| number = ML17254A054
| number = ML17254A054
| issue date = 09/07/2017
| issue date = 09/07/2017
| title = North Anna, and ISFSI, Surry, and ISFSI, Temporary Modification of Interim Compensatory Measures for Order EA-02-104
| title = ISFSI, Surry, and ISFSI, Temporary Modification of Interim Compensatory Measures for Order EA-02-104
| author name = Stoddard D G
| author name = Stoddard D
| author affiliation = Virginia Electric & Power Co (VEPCO)
| author affiliation = Virginia Electric & Power Co (VEPCO)
| addressee name =  
| addressee name =  
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 September 7, 2017 U.S. Nuclear Regulatory Commission Attention:
{{#Wiki_filter:VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 September 7, 2017 U.S. Nuclear Regulatory Commission                       Serial No.:    17-368 Attention: Document Control Desk                         NRA/MAE:      R1 Washington, D.C. 20555-0001                             Docket Nos.:  72-2/16 License Nos.:  SNM-2501/2507 VIRGINIA ELECTRIC AND POWER COMPANY NORTH .ANNA POWER STATION ISFSI SURRY POWER STATION ISFSI TEMPORARY MODIFICATION OF INTERIM COMPENSATORY MEASURES FOR ORDER EA-02-104 On October 16, 2002, the NRC issued Orders EA-02-104 (the Orders) that modified the specific licenses for North Anna and Surry Power Stations' Independent Spent Fuel Storage Installations (ISFSls). These Orders required compliance with the specified interim safeguards and security compensatory measures. Virginia Electric and Power Company (Dominion Energy Virginia) initially responded to the October 16, 2002 Order in letters dated November 1, 2002 (Serial Nos. 02-646 and 02-647 for North Anna and Surry Power Stations, respectively).
Document Control Desk Washington, D.C. 20555-0001 VIRGINIA ELECTRIC AND POWER COMPANY NORTH .ANNA POWER STATION ISFSI SURRY POWER STATION ISFSI Serial No.: NRA/MAE:
As part of preparations for the arrival of Hurricane Irma, we have assessed our compliance strategy for the Orders and determined that due to presently predicted weather conditions and the concern for security personnel safety, Dominion Energy Virginia may need to temporarily modify our implementation of those interim compensatory measures (ICMs) C.1.b, C.3.a(1), and C.3.d.               Alternate security measures will be initiated when possible based on weather limitations and personnel safety concerns.
Docket Nos.: License Nos.: 17-368 R1 72-2/16 SNM-2501/2507 TEMPORARY MODIFICATION OF INTERIM COMPENSATORY MEASURES FOR ORDER EA-02-104 On October 16, 2002, the NRC issued Orders EA-02-104 (the Orders) that modified the specific licenses for North Anna and Surry Power Stations' Independent Spent Fuel Storage Installations (ISFSls).
Dominion Energy Virginia specifically requests a one-time temporary modification of the implementation of our response to the identified ICMs. This one-time temporary modification will be used as necessary to address the effects of weather and for a period of time corresponding to abnormally high wind conditions and rain due to the passing of Hurricane Irma. This request is necessary to protect security personnel from hazards associated with the weather conditions during the hurricane. Any suspension of security measures due to this weather-related situation will be reported and documented in accordance with the provisions of 10 CFR 73. 71.
These Orders required compliance with the specified interim safeguards and security compensatory measures.
 
