ML17309A794: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
| issue date = 08/02/1995
| issue date = 08/02/1995
| title = Forwards Suppl to ISI Plan Second ten-yr Interval Revised Stress & Fracture Mechanics Evaluations Pressurizer Instrument Nozzles
| title = Forwards Suppl to ISI Plan Second ten-yr Interval Revised Stress & Fracture Mechanics Evaluations Pressurizer Instrument Nozzles
| author name = SAGER D A
| author name = Sager D
| author affiliation = FLORIDA POWER & LIGHT CO.
| author affiliation = FLORIDA POWER & LIGHT CO.
| addressee name =  
| addressee name =  
Line 18: Line 18:
=Text=
=Text=
{{#Wiki_filter:PRIORITY (ACCELERATED RIDS PROCESSING)
{{#Wiki_filter:PRIORITY (ACCELERATED RIDS PROCESSING)
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSION NBR:9508100176 DOC.DATE: 95/08/02 NOTARIZED:
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
NO DOCKET g FACIL:50-389 St.Lucie Plant, Unit 2, Florida Power&Light Co.05000389 P AUTH.NAME AUTHOR AFFILIATION SAGER,D.A.
ACCESSION NBR:9508100176           DOC.DATE: 95/08/02       NOTARIZED: NO         DOCKET g FACIL:50-389 St. Lucie Plant, Unit 2, Florida Power & Light Co.                   05000389 P AUTH. NAME           AUTHOR AFFILIATION SAGER,D.A.           Florida   Power &. Light Co.
Florida Power&.Light Co.RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
RECIP.NAME           RECIPIENT AFFILIATION Document Control Branch (Document           Control Desk)


==SUBJECT:==
==SUBJECT:==
Forwards suppl to ISI plan second ten-yr interval revised stress&fracture mechanics evaluations pressurizer instrument nozzles.DISTRIBUTION CODE: A047D COPIES RECEIVED: LTR j ENCL j SIZE:2+~i TITLE: OR Submittal:
Forwards suppl to ISI plan second ten-yr interval revised stress & fracture mechanics evaluations pressurizer TITLE:
Inservice/Testing/Relief from ASME Code-GL-89-04 NOTES: 0 RECIPIENT ID CODE/NAME PD2-1 LA NORRIS,J INTERNAL: C ZKE CEN ER ED0-MEB OGC/HDS3 EXTERNAL: LITCO ANDERSON NOAC COPIES LTTR ENCL 1 1 1 1 6 0 1 1 1 1 1 0 1 1 1 1 RECIPIENT ID CODE/NAME PD2-1 PD AEOD/SPD/RAB NRR/DE/EMCB NUDOCS-ABSTRACT RES/DSIR/EIB LITCO RANSOME,C NRC PDR COPIES LTTR ENCL 1 1 1 1 1" 1 1 1 1 1 1 1 1 1 D 0, N NOTETO ALL"RZDS" RECIPIENTS:
NOTES:
PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN 5DB (415-2083)
OR instrument nozzles.
TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEEDt TOTAL NUMBER OF COPIES REQUIRED: LTTR 20 ENCL 13 1
DISTRIBUTION CODE: A047D         COPIES RECEIVED: LTR Submittal: Inservice/Testing/Relief from    j   ENCL j   SIZE:2+ ~ i ASME Code GL-89-04 0
0 P.O.Box 128, Ft.Pierce, FL 34954-0120 August 2, 1995 L-95-220 10 CFR 50.4 10 CFR 50.55a U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.20555 RE: St.Lucie Unit 2 Docket No.50-389 In-Service-Inspection Plan Second Ten-Year Interval Revised Stress and Fracture Mechanics Evaluations Pressurizer Instrument Nozzles-Su lement By letter(L-95-185) dated July 7, 1995, Florida Power and Light Company (FPL)provided a response to your June 9, 1995 request for additional information (RAI).The information was submitted to support the Staff's review of the'PL evaluation of flaw indications and subsequent in-service inspection (ISI)plans submitted by FPL letter L-95-74 on March 2, 1995.FPL requested the approval by July 1, 1995, to support planning for the Fall 1995 Unit 2 refueling outage.In a conference call on July 25, 1995, the NRC reviewer requested FPL to submit stress and fracture mechanics evaluations revised in response to the RAI.Attachments A and B are the revised evaluations you requested.
RECIPIENT          COPIES            RECIPIENT           COPIES ID CODE/NAME        LTTR ENCL        ID CODE/NAME       LTTR ENCL PD2-1 LA                 1    1      PD2-1 PD                1    1 NORRIS,J                 1    1 INTERNAL:   C                       6    0      AEOD/SPD/RAB            1    1 ZKE CEN ER   ED0-     1     1       NRR/DE/EMCB            1"    1 MEB            1     1       NUDOCS-ABSTRACT        1     1 OGC/HDS3                  1     0       RES/DSIR/EIB           1    1 EXTERNAL: LITCO ANDERSON            1    1      LITCO RANSOME,C         1     1 NOAC                      1     1       NRC PDR                1   1           D 0,
Please contact us should you need any additional clarifications.
N NOTETO ALL "RZDS" RECIPIENTS:
Very truly yours, D.A.Vice St.L ager esident ie Plant DAS/GRM cc: Stewart D.Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, St.Lucie Plant 080095 9508100i7b 950802 PDR ADOCK 05000389 9 PDR an FPL Group company NUCLEAR ENGINEERING DEPAR7MEN7 CoMPoNENTi SUPPoRT AND INsPEcTIoNs P.O.Box 14000 JUNo BEAcH, FioRIDA 33408 St.Lucie Nuclear Power Plant Unit 2 ATTACHMENT A FRACTURE MECHANICS EVALUATION OF ST.LUCIE PRESS URIZER INS TRUMENT NOZZLES Prepared by B&VY NUCLEAR SERVICE COMPANY For St.Lucie Nuclear Power Plant 10 Miles South of Ft.Pierce on A1A Ft.Pierce, Florida 33034 Revision Number: 2 Date: Commercial Service Date: NRC Docket Number: Document Number: August 8, 1983 50-389 32-1235128-02 July 11, 1995 08/02/95....
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN 5DB (415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEEDt TOTAL NUMBER OF COPIES REQUIRED: LTTR             20   ENCL     13
9508100176}}
 
