(One intermediate revision by the same user not shown) |
Line 3: |
Line 3: |
| | issue date = 06/05/1981 | | | issue date = 06/05/1981 |
| | title = Containment Leakage Rate Testing,Turkey Point Units 3 & 4, Technical Evaluation Rept | | | title = Containment Leakage Rate Testing,Turkey Point Units 3 & 4, Technical Evaluation Rept |
| | author name = DELGAIZO T J | | | author name = Delgaizo T |
| | author affiliation = FRANKLIN INSTITUTE | | | author affiliation = FRANKLIN INSTITUTE |
| | addressee name = | | | addressee name = |
Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:TECHNICAL EVALUATION REPORT CONTAINMENT LEAKAGE RATE TESTING FLORIDA PONER 8, LIGHT CNPIY TURKEY POINT UNITS 5 ID 0 NRC DOCKET NO.50-250, 50-251 NRC TAC NO.08779, 08780 NRC CONTRACT NO.NRC43-79-118 FRC PROJECT C5257 FRC TASK 53/54 Prepared by Franklin Research Center The Parkway at Twentieth Street Philadelphia, PA 19103 Author: T.J.DelGaizo'FRCGrOup Leader: T.J.DelGaizo Prepared for Nuclear Regulatory Commission Washington, D.C, 20555 Lead NRC Engineer: Y.s.Huang.June 5, 1981 This report was prepared as an account of work sponsored by an agency of the United States Government. | | {{#Wiki_filter:TECHNICAL EVALUATION REPORT CONTAINMENT LEAKAGE RATE TESTING FLORIDA PONER 8, LIGHT CNPIY TURKEY POINT UNITS 5 ID 0 NRC DOCKET NO. 50-250, 50-251 NRC TAC NO. 08779, 08780 FRC PROJECT C5257 NRC CONTRACT NO. NRC43-79-118 FRC TASK 53/54 Prepared by Franklin Research Center Author: T. J. DelGaizo The Parkway at Twentieth Street ' |
| Neither the United States Government nor any agency thereof, or any of their employees, makes any warranty, expressed or implied, or assumes any legal liability or responsibility for any third party's use, or the results of such use, of any information, apparatus, oroduct or process disclosed In this report, or represents that its use by such third party would not infringe privately owned rights.Franklin Research Center A Division of The Franklin Institute amin Franklin Parkway, Phila..Pa l9I03 (215)448-1000 mi Ic'licoggg TER-C5257-53/54 CONTENTS Section Title Pacae BACKGROUND | | Philadelphia, PA 19103 FRCGrOup Leader: T. J. DelGaizo Prepared for Nuclear Regulatory Commission Washington, D.C, 20555 Lead NRC Engineer: Y. s. Huang . |
| ~, o EVALUATION CRITERIA TECHNICAL EVALUATION 3.1 Request for Exemption From the Requirements Appendix J of 10CFR50, 3.1.1 Testing of Containment Airlocks 3 3.2 Proposed Technical Specification Change CONCLUS IONS~~~~~~~~8 REFERENCES o.o o.~9 APPENDIX A-Extrapolation of Reduced Pressure Leakage Measurements to Equivalent Full Pressure Leakage 00 FranMin Research Center A Olvl sion ur The Ftenitttn Institute TER-C5257-53/54 1.BACKGROUND On August 7r 1975[1)the NRC requested Florida Power a Light Company (FPL)to review the containment leakage testing programs at Turkey Point Units 3 and 4 and to provide a plan for achieving full compliance with 10CFR50, Appendix J, including appropriate design modifications, changes to Technical Specifications, or requests for exemption from the requirements pursuant to 10CFR50.12, where necessary.
| | June 5, 1981 This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, or any of their employees, makes any warranty, expressed or implied, or assumes any legal liability or responsibility for any third party's use, or the results of such use, of any information, apparatus, oroduct or process disclosed In this report, or represents that its use by such third party would not infringe privately owned rights. |
| FPL responded on September 12, 1975[2], stating that the containment leakage testing program at Turkey Point Units 3 and 4 conformed to the requirements of Appendix J except for the frequency and method of testing containment airlocks, the frequency of performing Type B electrical penetration leak tests, and minor differences in terminology between the Technical Specifications and Appendix J.FPL indicated that the minor differences in terminology were eliminated by its proposed Technical Specification change of September 20, 1974[3].1 FPL's letter of July 27, 1977[4]provided additional information regarding proposed testing of containment airlocks.This letter also indicated that Type B electrical penetrations would be tested every refueling outage;leaving the question of testing of containment airlocks as the only remaining request for exemption from the requirements of Appendix J.The purpose of this report is to conduct technical evaluations of out-standing issues regarding the implementation of 10CFR50, Appendix J, at Turkey Point Units 3 and 4.Consequently, technical evaluations are provided for FPL's request for exemption from the requirements of Appendix J regarding the testing of containment airlocks as submitted in References 2 and 4, as well as a proposed revision to Technical Specification 4.4.2 submitted in Reference 4.0()Franklin Research Center A 0@sion oI The Frentttin Institute TER-C5257-53/54 2~EVALUATION CRITERIA Code of Federal Regulations, Title 10, Part 50 (10CFR50), Appendix J, Containment Leakage Testing, provided the criteria used in conducting the technical evaluations.
| | Franklin Research Center A Division of The Franklin Institute amin Franklin Parkway, Phila.. Pa l9I03 (215) 448-1000 mi Ic'licoggg |
| Where applied to the following evaluations, the criteria are either referenced or briefly stated, where necessary, in support of the results of the evaluations.
| |
| Furthermore, in recognition of the plant-specific conditions that could lead to requests for exemption not explicitly covered by the regulations, the NRC directed that the technical reviews con-stantly emphasize the basic intent of Appendix J, that potential containment
| |
| /atmospheric leakage paths be identified, monitored, and maintained below estab-lished limits.()(I Franklin Research Center A Divlsiot nI The Ftenttttn Institute TER-C5257-53/54 3.TECHNICAL EVALUATION 3~1 REQUESTS FOR EXEMPTION FROM THE REQUIREMENTS OF 10CFR50 g APPENDIX J 3.1.1 Testing of Containment Airlocks In Reference 2, FPL requested an exemption from the'requirements of 10CFR50, Appendix J with regard to the testing frequency and method of testing containment airlocks.This exemption request would permit continued testing in accordance with Turkey Point Technical Specification 4.4.2.2, which required pressure testing of the personnel and emergency airlocks either annually, if not used, or every 4 months if used periodically.
| |
| FPL's basis for this request was given as follows: Personnel and emergency airlocks are leak tested in accordance with Turkey Point Operating Procedure 13514.1.Leak tightness of the inner door is tested by pressurizing the annulus, between the two 0-rings.The outer door 0-rings are then tested by pressurizing the entire airlock.However, since the inner door opens into containment, both tests tend to unseat the inner door.Therefore, if the inner door 0-rings are to be meaningfully tested, the door must be held shut by a clamping arrangement which takes a minimum of about 12 man-hours to install.A similar arrangement is not required on the outer door because that door opens into the airlock and the test differential pres-sure is in the direction which seats the door.Thus, a simple positive-pressure test of the personnel and emergency airlocks is not possible because of the design and arrangement of the doors'Both containments are entered approximately once each week for performance of routine inspections and minor maintenance.
| |
| If we were to perform the inspection program required by Operating Procedure 13514.1 after each airlock opening, routine entry of the containment would become impractical due to the many man-hours which would be necessary for leak testing.Therefore, in order to continue a viable containment inspection program, and at the same time achieve compliance with the intent of Appendix J, we submitted a proposed Technical Specification change on September 20, 1974, which provided for the performance of an 0-ring vacuum test, instead of a pressure test.We have designed and built a vacuum test device which could be duplicated and permanently installed on all airlock outer doors and used to 99 FranMin Research Center A Division ol The Ftonklin Insatuie TER-C5257-53/54 leak test the doors after each opening.Pending disposition of the proposed change, however, we are currently complying with the existing Technical Specification 4.4.2.2 requirement which requires airlock testing once every 4 months.In Reference 4, FPL withdrew.its request for exemption with regard to the frequency of testing airlocks, but continued to request an exemption in order to use the vacuum testing technique to verify airlock door seals after each opening.In this letter, FPL provided a revised Technical Specification 4.4.2.2 which required airlocks to be tested as follows: 4.4.2 LOCAL PENETRATION TESTS Test Procedure and Frequency Local leak detection tests of the following components shall be performed at a pressure not less than 50 psig using pressure decay, soap bubble, halogen detection or equivalent methods at the frequency listed, unless other-wise noted: 2.Personnel and Emergency Airlocks a.Within 3 days of every first of a series of openings when containment integrity is required, verify that door seals have not been damaged or seated improperly by vacuum testing the volume between the door seals in accordance with approved plant procedures.
| |
| b.At least once per 6 months, conduct an overall airlock leakage test to verify that the overall airlock leakage rate is within its limit.FRC Evaluation:
| |
| Sections III.B.2 and III.D.2 of Appendix J require that containment air-locks be tested at peak calculated'accident pressure (Pa)at 6-month intervals and after each opening in the interim between 6-month tests.These require-ments were imposed because airlocks represent potentially large leakage paths which are more subject to human error than other containment penetrations.
| |
| Type B penetrations (other than airlocks)require testing in accordance with Appendix J at intervals not to exceed 2 years.0()FranMin Research Center h cntelon oI The Fcenlttln Institute TER-C5257-53/54 Appendix J was published in 1973.A compilation of airlock events from Licensee Event Reports submitted since 1969 shows that airlock testing in accordance with Appendix J has been effective in the prompt identification of airlock leakage, but'hat rigid adherence to the after-each-opening requirement may not be necessary.
| |
| Since 1969, there have been approximately 70 reported airlock leakage tests in which measured leakage exceeded allowable limits.Of these events, C 25%were the result of leakage other than from improper seating of airlock door seals.These failures were generally caused by leakage past door-operating mechanism handwheel packing, door-operating cylinder shaft seals, equalizer valves, or test lines.These penetrations resemble other Type B or C contain-ment penetrations except that they may be operated more frequently.
| |
| Since air-locks are tested at a pressure of Pa every 6 months, these penetrations are tested, at a minimum, four times more frequently than typical Type B or C pene-trations.The 6-month test is, therefore, considered to be both justified and adequate for the prompt identification of this leakage.Improper seating of the airlock door seals, however, is not only the most frequent cause of airlock failures (the remaining 75%), but also represents a potentially large leakage path.While testing at a pressure of Pa after each opening will identify seal leakage, it can also be identified by alternative methods such as pressurizing between double-gasketed door seals (for airlocks designed with this type of seal)or pressurizing the airlock to pressures other than Pa.Furthermore, experience gained in testing airlocks since the issuance of Appendix J indicates that the use of one of these alternative methods.may be preferable to the full-pressure test of the entire airlock.Reactor plants designed prior to the issuance of Appendix J often do not have the capability to test airlocks at Pa without the installation of strong-backs or the performance of mechanical adjustments to the operating mechanism of the inner doors.The reason for this is that the inner doors are designed to seat with accident pressure on the containment side of the door, and there-fore, the operating mechanisms were not designed to withstand accident pressure in the opposite direction.