Virginia Electric and Power Company (Dominion Energy Virginia) initially responded to the October 16, 2002 Order in letters dated November 1, 2002 (Serial Nos. 02-646 and 02-647 for North Anna and Surry Power Stations, respectively).
As part of preparations for the arrival of Hurricane Irma, we have assessed our compliance strategy for the Orders and determined that due to presently predicted weather conditions and the concern for security personnel safety, Dominion Energy Virginia may need to temporarily modify our implementation of those interim compensatory measures (ICMs) C.1.b, C.3.a(1),
and C.3.d. Alternate security measures will be initiated when possible based on weather limitations and personnel safety concerns.
Dominion Energy Virginia specifically requests a one-time temporary modification of the implementation of our response to the identified ICMs. This one-time temporary modification will be used as necessary to address the effects of weather and for a period of time corresponding to abnormally high wind conditions and rain due to the passing of Hurricane Irma. This request is necessary to protect security personnel from hazards associated with the weather conditions during the hurricane.
Any suspension of security measures due to this weather-related situation will be reported and documented in accordance with the provisions of 10 CFR 73. 71.
Serial No. 17-368 Docket Nos.:72-2/16 Page 2 of 3 If you have any questions, please contact Ms. Margaret A. Earle at (804) 273-2768.
Serial No. 17-368 Docket Nos.:72-2/16 Page 2 of 3 If you have any questions, please contact Ms. Margaret A. Earle at (804) 273-2768.
Sincerely, Daniel G. Stoddard Senior Vice President and Chief Nuclear Officer COMMONWEAL TH OF VIRGINIA COUNTY OF HENRICO . . ' *, *. ! .
Sincerely, Daniel G. Stoddard                                                       . ~ . ' *, *. ! . *~ -~*: ;*  .
;* . The foregoing document was acknowledged before me, in and for the County and Commonwealth aforesaid, today by Daniel G. Stoddard who is Senior Vice President and Chief Nuclear Officer of Virginia Electric and Power Company.
Senior Vice President and Chief Nuclear Officer COMMONWEALTH OF VIRGINIA COUNTY OF HENRICO The foregoing document was acknowledged before me, in and for the County and Commonwealth aforesaid, today by Daniel G. Stoddard who is Senior Vice President and Chief Nuclear Officer of Virginia Electric and Power Company. He has affirmed before me that he is duly authorized to execute and file the foregoing document in behalf of the Company, and that the statements in the document are true to the best of his knowledge and belief.
He has affirmed before me that he is duly authorized to execute and file the foregoing document in behalf of the Company, and that the statements in the document are true to the best of his knowledge and belief. Acknowledged before me this 7 20*X My Commission Expires:
7 ~ay of~('lb~                20*X a/ALL Acknowledged before me this My Commission Expires:       S -3/ - /8               JtJ.c         .
S -3/ -/8 JtJ.c . a/ALL Notary Public Commitments made by this letter: None cc: U. S. Nuclear Regulatory Commission, Region II Attn.: Regional Administrator Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, Georgia 30303-1257  
Notary Public Commitments made by this letter: None cc:     U. S. Nuclear Regulatory Commission, Region II Attn.: Regional Administrator Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, Georgia 30303-1257 Director, Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Ms. Yen-Ju Chen NRC Senior Project Manager U.S. Nuclear Regulatory Commission Mail Stop 4834 Two White Flint North 11545 Rockville Pike Rockville, MD 20852-2738
: Director, Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Ms. Yen-Ju Chen NRC Senior Project Manager U.S. Nuclear Regulatory Commission Mail Stop 4834 Two White Flint North 11545 Rockville Pike Rockville, MD 20852-2738 Ms. K. R. Cotton Gross NRC Project Manager Surry U. S. Nuclear Regulatory Commission Mail Stop 08 G-9A One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 Mr. James R. Hall NRC Senior Project Manager North Anna U.S. Nuclear Regulatory Commission Mail Stop 08 B 1-A One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 NRC Senior Resident Inspector North Anna Power Station NRC Senior Resident Inspector Surry Power Station Serial No. 17 -368 Docket Nos.:72-2/16 Page 3 of 3}}
 
Serial No. 17-368 Docket Nos.:72-2/16 Page 3 of 3 Ms. K. R. Cotton Gross NRC Project Manager Surry U. S. Nuclear Regulatory Commission Mail Stop 08 G-9A One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 Mr. James R. Hall NRC Senior Project Manager North Anna U.S. Nuclear Regulatory Commission Mail Stop 08 B 1-A One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 NRC Senior Resident Inspector North Anna Power Station NRC Senior Resident Inspector Surry Power Station}}

