ML17340A811: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
| issue date = 03/05/1981
| issue date = 03/05/1981
| title = Application to Amend App a of Licenses DPR-31 & DPR-41, Enabling 28% Tube Plugging Level
| title = Application to Amend App a of Licenses DPR-31 & DPR-41, Enabling 28% Tube Plugging Level
| author name = UHRIG R E
| author name = Uhrig R
| author affiliation = FLORIDA POWER & LIGHT CO.
| author affiliation = FLORIDA POWER & LIGHT CO.
| addressee name = EISENHUT D G
| addressee name = Eisenhut D
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| docket = 05000250, 05000251
| docket = 05000250, 05000251
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSION NBR;8103110663 OOC~DATE: 81/03/OS NOTARIZED:
{{#Wiki_filter:REGULATORY INFORMATION DISTRIBUTION SYSTEM           (RIDS)
YES DOCKET¹FACIL:50-250 Turkey Point PlantA Unit 3P Florida Power and Lioht C 0 OJU1250 50 251 Turkey point P'lantA Unit OF Florida Power and Lipht C AUTH~NAJU!E AUTHOR AF F ILI ATION UHRIGPR~E~Florida Power 4 Light Co~RECIP~NAME REC IP IENl AFFILIATION EISENHUTiD
ACCESSION NBR;8103110663             OOC ~ DATE: 81/03/OS     NOTARIZED: YES           DOCKET ¹ FACIL:50-250 Turkey Point PlantA Unit             3P   Florida Power and Lioht       C 0 OJU1250 50 251 Turkey point P'lantA Unit         OF   Florida Power and     Lipht   C AUTH ~ NAJU!E           AUTHOR AF F ILIATION UHRIGPR ~ E ~         Florida Power 4 Light Co     ~
~G~Division of Licensing I
RECIP ~ NAME             REC IP IENl AFFILIATION EISENHUTiD ~ G ~
I Division of Licensing


==SUBJECT:==
==SUBJECT:==
Application to amena App A of Licenses OPR 31 R DPR 41, enabling 28K tube plugging level.DISTRIBUTION CODE: 00010 COPIES RECEIVED:LTR ENCL SIZE: TITLE: Gener al Distribution for after Issuance of Oper ating License NOTES: RECIPIENT IO CODE/NAb'E ACTION'ARGA F S~04 ,INTERNAL:
Application to amena App A of Licenses           OPR 31 R DPR 41, enabling   28K tube   plugging level.
0/DIRFHUA FAC08 I8,E 06~OEL~11 COPIES LTl'R ENCL 13 13 1 1 2 2 1 0 1 1 RECIPIENT ID CODE/NAIVE OIRF OIV OF LIC NRC POR 02 OR ASSESS BR 10 COPIES LTTR ENCL 1 1 1 1 1 0 EXTERNAL: ACRS NSIC 09-05 1e 16 1 LPDR 03 1 1 TOTAL NURBER OF COPIES REQUIRED: LTTR 39 ENCL 37 FLORIDA POWSR ck LiGHT COMPANY March 5, 1981 L-81-99 Office of Nuclear Reactor Regulation Attention:
DISTRIBUTION CODE: 00010           COPIES RECEIVED:LTR         ENCL       SIZE:
Mr.Darrell G.Eisenhut, Director Division of Licensing U.S.Nuclear Regulatory Commission Washington, D*C.20555
TITLE: Gener al       Distribution for after Issuance of       Oper ating License NOTES:
RECIPIENT           COPIES            RECIPIENT            COPIES IO CODE/NAb'E         LTl'R ENCL      ID CODE/NAIVE        LTTR ENCL ACTION'ARGA           F S ~     04     13    13
,INTERNAL: 0/DIRFHUA FAC08               1      1    OIRF OIV OF LIC            1    1 EXTERNAL: ACRS I8,E
              ~OEL
                    ~           06 11 09-2 1
1 1e 2
0 1
16 NRC POR OR ASSESS BR 10 LPDR 02 03 1
1 1
1 0
1 NSIC             05             1 TOTAL NURBER OF COPIES           REQUIRED: LTTR     39   ENCL   37


==Dear Mr.Eisenhut:==
FLORIDA POWSR    ck LiGHT COMPANY March 5, 1981 L-81-99 Office of Nuclear Reactor Regulation Attention: Mr. Darrell G. Eisenhut, Director Division of Licensing U. S. Nuclear Regulatory Commission Washington, D* C. 20555
RE: Turkey Point Units 3&4 Docket No.50-250&50-251 Licensed Amendments 28X Steam Generator Tube Plugging ECCS Anal sis~g gO In accordance with 10 CFR 50.30 Florida Power&Light Company submits herewith three (3)signed originals and forty (40)copies of a request to amend Appendix A of Facility Operating Licenses DPR-31.and DPR-41~Our NSSS vendor (Westinghouse Electric Corp~)has completed a revised large break LOCA analysis (Attachment A)identifying the limiting break (DECLG, C 0.4)at a 28X steam generator tube plugging level, 95X thermal design flow and a measured Tavg of 574'F.(A recent flow test confirmed that the 95X design flow assumption used in the analysis conservatively bounds the flow predicted at 28X tube plugging.)
 