1 0
P.O. Box 128, Ft. Pierce, FL 34954-0120 August 2, 1995                       L-95-220 10 CFR 50.4 10 CFR 50.55a U. S. Nuclear Regulatory Commission Attn:     Document Control Desk Washington, D. C. 20555 RE:     St. Lucie Unit       2 Docket No. 50-389 In-Service-Inspection Plan Second Ten-Year Interval Revised Stress and Fracture Mechanics Evaluations Pressurizer Instrument Nozzles Su lement By letter(L-95-185) dated July 7, 1995, Florida Power and Light Company (FPL) provided a response to your June 9, 1995 request for additional information (RAI). The information was submitted to support the Staff's review of the 'PL evaluation of flaw indications and subsequent in-service inspection (ISI) plans submitted by FPL letter L-95-74 on March 2, 1995. FPL requested the approval by July 1, 1995, to support planning for the Fall 1995 Unit 2 refueling outage.
In a conference call on July 25, 1995, the NRC reviewer requested FPL to submit stress and fracture mechanics evaluations revised in response to the RAI.             Attachments A and B are the revised evaluations you requested. Please contact us should you need any additional clarifications.
Very   truly yours, D. A. ager Vice esident St. L ie Plant DAS/GRM cc:     Stewart D. Ebneter, Regional Administrator, Region Senior Resident Inspector, USNRC, St. Lucie Plant II,  USNRC 080095 9508100i7b 95080205000389 PDR     ADOCK 9                   PDR an FPL Group company
 
NUCLEAR ENGINEERING DEPAR7MEN7 CoMPoNENTi SUPPoRT AND INsPEcTIoNs P.O. Box 14000 JUNo BEAcH, FioRIDA 33408 St. Lucie Nuclear Power Plant Unit 2 ATTACHMENTA FRACTURE MECHANICS EVALUATION OF ST. LUCIE PRESS URIZER INS TRUMENT NOZZLES Prepared by B&VYNUCLEAR SERVICE COMPANY For St. Lucie Nuclear Power Plant 10 Miles South of Ft. Pierce on A1A Ft. Pierce, Florida 33034 Commercial Service Date:                     August  8, 1983 NRC Docket Number:                           50-389 Document Number:                             32-1235128-02 Revision Number:        2      Date:        July 11, 1995 08/02/95.... 9508100176}}

