ML062970060: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 3: | Line 3: | ||
| issue date = 05/18/2006 | | issue date = 05/18/2006 | ||
| title = Yankee Nuclear Power Station - Generic ALARA Evaluation Comparison Worksheet | | title = Yankee Nuclear Power Station - Generic ALARA Evaluation Comparison Worksheet | ||
| author name = Smith D | | author name = Smith D | ||
| author affiliation = Yankee Atomic Electric Co | | author affiliation = Yankee Atomic Electric Co | ||
| addressee name = | | addressee name = | ||
Line 20: | Line 20: | ||
X Generic ALARA AL I$ satisfied. Generic ALARA AL IS NOT satisfied. | X Generic ALARA AL I$ satisfied. Generic ALARA AL IS NOT satisfied. | ||
I Reviewed by:% & 0 , / Date: d-LkhA -I ' ~ PSS krojectdGlanager DPF-8867.1 Rev. 2 Page 1 of 1 Generic ALARA Evaluation Comparison Worksheet Survey Area: NOL-05 Survey Unit: | I Reviewed by:% & 0 , / Date: d-LkhA -I ' ~ PSS krojectdGlanager DPF-8867.1 Rev. 2 Page 1 of 1 Generic ALARA Evaluation Comparison Worksheet Survey Area: NOL-05 Survey Unit: | ||
02 Reference Generic ALARA Evaluation No.: YA-REPT-00-003-05 Applicable Generic ALARA AL: 165 Radionuclide Average Concentration DCGL fraction DCGL | 02 Reference Generic ALARA Evaluation No.: YA-REPT-00-003-05 Applicable Generic ALARA AL: 165 Radionuclide Average Concentration DCGL fraction DCGL | ||
: 3. 4. C(fraction DCGL) = _-0.19 ___ If the C(fraction DCGL) < the generic ALARA AL, then the generic ALARA evaluation is applicable to the survey unit. Check one: | : 3. 4. C(fraction DCGL) = _-0.19 ___ If the C(fraction DCGL) < the generic ALARA AL, then the generic ALARA evaluation is applicable to the survey unit. Check one: | ||
X Generic ALARA AL IS satisfied. Generic ALARA AL IS NOT satisfied, Prepared by: Date: /!.A/ \ Reviewed by: &fiC h,~mm Date: 1. ,/!!;/OJ/ | X Generic ALARA AL IS satisfied. Generic ALARA AL IS NOT satisfied, Prepared by: Date: /!.A/ \ Reviewed by: &fiC h,~mm Date: 1. ,/!!;/OJ/ |
Revision as of 10:58, 13 July 2019
ML062970060 | |
Person / Time | |
---|---|
Site: | Yankee Rowe |
Issue date: | 05/18/2006 |
From: | Danni Smith Yankee Atomic Electric Co |
To: | NRC/FSME |
References | |
YA-REPT-00-003-05 | |
Download: ML062970060 (3) | |
Text
Generic ALARA Evaluation Comparison Worksheet Survey Area: NOL-05 Surveyunit:
01 Reference Generic ALARA Evaluation No.: YA-REPT-00-003-05 Applicable Generic ALARA AL: 165 ---- - Radionuclide Average Concentration DCGL fraction DCGL Co-60 0.04 1.4 0.03 CS-137 0.11 -- 3 .O 0.04 0.016 2 -5 0.00 b 4. X(fraction DCGL) = 0.076 If the C(fraction DCGL) < the generic ALARA AL, then the generic ALARA evaluation is applicable to the survey unit. Check one:
X Generic ALARA AL I$ satisfied. Generic ALARA AL IS NOT satisfied.
I Reviewed by:% & 0 , / Date: d-LkhA -I ' ~ PSS krojectdGlanager DPF-8867.1 Rev. 2 Page 1 of 1 Generic ALARA Evaluation Comparison Worksheet Survey Area: NOL-05 Survey Unit:
02 Reference Generic ALARA Evaluation No.: YA-REPT-00-003-05 Applicable Generic ALARA AL: 165 Radionuclide Average Concentration DCGL fraction DCGL
- 3. 4. C(fraction DCGL) = _-0.19 ___ If the C(fraction DCGL) < the generic ALARA AL, then the generic ALARA evaluation is applicable to the survey unit. Check one:
X Generic ALARA AL IS satisfied. Generic ALARA AL IS NOT satisfied, Prepared by: Date: /!.A/ \ Reviewed by: &fiC h,~mm Date: 1. ,/!!;/OJ/
DPF-8867.
I Rev. 2 Page 1 of 1 ALARA Analysis Worksheet 1 1. Decision Criteria: If the sum of the DCGL fractions
< AL, then additional remediation is not cost beneficial.
If the sum of the fractions
> AL, then additional remediation is cost beneficial. Check one: Additional remediation IS NOT cost beneficial Additional remediation IS cost beneficial - Prepared by:
.( - Date: !Ah-- FSS Radiological Engineer
+OK b. 3h-L LYFf u - Independent Review by:
r&LC&2L Date: ,&/;A, 5y FSS Project Man&er/ Radiat'on Protection Manager DPF-8867.2 Rev. 2 Page 3 of 3