| |
| When the airlock is pressurized for a local airlock Franklin Research Center A Division or The Ftenitttn Institute TER-C5257-53/54 test (i.e., pressurized between the doors), pressure is exerted on the airlock side of the inner door, causing the door to unseat and preventing the perfor-mance of a meaningful test.The strongback or mechanical adjustments prevent the unseating of the inner door, allowing the test to proceed.The installa-tion of strongbacks or performance of mechanical adjustments.is time consuming (often taking several hours), may result in additional radiation exposure to operating personnel, and may also cause degradation of the operating mechanism of the inner door, with consequential loss of reliability of the airlock.In addition, when conditions require frequent openings over a short period of time, testing at Pa after each opening becomes both impractical (tests often take from 8 hours to several days)and accelerates the rate of exposure of personnel and the degradation of mechanical equipment.
| |
| For these reasons, the intent of Appendix J is satisfied, and the undesirable effects of testing after each opening are reduced if a satis-factory test of the airlock door seals is performed within 3 days of each opening or every 3 days during periods of frequent openings, whenever containment integrity is required.The test of the airlock door'seals may be performed by pressurizing the space between the double-gasketed seals (if so equipped)or by pressurizing the entire airlock to a pressure less than Pa that does not require the installation of strongbacks or performance of other, mechanical adjustments.
| |
| If the reduced pressure airlock test is to be employed, the results of the leakage test must be conservatively extrapolated to equivalent Pa test results.In view of the foregoing discussion, FPL's proposed Technical Specification 4.4.2.2 is acceptable.
| |
| Furthermore, no exemption from the requirements of Appendix J is necessary because FPL's proposed testing is within the revised version of Section III.D.2 (effective October 22, 1980).FPL should ensure that its airlock testing program is in complete conformance with the revised rule.With regard to the extrapolation of the reduced pressure test to equivalent Pa test results, comments on FPL's proposed extrapolation method submitted on November 26, 1980[5]are contained in Appendix A to this report.Frankiin Research Center A Svlslon ot The FunMln Institute TER-C5257-53/54 3.2 PROPOSED TECHNICAL SPECIFICATION CHANGE In Reference 4, FPL proposed to revise Specification 4.4.2 to incorporate its proposed exemption from Appendix J with regard to the testing of contain-ment airlocks.In addition, this specification provided for testing at Pa using pressure decay, soap bubble, halogen detection, or equivalent methods of the following components:
| |
| Containment purge valves-each refueling Equipment access openings-annually and after use Fuel transfer tube flange-each refueling Electrical penetrations
| |
| -each refueling.
| |
| 4 The proposed specification also required that repairs and tests be made whenever the sum of the local leak rate tests, including isolation valves, exceeds 60%of the total containment allowable leak rate.II FRC Evaluation:
| |
| In Section 3.1 of this report, FRC found FPL's proposal for testing of containment airlocks to be acceptable, provided that the results'of the vacuum testing between airlock door seals are conservatively extrapolated to Pa results.The remainder of the proposed specification conforms to Section III.B of Appendix J.Consequently, Proposed Specification 4.4.2 is acceptable in meeting the requirements and intent of Appendix J.l)ll Franklin Research Center A DiNtston ol The FranklIn Institute TER-C5257-53/54 4.CONCLUSIONS FPL's request for exemption from the requirements of Appendix J regarding testing of containment airlo'cks as submitted in References 2 and 4 and FPL's proposed change to Technical Specification 4.4.2 as submitted in Reference 4 were technically evaluated.
| |
| The conclusions of these evaluations are as follows: o FPL's proposal to verify that airlock door seals have not been damaged or seated improperly by vacuum testing the volume between the seals within 3 days of every first of a series of openings, when containment integrity is required in the interim between full-pressure 6-month, tests is acceptable.
| |
| No exemption is required because of the revision to Section III.D.2, effective October 22, 1980.o FPL's proposed change to Technical Specification 4.4.2 is acceptable since it conforms to the requirements of Appendix J.t)l)FranMin Research Center A OMslon of The Ftenttltn Institute TER-C5257-53/54 5.REFERENCES 1.K.R.Goller (NRC)Letter to FPL August 7, 1975.2.R.E.Uhrig (FPL)Letter to K.R.Goller (NRC)September 12, 1975.3.R.E.Uhrig (FPL)Letter to E.G.Case (NRC)September 20, 1974.4.R.E.Uhrig (FPL)Letter to V.Stello (NRC)July 27, 1977.5.R.E.Uhrig (FPL)Letter to S.A.Varga (NRC)November 26, 1980.0()Franklin Research Center A DMsion OiIhe Fronktin Institute TER-C5257-53/54 APPENDIX A-EXTRAPOLATION OF REDUCED PRESSURE LEAKAGE MEASUREMENTS TO EQUIVALENT FULL PRESSURE LEAKAGE 1.FPL's CORRELATION In Reference 5, FPL provided the following information: "The test will begin at a absolute pressure of 12.92n Hg (17" Hg vacuum)and alarm if pressure increases to 14.42n Hg (15.5" Hg vacuum).To determine the leak rate at 50 psig (64.7 psia), the design basis accident pressure, the following derivation was used: Flow for a compressible fluid may be calculated as follows: F=KY JhP where F=K Y bP Flow or leakage Coefficient of resistance Expansion factor Pressure drop across seal The maximum valve for Y is 1.0 and calculates the leakage for a non-compressible fluid.The coefficient of resistance is constant for each seal tested.Therefore:
| |
| Fee K~hP or L=K JhP A ratio between the leak rate at L5p and Ltest becomes: L5p K P64.7 14..7 L K P-P test 14.7 test L50='Ltest 64.7 14.7 P-P 14.7 test wher e P64~7-131~73" Hg P14 7=29.92n Hg L5p=Ltest 131i73-29'2~29.92-P 1Chemical Engineer's Handbook, McGraw-Hill, Inc., 1963, Section 5 (Fluid Mechanics, Flow Measurement), Pages 5-8&5-9 00 Franklin Research Center A DMsion nI The Ftenttiin Institute TER-C5257-53/54 L5p=102 52 Ltest 29.92-P test L5p=10.13 Ltest 29.92-P test with pressures in inches of Hg" By substituting 12.92 in.Hg for P , this formula yields the following test'orrelation:
| |
| 2.'45 L50 L test EVALUATION:
| |
| e r The Licensee dropped the value of Y from the formula F=KY JbP because the maximum value of Y is 1.0.If the value of Y is retained, the correlation would be: L5p KY5p P64~7 P14~7 L KY test test 14.7 test P Although the maximum value of Y is 1.0, it does not follow that the ratio of Y to Y is necessarily
| |
| <1.0.Consequently, the Licensee's cor-50 test relation is not necessarily conservative.
| |
| 2.VISC9US FLOE For viscous flow, mass flow rate (m)is proportional to the difference of the square of inlet pressure and the square of outlet pressure: m5p m test (64.72-14.72)x const.(14.7-Pt t2)x const.2 test m5p 64 72 14 72 L50 F50=P50 64~7 x const.!jII Franklin Research Center A Division or The Ffsnklin Institute TER-C5257-53/54 mtest 7 test 2 Ltest Ftest x const P 14.7 test'50 L test 4 72 14 72 64.7 14.7 147-Pt 2 2 test Using" in.Hg units: 64.7=131.73 14.7=29.92 then L L test P=12.92 test 5.13 3~CHOKED FLOW For choked flow, P..-P Therefore, apart from orifice source Reynold's Number effects, mass flow rate-P source, abs'=volumetric flow rate (at source density)is independent of P tl.Therefore, since volumetric flow rate is proportional to the outlet percent of mass per unit time (denoted by L), L50 P64~7 131.73 in.Hg 29'2 in'g test'est
| |
|
| |
|
| ==10.2 CONCLUSION== | | TER-C5257-53/54 CONTENTS Section Title Pacae BACKGROUND ~, o EVALUATION CRITERIA TECHNICAL EVALUATION 3.1 Request for Exemption From the Requirements of 10CFR50, Appendix J 3.1.1 Testing of Containment Airlocks 3 3.2 Proposed Technical Specification Change CONCLUS IONS ~ ~ ~ ~ ~ ~ ~ ~ 8 REFERENCES o . o o . ~ 9 APPENDIX A Extrapolation of Reduced Pressure Leakage Measurements to Equivalent Full Pressure Leakage 00 FranMin Research Center A Olvlsion ur The Ftenitttn Institute |
| : | | |
| The above analysis yields the following results for the correlation of 50 test FPL's t/hP Method Viscous Flow Choked Flow 2.45 5.13 10.2 Since the choked flow correlation is the most conservative, this correlation should be used.It should be noted that FPL stated in Reference 5 that the allowable local leakage rate at Turkey Point is 0.25%wt/day or 45,000 cc/min.At the 00 Franklin Research Center A Division d The FrenMin Institute TER-C5257-53/54 same time, FPL calculated airlock leakage rates (including instrument errors)which will cause an alarm to sound after an elapsed time of 1 minute as'o1lows".Lt=31.93 cc/min (personnel airlock)test Lt t=7.98 cc/min (emergency airlock).test It can be seen that even using the most conservative correlation (choked flow), the alarm will detect leakage which is a very small percentage of, total allowable local leakage (less than 1%).A DMsfon of The Frenfrfin Insrlrure-13-}} | | TER-C5257-53/54 |
| | : 1. BACKGROUND On August 7r 1975 [1) the NRC requested Florida Power a Light Company (FPL) to review the containment leakage testing programs at Turkey Point Units 3 and 4 and to provide a plan for achieving full compliance with 10CFR50, Appendix J, including appropriate design modifications, changes to Technical Specifications, or requests for exemption from the requirements pursuant to 10CFR50.12, where necessary. |
| | FPL responded on September 12, 1975 [2], stating that the containment leakage testing program at Turkey Point Units 3 and 4 conformed to the requirements of Appendix J except for the frequency and method of testing containment airlocks, the frequency of performing Type B electrical penetration leak tests, and minor differences in terminology between the Technical Specifications and Appendix J. FPL indicated that the minor differences in terminology were eliminated by its proposed Technical Specification change of September 20, 1974 [3]. 1 FPL's letter of July 27, 1977 [4] provided additional information regarding proposed testing of containment airlocks. This letter also indicated that Type B electrical penetrations would be tested every refueling outage; leaving the question of testing of containment airlocks as the only remaining request for exemption from the requirements of Appendix J. |
| | The purpose of this report is to conduct technical evaluations of out-standing issues regarding the implementation of 10CFR50, Appendix J, at Turkey Point Units 3 and 4. Consequently, technical evaluations are provided for FPL's request for exemption from the requirements of Appendix J regarding the testing of containment airlocks as submitted in References 2 and 4, as well as a proposed revision to Technical Specification 4.4.2 submitted in Reference 4. |
| | 0() Franklin Research Center A 0@sion oI The Frentttin Institute |
