| issue date = 02/27/2018
| issue date = 02/27/2018
| title = Enclosurequest for Additional Information [Letter: RAI Regarding Florida Power and Light/Nextera Decommissioning Funding Plan Updates for St. Lucie, Units 1 & 2; Seabrook Station; Duane Arnold Energy Center; and Point Beach, Units 1 and 2]
| title = Enclosurequest for Additional Information (Letter: RAI Regarding Florida Power and Light/Nextera Decommissioning Funding Plan Updates for St. Lucie, Units 1 & 2; Seabrook Station; Duane Arnold Energy Center; and Point Beach, Units 1 and 2)
| author name = Longmire P
| author name = Longmire P
| author affiliation = NRC/NMSS/DSFM/SFLB
| author affiliation = NRC/NMSS/DSFM/SFLB
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter: Enclosure REQUEST FOR ADDITIONAL INFORMATION REGARDING FLORIDA POWER AND LIGHT/NEXTERA DECOMMISSIONING FUNDING PLAN UPDATES FOR ST. LUCIE, UNITS 1 AND 2; SEABROOK STATION; DUANE ARNOLD ENERGY CENTER; AND POINT BEACH, UNITS 1 AND 2 INDEPENDENT SPENT FUEL STORAGE INSTALLATIONS DOCKET NOS. 72-61; 72-63; 72-32; and 72-05   Regulatory Requirement Pursuant to Title 10 of the Code of Federal Regulations (10 CFR) 72.30(c), at the time of license renewal and at intervals not to exceed 3 years, the decommissioning funding plan (DFP) required to be submitted by 10 CFR 72.30(b) must be resubmitted with adjustments as necessary to account for changes in costs and the extent of contamination. The DFP must update the information submitted with the original or prior approved plan. In addition, the DFP must also specifically consider the effect of the following events on decommissioning costs, as required by 10 CFR 72.30(c)(1)-(4): (1) spills of radioactive material producing additional residual radioactivity in onsite subsurface material, (2) facility modifications, (3) changes in authorized possession limits, and (4) actual remediation costs that exceed the previous cost estimate.
{{#Wiki_filter:REQUEST FOR ADDITIONAL INFORMATION REGARDING FLORIDA POWER AND LIGHT/NEXTERA DECOMMISSIONING FUNDING PLAN UPDATES FOR ST. LUCIE, UNITS 1 AND 2; SEABROOK STATION; DUANE ARNOLD ENERGY CENTER; AND POINT BEACH, UNITS 1 AND 2 INDEPENDENT SPENT FUEL STORAGE INSTALLATIONS DOCKET NOS. 72-61; 72-63; 72-32; and 72-05 Regulatory Requirement Pursuant to Title 10 of the Code of Federal Regulations (10 CFR) 72.30(c), at the time of license renewal and at intervals not to exceed 3 years, the decommissioning funding plan (DFP) required to be submitted by 10 CFR 72.30(b) must be resubmitted with adjustments as necessary to account for changes in costs and the extent of contamination. The DFP must update the information submitted with the original or prior approved plan. In addition, the DFP must also specifically consider the effect of the following events on decommissioning costs, as required by 10 CFR 72.30(c)(1)-(4): (1) spills of radioactive material producing additional residual radioactivity in onsite subsurface material, (2) facility modifications, (3) changes in authorized possession limits, and (4) actual remediation costs that exceed the previous cost estimate.
Background By letter dated March 27, 2015, Florida Power and Light/NextEra Energy submitted for U.S. Nuclear Regulatory Commission (NRC) staff review and approval, DFP updates for the independent spent fuel storage installations at St. Lucie Units 1 and 2; Seabrook Station; Duane Arnold Energy Center; and Point Beach Units 1 and 2 (Agencywide Documents Access and Management System Accession No. ML15090A114). The NRC staff reviewed Florida Power and Light/NextEra's DFP updates for each ISFSI and believes Florida Power and Light/NextEra's submittal was not sufficient to meet the intent of the requirement in 72.30(c). Specifically, the DFP updates do not provide sufficient information to allow the NRC to determine that the events listed in 10 CFR 72.30(c)(1)-(4) have been specifically considered. RAI 1 For each ISFSI, provide a revised DFP that includes information on the occurrence, and the effect on decommissioning costs, of each of the events listed in 10 CFR 72.30(c)(1)-(4): (1) spills of radioactive material producing additional residual radioactivity in onsite subsurface material, (2) facility modifications, (3) changes in authorized possession limits, and (4) actual remediation costs that exceed the previous cost estimate.  
 
