ML17361A364: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(One intermediate revision by the same user not shown) | |||
Line 5: | Line 5: | ||
| author name = Tiktinsky D | | author name = Tiktinsky D | ||
| author affiliation = NRC/NMSS/DFCSE/FMB | | author affiliation = NRC/NMSS/DFCSE/FMB | ||
| addressee name = Gwyn D | | addressee name = Gwyn D | ||
| addressee affiliation = CB&I AREVA MOX Services, LLC | | addressee affiliation = CB&I AREVA MOX Services, LLC | ||
| docket = 07003098 | | docket = 07003098 | ||
Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 February 5, 2018 Mr. Dealis W. Gwyn Licensing Manager CB&I AREVA MOX Services P.O. Box 7097 Aiken, SC 29804-7097 | ||
February 5, 2018 | |||
Mr. Dealis W. Gwyn | |||
Licensing Manager CB&I AREVA MOX Services | |||
P.O. Box 7097 | |||
Aiken, SC | |||
==SUBJECT:== | ==SUBJECT:== | ||
U.S. NUCLEAR REGULATORY COMMISSION EVALUATION OF REVISION TO THE | U.S. NUCLEAR REGULATORY COMMISSION EVALUATION OF REVISION TO THE PHYSICAL PROTECTION PLAN, SAFEGUARDS CONTINGENCY RESPONSE PLAN, AND THE TRAINING AND QUALIFICATION PLAN FOR THE MIXED OXIDE FUEL FABRICATION FACILITY | ||
RESPONSE PLAN | |||
==Dear Mr. Gwyn:== | ==Dear Mr. Gwyn:== | ||
On March 1, 2017, CB&I AREVA Mixed MOX Services (MOX Services) submitted revisions to the | On March 1, 2017, CB&I AREVA Mixed MOX Services (MOX Services) submitted revisions to the Physical Protection Plan (PPP), Safeguards Contingency Response Plan (SCRP), and the Training and Qualification Plan (T&QP) for the Mixed Oxide Fuel Fabrication Facility for review and approval (Agencywide Documents Access and Management System [ADAMS] | ||
Accession Numbers ML17222A201, ML17096A721, and ML17096A771). | |||
the | As stated in the enclosed Safeguards Evaluation Reports (SER), the U.S. Nuclear Regulatory Commission (NRC) staff has reviewed the changes requested by MOX Services in the revision of the PPP, SCRP and T&QP. | ||
The methods and procedures outlined in MOX Services February 2017, Revisions of the PPP, T&QP, and SCRP satisfy the performance objectives, systems capabilities, and reporting requirements specified in Title10 of the Code of Federal Regulations (10 CFR) Sections 73.45 and 73.46, and Appendices B, C and H of Part 73. Therefore, NRC staff finds the MOX Services February 2017, Revisions to the PPP, T&QP, and SCRP are acceptable and provide high assurance that activities involving Special Nuclear Material are not inimical to the common defense and security and do not constitute an unreasonable risk to the public health and safety. | |||
We are basing our conclusions and findings in the SER on the information provided by MOX Services. The PPP SER (Secret // Restricted Data) is provided under a separate cover. The T&QP, and SCRP SERs are attached as enclosures and are Official Use Only - Security Related information. | |||
In accordance with 10 CFR 2.390 of the NRCs Agency Rules of Practice and Procedure, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRCs ADAMS. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. | |||
Document transmitted contains Security-Related Information. | |||
When separated from the enclosures, this letter is decontrolled. | |||
D. Gwyn If you have any questions concerning the above, please contact me at (301) 415-8740, or via e-mail at David.Tiktinsky@nrc.gov. | |||
Sincerely, | |||
\RA\ | |||
David Tiktinsky, Senior Project Manager Fuel Manufacturing Branch Division of Fuel Cycle Safety, Safeguards, and Environmental Review Office of Nuclear Material Safety and Safeguards Docket No. 70-3098 Document transmitted contains Security-Related Information. | |||