| | |
| | TER-C5257-53/54 2~ EVALUATION CRITERIA Code of Federal Regulations, Title 10, Part 50 (10CFR50), Appendix J, Containment Leakage Testing, provided the criteria used in conducting the technical evaluations. Where applied to the following evaluations, the criteria are either referenced or briefly stated, where necessary, in support of the results of the evaluations. Furthermore, in recognition of the plant-specific conditions that could lead to requests for exemption not explicitly covered by the regulations, the NRC directed that the technical reviews con-stantly emphasize the basic intent of Appendix J, that potential containment |
| | / |
| | atmospheric leakage paths be identified, monitored, and maintained below estab-lished limits. |
| | ()(I Franklin Research Center A Divlsiot nI The Ftenttttn Institute |
| | |
| | TER-C5257-53/54 |
| | : 3. TECHNICAL EVALUATION 3 ~1 REQUESTS FOR EXEMPTION FROM THE REQUIREMENTS OF 10CFR50 g APPENDIX J 3.1.1 Testing of Containment Airlocks In Reference 2, FPL requested an exemption from the 'requirements of 10CFR50, Appendix J with regard to the testing frequency and method of testing containment airlocks. This exemption request would permit continued testing in accordance with Turkey Point Technical Specification 4.4.2.2, which required pressure testing of the personnel and emergency airlocks either annually, if not used, or every 4 months if used periodically. FPL's basis for this request was given as follows: |
| | Personnel and emergency airlocks are leak tested in accordance with Turkey Point Operating Procedure 13514.1. Leak tightness of the inner door is tested by pressurizing the annulus, between the two 0-rings. The outer door 0-rings are then tested by pressurizing the entire airlock. However, since the inner door opens into containment, both tests tend to unseat the inner door. |
| | Therefore, if the inner door 0-rings are to be meaningfully tested, the door must be held shut by a clamping arrangement which takes a minimum of about 12 man-hours to install. A similar arrangement is not required on the outer door because that door opens into the airlock and the test differential pres-sure is in the direction which seats the door. Thus, a simple positive-pressure test of the personnel and emergency airlocks is not possible because of the design and arrangement of the doors' Both containments are entered approximately once each week for performance of routine inspections and minor maintenance. If we were to perform the inspection program required by Operating Procedure 13514.1 after each airlock opening, routine entry of the containment would become impractical due to the many man-hours which would be necessary for leak testing. Therefore, in order to continue a viable containment inspection program, and at the same time achieve compliance with the intent of Appendix J, we submitted a proposed Technical Specification change on September 20, 1974, which provided for the performance of an 0-ring vacuum test, instead of a pressure test. We have designed and built a vacuum test device which could be duplicated and permanently installed on all airlock outer doors and used to 99 FranMin Research Center A Division ol The Ftonklin Insatuie |
| | |
| | TER-C5257-53/54 leak test the doors after each opening. Pending disposition of the proposed change, however, we are currently complying with the existing Technical Specification 4.4.2.2 requirement which requires airlock testing once every 4 months. |
| | In Reference 4, FPL withdrew. its request for exemption with regard to the frequency of testing airlocks, but continued to request an exemption in order to use the vacuum testing technique to verify airlock door seals after each opening. In this letter, FPL provided a revised Technical Specification 4.4.2.2 which required airlocks to be tested as follows: |
| | 4.4.2 LOCAL PENETRATION TESTS Test Procedure and Frequency Local leak detection tests of the following components shall be performed at a pressure not less than 50 psig using pressure decay, soap bubble, halogen detection or equivalent methods at the frequency listed, unless other-wise noted: |
| | : 2. Personnel and Emergency Airlocks |
| | : a. Within 3 days of every first of a series of openings when containment integrity is required, verify that door seals have not been damaged or seated improperly by vacuum testing the volume between the door seals in accordance with approved plant procedures. |
| | : b. At least once per 6 months, conduct an overall airlock leakage test to verify that the overall airlock leakage rate is within its limit. |
| | FRC Evaluation: |
| | Sections III.B.2 and III.D.2 of Appendix J require that containment air-locks be tested at peak calculated'accident pressure (Pa) at 6-month intervals and after each opening in the interim between 6-month tests. These require-ments were imposed because airlocks represent potentially large leakage paths which are more subject to human error than other containment penetrations. |
| | Type B penetrations (other than airlocks) require testing in accordance with Appendix J at intervals not to exceed 2 years. |
| | 0() FranMin Research Center h cntelon oI The Fcenlttln Institute |
| | |
| | TER-C5257-53/54 Appendix J was published in 1973. A compilation of airlock events from Licensee Event Reports submitted since 1969 shows that airlock testing in accordance with Appendix J has been effective in the prompt identification of airlock leakage, but'hat rigid adherence to the after-each-opening requirement may not be necessary. |
| | Since 1969, there have been approximately 70 reported airlock leakage tests in which measured leakage exceeded allowable limits. Of these events, C 25% were the result of leakage other than from improper seating of airlock door seals. These failures were generally caused by leakage past door-operating mechanism handwheel packing, door-operating cylinder shaft seals, equalizer valves, or test lines. These penetrations resemble other Type B or C contain-ment penetrations except that they may be operated more frequently. Since air-locks are tested at a pressure of Pa every 6 months, these penetrations are tested, at a minimum, four times more frequently than typical Type B or C pene-trations. The 6-month test is, therefore, considered to be both justified and adequate for the prompt identification of this leakage. |
| | Improper seating of the airlock door seals, however, is not only the most frequent cause of airlock failures (the remaining 75%), but also represents a potentially large leakage path. While testing at a pressure of Pa after each opening will identify seal leakage, it can also be identified by alternative methods such as pressurizing between double-gasketed door seals (for airlocks designed with this type of seal) or pressurizing the airlock to pressures other than Pa. Furthermore, experience gained in testing airlocks since the issuance of Appendix J indicates that the use of one of these alternative methods. may be preferable to the full-pressure test of the entire airlock. |
| | Reactor plants designed prior to the issuance of Appendix J often do not have the capability to test airlocks at Pa without the installation of strong-backs or the performance of mechanical adjustments to the operating mechanism of the inner doors. The reason for this is that the inner doors are designed to seat with accident pressure on the containment side of the door, and there-fore, the operating mechanisms were not designed to withstand accident pressure in the opposite direction. When the airlock is pressurized for a local airlock Franklin Research Center A Division or The Ftenitttn Institute |
| | |
| | TER-C5257-53/54 test (i.e., pressurized between the doors), pressure is exerted on the airlock side of the inner door, causing the door to unseat and preventing the perfor-mance of a meaningful test. The strongback or mechanical adjustments prevent the unseating of the inner door, allowing the test to proceed. The installa-tion of strongbacks or performance of mechanical adjustments .is time consuming (often taking several hours), may result in additional radiation exposure to operating personnel, and may also cause degradation of the operating mechanism of the inner door, with consequential loss of reliability of the airlock. In addition, when conditions require frequent openings over a short period of time, testing at Pa after each opening becomes both impractical (tests often take from 8 hours to several days) and accelerates the rate of exposure of personnel and the degradation of mechanical equipment. |
| | For these reasons, the intent of Appendix J is satisfied, and the undesirable effects of testing after each opening are reduced if a satis-factory test of the airlock door seals is performed within 3 days of each opening or every 3 days during periods of frequent openings, whenever containment integrity is required. The test of the airlock door'seals may be performed by pressurizing the space between the double-gasketed seals (if so equipped) or by pressurizing the entire airlock to a pressure less than Pa that does not require the installation of strongbacks or performance of other, mechanical adjustments. If the reduced pressure airlock test is to be employed, the results of the leakage test must be conservatively extrapolated to equivalent Pa test results. |
| | In view of the foregoing discussion, FPL's proposed Technical Specification 4.4.2.2 is acceptable. Furthermore, no exemption from the requirements of Appendix J is necessary because FPL's proposed testing is within the revised version of Section III.D.2 (effective October 22, 1980). |
| | FPL should ensure that its airlock testing program is in complete conformance with the revised rule. |
| | With regard to the extrapolation of the reduced pressure test to equivalent Pa test results, comments on FPL's proposed extrapolation method submitted on November 26, 1980 [5] are contained in Appendix A to this report. |
| | Frankiin Research Center A Svlslon ot The FunMln Institute |
| | |
| | TER-C5257-53/54 3.2 PROPOSED TECHNICAL SPECIFICATION CHANGE In Reference 4, FPL proposed to revise Specification 4.4.2 to incorporate its proposed exemption from Appendix J with regard to the testing of contain-ment airlocks. In addition, this specification provided for testing at Pa using pressure decay, soap bubble, halogen detection, or equivalent methods of the following components: |
| | Containment purge valves each refueling Equipment access openings - annually and after use Fuel transfer tube flange each refueling Electrical penetrations each refueling. |
| | 4 The proposed specification also required that repairs and tests be made whenever the sum of the local leak rate tests, including isolation valves, exceeds 60% of the total containment allowable leak rate. |
| | II FRC Evaluation: |