The analysis resulted in a peak clad temperature (PCT)of 2183'F at an F of 2.25, using the February 1978 Appendix K evaluation model and the NRC approved removal of 65'F of the fuel temperature conservatism related to the PAD code.The most limiting non LOCA accidents have also been analyzed and shown to be acceptable (Attachment B)for operation at the 28X steam generator tube plugging level.The LOCA analysis utilizes the"Upper Head Injection (UHI)Sof tware Technology" modeling techniques described in Appendix A of WCAP 8479, and Westinghouse letter NS-TMA-2311 dated 9/1 5/80 with the appropriate code modifications to reflect the design of Turkey Point Units 3&4 ECCS and to$f Q modify its application to a three loop plant.I~The analysis also takes into account the new fuel rod models in NUREG-0630.
==Dear Mr. Eisenhut:==
The increase in F due to the"UHI Sof tware Technology" more than compensate'f for the reduction due to the fuel rod models proposed in NUREG-.0630 and the increased level of steam generator tube plugging, resulting, in a new F~of 2.125.The proposed amendment to enable a 28X tube plugging level is described below and shown on the accompanying Technical Specif ication pages bearing the date of this letter in the lower right hand corner.PSOPLS...SSRVING PEOPL Mr.Darrell G.Eisenhut, Director Page 2 Fi ure 2.1-1b Th'e curve has been updated to reflect the new steam generator tube plugging limit, and has been corrected per our NSSS vendor's recommendation-Pa e 2.3-2 The overtemperature AT setpoint is now applicable for steam generator tube plugging<28 percent.The overpower hT setpoint values for>19X and<25X are now applicable for steam generator tube plugging>19X and<28X.Pa e 3.1-7 Reactor coolant limits for>19X and<25X are now applicable for>19X and<28X steam generator tube plugging.Pa e 3.2-3 The steam generator tube plugging limit in Specification 3-2.6a is increased to 28X and the F~to 2.1 25.Fi ure 3 2-3 The K(Z)curve has been modified to reflect the new steam generator tube plugging limit and new F~.The proposed amendment has been approved by the Turkey Point Plant Nuclear Safety Committee and the Florida Power 6 Light Company Nuclear Review Board.We have determined that since this request involves a single safety issue and a duplicate amendment, the request should be classified as a class I and III amendment pursuant to 10 CFR 1 70.Accordingly, a check for 94,400 is attached.Very truly ours, Robert E.Uhrig Vice President Advanced Systems&Technology REU/JEM/ras Attachments cc: Mr-James P.O'Reilly, Region II Harold F.Reis, Esquire I STATE OF FI,ORXDA))SS COUNTY OF DADE)Robert E.Uhrig, being first duly sworn, deposes and says: That he is a Vice President of Florida Power&Light Company, the Applicant herein: That he has executed the foregoing document;that the statements made in this said document are true and correct to the hest of his knowledge, information and belief, and that he is authorized to execute the document on behalf of said Applicant.
 
Robert E Uhr Subscribed and sworn to before me this day of NOTARY PUBLIC, in nd for the County of,'Dade, State of Florida My commission expires: t40tetV pu"!iC.8'"te Cf BIO-.Ca"!LOrJO~~" Jqr(d Qgt:<l,'ig AQQhc'f  
gO            ~g RE:   Turkey Point Units 3 & 4 Docket No. 50-250 & 50-251 Licensed Amendments 28X Steam Generator Tube Plugging ECCS Anal sis In accordance with 10 CFR 50.30 Florida Power & Light Company submits herewith three (3) signed originals and forty (40) copies of a request to amend Appendix A of Facility Operating Licenses DPR-31.and DPR-41   ~
~~h 1'}}
Our NSSS vendor (Westinghouse Electric Corp ) has completed a revised large
                                            ~
break LOCA analysis (Attachment A) identifying the limiting break (DECLG, C 0.4) at a 28X steam generator tube plugging level, 95X thermal design flow and a measured Tavg of 574'F.   (A recent flow test confirmed that the 95X design flow assumption used in the analysis conservatively bounds the flow predicted at 28X tube plugging.) The analysis resulted in a peak clad temperature (PCT) of 2183'F at an F of 2.25, using the February 1978 Appendix K evaluation model and the NRC approved removal of 65'F of the fuel temperature conservatism related to the PAD code. The most limiting non LOCA accidents have also been analyzed and shown to be acceptable (Attachment B) for operation at the 28X steam generator tube plugging level.
The LOCA analysis utilizes the "Upper Head Injection (UHI) Sof tware Technology" modeling techniques described in Appendix A of WCAP 8479, and Westinghouse letter NS-TMA-2311 dated 9/1 5/80 with the appropriate code modifications to reflect the design of Turkey Point Units 3 & 4 ECCS and to modify its application to a three loop plant.
                                                                                      $  fQI ~
The analysis also takes into account the new fuel rod models in NUREG-0630.
The increase   in F due to the "UHI Sof tware Technology" more than compensate'f for the reduction due to the fuel rod models proposed in NUREG-.0630 and the increased level of steam generator tube plugging, resulting, in a new F~ of 2.125.
The proposed amendment to enable a 28X tube plugging level   is described       below and shown on the accompanying Technical Specif ication pages   bearing the date of this letter in the lower right hand corner.
PSOPLS... SSRVING PEOPL
 