Latest revision as of 09:39, 29 October 2019

Forwards Suppl to ISI Plan Second ten-yr Interval Revised Stress & Fracture Mechanics Evaluations Pressurizer Instrument Nozzles
ML17309A794
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 08/02/1995
From: Sager D
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17228B236 List:
References
L-95-220, NUDOCS 9508100176
Download: ML17309A794 (4)


Text

PRIORITY (ACCELERATED RIDS PROCESSING)

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9508100176 DOC.DATE: 95/08/02 NOTARIZED: NO DOCKET g FACIL:50-389 St. Lucie Plant, Unit 2, Florida Power & Light Co. 05000389 P AUTH. NAME AUTHOR AFFILIATION SAGER,D.A. Florida Power &. Light Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Forwards suppl to ISI plan second ten-yr interval revised stress & fracture mechanics evaluations pressurizer TITLE:

NOTES:

OR instrument nozzles.

DISTRIBUTION CODE: A047D COPIES RECEIVED: LTR Submittal: Inservice/Testing/Relief from j ENCL j SIZE:2+ ~ i ASME Code GL-89-04 0

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-1 LA 1 1 PD2-1 PD 1 1 NORRIS,J 1 1 INTERNAL: C 6 0 AEOD/SPD/RAB 1 1 ZKE CEN ER ED0- 1 1 NRR/DE/EMCB 1" 1 MEB 1 1 NUDOCS-ABSTRACT 1 1 OGC/HDS3 1 0 RES/DSIR/EIB 1 1 EXTERNAL: LITCO ANDERSON 1 1 LITCO RANSOME,C 1 1 NOAC 1 1 NRC PDR 1 1 D 0,

N NOTETO ALL "RZDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN 5DB (415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEEDt TOTAL NUMBER OF COPIES REQUIRED: LTTR 20 ENCL 13

1 0

P.O. Box 128, Ft. Pierce, FL 34954-0120 August 2, 1995 L-95-220 10 CFR 50.4 10 CFR 50.55a U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 RE: St. Lucie Unit 2 Docket No. 50-389 In-Service-Inspection Plan Second Ten-Year Interval Revised Stress and Fracture Mechanics Evaluations Pressurizer Instrument Nozzles Su lement By letter(L-95-185) dated July 7, 1995, Florida Power and Light Company (FPL) provided a response to your June 9, 1995 request for additional information (RAI). The information was submitted to support the Staff's review of the 'PL evaluation of flaw indications and subsequent in-service inspection (ISI) plans submitted by FPL letter L-95-74 on March 2, 1995. FPL requested the approval by July 1, 1995, to support planning for the Fall 1995 Unit 2 refueling outage.

In a conference call on July 25, 1995, the NRC reviewer requested FPL to submit stress and fracture mechanics evaluations revised in response to the RAI. Attachments A and B are the revised evaluations you requested. Please contact us should you need any additional clarifications.

Very truly yours, D. A. ager Vice esident St. L ie Plant DAS/GRM cc: Stewart D. Ebneter, Regional Administrator, Region Senior Resident Inspector, USNRC, St. Lucie Plant II, USNRC 080095 9508100i7b 95080205000389 PDR ADOCK 9 PDR an FPL Group company

NUCLEAR ENGINEERING DEPAR7MEN7 CoMPoNENTi SUPPoRT AND INsPEcTIoNs P.O. Box 14000 JUNo BEAcH, FioRIDA 33408 St. Lucie Nuclear Power Plant Unit 2 ATTACHMENTA FRACTURE MECHANICS EVALUATION OF ST. LUCIE PRESS URIZER INS TRUMENT NOZZLES Prepared by B&VYNUCLEAR SERVICE COMPANY For St. Lucie Nuclear Power Plant 10 Miles South of Ft. Pierce on A1A Ft. Pierce, Florida 33034 Commercial Service Date: August 8, 1983 NRC Docket Number: 50-389 Document Number: 32-1235128-02 Revision Number: 2 Date: July 11, 1995 08/02/95.... 9508100176