| | number = ML18058A052 | | | number = ML18058A052 |
| | issue date = 02/27/2018 | | | issue date = 02/27/2018 |
| | title = Enclosurequest for Additional Information [Letter: RAI Regarding Florida Power and Light/Nextera Decommissioning Funding Plan Updates for St. Lucie, Units 1 & 2; Seabrook Station; Duane Arnold Energy Center; and Point Beach, Units 1 and 2] | | | title = Enclosurequest for Additional Information (Letter: RAI Regarding Florida Power and Light/Nextera Decommissioning Funding Plan Updates for St. Lucie, Units 1 & 2; Seabrook Station; Duane Arnold Energy Center; and Point Beach, Units 1 and 2) |
| | author name = Longmire P | | | author name = Longmire P |
| | author affiliation = NRC/NMSS/DSFM/SFLB | | | author affiliation = NRC/NMSS/DSFM/SFLB |
Line 19: |
Line 19: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter: Enclosure REQUEST FOR ADDITIONAL INFORMATION REGARDING FLORIDA POWER AND LIGHT/NEXTERA DECOMMISSIONING FUNDING PLAN UPDATES FOR ST. LUCIE, UNITS 1 AND 2; SEABROOK STATION; DUANE ARNOLD ENERGY CENTER; AND POINT BEACH, UNITS 1 AND 2 INDEPENDENT SPENT FUEL STORAGE INSTALLATIONS DOCKET NOS. 72-61; 72-63; 72-32; and 72-05 Regulatory Requirement Pursuant to Title 10 of the Code of Federal Regulations (10 CFR) 72.30(c), at the time of license renewal and at intervals not to exceed 3 years, the decommissioning funding plan (DFP) required to be submitted by 10 CFR 72.30(b) must be resubmitted with adjustments as necessary to account for changes in costs and the extent of contamination. The DFP must update the information submitted with the original or prior approved plan. In addition, the DFP must also specifically consider the effect of the following events on decommissioning costs, as required by 10 CFR 72.30(c)(1)-(4): (1) spills of radioactive material producing additional residual radioactivity in onsite subsurface material, (2) facility modifications, (3) changes in authorized possession limits, and (4) actual remediation costs that exceed the previous cost estimate. | | {{#Wiki_filter:REQUEST FOR ADDITIONAL INFORMATION REGARDING FLORIDA POWER AND LIGHT/NEXTERA DECOMMISSIONING FUNDING PLAN UPDATES FOR ST. LUCIE, UNITS 1 AND 2; SEABROOK STATION; DUANE ARNOLD ENERGY CENTER; AND POINT BEACH, UNITS 1 AND 2 INDEPENDENT SPENT FUEL STORAGE INSTALLATIONS DOCKET NOS. 72-61; 72-63; 72-32; and 72-05 Regulatory Requirement Pursuant to Title 10 of the Code of Federal Regulations (10 CFR) 72.30(c), at the time of license renewal and at intervals not to exceed 3 years, the decommissioning funding plan (DFP) required to be submitted by 10 CFR 72.30(b) must be resubmitted with adjustments as necessary to account for changes in costs and the extent of contamination. The DFP must update the information submitted with the original or prior approved plan. In addition, the DFP must also specifically consider the effect of the following events on decommissioning costs, as required by 10 CFR 72.30(c)(1)-(4): (1) spills of radioactive material producing additional residual radioactivity in onsite subsurface material, (2) facility modifications, (3) changes in authorized possession limits, and (4) actual remediation costs that exceed the previous cost estimate. |
| Background By letter dated March 27, 2015, Florida Power and Light/NextEra Energy submitted for U.S. Nuclear Regulatory Commission (NRC) staff review and approval, DFP updates for the independent spent fuel storage installations at St. Lucie Units 1 and 2; Seabrook Station; Duane Arnold Energy Center; and Point Beach Units 1 and 2 (Agencywide Documents Access and Management System Accession No. ML15090A114). The NRC staff reviewed Florida Power and Light/NextEra's DFP updates for each ISFSI and believes Florida Power and Light/NextEra's submittal was not sufficient to meet the intent of the requirement in 72.30(c). Specifically, the DFP updates do not provide sufficient information to allow the NRC to determine that the events listed in 10 CFR 72.30(c)(1)-(4) have been specifically considered. RAI 1 For each ISFSI, provide a revised DFP that includes information on the occurrence, and the effect on decommissioning costs, of each of the events listed in 10 CFR 72.30(c)(1)-(4): (1) spills of radioactive material producing additional residual radioactivity in onsite subsurface material, (2) facility modifications, (3) changes in authorized possession limits, and (4) actual remediation costs that exceed the previous cost estimate. | | |
