(2 intermediate revisions by the same user not shown) |
Line 3: |
Line 3: |
| | issue date = 12/18/2018 | | | issue date = 12/18/2018 |
| | title = Guarantee of Payment of Deferred Premium | | | title = Guarantee of Payment of Deferred Premium |
| | author name = Gregoire D W | | | author name = Gregoire D |
| | author affiliation = Energy Northwest | | | author affiliation = Energy Northwest |
| | addressee name = | | | addressee name = |
Line 16: |
Line 16: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:Donald W. Gregoire Columbia Generating Station P.O. Box 968, Mail Drop PE 20 Richland, WA 99352 | | {{#Wiki_filter:ENERGY Donald W. Gregoire Columbia Generating Station |
| -0968 Ph. 509-377-8616 l F. 509-377-4674 dwgregoire@energy | | ,';,&'. . . NORTHWEST P.O. Box 968, Mail Drop PE20 Richland, WA 99352-0968 Ph. 509-377-8616 l F. 509-377-4674 dwgregoire@energy-northwest.com December 18, 2018 10 CFR 140.21 GO2-18-155 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 |
| -northwest.com | |
| | |
| December 18, 2018 10 CFR 140.21 GO2-18-155 | |
| | |
| U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 | |
| -0001 | |
|
| |
|
| ==Subject:== | | ==Subject:== |
| COLUMBIA GENERATING STATION, DOCKET NO. 50 | | COLUMBIA GENERATING STATION, DOCKET NO. 50-397 GUARANTEE OF PAYMENT OF DEFERRED PREMIUM |
| -397 GUARANTEE OF PAYMENT OF DEFERRED PREMIUM | |
|
| |
|
| ==References:== | | ==References:== |
| : 1. Letter, G.C. Sorensen (Washington Public Power Supply System) to | | : 1. Letter, G.C. Sorensen (Washington Public Power Supply System) to I. Dinitz (NRC), Financial Guaranty - Secondary Financial Protection, GO2-84-514, dated July 12, 1984. |
| | |
| I. Dinitz (NRC), "Financial Guaranty - Secondary Financial Protection," | |
| GO2-84-514, dated July 12, 1984. | |
| : 2. Letter, J. Saltzman (NRC) to G.C. Sorensen (Washington Public Power Supply System), GI2-84-103, dated September 12, 1984. | | : 2. Letter, J. Saltzman (NRC) to G.C. Sorensen (Washington Public Power Supply System), GI2-84-103, dated September 12, 1984. |
| : 3. Letter, B. Ridge (Energy Northwest) to NRC, "Guarantee of Payment of Deferred Premium," GO2-12-187, dated December 20, 2012. | | : 3. Letter, B. Ridge (Energy Northwest) to NRC, Guarantee of Payment of Deferred Premium, GO2-12-187, dated December 20, 2012. |
|
| |
|
| ==Dear Sir or Madam:== | | ==Dear Sir or Madam:== |
|
| |
|
| This letter is provided in compliance with 10 CFR 140.21, which requires annual filing of a guarantee of payment of deferred premiums limited to $20,496,000 for each licensed reactor per incident within one calendar year. | | This letter is provided in compliance with 10 CFR 140.21, which requires annual filing of a guarantee of payment of deferred premiums limited to $20,496,000 for each licensed reactor per incident within one calendar year. |
| | Energy Northwest, a joint operating agency and municipal corporation for the State of Washington, obtains revenue from Columbia Generating Station by selling the capability of the plant. The Bonneville Power Administration (BPA), an agency of the U.S. |
| | Department of Energy, has purchased the entire capability of Columbia Generating Station from certain of its statutory preference customers known as Participants through agreements referred to as Net Billing Agreements. BPA and Energy Northwest (then known as Washington Public Power Supply System) entered into Net Billing Agreements with various Participants on the same terms. A representative sample of these agreements was previously provided in Reference 1. |
|
| |
|
| Energy Northwest, a joint operating agency and municipal corporation for the State of Washington, obtains revenue from Columbia Generating Station by selling the capability of the plant. The Bonneville Power Administration (BPA), an agency of the U.S. | | GO2-18-155 Page 2 of 2 Additionally, in May 2006, Energy Northwest and BPA entered into a Direct Pay Agreement and a copy of that agreement was previously provided in Reference 3. |
| Department of Energy, has purchased the entire capability of Columbia Generating Station from certain of its statutory preference customers known as Participants through agreements referred to as Net Billing Agreements. BPA and Energy Northwest (then known as Washington Public Power Supply System) entered into Net Billing Agreements with various Participants on the same terms. A representative sample of these agreements was previously provided in Reference 1.}}
