 DOC.DATE: 96/03/21 NOTARIZED:
Forwards     "SS Lucre Nuclear Plant Status Meeting           for Units       1 a 2."
NO FACIL:50-335 St.Lucie Plant, Unit 3., Florida Power&Light Co.50-389 St.Lucre Plant, Unit 2, Florida Power a Light Co.AUTH.NAME AUTHOR'AFFILIATION BOHLKE,W.H.
DISTRIBUTION CODE:A001D       COPIES RECEIVED:LTR       i ENCL   I   SIZE:  I    +:
Florida Power 6 Light Co.RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)~~DISTRIBUTION CODE:A001D COPIES RECEIVED:LTR i ENCL I TITLE: OR Submittal:
TITLE: OR   Submittal: General Distribution                                                       T NOTES:                                                                                             E e
General Distribution NOTES: SIZE: I+: T E e RECIPIENT ID CODE/PAME PD2-1 LA NORRISEJ INTERNAL: ACRS NRR/DE/EMCB NRR/DSSA/SPLB NUDOCS-ABSTRACT EXTERNAL: NOAC COPIES LTTR ENCI 1 1 1 1 6 6 1 1 1 1 1 RECIPIENT ID CODE/NAME PD2-1 PD LE CENTER 0 NRR DRCH+H CB NRR/DSSA/SRXB OGC/HDS3 NRC PDR COPIES'TTR ENCL 1 1 1 1 1 1 1 1 1 0 1 1 0 C U NOTE TO ALL MRZDSM RECIPIENTS'!" PLEASE HELP US TO REDUCE WASTEI CONTACT THE DOCUMENT CONTROL DESKI ROOM OWFN SD-S(EXT, 41S"2083)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEEDl TOTAL NUMBER OF COPIES REQUIRED: LTTR 18 ENCL 17 March 21, 1996 L-96-76 10 CFR 50.4 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 RE: St.Lucie Units 1 and 2 Docket Nos.50-335 and 50-389 During a November 1995 meeting with the NRC, Florida Power and Light Company (FPL)reviewed the progress made in completing activities outlined in the St.Lucie Plan to Improve Operational Performance.
RECIPIENT          COPIES            RECIPIENT           COPIES ID CODE/PAME         LTTR ENCI        ID  CODE/NAME                ENCL
FPL stated that meetings to review performance would be held monthly and would include a detailed review of the plant's key performance indicators.
                                                                                      'TTR PD2-1 LA                 1    1      PD2-1 PD                  1      1                0 NORRISEJ                 1    1 INTERNAL: ACRS                       6    6        LE CENTER    0        1      1 NRR/DE/EMCB               1   1     NRR DRCH+H CB             1      1 NRR/DSSA/SPLB                  1      NRR/DSSA/SRXB             1      1 NUDOCS-ABSTRACT                      OGC/HDS3                 1     0 EXTERNAL: NOAC                        1   1     NRC PDR                  1     1 C
In the November meeting, FPL committed to provide the monthly review materials to the NRC.Attached is a copy of the materials reviewed during the March 15, 1996, FPL Management Review Meeting including the key performance indicators for St.Lucie Plant.We look forward to NRC presence and feedback at these monthly meetings.If you have any questions on this material, please contact us.Very truly yours, W.H.Bohlke Vice President St.Lucie Plant WHB/GRM CC'tewart D.Ebneter, Regional Administrator, USNRC, Region II Ellis W.Merschoff, Director, DRP, USNRC, Region II Kerry D.Landis, Branch Chief, USNRC, Region II Senior Resident Inspector, USNRC, St.Lucie Plant Jan Norris, Senior Project Manager, USNRC, NRR~tngh)9603270303 960321 PDR ADQCK 05000335 PDR 0 an FPL Group company 0 II\1l}}
U NOTE TO ALL MRZDSM RECIPIENTS'!"
PLEASE HELP US TO REDUCE WASTEI CONTACT THE DOCUMENT CONTROL DESKI ROOM OWFN SD-S(EXT, 41S"2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEEDl TOTAL NUMBER OF COPIES REQUIRED: LTTR           18   ENCL     17
 