| }} | | ===Background=== |
| | By letter dated March 27, 2015, Florida Power and Light/NextEra Energy submitted for U.S. |
| | Nuclear Regulatory Commission (NRC) staff review and approval, DFP updates for the independent spent fuel storage installations at St. Lucie Units 1 and 2; Seabrook Station; Duane Arnold Energy Center; and Point Beach Units 1 and 2 (Agencywide Documents Access and Management System Accession No. ML15090A114). The NRC staff reviewed Florida Power and Light/NextEras DFP updates for each ISFSI and believes Florida Power and Light/NextEras submittal was not sufficient to meet the intent of the requirement in 72.30(c). |
| | Specifically, the DFP updates do not provide sufficient information to allow the NRC to determine that the events listed in 10 CFR 72.30(c)(1)-(4) have been specifically considered. |
| | |
| | ===RAI 1=== |
| | For each ISFSI, provide a revised DFP that includes information on the occurrence, and the effect on decommissioning costs, of each of the events listed in 10 CFR 72.30(c)(1)-(4): (1) spills of radioactive material producing additional residual radioactivity in onsite subsurface material, (2) facility modifications, (3) changes in authorized possession limits, and (4) actual remediation costs that exceed the previous cost estimate. |
| | Enclosure}} |
Letter Sequence RAI |
---|
EPID:L-2017-FPR-0023, Package: Request for Additional Information Regarding Florida Power and Light/Nextera Decommissioning Funding Updates for St. Lucie, Units 1 and 2; Seabrook Station; Duane Arnold Energy Center; and Point Beach, Units 1 and 2 ISFSI (Open) EPID:L-2017-FPR-0055, Package: Request for Additional Information Regarding Florida Power and Light/Nextera Decommissioning Funding Updates for St. Lucie, Units 1 and 2; Seabrook Station; Duane Arnold Energy Center; and Point Beach, Units 1 and 2 ISFSI (Open) EPID:L-2017-FPR-0061, Package: Request for Additional Information Regarding Florida Power and Light/Nextera Decommissioning Funding Updates for St. Lucie, Units 1 and 2; Seabrook Station; Duane Arnold Energy Center; and Point Beach, Units 1 and 2 ISFSI (Open) EPID:L-2017-FPR-0063, Package: Request for Additional Information Regarding Florida Power and Light/Nextera Decommissioning Funding Updates for St. Lucie, Units 1 and 2; Seabrook Station; Duane Arnold Energy Center; and Point Beach, Units 1 and 2 ISFSI (Open) |
|
MONTHYEARML18058A0532018-02-27027 February 2018 Letter: Request for Additional Information Regarding Florida Power and Light/Nextera Decommissioning Funding Plan Updates for St. Lucie, Units 1 and 2; Seabrook Station; Duane Arnold Energy Center; and Point Beach Units 1 and 2 ISFSI Project stage: RAI ML18058A0512018-02-27027 February 2018 Package: Request for Additional Information Regarding Florida Power and Light/Nextera Decommissioning Funding Updates for St. Lucie, Units 1 and 2; Seabrook Station; Duane Arnold Energy Center; and Point Beach, Units 1 and 2 ISFSI Project stage: Request ML18058A0522018-02-27027 February 2018 Enclosurequest for Additional Information (Letter: RAI Regarding Florida Power and Light/Nextera Decommissioning Funding Plan Updates for St. Lucie, Units 1 & 2; Seabrook Station; Duane Arnold Energy Center; and Point Beach, Units 1 and 2) Project stage: RAI ML21062A0572021-04-21021 April 2021 Final Environmental Assessment and Finding of No Significant Impact of 2012 and 2015 Decommissioning Funding Plans for Turkey Point Units 3 and 4 Independent Spent Fuel Storage Installation Project stage: Request ML21062A0632021-04-21021 April 2021 Final Environmental Assessment and Finding of No Significant Impact of 2012 and 2015 Decommissioning Funding Plans for St. Lucie Units 1 and 2 Independent Spent Fuel Storage Installation Project stage: Request ML21062A1472021-04-21021 April 2021 Final Environmental Assessment and Finding of No Significant Impact of 2012 and 2015 Decommissioning Funding Plans for Seabrook Station Unit 1 Independent Spent Fuel Storage Installation Project stage: Request ML21062A0942021-04-21021 April 2021 Final