ML072490008: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 9: Line 9:
| docket = 05000416
| docket = 05000416
| license number = NPF-029
| license number = NPF-029
| contact person = Vaidya B K, NRR/DORL/LP4, 415-3308
| contact person = Vaidya B, NRR/DORL/LP4, 415-3308
| case reference number = TAC MD3469
| case reference number = TAC MD3469
| package number = ML072490005
| package number = ML072490005

Revision as of 19:59, 12 July 2019

Technical Specifications, Issuance of Amendment No. 177 Changes to Technical Specifications Surveillance Requirement 3.3.1.1.7, the Local Power Range Monitor Calibration Frequency
ML072490008
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 10/24/2007
From:
NRC/NRR/ADRO/DORL/LPLIV
To:
Vaidya B, NRR/DORL/LP4, 415-3308
Shared Package
ML072490005 List:
References
TAC MD3469
Download: ML072490008 (1)


Text

RPS Instrumentation 3.3.1.1GRAND GULF 3.3-4 Amendment No. 1 69 , SURVEILLANCE REQUIREMENTS (continued) SURVEILLANCEFREQUENCYSR 3.3.1.1.5 Deleted SR 3.3.1.1.6 Deleted SR 3.3.1.1.7 Calibrate the local power range monitors.

2000 MWD/T average core exposureSR 3.3.1.1.8 Perform CHANNEL FUNCTIONAL TEST. 92 days SR 3.3.1.1.9 Calibrate the trip units. 92 days (continued) 177