ML17228B467: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(6 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 04/18/1996
| issue date = 04/18/1996
| title = Provides Response to GL 96-01, Testing of Safety Related Logic Circuits, for Units 1 & 2
| title = Provides Response to GL 96-01, Testing of Safety Related Logic Circuits, for Units 1 & 2
| author name = BOHLKE W H
| author name = Bohlke W
| author affiliation = FLORIDA POWER & LIGHT CO.
| author affiliation = FLORIDA POWER & LIGHT CO.
| addressee name =  
| addressee name =  
Line 13: Line 13:
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE
| page count = 7
| page count = 7
| revision = 0
}}
}}
=Text=
{{#Wiki_filter:CATEGORY 1
                  ,REGULATO      INFORMATION DISTRIBUTION          . TEM (RIDS)
ACCESS.(ph'BA:9604220398          DOC.DATE: 96/04/18        NOTARIZED: YES                  DOCKET FAC".::50-335 St. Lucie Plant, Unit 1, Florida Power & Light Co.                            05000335 50-389 St. Lucie Plant, Unit 2, Florida Power & Light Co.                            05000389 AUTH. NAME          AUTHOR AFFILIATION BOHLKE,W.H.        Florida    Power & Light Co.
RECIP.NAME          RECIPIENT AFFILIATION Document Control Branch (Document            Control Desk)
==SUBJECT:==
Provides response to GL 96-01, "Testing of Safety Related Logic Circuits," for Units 1 & 2.
DISTRIBUTION CODE: B067D        COPIES RECEIVED:LTR      I  ENCL    (  SIZE:
TITLE:  GL  96-01 Response-Testing      of Safety-Related Logic NOTES:
RECIPIENT          COPIES            RECIPIENT-            COPIES.'TTR ID CODE/NAME        LTTR ENCL        ID CODE/NAME                        ENCL PD3-3 ~EIII YiG          1    1      NORRIS I J                '1 INTERNAL: F    E CENTER    1        1    1      NRR/DRCH/HICB              1            1' EXTERNAL: NOAC                      1    1      NRC PDR                                1 NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTEI CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN SD-5(EXT. 415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEEDI TOTAL NUMBER OF COPIES REQUIRED: LT'IR            6  ENCL      6
Florida Power tk Light Company, P.O. Box128, Fort Pierce, FL 34954-0128 L-96-88 April      18, 1996                        10 CFR        50.4 10 CFR 50            54    (f)
U. S.      Nuclear Regulatory Commission Attn:      Document Control Desk Washington,        D. C. 20555 RE:      St. Lucie Units      1 and 2 Docket Nos. 50-335 and 50-389 Generic Letter 96-01  Initial Res onse This      letter    provides the Florida Power and Light Company (FPL) initial response to Generic Letter (GL) 96-01 "Testing of Safety Related Logic Circuits" for St. Lucie Units 1 and 2.                                                The GL initially requested a written response within sixty days of January 10, 1996, indicating FPL's intentions to implement the actions requested in the GL and a schedule for completion. The response date was extended to April- 18, 1996, by NRC- letter to Nuclear Energy      Institute    (NEI) dated February 14, 1996.
FPL plans to take credit for reviews of the integrated safeguards surveillance procedures for each unit which were previously completed.          The St. Lucie Units 1 and 2 Operating Procedures, Peri odi c Integrated Test of Engineered Safety Features, were reviewed against control schematic/wiring diagrams for the safeguards equipment and the circuits analyzed to verify that all circuit components necessary for the equipment to perform their safety functions during a loss-of-offsite-power (LOOP), LOOP with a loss-of-coolant-accident            (LOCA), and LOCA were tested.                                  These reviews included bus alignments for swing components.                                      The Unit 1 procedure revisions were completed in the Fall of 1994 and the Unit 2 procedure revisions were completed in the Fall of 1995.
FPL plans to implement the actions requested in accordance with the schedule in the GL.              The additional reviews and any necessary procedure changes for St. Lucie Unit 2 will be completed prior to startup from the Spring 1997 refueling outage (SL2-10).                                                    The additional reviews and any necessary procedure changes for St.
Lucie Unit 1 will be completed prior to startup from the Spring 1998 refueling outage (SL1-15).- FPL will notify the NRC in writing within 30 days of completing the requested actions for each unit.
9604220398 9604i8 PDR      ADQCK 05000335 P                      PDR an FPL Group company
      'I 1 p' II e
St. Lucie Units    1  and 2 Docket Nos. 50-335 and 50-389 Generic Letter 96-01  Initial Res onse This information is provided pursuant to the requirements of Section 182a of the Atomic Energy Act of 1954, as amended, and 10 CFR  50.54  (f) .
Please contact us    if there are any questions about this submittal.
Very  truly  yours, W.H. Bo  lke Vice President St. Lucie Plant WHB/GRM cc:  Stewart D. Ebneter, Regional Administrator, Region    II, USNRC Senior Resident Inspector, USNRC, St. Lucie Plant
f1 St. Lucie Units      1  and  2 Docket Nos. 50-335 and 50-389 Generic Letter 96-01  Initial Res onse STATE OF FLORIDA              )
                              )
COUNTY OF PALM BEACH          )
W. H. Bohlke being      first    duly sworn,'deposes  and says:
That he  is Vice President, St. Lucie Plant for the Nuclear Division of Florida    Power    6  Light    Company, the Licensee herein; That he has executed the foregoing document; that the statements made in this document are true and correct to the best of his knowledge, information and belief, and that he is authorized to execute the document on behalf of said Licensee.
W.  . Bohlke STATE OF FLORIDA COUNTY OF        St. Lucie The  foregoing instrument        was acknowledged  before me  this l94h      day    of A                  , 19't(
by  W. H. Bohlke, who is personally known to          me and who  did take an oath.
ygglllil///////
A IN+i+
Name  of Notary Public My Commission    expires                                        YACC 477524 Commission No.      Q.Q  0  ) lGQ/-I
                                                                  ///pcinlb4
I II I
I C
Ill I
I V
I',        I}}