Environmental Assessment and Finding of No Significant Impact of 2012 and 2015 Decommissioning Funding Plans for Duane Arnold Energy Center Independent Spent Fuel Storage Installation Project stage: Request ML21062A0712021-04-21021 April 2021 Final Environmental Assessment and Finding of No Significant Impact of 2012 and 2015 Decommissioning Funding Plans for Point Beach Units 1 and 2 Independent Spent Fuel Storage Installation Project stage: Request ML21090A2412021-04-29029 April 2021 Closeout Letter, Analysis of Florida Power & Light & NextEra Energy'S Initial & Updated Decommissioning Funding Pans for ISFSIs Related to Turkey Point, St. Lucie, Point Beach, Duane Arnold, Seabrook, & Point Beach Project stage: Other 2021-04-21
[Table View] |
|
---|
Category:Request for Additional Information (RAI)
MONTHYEARML24215A2092024-08-0101 August 2024 NRR E-mail Capture - Final RAI - Point Beach 1 & 2 - License Amendment Request to Modify Containment Average Air Temperature Requirements ML24193A2432024-07-12012 July 2024 – Interim Audit Summary Report in Support of Review of License Amendment Requests Regarding Fleet Emergency Plan ML24176A2242024-06-24024 June 2024 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML24149A1922024-05-28028 May 2024 Notification of NRC Baseline Inspection and Request for Information ML24141A1382024-05-20020 May 2024 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection.Docx ML24030A0352024-01-30030 January 2024 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection ML23318A0772023-11-14014 November 2023 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000443/2024011 ML23173A1522023-06-22022 June 2023 Request for Additional Information NextEra Fleet Emergency Plan Amendment Request ML23163A2422023-06-13013 June 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000266/2023004 ML23136A2802023-05-0505 May 2023 SLRA Second Annual Update RAI Set 1 ML23122A0132023-05-0101 May 2023 NRR E-mail Capture - Point Beach 1 & 2 - Final RAI - License Amendment Request Regarding Risk-Informed Approach to Address GSI-191 ML23033A0292023-01-31031 January 2023 NRR E-mail Capture - Point Beach 1 & 2 - Final RAI (Volume 2) - License Amendment Request Regarding TSTS-505 ML23011A3082023-01-11011 January 2023 Request for Additional Information Regarding Relief Request 4RA-22-001 (L-2022-LLR-0074) ML23003A8022023-01-0303 January 2023 Notification of NRC Baseline Inspection and Request for Information ML22354A1612022-12-20020 December 2022 NRR E-mail Capture - Point Beach 1 & 2 - Final RAI - License Amendment Request Regarding TSTS-505 ML22311A5582022-11-22022 November 2022 Supplemental Information Needed for Acceptance of Requested Licensing Action Amendment Request for Cep ML22266A0872022-09-23023 September 2022 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML22228A0552022-08-15015 August 2022 Request for Additional Information Steam Generator Tube Inspection Report Review ML22172A1192022-06-27027 June 2022 Supplemental Information Needed for Acceptance of Requested Licensing Action Amendment Request to Adopt TSTF-505 Provide Risk Informed Extended Complete Times - RITSTF Initiative 4B ML22153A4152022-05-31031 May 2022 Request for Additional Information Re 120V Inverter LAR from TS Branch - Final ML22130A5712022-05-12012 May 2022 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection ML22041B0752022-02-10010 February 2022 Notification of NRC Baseline Inspection and Request for Information Inspection Report 05000266/2022002 ML22062B6642022-02-0707 February 2022 Request for Additional Information 120V Inverter LAR from the Electrical Branch ML22063A0002022-01-25025 January 2022 Requests for Additional Information from Risk Branch Regarding 120V Inverter LAR ML22005A0862022-01-0404 January 2022 1-4-2022 Email Communication to Duane Arnold Regarding Its ISFSI Related Exemption Request on Supplemental Information Needed ML21362A6822021-12-17017 December 2021 SLRA Safety RAIs Set 14 Final Email ML21362A6812021-12-17017 December 2021 SLRA Safety RAIs Set 14 Final ML21362A6712021-12-15015 December 2021 SLRA Safety RAIs Set 13 Final Email ML21362A6702021-12-15015 December 2021 SLRA Safety RAIs Set 13 Final ML21335A0702021-12-0101 December 2021 Cover Letter to B. Coffey from