ML17228B476: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
| issue date = 04/23/1996
| issue date = 04/23/1996
| title = Forwards St Lucie Nuclear Plant Status Meeting for Units 1 & 2.
| title = Forwards St Lucie Nuclear Plant Status Meeting for Units 1 & 2.
| author name = BOHLKE W H
| author name = Bohlke W
| author affiliation = FLORIDA POWER & LIGHT CO.
| author affiliation = FLORIDA POWER & LIGHT CO.
| addressee name =  
| addressee name =  
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:CATEGORY j., REGULAT INFORMATION DISTRIBUTIO SYSTEM (RIDS)0 ACCESSION NBR:9604300237 DOC.DATE: 96/04/23 NOTARIZED:
{{#Wiki_filter:CATEGORY               j.,
NO FACIL:50-335 St.Lucie Plant, Unit 1, Florida Power a Light Co.50-389 St.Lucie Plant, Unit 2, Florida Power&Light Co.AUTH.NAME AUTHOR AFFILIATION BOHLKE,W.H.
0 REGULAT       INFORMATION DISTRIBUTIO         SYSTEM   (RIDS)
Florida Power a Light Co.RECIP.NAME RECIPIENT AFFILIATION AeP Document Control Branch (Document Control Desk)DOCKET I 05000335 05000389
ACCESSION NBR:9604300237           DOC.DATE:   96/04/23     NOTARIZED: NO             DOCKET  I FACIL:50-335 St. Lucie Plant, Unit 1, Florida Power               a   Light   Co.     05000335 50-389 St. Lucie Plant, Unit 2, Florida Power             &   Light   Co.     05000389 AUTH. NAME           AUTHOR AFFILIATION BOHLKE,W.H.         Florida   Power a Light Co.
RECIP.NAME           RECIPIENT AFFILIATION                                         AeP Document Control Branch (Document           Control Desk)


==SUBJECT:==
==SUBJECT:==
Forwards"St Lucie Nuclear Plant Status Meeting for Units 1 C II A DISTRIBUTION CODE: COOID COPIES RECEIVED:LTR J=ENCL i SIZE:+I~/TITLE: Licensing Submittal:
Forwards "St Lucie Nuclear Plant Status Meeting for Units                 1           C NOTES:
Environmental Rept Amdt 6 Related Correspondence T NOTES: E RECIPIENT ID CODE/NAME PD2-1 PD INTERNAL: ACRS NUDOCS-ABSTRACT RGN2 DRSS/RPB EXTERNAL: LITCO AKERS,D NRC PDR COPIES LTTR ENCL 1 1 6 6 1 1 1 1 1 1 1 1 RECIPIENT--ID CODE/NAME NORRIS,J FILE CENTER 1 OGC HDS3 NOAC.COPIES LTTR ENCL 1 1 1 1 1 0 1 1 D E N NOTE TO ALL"RIDS" RECIPIENTS:
II DISTRIBUTION CODE: COOID         COPIES RECEIVED:LTR TITLE: Licensing Submittal: Environmental Rept Amdt J   =ENCL 6
PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN SD-5(EXT.415-2083)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR'5 ENCI'4 I II~l 0 i 0 Florida Power 5 Light Company, P.O.Box 128, Fort Pierce, FL 34954-0128 April 23, 1996 L-96-109 10 CFR 50.4 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 RE: St.Lucie Units 1 and 2 Docket Nos.50-335 and 50-389 Mana ement Review Meetin-A ril 1996 During a November 1995 meeting with the NRC, Florida Power and Light Company (FPL)reviewed the progress made in completing activities outlined in the St.Lucie Plan to Improve Operational Performance.
i   SIZE:     + I~/
FPL stated that meetings to review performance would be held monthly and would include a detailed review of the plant's key performance indicators.
Related Correspondence A
In the November meeting, FPL committed to provide the monthly review materials to the NRC.Attached is a copy of the materials reviewed during the April 18, 1996, FPL Management Review Meeting including the key performance indicators for St.Lucie Plant.We look forward to NRC presence and feedback at these monthly meetings.If you have any questions on this material, please contact us.Very truly yours, W.H.Bohlke Vice President St.Lucie Plant'Pb04300237
T E
'Pb0423 PDR ADDCK 05000335 P PDR Cct Stewart D.Ebneter, Regional Administrator, USNRC, Region II Ellis W.Merschoff, Director, DRP, USNRC, Region II Kerry D.Landis, Branch Chief, USNRC, Region II Senior Resident Inspector, USNRC, St.Lucie Plant Jan Norris, Senior Project Manager, USNRC, NRR an FPL Group company}}
RECIPIENT            COPIES              RECIPIENT           .COPIES ID CODE/NAME          LTTR ENCL      -
ID CODE/NAME         LTTR ENCL PD2-1 PD                 1    1      NORRIS,J                  1    1 INTERNAL: ACRS                       6    6      FILE  CENTER      1      1    1 NUDOCS-ABSTRACT         1    1      OGC HDS3                  1    0 RGN2     DRSS/RPB       1    1 EXTERNAL: LITCO AKERS,D               1     1       NOAC                       1     1 NRC PDR                  1     1 D
E N
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN SD-5(EXT. 415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR           '5     ENCI   '4
 