March 21, 1996 L-96-76 10 CFR 50.4 U. S.     Nuclear Regulatory Commission Attn:       Document Control Desk Washington,         DC 20555 RE:       St. Lucie Units       1 and 2 Docket Nos. 50-335 and 50-389 During a November 1995 meeting with the NRC, Florida Power and Light       Company (FPL) reviewed the progress made in completing activities outlined in the St. Lucie Plan to Improve Operational Performance.           FPL stated that meetings to review performance would be held monthly and would include a detailed review of the plant's key performance indicators. In the November meeting, FPL committed to provide the monthly review materials to the NRC.
Attached         is a copy of the materials reviewed during the March 15, 1996, FPL Management Review Meeting including the key performance indicators for St. Lucie Plant.
We look forward to NRC presence               and feedback at these monthly meetings.
contact us.
If you have   any questions on this material, please Very     truly     yours, W. H.     Bohlke Vice President St. Lucie Plant WHB/GRM CC'tewart D.
Ellis      W.
Ebneter, Regional Administrator, USNRC, Region Merschoff, Director, DRP, USNRC, Region II II Kerry D. Landis, Branch Chief, USNRC, Region II Senior Resident Inspector, USNRC, St. Lucie Plant Jan Norris, Senior Project Manager, USNRC, NRR 9603270303 960321
                            ~tngh )
PDR     ADQCK 05000335 PDR                                             0 an FPL Group company
 
0   II \
1l}}

Latest revision as of 21:01, 29 October 2019

Forwards St Lucie Nuclear Plant Status Meeting for Units 1 & 2.
ML17228B436
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 03/21/1996
From: Bohlke W
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17228B437 List:
References
L-96-76, NUDOCS 9603270303
Download: ML17228B436 (3)


Text

.CATEGORY 1 r REGUD)(Ti~i'N(rORMATION DISTRIBUTIONOYSTEM (RIDS)

ACCESSION NBR:9603270303 DOC.DATE: 96/03/21 NOTARIZED: NO DOCKET FACIL:50-335 St. Lucie Plant, Unit 3., Florida Power & Light Co. 05000335 50-389 St. Lucre Plant, Unit 2, Florida Power a Light Co. 05000389 AUTH. NAME AUTHOR'AFFILIATION BOHLKE,W.H. Florida Power 6 Light Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)~~

SUBJECT:

Forwards "SS Lucre Nuclear Plant Status Meeting for Units 1 a 2."

DISTRIBUTION CODE:A001D COPIES RECEIVED:LTR i ENCL I SIZE: I +:

TITLE: OR Submittal: General Distribution T NOTES: E e

RECIPIENT COPIES RECIPIENT COPIES ID CODE/PAME LTTR ENCI ID CODE/NAME ENCL

'TTR PD2-1 LA 1 1 PD2-1 PD 1 1 0 NORRISEJ 1 1 INTERNAL: ACRS 6 6 LE CENTER 0 1 1 NRR/DE/EMCB 1 1 NRR DRCH+H CB 1 1 NRR/DSSA/SPLB 1 NRR/DSSA/SRXB 1 1 NUDOCS-ABSTRACT OGC/HDS3 1 0 EXTERNAL: NOAC 1 1 NRC PDR 1 1 C

U NOTE TO ALL MRZDSM RECIPIENTS'!"

PLEASE HELP US TO REDUCE WASTEI CONTACT THE DOCUMENT CONTROL DESKI ROOM OWFN SD-S(EXT, 41S"2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEEDl TOTAL NUMBER OF COPIES REQUIRED: LTTR 18 ENCL 17

March 21, 1996 L-96-76 10 CFR 50.4 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 RE: St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 During a November 1995 meeting with the NRC, Florida Power and Light Company (FPL) reviewed the progress made in completing activities outlined in the St. Lucie Plan to Improve Operational Performance. FPL stated that meetings to review performance would be held monthly and would include a detailed review of the plant's key performance indicators. In the November meeting, FPL committed to provide the monthly review materials to the NRC.

Attached is a copy of the materials reviewed during the March 15, 1996, FPL Management Review Meeting including the key performance indicators for St. Lucie Plant.

We look forward to NRC presence and feedback at these monthly meetings.

contact us.

If you have any questions on this material, please Very truly yours, W. H. Bohlke Vice President St. Lucie Plant WHB/GRM CC'tewart D.

Ellis W.

Ebneter, Regional Administrator, USNRC, Region Merschoff, Director, DRP, USNRC, Region II II Kerry D. Landis, Branch Chief, USNRC, Region II Senior Resident Inspector, USNRC, St. Lucie Plant Jan Norris, Senior Project Manager, USNRC, NRR 9603270303 960321

~tngh )

PDR ADQCK 05000335 PDR 0 an FPL Group company