ML120050230: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 1: Line 1:
#REDIRECT [[Press Release-IV-12-001, NRC Staff to Meet with Omaha Public Power District Officials to Discuss Fort Calhoun Nuclear Plant]]
{{Adams
| number = ML120050230
| issue date = 01/05/2012
| title = Press Release-IV-12-001: NRC Staff to Meet with Omaha Public Power District Officials to Discuss Fort Calhoun Nuclear Plant
| author name =
| author affiliation = NRC/OPA/RGN-IV/FO
| addressee name =
| addressee affiliation =
| docket = 05000285
| license number =
| contact person =
| document report number = Press Release IV-12-001
| document type = Press Release
| page count = 2
}}
See also: [[see also:Press Release-IV-12-001]]
 
=Text=
{{#Wiki_filter:No. IV-1 2-0 01 Contact:  Victor Dricks
  (817) 200-1 128                Lara Uselding  (817) 2
00-1 519                     
               
                      January 5, 2012
                                   
        E-Mail: OPA4.Resource@nrc.gov
    NRC STAFF TO MEET WITH OMAHA PUBLIC POWER DISTRICT OFFICIALS TO DISCUSS FORT CALHOUN NUCLEAR PLANT    U.S. Nuclear Regulatory Commission staff will meet with officials from the Omaha Public Power District (OPPD) in Omaha, Neb., on Jan. 19, to discuss the process it will use to maintain oversight of the Fort Calhoun nuclear plant.  OPPD operates the plant, located 19 miles
north of Omaha.
 
The meeting, which is open to public observation, will begin at 6 p.m. at the Doubletree Hotel, 1616 Dodge St.
 
Fort Calhoun is shut down and remains in a safe mode following flooding last spring along the Missouri River.
Conferees will discuss specifics of the process the NRC will use to monitor the plant and maintain inspection oversight during post
-flooding recovery actions.  The licensee was notified via letter on Dec. 13, of this transition from the normal oversight process designed for operating reactors to a program tailored for plants that have been shut down for a prolonged period and
have performance issues that must be resolved prior to restart.
 
The letter is available through ADAMS by going to http://wba.nrc.gov:8080/ves// and doing a Simple Search for ML113470721.
  Members of the NRC staff will be available to answer questions from the public after the business portion of the meeting.
  ###  News releases are available through a free
Listserv subscription or by clicking on the EMAIL UPDATES link on the NRC homepage (www.nrc.gov). E-mail notifications are sent to subscribers when news releases are posted to NRC's website. For the latest news, follow the NRC on www.twitter.com/NRCgov
.  NRC NEWS U.S. NUCLEAR REGULATORY COMMISSION
Office of Public Affairs  Region IV                       
    1600 E. Lamar Blvd.
                       
  Arlington, TX  76011
-4 511 Telephone: (817) 860
-81 00 Site: www.nrc.gov
Blog: http://public
-blog.nrc-gateway.gov
}}

Revision as of 20:47, 15 July 2019

Press Release-IV-12-001: NRC Staff to Meet with Omaha Public Power District Officials to Discuss Fort Calhoun Nuclear Plant
ML120050230
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 01/05/2012
From:
Office of Public Affairs Region IV
To:
References
Press Release IV-12-001
Download: ML120050230 (2)


See also: see also:Press Release-IV-12-001

Text

No. IV-1 2-0 01 Contact: Victor Dricks

(817) 200-1 128 Lara Uselding (817) 2

00-1 519

January 5, 2012

E-Mail: OPA4.Resource@nrc.gov

NRC STAFF TO MEET WITH OMAHA PUBLIC POWER DISTRICT OFFICIALS TO DISCUSS FORT CALHOUN NUCLEAR PLANT U.S. Nuclear Regulatory Commission staff will meet with officials from the Omaha Public Power District (OPPD) in Omaha, Neb., on Jan. 19, to discuss the process it will use to maintain oversight of the Fort Calhoun nuclear plant. OPPD operates the plant, located 19 miles

north of Omaha.

The meeting, which is open to public observation, will begin at 6 p.m. at the Doubletree Hotel, 1616 Dodge St.

Fort Calhoun is shut down and remains in a safe mode following flooding last spring along the Missouri River.

Conferees will discuss specifics of the process the NRC will use to monitor the plant and maintain inspection oversight during post

-flooding recovery actions. The licensee was notified via letter on Dec. 13, of this transition from the normal oversight process designed for operating reactors to a program tailored for plants that have been shut down for a prolonged period and

have performance issues that must be resolved prior to restart.

The letter is available through ADAMS by going to http://wba.nrc.gov:8080/ves// and doing a Simple Search for ML113470721.

Members of the NRC staff will be available to answer questions from the public after the business portion of the meeting.

      1. News releases are available through a free

Listserv subscription or by clicking on the EMAIL UPDATES link on the NRC homepage (www.nrc.gov). E-mail notifications are sent to subscribers when news releases are posted to NRC's website. For the latest news, follow the NRC on www.twitter.com/NRCgov

. NRC NEWS U.S. NUCLEAR REGULATORY COMMISSION

Office of Public Affairs Region IV

1600 E. Lamar Blvd.

Arlington, TX 76011

-4 511 Telephone: (817) 860

-81 00 Site: www.nrc.gov

Blog: http://public

-blog.nrc-gateway.gov