| | Among the terms of the Direct Pay Agreement, BPA agrees to pay to Energy Northwest all costs for the operation of Columbia Generating Station (less amounts Energy Northwest estimates it will receive from sources other than under the terms of any Net Billing Agreement relating to the operation of Columbia Generating Station) and an amount sufficient to maintain a reasonable working capital balance. |
| | The terms of the Net Billing Agreements, Direct Pay Agreement, and BPA's obligations thereunder to pay Energy Northwest's operating costs and provide reasonable capital funds for Columbia Generating Station satisfies the requirements of 10 CFR 140.21. If you have any questions, please contact Ms. Cristina M. Reyff at (509) 377-4028. |
| | There are no new commitments being made to the U.S. Nuclear Regulatory Commission by this letter. |
| | Executed this t ~ -IA day of December, 2018. |
| | ~ ully D. W . Gregoire Manager, Regulatory Affairs cc: NRC Region IV Administrator NRC NRR Project Manager NRC Sr. Resident Inspector - 988C CD Sonoda - BPA/1399 WA Horin - Winston & Strawn}} |
|
---|
Category:Letter type:GO
MONTHYEARGO2-24-004, License Amendment Request to Revise Emergency Plan2024-01-30030 January 2024 License Amendment Request to Revise Emergency Plan GO2-24-003, Relief Requests for the Columbia Generating Station Fifth Ten-Year Interval Inservice Testing2024-01-29029 January 2024 Relief Requests for the Columbia Generating Station Fifth Ten-Year Interval Inservice Testing GO2-24-005, Docket No. 50-397 Supplement to Reply to a Notice of Violation; EA-21-1702024-01-0808 January 2024 Docket No. 50-397 Supplement to Reply to a Notice of Violation; EA-21-170 GO2-23-136, Guarantee of Payment of Deferred Premium2023-12-20020 December 2023 Guarantee of Payment of Deferred Premium GO2-23-135, Notice of Readiness for Supplemental Inspection2023-12-14014 December 2023 Notice of Readiness for Supplemental Inspection GO2-23-130, Reply to a Notice of Violation; EA-23-0542023-12-14014 December 2023 Reply to a Notice of Violation; EA-23-054 GO2-23-105, Licensing Basis Document Update and Biennial Commitment Change Report2023-12-12012 December 2023 Licensing Basis Document Update and Biennial Commitment Change Report GO2-23-107, Application to Revise Technical Specifications to Adopt TSTS-584, Eliminate Automatic RWCU System Isolation on SLC Initiation2023-12-0505 December 2023 Application to Revise Technical Specifications to Adopt TSTS-584, Eliminate Automatic RWCU System Isolation on SLC Initiation GO2-23-126, Docket No. 50-397 Voluntary Response to Regulatory Issue Summary 2023-012023-11-28028 November 2023 Docket No. 50-397 Voluntary Response to Regulatory Issue Summary 2023-01 GO2-23-121, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-27027 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation GO2-23-097, In-Service Inspection Summary Report for the Twenty-Sixth Refueling Outage (R26)2023-09-0606 September 2023 In-Service Inspection Summary Report for the Twenty-Sixth Refueling Outage (R26) GO2-23-100, Technical Specification Section 5.6.4 Post Accident Monitoring Instrumentation 14-Day Report for Inoperable Suppression Pool Level Indication2023-08-31031 August 2023 Technical Specification Section 5.6.4 Post Accident Monitoring Instrumentation 14-Day Report for Inoperable Suppression Pool Level Indication GO2-23-056, Application to Revise Technical Specifications to Adopt TSTF-230, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling2023-08-29029 August 2023 Application to Revise Technical Specifications to Adopt TSTF-230, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling GO2-23-093, Supplement to Reply to a Notice of Violation: EA-21-1702023-07-27027 July 2023 Supplement to Reply to a Notice of Violation: EA-21-170 GO2-23-068, Notification of Completion of Commitments Required Prior to Entry Into the Period of Extended Operation2023-07-19019 July 2023 Notification of Completion of Commitments Required Prior to Entry Into the Period of Extended Operation GO2-23-090, Reply to a Notice of Violation2023-07-12012 July 2023 Reply to a Notice of Violation GO2-23-073, Notification of NPDES Permit Issuance2023-06-26026 June 2023 Notification of NPDES Permit Issuance GO2-23-072, Cycle 27 Core Operating Limits Report2023-06-0505 June 2023 Cycle 27 Core Operating Limits Report GO2-23-055, Independent Spent Fuel Storage Installation, 2022 Annual Radiological Environmental Operating Report2023-05-15015 May 2023 Independent Spent Fuel Storage Installation, 2022 Annual Radiological Environmental