If you have any questions concerning the above, please contact me at (301) 415-8740, or via | |||
e-mail at David.Tiktinsky@nrc.gov. Sincerely, | |||
David Tiktinsky, Senior Project Manager Fuel Manufacturing Branch Division of Fuel Cycle Safety, Safeguards, and Environmental Review Office of Nuclear Material Safety and Safeguards | |||
Docket No. 70-3098 | |||
==Enclosures:== | ==Enclosures:== | ||
When separated from the enclosure, this letter is decontrolled. | |||
: 1. Training and Qualification Plan | : 1. Training and Qualification Plan | ||
: 2. Safeguards Contingency Response Plan | : 2. Safeguards Contingency Response Plan cc: See next page | ||
D. Gwyn cc w/o | |||
cc w/o | |||
==Enclosure:== | ==Enclosure:== | ||
Mr. Scott Cannon Federal Project Director | Ms. Glenn Carroll Mr. Scott Cannon Nuclear Watch South Federal Project Director P.O. Box 8574 NA-262.1 Atlanta, GA 30306 P.O. Box A Aiken, SC 29802 Mr. Lewis Zeller Blue Ridge Environmental Defense League Ms. Joyce Connery, Chairman P.O. Box 88 Defense Nuclear Facilities Safety Board Glendale Springs, NC 28629 625 Indiana Ave., NW, Suite 700 Washington, DC 20004 Ms. Susan Jenkins Division of Radioactive Waste Management Bureau of Health and Environmental Control 2600 Bull St. | ||
Columbia, SC 292011 Ms. Kathryn M. Sutton Morgan, Lewis, & Bockius 1111 Penn. Ave., NW Washington, DC 20004 Ms. Diane Curran Harmon, Curran, Spielburg & Eisenberg, LLP 1726 M St., NW Suite 600 Washington, DC 20036 | |||
D. Gwyn | |||
==SUBJECT:== | ==SUBJECT:== | ||
UNITED STATES NUCLEAR REGULATORY COMMISSION EVALUATION OF REVISION TO THE | UNITED STATES NUCLEAR REGULATORY COMMISSION EVALUATION OF REVISION TO THE PHYSICAL PROTECTION PLAN, SAFEGUARDS CONTINGENCY RESPONSE PLAN, AND THE TRAINING AND QUALIFICATION PLAN FOR THE MIXED OXIDE FUEL FABRICATION FACILITY DATE: January 25, 2018 ADAMS ACCESSION No. ML17361A363 OFC FCSE/FMB NSIR NSIR FCSE/ERB FCSE/FMB NAME DTiktinsky THarris* RStone* TBrockington RJohnson DATE 1/17/2018 1/17/2018 1/17/2018 1/25/2018 1/25/2018 OFFICIAL RECORD COPY}} | ||
CONTINGENCY RESPONSE PLAN | |||
FACILITY | |||
DATE: January 25, 2018 | |||
ADAMS ACCESSION No. ML17361A363 OFC FCSE/FMB NSIR NSIR FCSE/ERB FCSE/FMB NAME DTiktinsky THarris* RStone* TBrockington RJohnson DATE 1/17/2018 1/17/2018 1/17/2018 1/25/2018 1/25/2018 OFFICIAL RECORD COPY}} |
Latest revision as of 07:45, 22 October 2019
ML17361A364 | |
Person / Time | |
---|---|
Site: | 07003098 |
Issue date: | 02/05/2018 |
From: | David Tiktinsky Fuel Manufacturing Branch |
To: | Gwyn D CB&I AREVA MOX Services |
Tiktinsky D | |
Shared Package | |
ML17361A363 | List: |
References | |
Download: ML17361A364 (4) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 February 5, 2018 Mr. Dealis W. Gwyn Licensing Manager CB&I AREVA MOX Services P.O. Box 7097 Aiken, SC 29804-7097
SUBJECT:
U.S. NUCLEAR REGULATORY COMMISSION EVALUATION OF REVISION TO THE PHYSICAL PROTECTION PLAN, SAFEGUARDS CONTINGENCY RESPONSE PLAN, AND THE TRAINING AND QUALIFICATION PLAN FOR THE MIXED OXIDE FUEL FABRICATION FACILITY
Dear Mr. Gwyn:
On March 1, 2017, CB&I AREVA Mixed MOX Services (MOX Services) submitted revisions to the Physical Protection Plan (PPP), Safeguards Contingency Response Plan (SCRP), and the Training and Qualification Plan (T&QP) for the Mixed Oxide Fuel Fabrication Facility for review and approval (Agencywide Documents Access and Management System [ADAMS]
Accession Numbers ML17222A201, ML17096A721, and ML17096A771).