I     l II 0
        ~
i
 
0             Florida Power 5 Light Company, P.O. Box 128, Fort Pierce, FL 34954-0128 April 23,         1996 L-96-109 10 CFR 50.4 U. S. Nuclear Regulatory Commission Attn:     Document Control Desk Washington, DC 20555 RE:       St. Lucie Units       1 and 2 Docket Nos. 50-335 and 50-389 Mana ement Review Meetin A                 ril 1996 During       a November     1995 meeting       with the NRC, Florida Power and Light       Company     (FPL) reviewed         the progress made in completing activities outlined in the St. Lucie Plan to Improve Operational Performance.           FPL stated that meetings to review performance would be held monthly and would include a detailed review of the plant's key performance indicators. In the November meeting, FPL committed to provide the monthly review materials to the NRC.
Attached       is a copy of the materials             reviewed during the April 18, 1996,     FPL Management Review Meeting               including the key performance indicators for St. Lucie Plant.
We look forward to NRC presence                     and feedback at these monthly meetings.
contact us.
If you have any questions on this material, please Very     truly     yours, W. H. Bohlke Vice President St. Lucie Plant
                        'Pb04300237 'Pb0423 PDR   ADDCK 05000335 P                   PDR Cct Stewart D. Ebneter, Regional Administrator, USNRC, Region                                           II Ellis     W. Merschoff, Director, DRP, USNRC, Region II Kerry D. Landis, Branch Chief, USNRC, Region II Senior Resident Inspector, USNRC, St. Lucie Plant Jan Norris, Senior Project Manager, USNRC, NRR an FPL Group company}}

Latest revision as of 21:01, 29 October 2019

Forwards St Lucie Nuclear Plant Status Meeting for Units 1 & 2.
ML17228B476
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 04/23/1996
From: Bohlke W
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17228B477 List:
References
L-96-109, NUDOCS 9604300237
Download: ML17228B476 (3)


Text

CATEGORY j.,

0 REGULAT INFORMATION DISTRIBUTIO SYSTEM (RIDS)

ACCESSION NBR:9604300237 DOC.DATE: 96/04/23 NOTARIZED: NO DOCKET I FACIL:50-335 St. Lucie Plant, Unit 1, Florida Power a Light Co. 05000335 50-389 St. Lucie Plant, Unit 2, Florida Power & Light Co. 05000389 AUTH. NAME AUTHOR AFFILIATION BOHLKE,W.H. Florida Power a Light Co.

RECIP.NAME RECIPIENT AFFILIATION AeP Document Control Branch (Document Control Desk)

SUBJECT:

Forwards "St Lucie Nuclear Plant Status Meeting for Units 1 C NOTES:

II DISTRIBUTION CODE: COOID COPIES RECEIVED:LTR TITLE: Licensing Submittal: Environmental Rept Amdt J =ENCL 6

i SIZE: + I~/

Related Correspondence A

T E

RECIPIENT COPIES RECIPIENT .COPIES ID CODE/NAME LTTR ENCL -

ID CODE/NAME LTTR ENCL PD2-1 PD 1 1 NORRIS,J 1 1 INTERNAL: ACRS 6 6 FILE CENTER 1 1 1 NUDOCS-ABSTRACT 1 1 OGC HDS3 1 0 RGN2 DRSS/RPB 1 1 EXTERNAL: LITCO AKERS,D 1 1 NOAC 1 1 NRC PDR 1 1 D

E N

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN SD-5(EXT. 415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR '5 ENCI '4

I l II 0

~

i

0 Florida Power 5 Light Company, P.O. Box 128, Fort Pierce, FL 34954-0128 April 23, 1996 L-96-109 10 CFR 50.4 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 RE: St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Mana ement Review Meetin A ril 1996 During a November 1995 meeting with the NRC, Florida Power and Light Company (FPL) reviewed the progress made in completing activities outlined in the St. Lucie Plan to Improve Operational Performance. FPL stated that meetings to review performance would be held monthly and would include a detailed review of the plant's key performance indicators. In the November meeting, FPL committed to provide the monthly review materials to the NRC.

Attached is a copy of the materials reviewed during the April 18, 1996, FPL Management Review Meeting including the key performance indicators for St. Lucie Plant.

We look forward to NRC presence and feedback at these monthly meetings.

contact us.

If you have any questions on this material, please Very truly yours, W. H. Bohlke Vice President St. Lucie Plant

'Pb04300237 'Pb0423 PDR ADDCK 05000335 P PDR Cct Stewart D. Ebneter, Regional Administrator, USNRC, Region II Ellis W. Merschoff, Director, DRP, USNRC, Region II Kerry D. Landis, Branch Chief, USNRC, Region II Senior Resident Inspector, USNRC, St. Lucie Plant Jan Norris, Senior Project Manager, USNRC, NRR an FPL Group company