Operating Report GO2-23-006, License Amendment Request to Clean-Up Operating License and Appendix a Technical Specifications2023-05-0101 May 2023 License Amendment Request to Clean-Up Operating License and Appendix a Technical Specifications GO2-23-053, 2022 Annual Environmental Operating Report2023-04-26026 April 2023 2022 Annual Environmental Operating Report GO2-23-057, 2022 Annual Radioactive Effluent Release Report2023-04-25025 April 2023 2022 Annual Radioactive Effluent Release Report GO2-23-012, Application to Revise Technical Specifications to Adopt Tstf-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2023-03-27027 March 2023 Application to Revise Technical Specifications to Adopt Tstf-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position GO2-23-041, Generation Station - Level of Financial Protection - Annual Reporting Requirement2023-03-15015 March 2023 Generation Station - Level of Financial Protection - Annual Reporting Requirement GO2-23-038, Plant Decommissioning Fund Status Report2023-03-15015 March 2023 Plant Decommissioning Fund Status Report GO2-23-034, Report of Changes or Errors in Emergency Core Cooling System Loss of Coolant Accident Analysis Models Pursuant to 10 CFR 50.462023-03-13013 March 2023 Report of Changes or Errors in Emergency Core Cooling System Loss of Coolant Accident Analysis Models Pursuant to 10 CFR 50.46 GO2-23-035, Supplement to License Amendment Request to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-03-0909 March 2023 Supplement to License Amendment Request to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling GO2-23-019, Emergency Plan - Summary of Changes and Analysis for Revision 68 of the EP-012023-02-0808 February 2023 Emergency Plan - Summary of Changes and Analysis for Revision 68 of the EP-01 GO2-22-131, Guarantee of Payment of Deferred Premium2022-12-19019 December 2022 Guarantee of Payment of Deferred Premium GO2-22-122, Response to Request for Additional Information Related to License Amendment Request to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2022-11-28028 November 2022 Response to Request for Additional Information Related to License Amendment Request to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b GO2-22-076, Status of License Renewal Commitments2022-10-31031 October 2022 Status of License Renewal Commitments GO2-22-110, Supplement to License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactor2022-10-17017 October 2022 Supplement to License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactor GO2-22-096, Supplement to License Amendment Request to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2022-10-0404 October 2022 Supplement to License Amendment Request to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b GO2-22-085, Docket No. 50-397, Evacuation Time Estimate Analysis2022-08-30030 August 2022 Docket No. 50-397, Evacuation Time Estimate Analysis GO2-22-075, Response to Request for Additional Information Related to Revised Pressure-Temperature Limit Curves2022-07-11011 July 2022 Response to Request for Additional Information Related to Revised Pressure-Temperature Limit Curves GO2-22-072, Summary of Changes and Analysis for Revision 57 of PPM 13.14.4 - Emergency Equipment Maintenance and Testing2022-07-11011 July 2022 Summary of Changes and Analysis for Revision 57 of PPM 13.14.4 - Emergency Equipment Maintenance and Testing GO2-22-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Colling Using the Consolidated Line Item Improvement Process2022-05-25025 May 2022 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Colling Using the Consolidated Line Item Improvement Process GO2-22-062, Registration of Spent Fuel Cask Use2022-05-19019 May 2022 Registration of Spent Fuel Cask Use GO2-22-049, Supplement to Licensing Amendment Request to Adopt 10CFR50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Rectors2022-05-10010 May 2022 Supplement to Licensing Amendment Request to Adopt 10CFR50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Rectors GO2-22-054, Independent Spent Fuel Storage Installation, 2021 Annual Radiological Environmental Operating Report2022-05-0909 May 2022 Independent Spent Fuel Storage Installation, 2021 Annual Radiological Environmental Operating Report GO2-22-056, Registration of Spent Fuel Cask Use2022-04-21021 April 2022 Registration of Spent Fuel Cask Use GO2-22-055, 2021 Annual Environmental Operating Report2022-04-20020 April 2022 2021 Annual Environmental Operating Report GO2-22-048, 2021 Annual Radioactive