Mr. Darrell     G. Eisenhut, Director Page 2 Fi ure 2.1-1b Th'e curve has been updated to       reflect the   new steam generator tube plugging limit,   and has been   corrected per our   NSSS vendor's recommendation-Pa e   2.3-2 The overtemperature AT setpoint is         now applicable for steam generator tube plugging < 28 percent.
The overpower hT setpoint values for > 19X and < 25X are now             applicable for steam generator tube plugging > 19X and < 28X.
Pa e   3.1-7 Reactor coolant limits for >19X and < 25X are now applicable             for >19X and
< 28X steam generator tube plugging.
Pa e   3.2-3 The steam generator       tube plugging   limit in Specification     3-2.6a is increased to   28X and the F~   to 2.1 25.
Fi ure   3 2-3 The K(Z) curve has been modified to         reflect the   new steam generator tube plugging limit and new F~.
The proposed     amendment   has been approved by the Turkey     Point Plant Nuclear Safety Committee and the Florida Power         6 Light Company   Nuclear Review Board.
We   have determined     that since this request involves a single safety issue and a duplicate amendment, the request         should be classified as a class I and III amendment pursuant to 10 CFR 1 70.         Accordingly, a check     for 94,400 is attached.
Very   truly ours, Robert E. Uhrig Vice President Advanced Systems     & Technology REU/JEM/ras Attachments cc:     Mr- James P. O'Reilly, Region       II Harold F. Reis, Esquire
 
I STATE OF FI,ORXDA   )
                    )     SS COUNTY OF DADE     )
Robert E. Uhrig, being first duly sworn, deposes and says:
That he is a Vice President of Florida Power & Light Company, the Applicant herein:
That he has executed the foregoing document; that the statements made in this said document are true and correct to the hest of his knowledge, information and belief, and that he is authorized to execute the document on behalf of said Applicant.
Robert         E   Uhr Subscribed and sworn to before             me this               day   of NOTARY PUBLIC, in   nd for the         County of,'Dade, State of Florida t40tetV pu"!iC. 8'"te   Cf BIO-.Ca   "! LOrJO My  commission expires:                      ~~" Jqr(d Qgt:<l,'ig AQQhc'f
 
h
    ~ ~
1'}}

Latest revision as of 10:59, 22 October 2019

Application to Amend App a of Licenses DPR-31 & DPR-41, Enabling 28% Tube Plugging Level
ML17340A811
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 03/05/1981
From: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
To: Eisenhut D
Office of Nuclear Reactor Regulation
Shared Package
ML17340A812 List:
References
L-81-99, NUDOCS 8103110663
Download: ML17340A811 (5)


Text

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR;8103110663 OOC ~ DATE: 81/03/OS NOTARIZED: YES DOCKET ¹ FACIL:50-250 Turkey Point PlantA Unit 3P Florida Power and Lioht C 0 OJU1250 50 251 Turkey point P'lantA Unit OF Florida Power and Lipht C AUTH ~ NAJU!E AUTHOR AF F ILIATION UHRIGPR ~ E ~ Florida Power 4 Light Co ~

RECIP ~ NAME REC IP IENl AFFILIATION EISENHUTiD ~ G ~

I Division of Licensing

SUBJECT:

Application to amena App A of Licenses OPR 31 R DPR 41, enabling 28K tube plugging level.