K. Conway - Duane Arnold Energy Center RAI Re License Amendment Request for ISFSI Only Emergency Plan ML21335A0712021-12-0101 December 2021 Request for Additional Information - Duane Arnold Energy Center ISFSI Only Emergency Plan ML21287A0852021-10-14014 October 2021 SLRA Safety RAI Set 11 Final Email ML21286A6042021-10-0505 October 2021 SLRA Safety RAIs Set 10 Final ML21286A6032021-10-0505 October 2021 SLRA Safety RAIs Set 10 Final Email ML21245A4382021-10-0505 October 2021 Supplemental Information Needed for Acceptance of Requested Licensing Action Amendment to Revise 120-Volt AC Vital Instrument Panel Technical Specification Requirements ML21287A0862021-09-29029 September 2021 SLRA Safety RAI Set 11 Final ML21273A0222021-09-29029 September 2021 SLRA Safety RAI Set 9 Final ML21253A1672021-09-10010 September 2021 Notification of NRC Design Bases Assurance Inspection (Programs) and Initial Request for Information Inspection Report 05000266/2022010 05000301/2022010 ML21250A3002021-09-0808 September 2021 Defueled Physical Security Plan RAI Cover Letter ML21242A2282021-08-27027 August 2021 SLRA Draft Safety RAI Set 9 ML21242A2292021-08-27027 August 2021 SLRA Draft Safety RAI Set 9 Email ML21242A2472021-08-26026 August 2021 SLRA Safety RAIs Set 8 Final ML21242A2232021-08-23023 August 2021 SLRA Draft Safety RAI Set 8 Email ML21242A2222021-08-23023 August 2021 SLRA Draft Safety RAI Set 8 ML21242A2202021-08-20020 August 2021 SLRA Safety RAI Set 7 Final ML21242A2192021-08-20020 August 2021 SLRA Safety RAI Set 7 Final Email ML21242A2142021-08-13013 August 2021 SLRA Safety RAIs Set 7 Draft ML21242A2132021-08-13013 August 2021 SLRA Safety RAIs Set 7 Draft Email ML21242A2382021-08-12012 August 2021 SLRA Safety RAIs Set 6 Final Email ML21242A2392021-08-12012 August 2021 SLRA Safety RAIs Set 6 Final 2024-08-01
[Table view] |
Text
REQUEST FOR ADDITIONAL INFORMATION REGARDING FLORIDA POWER AND LIGHT/NEXTERA DECOMMISSIONING FUNDING PLAN UPDATES FOR ST. LUCIE, UNITS 1 AND 2; SEABROOK STATION; DUANE ARNOLD ENERGY CENTER; AND POINT BEACH, UNITS 1 AND 2 INDEPENDENT SPENT FUEL STORAGE INSTALLATIONS DOCKET NOS. 72-61; 72-63; 72-32; and 72-05 Regulatory Requirement Pursuant to Title 10 of the Code of Federal Regulations (10 CFR) 72.30(c), at the time of license renewal and at intervals not to exceed 3 years, the decommissioning funding plan (DFP) required to be submitted by 10 CFR 72.30(b) must be resubmitted with adjustments as necessary to account for changes in costs and the extent of contamination. The DFP must update the information submitted with the original or prior approved plan. In addition, the DFP must also specifically consider the effect of the following events on decommissioning costs, as required by 10 CFR 72.30(c)(1)-(4): (1) spills of radioactive material producing additional residual radioactivity in onsite subsurface material, (2) facility modifications, (3) changes in authorized possession limits, and (4) actual remediation costs that exceed the previous cost estimate.
Background
By letter dated March 27, 2015, Florida Power and Light/NextEra Energy submitted for U.S.
Nuclear Regulatory Commission (NRC) staff review and approval, DFP updates for the independent spent fuel storage installations at St. Lucie Units 1 and 2; Seabrook Station; Duane Arnold Energy Center; and Point Beach Units 1 and 2 (Agencywide Documents Access and Management System Accession No. ML15090A114). The NRC staff reviewed Florida Power and Light/NextEras DFP updates for each ISFSI and believes Florida Power and Light/NextEras submittal was not sufficient to meet the intent of the requirement in 72.30(c).
Specifically, the DFP updates do not provide sufficient information to allow the NRC to determine that the events listed in 10 CFR 72.30(c)(1)-(4) have been specifically considered.
RAI 1
For each ISFSI, provide a revised DFP that includes information on the occurrence, and the effect on decommissioning costs, of each of the events listed in 10 CFR 72.30(c)(1)-(4): (1) spills of radioactive material producing additional residual radioactivity in onsite subsurface material, (2) facility modifications, (3) changes in authorized possession limits, and (4) actual remediation costs that exceed the previous cost estimate.
Enclosure