| | In Section 3.1 of this report, FRC found FPL's proposal for testing of containment airlocks to be acceptable, provided that the results'of the vacuum testing between airlock door seals are conservatively extrapolated to Pa results. The remainder of the proposed specification conforms to Section III.B of Appendix J. Consequently, Proposed Specification 4.4.2 is acceptable in meeting the requirements and intent of Appendix J. |
| | l)ll Franklin Research Center A DiNtston ol The FranklIn Institute |
| | |
| | TER-C5257-53/54 |
| | : 4. CONCLUSIONS FPL's request for exemption from the requirements of Appendix J regarding testing of containment airlo'cks as submitted in References 2 and 4 and FPL's proposed change to Technical Specification 4.4.2 as submitted in Reference 4 were technically evaluated. The conclusions of these evaluations are as follows: |
| | o FPL's proposal to verify that airlock door seals have not been damaged or seated improperly by vacuum testing the volume between the seals within 3 days of every first of a series of openings, when containment integrity is required in the interim between full-pressure 6-month, tests is acceptable. |
| | No exemption is required because of the revision to Section III.D.2, effective October 22, 1980. |
| | o FPL's proposed change to Technical Specification 4.4.2 is acceptable since it conforms to the requirements of Appendix J. |
| | t)l) FranMin Research Center A OMslon of The Ftenttltn Institute |
| | |
| | TER-C5257-53/54 |
| | : 5. REFERENCES |
| | : 1. K. R. Goller (NRC) |
| | Letter to FPL August 7, 1975. |
| | : 2. R. E. Uhrig (FPL) |
| | Letter to K. R. Goller (NRC) |
| | September 12, 1975. |
| | : 3. R. E. Uhrig (FPL) |
| | Letter to E. G. Case (NRC) |
| | September 20, 1974. |
| | : 4. R. E. Uhrig (FPL) |
| | Letter to V. Stello (NRC) |
| | July 27, 1977. |
| | : 5. R. E. Uhrig (FPL) |
| | Letter to S. A. Varga (NRC) |
| | November 26, 1980. |
| | 0() Franklin Research Center A DMsion OiIhe Fronktin Institute |
| | |
| | TER-C5257-53/54 APPENDIX A EXTRAPOLATION OF REDUCED PRESSURE LEAKAGE MEASUREMENTS TO EQUIVALENT FULL PRESSURE LEAKAGE |
| | : 1. FPL's CORRELATION In Reference 5, FPL provided the following information: |
| | "The test will begin at a absolute pressure of 12.92n Hg (17" Hg vacuum) and alarm if pressure increases to 14.42n Hg (15.5" Hg vacuum). |
| | To determine the leak rate at 50 psig (64.7 psia), the design basis accident pressure, the following derivation was used: |
| | Flow for a compressible fluid may be calculated as follows: |
| | F=KY JhP where F = Flow or leakage K Coefficient of resistance Y Expansion factor bP Pressure drop across seal The maximum valve for Y is 1.0 and calculates the leakage for a non-compressible fluid. The coefficient of resistance is constant for each seal tested. Therefore: |
| | Fee K~hP or L= K JhP A ratio between the leak rate at L5p and Ltest becomes: |
| | L5p K P64.7 14..7 L K P P test 14.7 test L50 = 'Ltest 64.7 14.7 P P 14.7 test wher e P64 ~ 7 131 ~ 73" Hg P14 7 = 29.92n Hg L5p = Ltest 131i73 29 '2 |
| | ~29.92 P 1Chemical Engineer 's Handbook, McGraw-Hill, Inc., 1963, Section 5 (Fluid Mechanics, Flow Measurement), Pages 5-8 & 5-9 00 Franklin Research Center A DMsion nI The Ftenttiin Institute |
| | |
| | TER-C5257-53/54 L5p = 102 52 Ltest 29.92 P test L5p = 10.13 Ltest with pressures in inches of Hg" 29.92 P test By substituting 12.92 in. Hg for P , this formula yields the following test'orrelation: |
| | L50 2.'45 L |
| | test EVALUATION: |
| | e r |
| | The Licensee dropped the value of Y from the formula F = KY JbP because the maximum value of Y is 1.0. If the value of Y is retained, the correlation would be: |
| | L5p KY5p P64 ~ 7 P14 ~ 7 L KY P test test test 14.7 Although the maximum value of Y is 1.0, it does not follow that the ratio of Y50 to Y test is necessarily < 1.0. Consequently, the Licensee's cor-relation is not necessarily conservative. |
| | : 2. VISC9US FLOE For viscous flow, mass flow rate (m) is proportional to the difference of the square of inlet pressure and the square of outlet pressure: |
| | m5p (64.72 14.72) x const. |
| | m (14.7 2 - Pttestt2) x const. |
| | test m5p 64 72 14 72 L50 F50 = x const. |
| | P50 64 ~ 7 |
| | !jII Franklin Research Center A Division or The Ffsnklin Institute |
| | |
| | TER-C5257-53/54 mtest 72 test Ltest Ftest x const P |
| | test 14.7 |
| | '50 4 72 14 72 14.7 L |
| | test 64.7 147 2 - Pttest 2 Using" in. Hg units: 64.7 = 131.73 14.7 = 29.92 P |
| | test = 12.92 L |
| | then 5.13 L |
| | test 3 ~ CHOKED FLOW For choked flow, P orifice . . - P source Therefore, apart from Reynold's Number effects, mass flow rate - P source, abs' |
| | = volumetric flow rate (at source density) is independent of P |
| | outlet. Therefore, since volumetric flow rate is proportional to the tl percent of mass per unit time (denoted by L), |
| | L50 P64 ~ 7 131.73 in. Hg 10.2 test 'est 29 '2 in'g CONCLUSION: |
| | The above analysis yields the following results for the correlation of 50 test FPL's t/hP Method Viscous Flow Choked Flow 2.45 5.13 10.2 Since the choked flow correlation is the most conservative, this correlation should be used. |
| | It should be noted that FPL stated in Reference 5 that the allowable local leakage rate at Turkey Point is 0.25% wt/day or 45,000 cc/min. At the 00 Franklin Research Center A Division d The FrenMin Institute |
| | |
| | TER-C5257-53/54 same time, FPL calculated airlock leakage rates (including instrument errors) which will cause an alarm to sound after an elapsed time of 1 minute as' o1lows". |
| | Lttest = 31.93 cc/min (personnel airlock) |
| | Lttestt = 7.98 cc/min (emergency airlock) . |
| | It can be seen that even using the most conservative correlation (choked flow), the alarm will detect leakage which is a very small percentage of,total allowable local leakage (less than 1%) . |
| | A DMsfon of The Frenfrfin Insrlrure}} |
Containment Leakage Rate Testing,Turkey Point Units 3 & 4, Technical Evaluation ReptML17341A208 |
Person / Time |
---|
Site: |
Turkey Point |
---|
Issue date: |
06/05/1981 |
---|
From: |
Delgaizo T FRANKLIN INSTITUTE |
---|
To: |
|
---|
Shared Package |
---|
ML17341A207 |
List: |
---|
References |
---|
CON-NRC-03-79-118, CON-NRC-3-79-118 TER-C5257-053, TER-C5257-053-54, TER-C5257-53, TER-C5257-53-54, NUDOCS 8106110369 |
Download: ML17341A208 (15) |
|
|
---|
Category:CONTRACTED REPORT - RTA
MONTHYEARML17355A2801998-09-30030 September 1998 Rev 1,Ltr Rept, Technical Evaluation of Florida Power & Light Fire Barrier Ampacity Derating Assessment for St.Lucie & Turkey Point. ML17354B1731998-01-31031 January 1998 Final TER on 'Submittal-Only' Review of IPEEE at Turkey Point Nuclear Plant Units 3 & 4. ML17353A4031995-09-30030 September 1995 Evaluation of Turkey Point Nuclear Plant Units 3 & 4 Offsite Dose Calculation Manual,Rev 4. ML20080K1101995-02-28028 February 1995 Technical Evaluation Rept on Third 10-yr Interval Inservice Insp Program Plan:Florida Power & Light Co,Turkey Point Nuclear Power Plant,Units 3 & 4 ML20076K9841994-09-30030 September 1994 Evaluation of Utility Response to Suppl 1 to NRC Bulletin 90-01:Turkey Point-3/4, Technical Evaluation Rept ML20076F2701994-09-30030 September 1994 Fpl,Pump & Valve Inservice Testing Program,Rev 0,Third Ten-Year Interval ML20114A6001992-08-31031 August 1992 TER Pump & Valve Inservice Testing Program Turkey Point, Units 3 & 4 ML17349A2131992-04-30030 April 1992 Auxiliary Feedwater System RISK-BASED Inspection Guide for the Turkey Point Nuclear Power Plant ML17349A4181991-12-31031 December 1991 Step 2 Review,Turkey Point Units 3 & 4 IPE Submittal, Human Reliability Analysis ML17349A4171991-12-21021 December 1991 IPE Back-End Audit,Task 3,Technical Evaluation Rept,December 21,1991,Rev 1 ML17349A4151991-12-21021 December 1991 Ipe:Front End Audit. ML17348B1241991-07-31031 July 1991 Technical Evaluation Rept,Pump & Valve Inservice Testing Program,Turkey Point,Units 3 & 4. ML20043F6331990-06-11011 June 1990 Technical Evaluation Rept Turkey Point Units 2 & 3 Station Blackout Evaluation, Final Rept ML20058K1031989-05-30030 May 1989 Conformance to Generic Ltr 83-28,Item 2.2-1 - Equipment Classification for All Other Safety-Related Components, Turkey Point-3/-4, Technical Evaluation Rept ML17347A5931987-07-31031 July 1987 Retran Code:Transient Analysis Model Qualification, Technical Evaluation Rept ML17342A7541987-06-30030 June 1987 Conformance to Generic Ltr 83-28,Item 2.2.2-Vendor Interface Programs for All Other Safety-Related Components: Turkey Point 3 & 4, Final Rept ML17342A7641987-06-30030 June 1987 TMI Action-NUREG-0737 (II.D.1),Relief & Safety Valve Testing,Turkey Point Units 3 & 4, Informal Technical Evaluation Rept ML20211N5031987-01-0909 January 1987 Reactor Trip Sys Reliability Conformance to Item 4.5.2 of Generic Ltr 83-28,HB Robinson Steam Electric Plant,Unit 2, Salem Generating Station Units 1 & 2,Shearon Harris Nuclear Power Plant Unit 1..., Technical Evaluation Rept ML20198A2481986-04-0404 April 1986 Metallurgical Failure Analysis of Check Valve Guide Pin ML20138J9491985-09-30030 September 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Farley Units 1 & 2,Turkey Point Units 3 & 4,Robinson Unit 2 & Summer Unit 1 ML17342A3571985-09-30030 September 1985 Addendum a to First Interval Inservice Insp Program for Turkey Point Units 3 & 4, Technical Evaluation Rept ML17342A3341985-09-30030 September 1985 Inservice Insp Program,Second Interval Technical Evaluation Rept. ML17342A1601985-07-19019 July 1985 Draft Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28 (Required Actions Based on Generic...), Item 1.2., `Post-Trip Review:Data & Info Capability,' for Turkey Point Plant..., Technical Evaluation Rept ML20244D3871985-07-10010 July 1985 Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28 (Required Actions Based on Generic Implications of Salem ATWS Events),Item 1.2, `Post-Trip Review:Data & Info Capabilities' for Bellefonte Nuclear Plant. ML20244D4381985-06-30030 June 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Dresden Units 2 & 3,Millstone Unit 1,Monticello,Pilgrim & Quad Cities Units 1 & 2. Contains Info for Dresden & Quad Cities ML20111B1661984-12-0505 December 1984 Masonry Wall Design, Technical Evaluation Rept ML20080E0711984-01-13013 January 1984 Evaluations of Detailed Control Room Design Reviews for St Lucie Units 1 & 2 & Turkey Point Units 3 & 4, Technical Evaluation Rept ML20080Q5131983-10-10010 October 1983 Control of Heavy Loads (C-10),Turkey Point Units 3 & 4, Technical Evaluation Rept ML20079Q6871983-03-14014 March 1983 Selected Operating Reactor Issues Program Ii:Rcs Vents (NUREG-0737,Item II.B.1), Final Technical Evaluation Rept ML17354A2561983-02-14014 February 1983 Post-Fire Safe Shutdown Capability, Technical Evaluation Rept ML20072B1201983-01-0606 January 1983 Control of Heavy Loads (C-10),Turkey Point Units 3 & 4, Draft Technical Evaluation Rept.Request for Addl Info Encl ML20076C3691982-11-29029 November 1982 ECCS Repts (F-47):TMI Action Plan Requirements,Turkey Point,Units 3 & 4, Technical Evaluation Rept ML17341B4711982-10-28028 October 1982 Proposed Design Mod & Tech Spec Changes on Grid Voltage Degradation for Turkey Point