}}
===Background===
By letter dated March 27, 2015, Florida Power and Light/NextEra Energy submitted for U.S.
Nuclear Regulatory Commission (NRC) staff review and approval, DFP updates for the independent spent fuel storage installations at St. Lucie Units 1 and 2; Seabrook Station; Duane Arnold Energy Center; and Point Beach Units 1 and 2 (Agencywide Documents Access and Management System Accession No. ML15090A114). The NRC staff reviewed Florida Power and Light/NextEras DFP updates for each ISFSI and believes Florida Power and Light/NextEras submittal was not sufficient to meet the intent of the requirement in 72.30(c).
Specifically, the DFP updates do not provide sufficient information to allow the NRC to determine that the events listed in 10 CFR 72.30(c)(1)-(4) have been specifically considered.
 
===RAI 1===
For each ISFSI, provide a revised DFP that includes information on the occurrence, and the effect on decommissioning costs, of each of the events listed in 10 CFR 72.30(c)(1)-(4): (1) spills of radioactive material producing additional residual radioactivity in onsite subsurface material, (2) facility modifications, (3) changes in authorized possession limits, and (4) actual remediation costs that exceed the previous cost estimate.
Enclosure}}

Latest revision as of 19:21, 21 October 2019

Enclosurequest for Additional Information (Letter: RAI Regarding Florida Power and Light/Nextera Decommissioning Funding Plan Updates for St. Lucie, Units 1 & 2; Seabrook Station; Duane Arnold Energy Center; and Point Beach, Units 1 and 2)
ML18058A052
Person / Time
Site: Point Beach, Seabrook, Duane Arnold, 07200061  NextEra Energy icon.png
Issue date: 02/27/2018
From: Pamela Longmire
Spent Fuel Licensing Branch
To: Larry Nicholson
NextEra Energy
Longmire P
Shared Package
ML18058A051 List:
References
CAC 001028, EPID L-2017-FPR-0023, EPID L-2017-FPR-0055, EPID L-2017-FPR-0061, EPID L-2017-FPR-0063
Download: ML18058A052 (1)


Text

REQUEST FOR ADDITIONAL INFORMATION REGARDING FLORIDA POWER AND LIGHT/NEXTERA DECOMMISSIONING FUNDING PLAN UPDATES FOR ST. LUCIE, UNITS 1 AND 2; SEABROOK STATION; DUANE ARNOLD ENERGY CENTER; AND POINT BEACH, UNITS 1 AND 2 INDEPENDENT SPENT FUEL STORAGE INSTALLATIONS DOCKET NOS. 72-61; 72-63; 72-32; and 72-05 Regulatory Requirement Pursuant to Title 10 of the Code of Federal Regulations (10 CFR) 72.30(c), at the time of license renewal and at intervals not to exceed 3 years, the decommissioning funding plan (DFP) required to be submitted by 10 CFR 72.30(b) must be resubmitted with adjustments as necessary to account for changes in costs and the extent of contamination. The DFP must update the information submitted with the original or prior approved plan. In addition, the DFP must also specifically consider the effect of the following events on decommissioning costs, as required by 10 CFR 72.30(c)(1)-(4): (1) spills of radioactive material producing additional residual radioactivity in onsite subsurface material, (2) facility modifications, (3) changes in authorized possession limits, and (4) actual remediation costs that exceed the previous cost estimate.

Background

By letter dated March 27, 2015, Florida Power and Light/NextEra Energy submitted for U.S.

Nuclear Regulatory Commission (NRC) staff review and approval, DFP updates for the independent spent fuel storage installations at St. Lucie Units 1 and 2; Seabrook Station; Duane Arnold Energy Center; and Point Beach Units 1 and 2 (Agencywide Documents Access and Management System Accession No. ML15090A114). The NRC staff reviewed Florida Power and Light/NextEras DFP updates for each ISFSI and believes Florida Power and Light/NextEras submittal was not sufficient to meet the intent of the requirement in 72.30(c).

Specifically, the DFP updates do not provide sufficient information to allow the NRC to determine that the events listed in 10 CFR 72.30(c)(1)-(4) have been specifically considered.

RAI 1

For each ISFSI, provide a revised DFP that includes information on the occurrence, and the effect on decommissioning costs, of each of the events listed in 10 CFR 72.30(c)(1)-(4): (1) spills of radioactive material producing additional residual radioactivity in onsite subsurface material, (2) facility modifications, (3) changes in authorized possession limits, and (4) actual remediation costs that exceed the previous cost estimate.

Enclosure