DISTRIBUTION CODE: 00010 COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Gener al Distribution for after Issuance of Oper ating License NOTES:

RECIPIENT COPIES RECIPIENT COPIES IO CODE/NAb'E LTl'R ENCL ID CODE/NAIVE LTTR ENCL ACTION'ARGA F S ~ 04 13 13

,INTERNAL: 0/DIRFHUA FAC08 1 1 OIRF OIV OF LIC 1 1 EXTERNAL: ACRS I8,E

~OEL

~ 06 11 09-2 1

1 1e 2

0 1

16 NRC POR OR ASSESS BR 10 LPDR 02 03 1

1 1

1 0

1 NSIC 05 1 TOTAL NURBER OF COPIES REQUIRED: LTTR 39 ENCL 37

FLORIDA POWSR ck LiGHT COMPANY March 5, 1981 L-81-99 Office of Nuclear Reactor Regulation Attention: Mr. Darrell G. Eisenhut, Director Division of Licensing U. S. Nuclear Regulatory Commission Washington, D* C. 20555

Dear Mr. Eisenhut:

gO ~g RE: Turkey Point Units 3 & 4 Docket No. 50-250 & 50-251 Licensed Amendments 28X Steam Generator Tube Plugging ECCS Anal sis In accordance with 10 CFR 50.30 Florida Power & Light Company submits herewith three (3) signed originals and forty (40) copies of a request to amend Appendix A of Facility Operating Licenses DPR-31.and DPR-41 ~

Our NSSS vendor (Westinghouse Electric Corp ) has completed a revised large

~

break LOCA analysis (Attachment A) identifying the limiting break (DECLG, C 0.4) at a 28X steam generator tube plugging level, 95X thermal design flow and a measured Tavg of 574'F. (A recent flow test confirmed that the 95X design flow assumption used in the analysis conservatively bounds the flow predicted at 28X tube plugging.) The analysis resulted in a peak clad temperature (PCT) of 2183'F at an F of 2.25, using the February 1978 Appendix K evaluation model and the NRC approved removal of 65'F of the fuel temperature conservatism related to the PAD code. The most limiting non LOCA accidents have also been analyzed and shown to be acceptable (Attachment B) for operation at the 28X steam generator tube plugging level.

The LOCA analysis utilizes the "Upper Head Injection (UHI) Sof tware Technology" modeling techniques described in Appendix A of WCAP 8479, and Westinghouse letter NS-TMA-2311 dated 9/1 5/80 with the appropriate code modifications to reflect the design of Turkey Point Units 3 & 4 ECCS and to modify its application to a three loop plant.

$ fQI ~

The analysis also takes into account the new fuel rod models in NUREG-0630.

The increase in F due to the "UHI Sof tware Technology" more than compensate'f for the reduction due to the fuel rod models proposed in NUREG-.0630 and the increased level of steam generator tube plugging, resulting, in a new F~ of 2.125.

The proposed amendment to enable a 28X tube plugging level is described below and shown on the accompanying Technical Specif ication pages bearing the date of this letter in the lower right hand corner.

PSOPLS... SSRVING PEOPL

Mr. Darrell G. Eisenhut, Director Page 2 Fi ure 2.1-1b Th'e curve has been updated to reflect the new steam generator tube plugging limit, and has been corrected per our NSSS vendor's recommendation-Pa e 2.3-2 The overtemperature AT setpoint is now applicable for steam generator tube plugging < 28 percent.

The overpower hT setpoint values for > 19X and < 25X are now applicable for steam generator tube plugging > 19X and < 28X.

Pa e 3.1-7 Reactor coolant limits for >19X and < 25X are now applicable for >19X and

< 28X steam generator tube plugging.

Pa e 3.2-3 The steam generator tube plugging limit in Specification 3-2.6a is increased to 28X and the F~ to 2.1 25.

Fi ure 3 2-3 The K(Z) curve has been modified to reflect the new steam generator tube plugging limit and new F~.

The proposed amendment has been approved by the Turkey Point Plant Nuclear Safety Committee and the Florida Power 6 Light Company Nuclear Review Board.

We have determined that since this request involves a single safety issue and a duplicate amendment, the request should be classified as a class I and III amendment pursuant to 10 CFR 1 70. Accordingly, a check for 94,400 is attached.

Very truly ours, Robert E. Uhrig Vice President Advanced Systems & Technology REU/JEM/ras Attachments cc: Mr- James P. O'Reilly, Region II Harold F. Reis, Esquire

I STATE OF FI,ORXDA )

) SS COUNTY OF DADE )

Robert E. Uhrig, being first duly sworn, deposes and says:

That he is a Vice President of Florida Power & Light Company, the Applicant herein:

That he has executed the foregoing document; that the statements made in this said document are true and correct to the hest of his knowledge, information and belief, and that he is authorized to execute the document on behalf of said Applicant.

Robert E Uhr Subscribed and sworn to before me this day of NOTARY PUBLIC, in nd for the County of,'Dade, State of Florida t40tetV pu"!iC. 8'"te Cf BIO-.Ca "! LOrJO My commission expires: ~~" Jqr(d Qgt:<l,'ig AQQhc'f

h

~ ~

1'