Nuclear Generating Plant, Units 3 & 4, Technical Evaluation Rept ML20069G5861982-09-30030 September 1982 Review of Licensees Resolution of Outstanding Issues from NRC Equipment Environ Qualification SERs (F-11 & B-60), Turkey Point Unit 4, Vols 1 & 2,technical Evaluation Rept ML17345B2391982-09-17017 September 1982 Seismic Qualification of Auxiliary Feedwater Sys,Turkey Point Nuclear Plant,Units 3 & 4, Technical Evaluation Rept ML20023A4891982-09-10010 September 1982 Inservice Insp Program, Technical Evaluation Rept ML17341B4661982-08-31031 August 1982 Improvements in Training & Requalification Programs as Required by TMI Action Items I.A.2.1 & II.B.4 for Turkey Point,Units 3 & 4, Technical Evaluation Rept ML20071L7081982-08-0808 August 1982 Adequacy of Station Electric Distribution Sys Voltages for Turkey Point Nuclear Generating Plant Units 3 & 4, Technical Evaluation Rept ML17341B4001982-06-18018 June 1982 Auxiliary Feedwater Sys Automatic Initiation & Flow Indication,Turkey Point Units 3 & 4, Technical Evaluation Rept ML20052F6841982-02-28028 February 1982 Tech Specs for Redundant Decay Heat Removal Capability, Turkey Point,Units 3 & 4, Preliminary Rept for Feb 1982 ML17341A9181982-01-31031 January 1982 Tech Specs for Insp of Steam Generators,Turkey Point Units 3 & 4, Technical Evaluation Rept ML17341A8291981-12-29029 December 1981 Control of Heavy Loads, Draft Technical Evaluation Rept ML20038D1341981-12-11011 December 1981 Request for Addl Info Re Equipment Environ Qualification Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification Safety Evaluation Repts & TMI Action Plan Installed Equipment. ML20039A1691981-12-11011 December 1981 Equipment Environ Qualification Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification Safety Evaluation Repts & TMI Action Plan Installed Equipment. ML17341A2081981-06-0505 June 1981 Containment Leakage Rate Testing,Turkey Point Units 3 & 4, Technical Evaluation Rept ML20003C2581981-01-31031 January 1981 Technical Evaluation of Electrical,Instrumentation & Control Design Aspects of Override of Containment Purge Valve Isolation & Other Engineered Safety Feature Signals for Crystal River Nuclear Power Plant,Unit 3. ML20003C2611981-01-31031 January 1981 Technical Evaluation of Electrical,Instrumentation & Control Design Aspects of Override of Containment Purge Valve Isolation & Other Engineered Safety Feature Signals for Indian Point 3 Nuclear Power Plant. ML17340A7621981-01-31031 January 1981 Technical Evaluation of Electrical,Instrumentation & Control Design Aspects of Override of Containment Purge Valve Isolation & Other Engineered Safety Feature Signals for Turkey Point Nuclear Power Station,Units 3 & 4. ML19336A4071980-09-30030 September 1980 In-Plant Source Term Measurements at Turkey Point Station Units 3 & 4. ML17339B1191980-05-31031 May 1980 Proposed Amend to Facility OLs DPR-31 & DPR-41,Delta T Vs Reactor Power Shift Check,Turkey Point Units 3 & 4, Informal Rept 1998-09-30
[Table view] Category:QUICK LOOK
MONTHYEARML17355A2801998-09-30030 September 1998 Rev 1,Ltr Rept, Technical Evaluation of Florida Power & Light Fire Barrier Ampacity Derating Assessment for St.Lucie & Turkey Point. ML17354B1731998-01-31031 January 1998 Final TER on 'Submittal-Only' Review of IPEEE at Turkey Point Nuclear Plant Units 3 & 4. ML17353A4031995-09-30030 September 1995 Evaluation of Turkey Point Nuclear Plant Units 3 & 4 Offsite Dose Calculation Manual,Rev 4. ML20080K1101995-02-28028 February 1995 Technical Evaluation Rept on Third 10-yr Interval Inservice Insp Program Plan:Florida Power & Light Co,Turkey Point Nuclear Power Plant,Units 3 & 4 ML20076K9841994-09-30030 September 1994 Evaluation of Utility Response to Suppl 1 to NRC Bulletin 90-01:Turkey Point-3/4, Technical Evaluation Rept ML20076F2701994-09-30030 September 1994 Fpl,Pump & Valve Inservice Testing Program,Rev 0,Third Ten-Year Interval ML20114A6001992-08-31031 August 1992 TER Pump & Valve Inservice Testing Program Turkey Point, Units 3 & 4 ML17349A2131992-04-30030 April 1992 Auxiliary Feedwater System RISK-BASED Inspection Guide for the Turkey Point Nuclear Power Plant ML17349A4181991-12-31031 December 1991 Step 2 Review,Turkey Point Units 3 & 4 IPE Submittal, Human Reliability Analysis ML17349A4171991-12-21021 December 1991 IPE Back-End Audit,Task 3,Technical Evaluation Rept,December 21,1991,Rev 1 ML17349A4151991-12-21021 December 1991 Ipe:Front End Audit. ML17348B1241991-07-31031 July 1991 Technical Evaluation Rept,Pump & Valve Inservice Testing Program,Turkey Point,Units 3 & 4. ML20043F6331990-06-11011 June 1990 Technical Evaluation Rept Turkey Point Units 2 & 3 Station Blackout Evaluation, Final Rept ML20058K1031989-05-30030 May 1989 Conformance to Generic Ltr 83-28,Item 2.2-1 - Equipment Classification for All Other Safety-Related Components, Turkey Point-3/-4, Technical Evaluation Rept ML17347A5931987-07-31031 July 1987 Retran Code:Transient Analysis Model Qualification, Technical Evaluation Rept ML17342A7541987-06-30030 June 1987 Conformance to Generic Ltr 83-28,Item 2.2.2-Vendor Interface Programs for All Other Safety-Related Components: Turkey Point 3 & 4, Final Rept ML17342A7641987-06-30030 June 1987 TMI Action-NUREG-0737 (II.D.1),Relief & Safety Valve Testing,Turkey Point Units 3 & 4, Informal Technical Evaluation Rept ML20211N5031987-01-0909 January 1987 Reactor Trip Sys Reliability Conformance to Item 4.5.2 of Generic Ltr 83-28,HB Robinson Steam Electric Plant,Unit 2, Salem Generating Station Units 1 & 2,Shearon Harris Nuclear Power Plant Unit 1..., Technical Evaluation Rept ML20198A2481986-04-0404 April 1986 Metallurgical Failure Analysis of Check Valve Guide Pin ML20138J9491985-09-30030 September 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Farley Units 1 & 2,Turkey Point Units 3 & 4,Robinson Unit 2 & Summer Unit 1 ML17342A3571985-09-30030 September 1985 Addendum a to First Interval Inservice Insp Program for Turkey Point Units 3 & 4, Technical Evaluation Rept ML17342A3341985-09-30030 September 1985 Inservice Insp Program,Second Interval Technical Evaluation Rept. ML17342A1601985-07-19019 July 1985 Draft Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28 (Required Actions Based on Generic...), Item 1.2., `Post-Trip Review:Data & Info Capability,' for Turkey Point Plant..., Technical Evaluation Rept ML20244D3871985-07-10010 July 1985 Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28 (Required Actions Based on Generic Implications of Salem ATWS Events),Item 1.2, `Post-Trip Review:Data & Info Capabilities' for Bellefonte Nuclear Plant. ML20244D4381985-06-30030 June 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Dresden Units 2 & 3,Millstone Unit 1,Monticello,Pilgrim & Quad Cities Units 1 & 2. Contains Info for Dresden & Quad Cities ML20111B1661984-12-0505 December 1984 Masonry Wall Design, Technical Evaluation Rept ML20080E0711984-01-13013 January 1984 Evaluations of Detailed Control Room Design Reviews for St Lucie Units 1 & 2 & Turkey Point Units 3 & 4, Technical Evaluation Rept ML20080Q5131983-10-10010 October 1983 Control of Heavy Loads (C-10),Turkey Point Units 3 & 4, Technical Evaluation Rept ML20079Q6871983-03-14014 March 1983 Selected Operating Reactor Issues Program Ii:Rcs Vents (NUREG-0737,Item II.B.1), Final Technical Evaluation Rept ML17354A2561983-02-14014 February 1983 Post-Fire Safe Shutdown Capability, Technical Evaluation Rept ML20072B1201983-01-0606 January 1983 Control of Heavy Loads (C-10),Turkey Point Units 3 & 4, Draft Technical Evaluation Rept.Request for Addl Info Encl ML20076C3691982-11-29029 November 1982 ECCS Repts (F-47):TMI Action Plan Requirements,Turkey Point,Units 3 & 4, Technical Evaluation Rept ML17341B4711982-10-28028 October 1982 Proposed Design Mod & Tech Spec Changes on Grid Voltage Degradation for Turkey Point Nuclear Generating Plant, Units 3 & 4, Technical Evaluation Rept ML20069G5861982-09-30030 September 1982 Review of Licensees Resolution of Outstanding Issues from NRC Equipment Environ Qualification SERs (F-11 & B-60), Turkey Point Unit 4, Vols 1 & 2,technical Evaluation Rept ML17345B2391982-09-17017 September 1982 Seismic Qualification of Auxiliary Feedwater Sys,Turkey Point Nuclear Plant,Units 3 & 4, Technical Evaluation Rept ML20023A4891982-09-10010 September 1982 Inservice Insp Program, Technical Evaluation Rept ML17341B4661982-08-31031 August 1982 Improvements in Training & Requalification Programs as Required by TMI Action Items I.A.2.1 & II.B.4 for Turkey Point,Units 3 & 4, Technical Evaluation Rept ML20071L7081982-08-0808 August 1982 Adequacy of Station Electric Distribution Sys Voltages for Turkey Point Nuclear Generating Plant Units 3 & 4, Technical Evaluation Rept ML17341B4001982-06-18018 June 1982 Auxiliary Feedwater Sys Automatic Initiation & Flow Indication,Turkey Point Units 3 & 4, Technical Evaluation Rept ML20052F6841982-02-28028 February 1982 Tech Specs for Redundant Decay Heat Removal Capability, Turkey Point,Units 3 & 4, Preliminary Rept for Feb 1982 ML17341A9181982-01-31031 January 1982 Tech Specs for Insp of Steam Generators,Turkey Point Units 3 & 4, Technical Evaluation Rept ML17341A8291981-12-29029 December 1981 Control of Heavy Loads, Draft Technical Evaluation Rept ML20038D1341981-12-11011 December 1981 Request for Addl Info Re Equipment Environ Qualification Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification Safety Evaluation Repts & TMI Action Plan Installed Equipment. ML20039A1691981-12-11011 December 1981 Equipment Environ Qualification Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification Safety Evaluation Repts & TMI Action Plan Installed Equipment. ML17341A2081981-06-0505 June 1981 Containment Leakage Rate Testing,Turkey Point Units 3 & 4, Technical Evaluation Rept ML20003C2581981-01-31031 January 1981 Technical Evaluation of Electrical,Instrumentation & Control Design Aspects of Override of Containment Purge Valve Isolation & Other Engineered Safety Feature Signals for Crystal River Nuclear Power Plant,Unit 3. ML20003C2611981-01-31031 January 1981 Technical Evaluation of Electrical,Instrumentation & Control Design Aspects of Override of Containment Purge Valve Isolation & Other Engineered Safety Feature Signals for Indian Point 3 Nuclear Power Plant. ML17340A7621981-01-31031 January 1981 Technical Evaluation of Electrical,Instrumentation & Control Design Aspects of Override of Containment Purge Valve Isolation & Other Engineered Safety Feature Signals for Turkey Point Nuclear Power Station,Units 3 & 4. ML19336A4071980-09-30030 September 1980 In-Plant Source Term Measurements at Turkey Point Station Units 3 & 4. ML17339B1191980-05-31031 May 1980 Proposed Amend to Facility OLs DPR-31 & DPR-41,Delta T Vs Reactor Power Shift Check,Turkey Point Units 3 & 4, Informal Rept 1998-09-30
[Table view] Category:ETC. (PERIODIC