Latest revision as of 22:01, 29 October 2019

Provides Response to GL 96-01, Testing of Safety Related Logic Circuits, for Units 1 & 2
ML17228B467
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 04/18/1996
From: Bohlke W
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-96-01, GL-96-1, L-96-88, NUDOCS 9604220398
Download: ML17228B467 (7)


Text

CATEGORY 1

,REGULATO INFORMATION DISTRIBUTION . TEM (RIDS)

ACCESS.(ph'BA:9604220398 DOC.DATE: 96/04/18 NOTARIZED: YES DOCKET FAC".::50-335 St. Lucie Plant, Unit 1, Florida Power & Light Co. 05000335 50-389 St. Lucie Plant, Unit 2, Florida Power & Light Co. 05000389 AUTH. NAME AUTHOR AFFILIATION BOHLKE,W.H. Florida Power & Light Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Provides response to GL 96-01, "Testing of Safety Related Logic Circuits," for Units 1 & 2.

DISTRIBUTION CODE: B067D COPIES RECEIVED:LTR I ENCL ( SIZE:

TITLE: GL 96-01 Response-Testing of Safety-Related Logic NOTES:

RECIPIENT COPIES RECIPIENT- COPIES.'TTR ID CODE/NAME LTTR ENCL ID CODE/NAME ENCL PD3-3 ~EIII YiG 1 1 NORRIS I J '1 INTERNAL: F E CENTER 1 1 1 NRR/DRCH/HICB 1 1' EXTERNAL: NOAC 1 1 NRC PDR 1 NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTEI CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN SD-5(EXT. 415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEEDI TOTAL NUMBER OF COPIES REQUIRED: LT'IR 6 ENCL 6

Florida Power tk Light Company, P.O. Box128, Fort Pierce, FL 34954-0128 L-96-88 April 18, 1996 10 CFR 50.4 10 CFR 50 54 (f)

U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 RE: St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Generic Letter 96-01 Initial Res onse This letter provides the Florida Power and Light Company (FPL) initial response to Generic Letter (GL) 96-01 "Testing of Safety Related Logic Circuits" for St. Lucie Units 1 and 2. The GL initially requested a written response within sixty days of January 10, 1996, indicating FPL's intentions to implement the actions requested in the GL and a schedule for completion. The response date was extended to April- 18, 1996, by NRC- letter to Nuclear Energy Institute (NEI) dated February 14, 1996.

FPL plans to take credit for reviews of the integrated safeguards surveillance procedures for each unit which were previously completed. The St. Lucie Units 1 and 2 Operating Procedures, Peri odi c Integrated Test of Engineered Safety Features, were reviewed against control schematic/wiring diagrams for the safeguards equipment and the circuits analyzed to verify that all circuit components necessary for the equipment to perform their safety functions during a loss-of-offsite-power (LOOP), LOOP with a loss-of-coolant-accident (LOCA), and LOCA were tested. These reviews included bus alignments for swing components. The Unit 1 procedure revisions were completed in the Fall of 1994 and the Unit 2 procedure revisions were completed in the Fall of 1995.

FPL plans to implement the actions requested in accordance with the schedule in the GL. The additional reviews and any necessary procedure changes for St. Lucie Unit 2 will be completed prior to startup from the Spring 1997 refueling outage (SL2-10). The additional reviews and any necessary procedure changes for St.

Lucie Unit 1 will be completed prior to startup from the Spring 1998 refueling outage (SL1-15).- FPL will notify the NRC in writing within 30 days of completing the requested actions for each unit.

9604220398 9604i8 PDR ADQCK 05000335 P PDR an FPL Group company

'I 1 p' II e

St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Generic Letter 96-01 Initial Res onse This information is provided pursuant to the requirements of Section 182a of the Atomic Energy Act of 1954, as amended, and 10 CFR 50.54 (f) .

Please contact us if there are any questions about this submittal.

Very truly yours, W.H. Bo lke Vice President St. Lucie Plant WHB/GRM cc: Stewart D. Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, St. Lucie Plant

f1 St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Generic Letter 96-01 Initial Res onse STATE OF FLORIDA )

)

COUNTY OF PALM BEACH )

W. H. Bohlke being first duly sworn,'deposes and says:

That he is Vice President, St. Lucie Plant for the Nuclear Division of Florida Power 6 Light Company, the Licensee herein; That he has executed the foregoing document; that the statements made in this document are true and correct to the best of his knowledge, information and belief, and that he is authorized to execute the document on behalf of said Licensee.

W. . Bohlke STATE OF FLORIDA COUNTY OF St. Lucie The foregoing instrument was acknowledged before me this l94h day of A , 19't(

by W. H. Bohlke, who is personally known to me and who did take an oath.

ygglllil///////

A IN+i+

Name of Notary Public My Commission expires YACC 477524 Commission No. Q.Q 0 ) lGQ/-I

///pcinlb4

I II I

I C

Ill I

I V

I', I