IR 05000407/2007201: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 07/27/2007
| issue date = 07/27/2007
| title = IR 05000407-07-201, on 07/16-19/2007, for Triga Mark-I Research Reactor Facility Center for Excellence in Nuclear Technology, Energy, and Research (Center.)
| title = IR 05000407-07-201, on 07/16-19/2007, for Triga Mark-I Research Reactor Facility Center for Excellence in Nuclear Technology, Energy, and Research (Center.)
| author name = Eads J H
| author name = Eads J
| author affiliation = NRC/NRR/ADRA/DPR/PRTB
| author affiliation = NRC/NRR/ADRA/DPR/PRTB
| addressee name = Krahenbuhl M
| addressee name = Krahenbuhl M
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:uly 27, 2007
[[Issue date::July 27, 2007]]


Dr. Melinda KrahenbuhlDirector of CENTER 122 S. Central Campus Drive, Room 104 University of Utah Salt Lake City, UT 84112
==SUBJECT:==
 
NRC INSPECTION REPORT NO. 50-407/2007-201
SUBJECT: NRC INSPECTION REPORT NO. 50-407/2007-201


==Dear Dr. Krahenbuhl:==
==Dear Dr. Krahenbuhl:==
This letter refers to the inspection conducted on July 16-19, 2007, at your TRIGA Mark-Iresearch reactor facility located in the Center for Excellence in Nuclear Technology, Energy, and Research (CENTER). The enclosed report documents the inspection results, which were discussed on July 19, 2007, with Dr. Ronald Pugmire, Associate Vice President for Research, Dr. Paul Tikalsky, Chair of the Civil and Environmental Engineering Department, you and another member of your staff.The inspection examined activities conducted under your license as they relate to safety andcompliance with the NRC's rules and regulations and with the conditions of your license. The inspector reviewed selected procedures and records, observed activities, and interviewed personnel. Based on the results of this inspection, no findings of significance were identified. In accordance with Section 2.390, "Public inspections, exemptions, and requests forwithholding," of Title 10 of the Code of Federal Regulations, a copy of this letter, its enclosure,and your response (if any) will be available electronically for public inspection in the NRC PublicDocument Room or from the Publicly Available Records component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).Should you have any questions concerning this inspection, please contact Craig Bassett at 404-358-6515.
This letter refers to the inspection conducted on July 16-19, 2007, at your TRIGA Mark-Iresearch reactor facility located in the Center for Excellence in Nuclear Technology, Energy, and Research (CENTER). The enclosed report documents the inspection results, which were discussed on July 19, 2007, with Dr. Ronald Pugmire, Associate Vice President for Research, Dr. Paul Tikalsky, Chair of the Civil and Environmental Engineering Department, you and another member of your staff.The inspection examined activities conducted under your license as they relate to safety andcompliance with the NRC's rules and regulations and with the conditions of your license. The inspector reviewed selected procedures and records, observed activities, and interviewed personnel. Based on the results of this inspection, no findings of significance were identified. In accordance with Section 2.390, "Public inspections, exemptions, and requests forwithholding," of Title 10 of the Code of Federal Regulations, a copy of this letter, its enclosure,and your response (if any) will be available electronically for public inspection in the NRC PublicDocument Room or from the Publicly Available Records component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).Should you have any questions concerning this inspection, please contact Craig Bassett at 404-358-6515.


Sincerely,/RA/
Sincerely,
Johnny H. Eads, Jr., Branch Chief Research and Test Reactors Branch B Division of Policy and Rulemaking Office of Nuclear Reactor RegulationDocket No. 50-407License No. R-126
/RA/
Johnny H. Eads, Jr., Branch Chief Research and Test Reactors Branch B Division of Policy and Rulemaking Office of Nuclear Reactor RegulationDocket No. 50-407License No. R-126Enclosure: NRC Inspection Report No. 50-407/2007-201cc w/encl.: Please see next page University of UtahDocket No. 50-407 cc:
Mayor of Salt Lake City451 South State Room 306 Salt Lake City, UT 84111Dr. Raymond F. GestelandVice President for Research 201 S. Presidents Circle, Room 210 University of Utah Salt Lake City, UT 84112-9011Dr. Dong-Ok ChoeReactor Supervisor 122 S. Central Campus Drive University of Utah Salt Lake City, UT 84112Ms. Karen LangleyDirector, University of Utah Radiological Health 100 OSH, University of Utah Salt Lake City, UT 84112Dr. Ronald J. PugmireAssociate Vice President for Research 210 Park, University of Utah uly 27, 2007