Effluent Release Report2022-04-15015 April 2022 2021 Annual Radioactive Effluent Release Report GO2-22-045, Registration of Spent Fuel Cask Use2022-04-0606 April 2022 Registration of Spent Fuel Cask Use GO2-22-044, Level of Financial Protection - Annual Reporting Requirement2022-03-21021 March 2022 Level of Financial Protection - Annual Reporting Requirement GO2-22-038, Docket No. 50-397, Report of Changes or Errors in Emergency Core Cooling System Loss of Coolant Accident Analysis Models Pursuant to 10 CFR 50.462022-03-0909 March 2022 Docket No. 50-397, Report of Changes or Errors in Emergency Core Cooling System Loss of Coolant Accident Analysis Models Pursuant to 10 CFR 50.46 GO2-22-031, Response to Audit Plan and Online Reference Portal Request2022-02-15015 February 2022 Response to Audit Plan and Online Reference Portal Request GO2-22-011, Docket No. 72-35; Independent Spent Fuel Storage Installation, 2021 Annual Effluent Release Report2022-02-0808 February 2022 Docket No. 72-35; Independent Spent Fuel Storage Installation, 2021 Annual Effluent Release Report GO2-22-001, License Amendment Request to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2022-02-0303 February 2022 License Amendment Request to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b GO2-22-012, Independent Spent Fuel Storage Installation - Biennial 50.59/72.48 Report2022-01-24024 January 2022 Independent Spent Fuel Storage Installation - Biennial 50.59/72.48 Report 2024-01-08
[Table view] |
Text
ENERGY Donald W. Gregoire Columbia Generating Station
,';,&'. . . NORTHWEST P.O. Box 968, Mail Drop PE20 Richland, WA 99352-0968 Ph. 509-377-8616 l F. 509-377-4674 dwgregoire@energy-northwest.com December 18, 2018 10 CFR 140.21 GO2-18-155 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001
Subject:
COLUMBIA GENERATING STATION, DOCKET NO. 50-397 GUARANTEE OF PAYMENT OF DEFERRED PREMIUM
References:
- 1. Letter, G.C. Sorensen (Washington Public Power Supply System) to I. Dinitz (NRC), Financial Guaranty - Secondary Financial Protection, GO2-84-514, dated July 12, 1984.
- 2. Letter, J. Saltzman (NRC) to G.C. Sorensen (Washington Public Power Supply System), GI2-84-103, dated September 12, 1984.
- 3. Letter, B. Ridge (Energy Northwest) to NRC, Guarantee of Payment of Deferred Premium, GO2-12-187, dated December 20, 2012.
Dear Sir or Madam:
This letter is provided in compliance with 10 CFR 140.21, which requires annual filing of a guarantee of payment of deferred premiums limited to $20,496,000 for each licensed reactor per incident within one calendar year.
Energy Northwest, a joint operating agency and municipal corporation for the State of Washington, obtains revenue from Columbia Generating Station by selling the capability of the plant. The Bonneville Power Administration (BPA), an agency of the U.S.
Department of Energy, has purchased the entire capability of Columbia Generating Station from certain of its statutory preference customers known as Participants through agreements referred to as Net Billing Agreements. BPA and Energy Northwest (then known as Washington Public Power Supply System) entered into Net Billing Agreements with various Participants on the same terms. A representative sample of these agreements was previously provided in Reference 1.
GO2-18-155 Page 2 of 2 Additionally, in May 2006, Energy Northwest and BPA entered into a Direct Pay Agreement and a copy of that agreement was previously provided in Reference 3.
Among the terms of the Direct Pay Agreement, BPA agrees to pay to Energy Northwest all costs for the operation of Columbia Generating Station (less amounts Energy Northwest estimates it will receive from sources other than under the terms of any Net Billing Agreement relating to the operation of Columbia Generating Station) and an amount sufficient to maintain a reasonable working capital balance.
The terms of the Net Billing Agreements, Direct Pay Agreement, and BPA's obligations thereunder to pay Energy Northwest's operating costs and provide reasonable capital funds for Columbia Generating Station satisfies the requirements of 10 CFR 140.21. If you have any questions, please contact Ms. Cristina M. Reyff at (509) 377-4028.
There are no new commitments being made to the U.S. Nuclear Regulatory Commission by this letter.
Executed this t ~ -IA day of December, 2018.
~ ully D. W . Gregoire Manager, Regulatory Affairs cc: NRC Region IV Administrator NRC NRR Project Manager NRC Sr. Resident Inspector - 988C CD Sonoda - BPA/1399 WA Horin - Winston & Strawn