As stated in the enclosed Safeguards Evaluation Reports (SER), the U.S. Nuclear Regulatory Commission (NRC) staff has reviewed the changes requested by MOX Services in the revision of the PPP, SCRP and T&QP.
The methods and procedures outlined in MOX Services February 2017, Revisions of the PPP, T&QP, and SCRP satisfy the performance objectives, systems capabilities, and reporting requirements specified in Title10 of the Code of Federal Regulations (10 CFR) Sections 73.45 and 73.46, and Appendices B, C and H of Part 73. Therefore, NRC staff finds the MOX Services February 2017, Revisions to the PPP, T&QP, and SCRP are acceptable and provide high assurance that activities involving Special Nuclear Material are not inimical to the common defense and security and do not constitute an unreasonable risk to the public health and safety.
We are basing our conclusions and findings in the SER on the information provided by MOX Services. The PPP SER (Secret // Restricted Data) is provided under a separate cover. The T&QP, and SCRP SERs are attached as enclosures and are Official Use Only - Security Related information.
In accordance with 10 CFR 2.390 of the NRCs Agency Rules of Practice and Procedure, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRCs ADAMS. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.
Document transmitted contains Security-Related Information.
When separated from the enclosures, this letter is decontrolled.
D. Gwyn If you have any questions concerning the above, please contact me at (301) 415-8740, or via e-mail at David.Tiktinsky@nrc.gov.
Sincerely,
\RA\
David Tiktinsky, Senior Project Manager Fuel Manufacturing Branch Division of Fuel Cycle Safety, Safeguards, and Environmental Review Office of Nuclear Material Safety and Safeguards Docket No. 70-3098 Document transmitted contains Security-Related Information.
Enclosures:
When separated from the enclosure, this letter is decontrolled.
- 1. Training and Qualification Plan
- 2. Safeguards Contingency Response Plan cc: See next page
D. Gwyn cc w/o
Enclosure:
Ms. Glenn Carroll Mr. Scott Cannon Nuclear Watch South Federal Project Director P.O. Box 8574 NA-262.1 Atlanta, GA 30306 P.O. Box A Aiken, SC 29802 Mr. Lewis Zeller Blue Ridge Environmental Defense League Ms. Joyce Connery, Chairman P.O. Box 88 Defense Nuclear Facilities Safety Board Glendale Springs, NC 28629 625 Indiana Ave., NW, Suite 700 Washington, DC 20004 Ms. Susan Jenkins Division of Radioactive Waste Management Bureau of Health and Environmental Control 2600 Bull St.
Columbia, SC 292011 Ms. Kathryn M. Sutton Morgan, Lewis, & Bockius 1111 Penn. Ave., NW Washington, DC 20004 Ms. Diane Curran Harmon, Curran, Spielburg & Eisenberg, LLP 1726 M St., NW Suite 600 Washington, DC 20036
D. Gwyn
SUBJECT:
UNITED STATES NUCLEAR REGULATORY COMMISSION EVALUATION OF REVISION TO THE PHYSICAL PROTECTION PLAN, SAFEGUARDS CONTINGENCY RESPONSE PLAN, AND THE TRAINING AND QUALIFICATION PLAN FOR THE MIXED OXIDE FUEL FABRICATION FACILITY DATE: January 25, 2018 ADAMS ACCESSION No. ML17361A363 OFC FCSE/FMB NSIR NSIR FCSE/ERB FCSE/FMB NAME DTiktinsky THarris* RStone* TBrockington RJohnson DATE 1/17/2018 1/17/2018 1/17/2018 1/25/2018 1/25/2018 OFFICIAL RECORD COPY