===Enclosure:===
==SUBJECT:==
NRC Inspection Report No. 50-407/2007-201cc w/encl.: Please see next page University of UtahDocket No. 50-407 cc:
NRC INSPECTION REPORT NO. 50-407/2007-201
Mayor of Salt Lake City451 South State Room 306 Salt Lake City, UT 84111Dr. Raymond F. GestelandVice President for Research 201 S. Presidents Circle, Room 210 University of Utah Salt Lake City, UT 84112-9011Dr. Dong-Ok ChoeReactor Supervisor 122 S. Central Campus Drive University of Utah Salt Lake City, UT 84112Ms. Karen LangleyDirector, University of Utah Radiological Health 100 OSH, University of Utah Salt Lake City, UT 84112Dr. Ronald J. PugmireAssociate Vice President for Research 210 Park, University of Utah Salt Lake City, UT 84112Test, Research, and Training Reactor Newsletter Universities of Florida 202 Nuclear Sciences Center Gainesville, FL 32611Director, Division of Radiation ControlDept. Of Environmental quality 168 North 1959 West P.O. Box 144850 Salt Lake City, UT 84114-4850 July 27, 2007Dr. Melinda KrahenbuhlDirector of CENTER 122 S. Central Campus Drive, Room 104 University of Utah Salt Lake City, UT 84112


SUBJECT: NRC INSPECTION REPORT NO. 50-407/2007-201 Dear D
Dear D
}}
}}

Revision as of 22:35, 12 July 2019

IR 05000407-07-201, on 07/16-19/2007, for Triga Mark-I Research Reactor Facility Center for Excellence in Nuclear Technology, Energy, and Research (Center.)
ML072070529
Person / Time
Site: University of Utah
Issue date: 07/27/2007
From: Johnny Eads
NRC/NRR/ADRA/DPR/PRTB
To: Krahenbuhl M
Univ of Utah
Bassett C, NRR/DRIP/REXB, 404-562-4899
References
IR-07-201
Download: ML072070529 (20)


Text

uly 27, 2007

SUBJECT:

NRC INSPECTION REPORT NO. 50-407/2007-201

Dear Dr. Krahenbuhl:

This letter refers to the inspection conducted on July 16-19, 2007, at your TRIGA Mark-Iresearch reactor facility located in the Center for Excellence in Nuclear Technology, Energy, and Research (CENTER). The enclosed report documents the inspection results, which were discussed on July 19, 2007, with Dr. Ronald Pugmire, Associate Vice President for Research, Dr. Paul Tikalsky, Chair of the Civil and Environmental Engineering Department, you and another member of your staff.The inspection examined activities conducted under your license as they relate to safety andcompliance with the NRC's rules and regulations and with the conditions of your license. The inspector reviewed selected procedures and records, observed activities, and interviewed personnel. Based on the results of this inspection, no findings of significance were identified. In accordance with Section 2.390, "Public inspections, exemptions, and requests forwithholding," of Title 10 of the Code of Federal Regulations, a copy of this letter, its enclosure,and your response (if any) will be available electronically for public inspection in the NRC PublicDocument Room or from the Publicly Available Records component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).Should you have any questions concerning this inspection, please contact Craig Bassett at 404-358-6515.

Sincerely,

/RA/

Johnny H. Eads, Jr., Branch Chief Research and Test Reactors Branch B Division of Policy and Rulemaking Office of Nuclear Reactor RegulationDocket No. 50-407License No. R-126Enclosure: NRC Inspection Report No. 50-407/2007-201cc w/encl.: Please see next page University of UtahDocket No. 50-407 cc:

Mayor of Salt Lake City451 South State Room 306 Salt Lake City, UT 84111Dr. Raymond F. GestelandVice President for Research 201 S. Presidents Circle, Room 210 University of Utah Salt Lake City, UT 84112-9011Dr. Dong-Ok ChoeReactor Supervisor 122 S. Central Campus Drive University of Utah Salt Lake City, UT 84112Ms. Karen LangleyDirector, University of Utah Radiological Health 100 OSH, University of Utah Salt Lake City, UT 84112Dr. Ronald J. PugmireAssociate Vice President for Research 210 Park, University of Utah uly 27, 2007

SUBJECT:

NRC INSPECTION REPORT NO. 50-407/2007-201

Dear D