MONTHYEARML17355A2801998-09-30030 September 1998 Rev 1,Ltr Rept, Technical Evaluation of Florida Power & Light Fire Barrier Ampacity Derating Assessment for St.Lucie & Turkey Point. ML17354B1731998-01-31031 January 1998 Final TER on 'Submittal-Only' Review of IPEEE at Turkey Point Nuclear Plant Units 3 & 4. ML17353A4031995-09-30030 September 1995 Evaluation of Turkey Point Nuclear Plant Units 3 & 4 Offsite Dose Calculation Manual,Rev 4. ML20080K1101995-02-28028 February 1995 Technical Evaluation Rept on Third 10-yr Interval Inservice Insp Program Plan:Florida Power & Light Co,Turkey Point Nuclear Power Plant,Units 3 & 4 ML20076K9841994-09-30030 September 1994 Evaluation of Utility Response to Suppl 1 to NRC Bulletin 90-01:Turkey Point-3/4, Technical Evaluation Rept ML20076F2701994-09-30030 September 1994 Fpl,Pump & Valve Inservice Testing Program,Rev 0,Third Ten-Year Interval ML20114A6001992-08-31031 August 1992 TER Pump & Valve Inservice Testing Program Turkey Point, Units 3 & 4 ML17349A2131992-04-30030 April 1992 Auxiliary Feedwater System RISK-BASED Inspection Guide for the Turkey Point Nuclear Power Plant ML17349A4181991-12-31031 December 1991 Step 2 Review,Turkey Point Units 3 & 4 IPE Submittal, Human Reliability Analysis ML17349A4171991-12-21021 December 1991 IPE Back-End Audit,Task 3,Technical Evaluation Rept,December 21,1991,Rev 1 ML17349A4151991-12-21021 December 1991 Ipe:Front End Audit. ML17348B1241991-07-31031 July 1991 Technical Evaluation Rept,Pump & Valve Inservice Testing Program,Turkey Point,Units 3 & 4. ML20043F6331990-06-11011 June 1990 Technical Evaluation Rept Turkey Point Units 2 & 3 Station Blackout Evaluation, Final Rept ML20058K1031989-05-30030 May 1989 Conformance to Generic Ltr 83-28,Item 2.2-1 - Equipment Classification for All Other Safety-Related Components, Turkey Point-3/-4, Technical Evaluation Rept ML17347A5931987-07-31031 July 1987 Retran Code:Transient Analysis Model Qualification, Technical Evaluation Rept ML17342A7541987-06-30030 June 1987 Conformance to Generic Ltr 83-28,Item 2.2.2-Vendor Interface Programs for All Other Safety-Related Components: Turkey Point 3 & 4, Final Rept ML17342A7641987-06-30030 June 1987 TMI Action-NUREG-0737 (II.D.1),Relief & Safety Valve Testing,Turkey Point Units 3 & 4, Informal Technical Evaluation Rept ML20211N5031987-01-0909 January 1987 Reactor Trip Sys Reliability Conformance to Item 4.5.2 of Generic Ltr 83-28,HB Robinson Steam Electric Plant,Unit 2, Salem Generating Station Units 1 & 2,Shearon Harris Nuclear Power Plant Unit 1..., Technical Evaluation Rept ML20198A2481986-04-0404 April 1986 Metallurgical Failure Analysis of Check Valve Guide Pin ML20138J9491985-09-30030 September 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Farley Units 1 & 2,Turkey Point Units 3 & 4,Robinson Unit 2 & Summer Unit 1 ML17342A3571985-09-30030 September 1985 Addendum a to First Interval Inservice Insp Program for Turkey Point Units 3 & 4, Technical Evaluation Rept ML17342A3341985-09-30030 September 1985 Inservice Insp Program,Second Interval Technical Evaluation Rept. ML17342A1601985-07-19019 July 1985 Draft Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28 (Required Actions Based on Generic...), Item 1.2., `Post-Trip Review:Data & Info Capability,' for Turkey Point Plant..., Technical Evaluation Rept ML20244D3871985-07-10010 July 1985 Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28 (Required Actions Based on Generic Implications of Salem ATWS Events),Item 1.2, `Post-Trip Review:Data & Info Capabilities' for Bellefonte Nuclear Plant. ML20244D4381985-06-30030 June 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Dresden Units 2 & 3,Millstone Unit 1,Monticello,Pilgrim & Quad Cities Units 1 & 2. Contains Info for Dresden & Quad Cities ML20111B1661984-12-0505 December 1984 Masonry Wall Design, Technical Evaluation Rept ML20080E0711984-01-13013 January 1984 Evaluations of Detailed Control Room Design Reviews for St Lucie Units 1 & 2 & Turkey Point Units 3 & 4, Technical Evaluation Rept ML20080Q5131983-10-10010 October 1983 Control of Heavy Loads (C-10),Turkey Point Units 3 & 4, Technical Evaluation Rept ML20079Q6871983-03-14014 March 1983 Selected Operating Reactor Issues Program Ii:Rcs Vents (NUREG-0737,Item II.B.1), Final Technical Evaluation Rept ML17354A2561983-02-14014 February 1983 Post-Fire Safe Shutdown Capability, Technical Evaluation Rept ML20072B1201983-01-0606 January 1983 Control of Heavy Loads (C-10),Turkey Point Units 3 & 4, Draft Technical Evaluation Rept.Request for Addl Info Encl ML20076C3691982-11-29029 November 1982 ECCS Repts (F-47):TMI Action Plan Requirements,Turkey Point,Units 3 & 4, Technical Evaluation Rept ML17341B4711982-10-28028 October 1982 Proposed Design Mod & Tech Spec Changes on Grid Voltage Degradation for Turkey Point Nuclear Generating Plant, Units 3 & 4, Technical Evaluation Rept ML20069G5861982-09-30030 September 1982 Review of Licensees Resolution of Outstanding Issues from NRC Equipment Environ Qualification SERs (F-11 & B-60), Turkey Point Unit 4, Vols 1 & 2,technical Evaluation Rept ML17345B2391982-09-17017 September 1982 Seismic Qualification of Auxiliary Feedwater Sys,Turkey Point Nuclear Plant,Units 3 & 4, Technical Evaluation Rept ML20023A4891982-09-10010 September 1982 Inservice Insp Program, Technical Evaluation Rept ML17341B4661982-08-31031 August 1982 Improvements in Training & Requalification Programs as Required by TMI Action Items I.A.2.1 & II.B.4 for Turkey Point,Units 3 & 4, Technical Evaluation Rept ML20071L7081982-08-0808 August 1982 Adequacy of Station Electric Distribution Sys Voltages for Turkey Point Nuclear Generating Plant Units 3 & 4, Technical Evaluation Rept ML17341B4001982-06-18018 June 1982 Auxiliary Feedwater Sys Automatic Initiation & Flow Indication,Turkey Point Units 3 & 4, Technical Evaluation Rept ML20052F6841982-02-28028 February 1982 Tech Specs for Redundant Decay Heat Removal Capability, Turkey Point,Units 3 & 4, Preliminary Rept for Feb 1982 ML17341A9181982-01-31031 January 1982 Tech Specs for Insp of Steam Generators,Turkey Point Units 3 & 4, Technical Evaluation Rept ML17341A8291981-12-29029 December 1981 Control of Heavy Loads, Draft Technical Evaluation Rept ML20038D1341981-12-11011 December 1981 Request for Addl Info Re Equipment Environ Qualification Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification Safety Evaluation Repts & TMI Action Plan Installed Equipment. ML20039A1691981-12-11011 December 1981 Equipment Environ Qualification Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification Safety Evaluation Repts & TMI Action Plan Installed Equipment. ML17341A2081981-06-0505 June 1981 Containment Leakage Rate Testing,Turkey Point Units 3 & 4, Technical Evaluation Rept ML20003C2581981-01-31031 January 1981 Technical Evaluation of Electrical,Instrumentation & Control Design Aspects of Override of Containment Purge Valve Isolation & Other Engineered Safety Feature Signals for Crystal River Nuclear Power Plant,Unit 3. ML20003C2611981-01-31031 January 1981 Technical Evaluation of Electrical,Instrumentation & Control Design Aspects of Override of Containment Purge Valve Isolation & Other Engineered Safety Feature Signals for Indian Point 3 Nuclear Power Plant. ML17340A7621981-01-31031 January 1981 Technical Evaluation of Electrical,Instrumentation & Control Design Aspects of Override of Containment Purge Valve Isolation & Other Engineered Safety Feature Signals for Turkey Point Nuclear Power Station,Units 3 & 4. ML19336A4071980-09-30030 September 1980 In-Plant Source Term Measurements at Turkey Point Station Units 3 & 4. ML17339B1191980-05-31031 May 1980 Proposed Amend to Facility OLs DPR-31 & DPR-41,Delta T Vs Reactor Power Shift Check,Turkey Point Units 3 & 4, Informal Rept 1998-09-30
[Table view] Category:TEXT-PROCUREMENT & CONTRACTS
MONTHYEARML17355A2801998-09-30030 September 1998 Rev 1,Ltr Rept, Technical Evaluation of Florida Power & Light Fire Barrier Ampacity Derating Assessment for St.Lucie & Turkey Point. ML17354B1731998-01-31031 January 1998 Final TER on 'Submittal-Only' Review of IPEEE at Turkey Point Nuclear Plant Units 3 & 4. ML17353A4031995-09-30030 September 1995 Evaluation of Turkey Point Nuclear Plant Units 3 & 4 Offsite Dose Calculation Manual,Rev 4. ML20080K1101995-02-28028 February 1995 Technical Evaluation Rept on Third 10-yr Interval Inservice Insp Program Plan:Florida Power & Light Co,Turkey Point Nuclear Power Plant,Units 3 & 4 ML20076K9841994-09-30030 September 1994 Evaluation of Utility Response to Suppl 1 to NRC Bulletin 90-01:Turkey Point-3/4, Technical Evaluation Rept ML20076F2701994-09-30030 September 1994 Fpl,Pump & Valve Inservice Testing Program,Rev 0,Third Ten-Year Interval ML20114A6001992-08-31031 August 1992 TER Pump & Valve Inservice Testing Program Turkey Point, Units 3 & 4 ML17349A2131992-04-30030 April 1992 Auxiliary Feedwater System RISK-BASED Inspection Guide for the Turkey Point Nuclear Power Plant ML17349A4181991-12-31031 December 1991 Step 2 Review,Turkey Point Units 3 & 4 IPE Submittal, Human Reliability Analysis ML17349A4171991-12-21021 December 1991 IPE Back-End Audit,Task 3,Technical Evaluation Rept,December 21,1991,Rev 1 ML17349A4151991-12-21021 December 1991 Ipe:Front End Audit. ML17348B1241991-07-31031 July 1991 Technical Evaluation Rept,Pump & Valve Inservice Testing Program,Turkey Point,Units 3 & 4. ML20043F6331990-06-11011 June 1990 Technical Evaluation Rept Turkey Point Units 2 & 3 Station Blackout Evaluation, Final Rept ML20058K1031989-05-30030 May 1989 Conformance to Generic Ltr 83-28,Item 2.2-1 - Equipment Classification for All Other Safety-Related Components, Turkey Point-3/-4, Technical Evaluation Rept ML17347A5931987-07-31031 July 1987 Retran Code:Transient Analysis Model Qualification, Technical Evaluation Rept ML17342A7541987-06-30030 June 1987 Conformance to Generic Ltr 83-28,Item 2.2.2-Vendor Interface Programs for All Other Safety-Related Components: Turkey Point 3 & 4, Final Rept ML17342A7641987-06-30030 June 1987 TMI Action-NUREG-0737 (II.D.1),Relief & Safety Valve Testing,Turkey Point Units 3 & 4, Informal Technical Evaluation Rept ML20211N5031987-01-0909 January 1987 Reactor Trip Sys Reliability Conformance to Item 4.5.2 of Generic Ltr 83-28,HB Robinson Steam Electric Plant,Unit 2, Salem Generating Station Units 1 & 2,Shearon Harris Nuclear Power Plant Unit 1..., Technical Evaluation Rept ML20198A2481986-04-0404 April 1986 Metallurgical Failure Analysis of Check Valve Guide Pin ML20138J9491985-09-30030 September 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Farley Units 1 & 2,Turkey Point Units 3 & 4,Robinson Unit 2 & Summer Unit 1 ML17342A3571985-09-30030 September 1985 Addendum a to First Interval Inservice Insp Program for Turkey Point Units 3 & 4, Technical Evaluation Rept ML17342A3341985-09-30030 September 1985 Inservice Insp Program,Second Interval Technical Evaluation Rept. ML17342A1601985-07-19019 July 1985 Draft Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28 (Required Actions Based on Generic...), Item 1.2., `Post-Trip Review:Data & Info Capability,' for Turkey Point Plant..., Technical Evaluation Rept ML20244D3871985-07-10010 July 1985 Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28 (Required Actions Based on Generic Implications of Salem ATWS Events),Item 1.2, `Post-Trip Review:Data & Info Capabilities' for Bellefonte Nuclear Plant. ML20244D4381985-06-30030 June 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Dresden Units 2 & 3,Millstone Unit 1,Monticello,Pilgrim & Quad Cities Units 1 & 2. Contains Info for Dresden & Quad Cities ML20111B1661984-12-0505 December 1984 Masonry Wall Design, Technical Evaluation Rept ML20080E0711984-01-13013 January 1984 Evaluations of Detailed Control Room Design Reviews for St Lucie Units 1 & 2 & Turkey Point Units 3 & 4, Technical Evaluation Rept ML20080Q5131983-10-10010 October 1983 Control of Heavy Loads (C-10),Turkey Point Units 3 & 4, Technical Evaluation Rept ML20079Q6871983-03-14014 March 1983 Selected Operating Reactor Issues Program Ii:Rcs Vents (NUREG-0737,Item II.B.1), Final Technical Evaluation Rept ML17354A2561983-02-14014 February 1983 Post-Fire Safe Shutdown Capability, Technical Evaluation Rept ML20072B1201983-01-0606 January 1983 Control of Heavy Loads (C-10),Turkey Point Units 3 & 4, Draft Technical Evaluation Rept.Request for Addl Info Encl ML20076C3691982-11-29029 November 1982 ECCS Repts (F-47):TMI Action Plan Requirements,Turkey Point,Units 3 & 4, Technical Evaluation Rept ML17341B4711982-10-28028 October 1982 Proposed Design Mod & Tech Spec Changes on Grid Voltage Degradation for Turkey Point Nuclear Generating Plant, Units 3 & 4, Technical Evaluation Rept ML20069G5861982-09-30030 September 1982 Review of Licensees Resolution of Outstanding Issues from NRC Equipment Environ Qualification SERs (F-11 & B-60), Turkey Point Unit 4, Vols 1 & 2,technical Evaluation Rept ML17345B2391982-09-17017 September 1982 Seismic Qualification of Auxiliary Feedwater Sys,Turkey Point Nuclear Plant,Units 3 & 4, Technical Evaluation Rept ML20023A4891982-09-10010 September 1982 Inservice Insp Program, Technical Evaluation Rept ML17341B4661982-08-31031 August 1982 Improvements in Training & Requalification Programs as Required by TMI Action Items I.A.2.1 & II.B.4 for Turkey Point,Units 3 & 4, Technical Evaluation Rept ML20071L7081982-08-0808 August 1982 Adequacy of Station Electric Distribution Sys Voltages for Turkey Point Nuclear Generating Plant Units 3 & 4, Technical Evaluation Rept ML17341B4001982-06-18018 June 1982 Auxiliary Feedwater Sys Automatic Initiation & Flow Indication,Turkey Point Units 3 & 4, Technical Evaluation Rept ML20052F6841982-02-28028 February 1982 Tech Specs for Redundant Decay Heat Removal Capability, Turkey Point,Units 3 & 4, Preliminary Rept for Feb 1982 ML17341A9181982-01-31031 January 1982 Tech Specs for Insp of Steam Generators,Turkey Point Units 3 & 4, Technical Evaluation Rept ML17341A8291981-12-29029 December 1981 Control of Heavy Loads, Draft Technical Evaluation Rept ML20038D1341981-12-11011 December 1981 Request for Addl Info Re Equipment Environ Qualification Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification Safety Evaluation Repts & TMI Action Plan Installed Equipment. ML20039A1691981-12-11011 December 1981 Equipment Environ Qualification Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification Safety Evaluation Repts & TMI Action Plan Installed Equipment. ML17341A2081981-06-0505 June 1981 Containment Leakage Rate Testing,Turkey Point Units 3 & 4, Technical Evaluation Rept ML20003C2581981-01-31031 January 1981 Technical Evaluation of Electrical,Instrumentation & Control Design Aspects of Override of Containment Purge Valve Isolation & Other Engineered Safety Feature Signals for Crystal River Nuclear Power Plant,Unit 3. ML20003C2611981-01-31031 January 1981 Technical Evaluation of Electrical,Instrumentation & Control Design Aspects of Override of Containment Purge Valve Isolation & Other Engineered Safety Feature Signals for Indian Point 3 Nuclear Power Plant. ML17340A7621981-01-31031 January 1981 Technical Evaluation of Electrical,Instrumentation & Control Design Aspects of Override of Containment Purge Valve Isolation & Other Engineered Safety Feature Signals for Turkey Point Nuclear Power Station,Units 3 & 4. ML19336A4071980-09-30030 September 1980 In-Plant Source Term Measurements at Turkey Point Station Units 3 & 4. ML17339B1191980-05-31031 May 1980 Proposed Amend to Facility OLs DPR-31 & DPR-41,Delta T Vs Reactor Power Shift Check,Turkey Point Units 3 & 4, Informal Rept 1998-09-30
[Table view] |
Text
TECHNICAL EVALUATION REPORT CONTAINMENT LEAKAGE RATE TESTING FLORIDA PONER 8, LIGHT CNPIY TURKEY POINT UNITS 5 ID 0 NRC DOCKET NO. 50-250, 50-251 NRC TAC NO. 08779, 08780 FRC PROJECT C5257 NRC CONTRACT NO. NRC43-79-118 FRC TASK 53/54 Prepared by Franklin Research Center Author: T. J. DelGaizo The Parkway at Twentieth Street '
Philadelphia, PA 19103 FRCGrOup Leader: T. J. DelGaizo Prepared for Nuclear Regulatory Commission Washington, D.C, 20555 Lead NRC Engineer: Y. s. Huang .
June 5, 1981 This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, or any of their employees, makes any warranty, expressed or implied, or assumes any legal liability or responsibility for any third party's use, or the results of such use, of any information, apparatus, oroduct or process disclosed In this report, or represents that its use by such third party would not infringe privately owned rights.
Franklin Research Center A Division of The Franklin Institute amin Franklin Parkway, Phila.. Pa l9I03 (215) 448-1000 mi Ic'licoggg
TER-C5257-53/54 CONTENTS Section Title Pacae BACKGROUND ~, o EVALUATION CRITERIA TECHNICAL EVALUATION 3.1 Request for Exemption From the Requirements of 10CFR50, Appendix J 3.1.1 Testing of Containment Airlocks 3 3.2 Proposed Technical Specification Change CONCLUS IONS ~ ~ ~ ~ ~ ~ ~ ~ 8 REFERENCES o . o o . ~ 9 APPENDIX A Extrapolation of Reduced Pressure Leakage Measurements to Equivalent Full Pressure Leakage 00 FranMin Research Center A Olvlsion ur The Ftenitttn Institute
TER-C5257-53/54
- 1. BACKGROUND On August 7r 1975 [1) the NRC requested Florida Power a Light Company (FPL) to review the containment leakage testing programs at Turkey Point Units 3 and 4 and to provide a plan for achieving full compliance with 10CFR50, Appendix J, including appropriate design modifications, changes to Technical Specifications, or requests for exemption from the requirements pursuant to 10CFR50.12, where necessary.
FPL responded on September 12, 1975 [2], stating that the containment leakage testing program at Turkey Point Units 3 and 4 conformed to the requirements of Appendix J except for the frequency and method of testing containment airlocks, the frequency of performing Type B electrical penetration leak tests, and minor differences in terminology between the Technical Specifications and Appendix J. FPL indicated that the minor differences in terminology were eliminated by its proposed Technical Specification change of September 20, 1974 [3]. 1 FPL's letter of July 27, 1977 [4] provided additional information regarding proposed testing of containment airlocks. This letter also indicated that Type B electrical penetrations would be tested every refueling outage; leaving the question of testing of containment airlocks as the only remaining request for exemption from the requirements of Appendix J.
The purpose of this report is to conduct technical evaluations of out-standing issues regarding the implementation of 10CFR50, Appendix J, at Turkey Point Units 3 and 4. Consequently, technical evaluations are provided for FPL's request for exemption from the requirements of Appendix J regarding the testing of containment airlocks as submitted in References 2 and 4, as well as a proposed revision to Technical Specification 4.4.2 submitted in Reference 4.
0() Franklin Research Center A 0@sion oI The Frentttin Institute
TER-C5257-53/54 2~ EVALUATION CRITERIA Code of Federal Regulations, Title 10, Part 50 (10CFR50), Appendix J, Containment Leakage Testing, provided the criteria used in conducting the technical evaluations. Where applied to the following evaluations, the criteria are either referenced or briefly stated, where necessary, in support of the results of the evaluations. Furthermore, in recognition of the plant-specific conditions that could lead to requests for exemption not explicitly covered by the regulations, the NRC directed that the technical reviews con-stantly emphasize the basic intent of Appendix J, that potential containment
/
atmospheric leakage paths be identified, monitored, and maintained below estab-lished limits.
()(I Franklin Research Center A Divlsiot nI The Ftenttttn Institute
TER-C5257-53/54
- 3. TECHNICAL EVALUATION 3 ~1 REQUESTS FOR EXEMPTION FROM THE REQUIREMENTS OF 10CFR50 g APPENDIX J 3.1.1 Testing of Containment Airlocks In Reference 2, FPL requested an exemption from the 'requirements of 10CFR50, Appendix J with regard to the testing frequency and method of testing containment airlocks. This exemption request would permit continued testing in accordance with Turkey Point Technical Specification 4.4.2.2, which required pressure testing of the personnel and emergency airlocks either annually, if not used, or every 4 months if used periodically. FPL's basis for this request was given as follows:
Personnel and emergency airlocks are leak tested in accordance with Turkey Point Operating Procedure 13514.1. Leak tightness of the inner door is tested by pressurizing the annulus, between the two 0-rings. The outer door 0-rings are then tested by pressurizing the entire airlock. However, since the inner door opens into containment, both tests tend to unseat the inner door.
Therefore, if the inner door 0-rings are to be meaningfully tested, the door must be held shut by a clamping arrangement which takes a minimum of about 12 man-hours to install. A similar arrangement is not required on the outer door because that door opens into the airlock and the test differential pres-sure is in the direction which seats the door. Thus, a simple positive-pressure test of the personnel and emergency airlocks is not possible because of the design and arrangement of the doors' Both containments are entered approximately once each week for performance of routine inspections and minor maintenance. If we were to perform the inspection program required by Operating Procedure 13514.1 after each airlock opening, routine entry of the containment would become impractical due to the many man-hours which would be necessary for leak testing. Therefore, in order to continue a viable containment inspection program, and at the same time achieve compliance with the intent of Appendix J, we submitted a proposed Technical Specification change on September 20, 1974, which provided for the performance of an 0-ring vacuum test, instead of a pressure test. We have designed and built a vacuum test device which could be duplicated and permanently installed on all airlock outer doors and used to 99 FranMin Research Center A Division ol The Ftonklin Insatuie
TER-C5257-53/54 leak test the doors after each opening. Pending disposition of the proposed change, however, we are currently complying with the existing Technical Specification 4.4.2.2 requirement which requires airlock testing once every 4 months.