Latest revision as of 19:59, 29 October 2019

ISFSI, Surry, and ISFSI, Temporary Modification of Interim Compensatory Measures for Order EA-02-104
ML17254A054
Person / Time
Site: Surry, North Anna, 07200002  Dominion icon.png
Issue date: 09/07/2017
From: Stoddard D
Virginia Electric & Power Co (VEPCO)
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards
References
17-368, EA-02-104
Download: ML17254A054 (3)


Text

VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 September 7, 2017 U.S. Nuclear Regulatory Commission Serial No.: 17-368 Attention: Document Control Desk NRA/MAE: R1 Washington, D.C. 20555-0001 Docket Nos.: 72-2/16 License Nos.: SNM-2501/2507 VIRGINIA ELECTRIC AND POWER COMPANY NORTH .ANNA POWER STATION ISFSI SURRY POWER STATION ISFSI TEMPORARY MODIFICATION OF INTERIM COMPENSATORY MEASURES FOR ORDER EA-02-104 On October 16, 2002, the NRC issued Orders EA-02-104 (the Orders) that modified the specific licenses for North Anna and Surry Power Stations' Independent Spent Fuel Storage Installations (ISFSls). These Orders required compliance with the specified interim safeguards and security compensatory measures. Virginia Electric and Power Company (Dominion Energy Virginia) initially responded to the October 16, 2002 Order in letters dated November 1, 2002 (Serial Nos.02-646 and 02-647 for North Anna and Surry Power Stations, respectively).

As part of preparations for the arrival of Hurricane Irma, we have assessed our compliance strategy for the Orders and determined that due to presently predicted weather conditions and the concern for security personnel safety, Dominion Energy Virginia may need to temporarily modify our implementation of those interim compensatory measures (ICMs) C.1.b, C.3.a(1), and C.3.d. Alternate security measures will be initiated when possible based on weather limitations and personnel safety concerns.

Dominion Energy Virginia specifically requests a one-time temporary modification of the implementation of our response to the identified ICMs. This one-time temporary modification will be used as necessary to address the effects of weather and for a period of time corresponding to abnormally high wind conditions and rain due to the passing of Hurricane Irma. This request is necessary to protect security personnel from hazards associated with the weather conditions during the hurricane. Any suspension of security measures due to this weather-related situation will be reported and documented in accordance with the provisions of 10 CFR 73. 71.

Serial No.17-368 Docket Nos.:72-2/16 Page 2 of 3 If you have any questions, please contact Ms. Margaret A. Earle at (804) 273-2768.

Sincerely, Daniel G. Stoddard . ~ . ' *, *. ! . *~ -~*: ;* .

Senior Vice President and Chief Nuclear Officer COMMONWEALTH OF VIRGINIA COUNTY OF HENRICO The foregoing document was acknowledged before me, in and for the County and Commonwealth aforesaid, today by Daniel G. Stoddard who is Senior Vice President and Chief Nuclear Officer of Virginia Electric and Power Company. He has affirmed before me that he is duly authorized to execute and file the foregoing document in behalf of the Company, and that the statements in the document are true to the best of his knowledge and belief.

7 ~ay of~('lb~ 20*X a/ALL Acknowledged before me this My Commission Expires: S -3/ - /8 JtJ.c .

Notary Public Commitments made by this letter: None cc: U. S. Nuclear Regulatory Commission, Region II Attn.: Regional Administrator Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, Georgia 30303-1257 Director, Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Ms. Yen-Ju Chen NRC Senior Project Manager U.S. Nuclear Regulatory Commission Mail Stop 4834 Two White Flint North 11545 Rockville Pike Rockville, MD 20852-2738

Serial No.17-368 Docket Nos.:72-2/16 Page 3 of 3 Ms. K. R. Cotton Gross NRC Project Manager Surry U. S. Nuclear Regulatory Commission Mail Stop 08 G-9A One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 Mr. James R. Hall NRC Senior Project Manager North Anna U.S. Nuclear Regulatory Commission Mail Stop 08 B 1-A One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 NRC Senior Resident Inspector North Anna Power Station NRC Senior Resident Inspector Surry Power Station