In Reference 4, FPL withdrew. its request for exemption with regard to the frequency of testing airlocks, but continued to request an exemption in order to use the vacuum testing technique to verify airlock door seals after each opening. In this letter, FPL provided a revised Technical Specification 4.4.2.2 which required airlocks to be tested as follows:
4.4.2 LOCAL PENETRATION TESTS Test Procedure and Frequency Local leak detection tests of the following components shall be performed at a pressure not less than 50 psig using pressure decay, soap bubble, halogen detection or equivalent methods at the frequency listed, unless other-wise noted:
- 2. Personnel and Emergency Airlocks
- a. Within 3 days of every first of a series of openings when containment integrity is required, verify that door seals have not been damaged or seated improperly by vacuum testing the volume between the door seals in accordance with approved plant procedures.
- b. At least once per 6 months, conduct an overall airlock leakage test to verify that the overall airlock leakage rate is within its limit.
FRC Evaluation:
Sections III.B.2 and III.D.2 of Appendix J require that containment air-locks be tested at peak calculated'accident pressure (Pa) at 6-month intervals and after each opening in the interim between 6-month tests. These require-ments were imposed because airlocks represent potentially large leakage paths which are more subject to human error than other containment penetrations.
Type B penetrations (other than airlocks) require testing in accordance with Appendix J at intervals not to exceed 2 years.
0() FranMin Research Center h cntelon oI The Fcenlttln Institute
TER-C5257-53/54 Appendix J was published in 1973. A compilation of airlock events from Licensee Event Reports submitted since 1969 shows that airlock testing in accordance with Appendix J has been effective in the prompt identification of airlock leakage, but'hat rigid adherence to the after-each-opening requirement may not be necessary.
Since 1969, there have been approximately 70 reported airlock leakage tests in which measured leakage exceeded allowable limits. Of these events, C 25% were the result of leakage other than from improper seating of airlock door seals. These failures were generally caused by leakage past door-operating mechanism handwheel packing, door-operating cylinder shaft seals, equalizer valves, or test lines. These penetrations resemble other Type B or C contain-ment penetrations except that they may be operated more frequently. Since air-locks are tested at a pressure of Pa every 6 months, these penetrations are tested, at a minimum, four times more frequently than typical Type B or C pene-trations. The 6-month test is, therefore, considered to be both justified and adequate for the prompt identification of this leakage.
Improper seating of the airlock door seals, however, is not only the most frequent cause of airlock failures (the remaining 75%), but also represents a potentially large leakage path. While testing at a pressure of Pa after each opening will identify seal leakage, it can also be identified by alternative methods such as pressurizing between double-gasketed door seals (for airlocks designed with this type of seal) or pressurizing the airlock to pressures other than Pa. Furthermore, experience gained in testing airlocks since the issuance of Appendix J indicates that the use of one of these alternative methods. may be preferable to the full-pressure test of the entire airlock.
Reactor plants designed prior to the issuance of Appendix J often do not have the capability to test airlocks at Pa without the installation of strong-backs or the performance of mechanical adjustments to the operating mechanism of the inner doors. The reason for this is that the inner doors are designed to seat with accident pressure on the containment side of the door, and there-fore, the operating mechanisms were not designed to withstand accident pressure in the opposite direction. When the airlock is pressurized for a local airlock Franklin Research Center A Division or The Ftenitttn Institute
TER-C5257-53/54 test (i.e., pressurized between the doors), pressure is exerted on the airlock side of the inner door, causing the door to unseat and preventing the perfor-mance of a meaningful test. The strongback or mechanical adjustments prevent the unseating of the inner door, allowing the test to proceed. The installa-tion of strongbacks or performance of mechanical adjustments .is time consuming (often taking several hours), may result in additional radiation exposure to operating personnel, and may also cause degradation of the operating mechanism of the inner door, with consequential loss of reliability of the airlock. In addition, when conditions require frequent openings over a short period of time, testing at Pa after each opening becomes both impractical (tests often take from 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> to several days) and accelerates the rate of exposure of personnel and the degradation of mechanical equipment.
For these reasons, the intent of Appendix J is satisfied, and the undesirable effects of testing after each opening are reduced if a satis-factory test of the airlock door seals is performed within 3 days of each opening or every 3 days during periods of frequent openings, whenever containment integrity is required. The test of the airlock door'seals may be performed by pressurizing the space between the double-gasketed seals (if so equipped) or by pressurizing the entire airlock to a pressure less than Pa that does not require the installation of strongbacks or performance of other, mechanical adjustments. If the reduced pressure airlock test is to be employed, the results of the leakage test must be conservatively extrapolated to equivalent Pa test results.
In view of the foregoing discussion, FPL's proposed Technical Specification 4.4.2.2 is acceptable. Furthermore, no exemption from the requirements of Appendix J is necessary because FPL's proposed testing is within the revised version of Section III.D.2 (effective October 22, 1980).
FPL should ensure that its airlock testing program is in complete conformance with the revised rule.
With regard to the extrapolation of the reduced pressure test to equivalent Pa test results, comments on FPL's proposed extrapolation method submitted on November 26, 1980 [5] are contained in Appendix A to this report.
Frankiin Research Center A Svlslon ot The FunMln Institute
TER-C5257-53/54 3.2 PROPOSED TECHNICAL SPECIFICATION CHANGE In Reference 4, FPL proposed to revise Specification 4.4.2 to incorporate its proposed exemption from Appendix J with regard to the testing of contain-ment airlocks. In addition, this specification provided for testing at Pa using pressure decay, soap bubble, halogen detection, or equivalent methods of the following components:
Containment purge valves each refueling Equipment access openings - annually and after use Fuel transfer tube flange each refueling Electrical penetrations each refueling.
4 The proposed specification also required that repairs and tests be made whenever the sum of the local leak rate tests, including isolation valves, exceeds 60% of the total containment allowable leak rate.
II FRC Evaluation:
In Section 3.1 of this report, FRC found FPL's proposal for testing of containment airlocks to be acceptable, provided that the results'of the vacuum testing between airlock door seals are conservatively extrapolated to Pa results. The remainder of the proposed specification conforms to Section III.B of Appendix J. Consequently, Proposed Specification 4.4.2 is acceptable in meeting the requirements and intent of Appendix J.
l)ll Franklin Research Center A DiNtston ol The FranklIn Institute
TER-C5257-53/54
- 4. CONCLUSIONS FPL's request for exemption from the requirements of Appendix J regarding testing of containment airlo'cks as submitted in References 2 and 4 and FPL's proposed change to Technical Specification 4.4.2 as submitted in Reference 4 were technically evaluated. The conclusions of these evaluations are as follows:
o FPL's proposal to verify that airlock door seals have not been damaged or seated improperly by vacuum testing the volume between the seals within 3 days of every first of a series of openings, when containment integrity is required in the interim between full-pressure 6-month, tests is acceptable.
No exemption is required because of the revision to Section III.D.2, effective October 22, 1980.
o FPL's proposed change to Technical Specification 4.4.2 is acceptable since it conforms to the requirements of Appendix J.
t)l) FranMin Research Center A OMslon of The Ftenttltn Institute
TER-C5257-53/54
- 5. REFERENCES
- 1. K. R. Goller (NRC)
Letter to FPL August 7, 1975.
- 2. R. E. Uhrig (FPL)
Letter to K. R. Goller (NRC)
September 12, 1975.
- 3. R. E. Uhrig (FPL)
Letter to E. G. Case (NRC)
September 20, 1974.
- 4. R. E. Uhrig (FPL)
Letter to V. Stello (NRC)
July 27, 1977.
- 5. R. E. Uhrig (FPL)
Letter to S. A. Varga (NRC)
November 26, 1980.
0() Franklin Research Center A DMsion OiIhe Fronktin Institute
TER-C5257-53/54 APPENDIX A EXTRAPOLATION OF REDUCED PRESSURE LEAKAGE MEASUREMENTS TO EQUIVALENT FULL PRESSURE LEAKAGE
- 1. FPL's CORRELATION In Reference 5, FPL provided the following information:
"The test will begin at a absolute pressure of 12.92n Hg (17" Hg vacuum) and alarm if pressure increases to 14.42n Hg (15.5" Hg vacuum).
To determine the leak rate at 50 psig (64.7 psia), the design basis accident pressure, the following derivation was used:
Flow for a compressible fluid may be calculated as follows:
F=KY JhP where F = Flow or leakage K Coefficient of resistance Y Expansion factor bP Pressure drop across seal The maximum valve for Y is 1.0 and calculates the leakage for a non-compressible fluid. The coefficient of resistance is constant for each seal tested. Therefore:
Fee K~hP or L= K JhP A ratio between the leak rate at L5p and Ltest becomes:
L5p K P64.7 14..7 L K P P test 14.7 test L50 = 'Ltest 64.7 14.7 P P 14.7 test wher e P64 ~ 7 131 ~ 73" Hg P14 7 = 29.92n Hg L5p = Ltest 131i73 29 '2
~29.92 P 1Chemical Engineer 's Handbook, McGraw-Hill, Inc., 1963, Section 5 (Fluid Mechanics, Flow Measurement), Pages 5-8 & 5-9 00 Franklin Research Center A DMsion nI The Ftenttiin Institute
TER-C5257-53/54 L5p = 102 52 Ltest 29.92 P test L5p = 10.13 Ltest with pressures in inches of Hg" 29.92 P test By substituting 12.92 in. Hg for P , this formula yields the following test'orrelation:
L50 2.'45 L
test EVALUATION:
e r
The Licensee dropped the value of Y from the formula F = KY JbP because the maximum value of Y is 1.0. If the value of Y is retained, the correlation would be:
L5p KY5p P64 ~ 7 P14 ~ 7 L KY P test test test 14.7 Although the maximum value of Y is 1.0, it does not follow that the ratio of Y50 to Y test is necessarily < 1.0. Consequently, the Licensee's cor-relation is not necessarily conservative.
- 2. VISC9US FLOE For viscous flow, mass flow rate (m) is proportional to the difference of the square of inlet pressure and the square of outlet pressure:
m5p (64.72 14.72) x const.
m (14.7 2 - Pttestt2) x const.
test m5p 64 72 14 72 L50 F50 = x const.
P50 64 ~ 7
!jII Franklin Research Center A Division or The Ffsnklin Institute
TER-C5257-53/54 mtest 72 test Ltest Ftest x const P
test 14.7
'50 4 72 14 72 14.7 L
test 64.7 147 2 - Pttest 2 Using" in. Hg units: 64.7 = 131.73 14.7 = 29.92 P
test = 12.92 L
then 5.13 L
test 3 ~ CHOKED FLOW For choked flow, P orifice . . - P source Therefore, apart from Reynold's Number effects, mass flow rate - P source, abs'
= volumetric flow rate (at source density) is independent of P
outlet. Therefore, since volumetric flow rate is proportional to the tl percent of mass per unit time (denoted by L),
L50 P64 ~ 7 131.73 in. Hg 10.2 test 'est 29 '2 in'g CONCLUSION:
The above analysis yields the following results for the correlation of 50 test FPL's t/hP Method Viscous Flow Choked Flow 2.45 5.13 10.2 Since the choked flow correlation is the most conservative, this correlation should be used.
It should be noted that FPL stated in Reference 5 that the allowable local leakage rate at Turkey Point is 0.25% wt/day or 45,000 cc/min. At the 00 Franklin Research Center A Division d The FrenMin Institute
TER-C5257-53/54 same time, FPL calculated airlock leakage rates (including instrument errors) which will cause an alarm to sound after an elapsed time of 1 minute as' o1lows".
Lttest = 31.93 cc/min (personnel airlock)
Lttestt = 7.98 cc/min (emergency airlock) .
It can be seen that even using the most conservative correlation (choked flow), the alarm will detect leakage which is a very small percentage of,total allowable local leakage (less than 1%) .
A DMsfon of The Frenfrfin Insrlrure