ML13086A526: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 3: | Line 3: | ||
| issue date = 03/27/2013 | | issue date = 03/27/2013 | ||
| title = Information Request for an NRC Post-Approval Site Inspection for License Renewal | | title = Information Request for an NRC Post-Approval Site Inspection for License Renewal | ||
| author name = Miller G | | author name = Miller G | ||
| author affiliation = NRC/RGN-IV/DRS/EB-2 | | author affiliation = NRC/RGN-IV/DRS/EB-2 | ||
| addressee name = Cortopassi L | | addressee name = Cortopassi L |
Revision as of 05:45, 22 June 2019
ML13086A526 | |
Person / Time | |
---|---|
Site: | Fort Calhoun |
Issue date: | 03/27/2013 |
From: | Geoffrey Miller NRC/RGN-IV/DRS/EB-2 |
To: | Cortopassi L Omaha Public Power District |
References | |
Download: ML13086A526 (6) | |
Text
March 27, 2013
Lou Cortopassi, Vice President
and Chief Nuclear Officer Omaha Public Power District Fort Calhoun Station FC-2-4 P.O. Box 550
Fort Calhoun, NE 68023-0550
SUBJECT:
FORT CALHOUN STATION INFORMATION REQUEST FOR AN NRC POST-APPROVAL SITE INSPECTION FOR LICENSE RENEWAL
Dear Mr. Cortopassi:
On May 13, 2013, the NRC will begin a Post-Approval Site Inspection for License Renewal at Fort Calhoun Station. A team of four inspectors will perform a 2-week Phase 2 inspection in accordance with NRC Inspection Procedure (IP) 71003. This inspection will include two weeks on-site, the week of May 13, 2013, and the week of June 3, 2013. This inspection will evaluate whether license conditions added as part of the renewed license, license renewal commitments, and selected aging management programs are implemented in accordance with Title 10 of the Code of Federal Regulations (CFR) Part 54, "Requirements for the Renewal of Operating Licenses for Nuclear Power Plants." In order to minimize the inspection impact on the site and to ensure a productive inspection for both parties, we have enclosed a request for information needed for the inspection. It is
important that all of these documents are up-to-date and complete in order to minimize the number of additional documents requested during the preparation and/or the on-site portions of the inspection. Insofar as possible, this information should be provided electronically to the lead inspector. The information request has been divided into two groups:
- The first group lists information necessary for our initial inspection scoping and in-office preparation activities. During the in-office preparation activities, the team will identify as much as possible the information and activities to be reviewed during the inspection. Please provide this information to the lead inspector by April 26, 2013.
- The second group includes the additional information required for the team to review the selected activities. This information should be available to the team on-site May 13, 2013. We also request that corrective action documents and/or questions developed during the inspection be provided to the lead inspector as the documents are generated. UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV1600 EAST LAMAR BLVDARLINGTON, TEXAS 76011-4511
The lead inspector for this inspection is Mr. Greg Pick. We understand that our licensing contact for this inspection is Mr. Erick Matzke of your organization. If there are any questions about the inspection or the material requested in the enclosure, please contact the lead inspector at (817) 200-1270 or via e-mail at Greg.Pick@nrc.gov. This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, Control Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electr onically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely, /RA/ Geoffrey Miller, Chief Engineering Branch 2
Division of Reactor Safety Docket: 50-285 License: DPR-40
Enclosure:
Request for Information Post-Approval Site Inspection for License Renewal cc w/enclosure: Electronic Distribution for Fort Calhoun Station
R:\_Reactors\_FCS\FCS 71003 Phase2 RFI 2013009 gap.docx ADAMS ACCESSION NUMBER: ML13086A526 SUNSI Rev Compl. Yes No ADAMS Yes No Reviewer Initials GAP Publicly Avail Yes No Sensitive Yes No Sens. Type Initials GAP DRS/EB2 C:DRS/EB2 C:DRP/F C:DRS/EB2 signatureGPick GMiller MHay GMiller /RA/ /RA/ W.Walker for /RA/ 03/25/2013 03/25/2013 03/26/2013 03/27/2013 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax
INFORMATION REQUEST FOR POST-APPROVAL SITE INSPECTION FOR LICENSE RENEWAL Enclosure I. Information Requested Prior to the On-site Information Gathering/Inspection Week The following information is requested by April 26, 2013, or sooner, to facilitate inspection preparation. If you have any questions regarding this information, contact the team leader as soon as possible. Please provide the information electronically in "pdf" files, Excel, or other searchable formats, preferably on some portable electronic media (e.g., CDROM, DVD, etc.). The portable electronic media should contain descriptive names and be indexed and hyperlinked to facilitate ease of use. Information in "lists" should contain enough information to be easily understood by someone who has knowledge of light water reactor technology. Please provide the following: 1. Information related to any commitment changes related to license renewal since receipt of the amendment and the license extension. 2. A list of your aging management programs and any time-limited aging analyses, copies of the program basis documents for each, and a listing of the action tracking items for each. 3. For each complete commitment, please provide documentation demonstrating that the commitment has been completed. 4. A list of any "newly identified" structures, systems, and components identified pursuant to 10 CFR 54.37(b) and Regulatory Information Summary 2007-16, "Implementation of the Requirements of 10 CFR 54.37(b) for Holders of Renewed Licenses." If an evaluation or assessment was performed to verify no in-scope structure, system, or components were excluded, please include a
copy. 5. Sections of the Quality Assurance Program Manual that are applicable to license renewal activities. 6. A copy of your updated final safety analysis report that includes descriptions of your aging management programs. 7. A copy of your living version of the final safety analysis report supplement. 8. A listing of completed license renewal inspections. If possible, separate those performed during outages and those performed online. 9. A listing of any remaining, outstanding inspections, credited for license renewal , include work order numbers where applicable. 10. A copy of any self-assessments that you have completed related to license renewal, including commitments, aging management programs, and time-limited aging analyses.
INFORMATION REQUEST FOR POST-APPROVAL SITE INSPECTION FOR LICENSE RENEWAL Enclosure 11. A copy of the GAP analysis and the status of any actions taken as a result of your analysis; include any corrective action documents. 12. A copy of current management and license renewal organizational charts. 13. Procedures related to your corrective action program, regulatory commitment change process, and operating experience. 14. A description of administrative controls that will be used to ensure that all activities due prior to (and during) the period of extended operation will be satisfactorily completed as described in the license renewal document. 15. A description of plans or processes that will be used during the period of extended operation to continuously incorporate operating experience into license renewal activities. 16. A copy of any correspondence between the licensee and the NRC after the license was issued associated with regulatory issues affecting the license renewal commitment. For example, this may include notifications of commitment changes or license amendment requests affecting a license condition or a license
renewal commitment. 17. A list of corrective action program documents (e.g., condition reports) associated with the implementation of each aging management program. This includes unacceptable aging effects identified during the implementation of license renewal activities and programmatic deficiencies requiring resolution. 18. A copy of evaluations performed for applicable external and internal operating experience issues associated with license renewal. This request is limited to operating experience items issued after the renewed operating license was granted. II. Information requested to be available when the inspectors arrive on-site on May 13, 2013 and during the inspection. 1. Documentation demonstrating closure of license renewal commitments that are complete as of the inspection date. For example, this may be in the form of a binder for each commitment, which includes the implementing documentation and references. Please include:
- Implementing procedures (e.g., visual examination procedure, ultrasonic examination procedure for the Flow Accelerated Corrosion Program, etc.).
INFORMATION REQUEST FOR POST-APPROVAL SITE INSPECTION FOR LICENSE RENEWAL Enclosure
- Copy of updated scoping drawings showing the structures, systems and components within the scope of the aging management programs.
- Copy of the applicable sections of the license renewal application.
- Copy of applicable Requests for Additional Information and corresponding responses.
- Copy of the applicable sections of the NRC Safety Evaluation Report.
- Copy or ready access to the key industry standards that will be followed during the period of extended operation for the implementation of the program (e.g., American Society of Mechanical Engineers Code, Electric Power Research Institute Guidelines, Nuclear Energy Institute Guidelines, etc.). 2. Copies of any corrective action documents generated as a result of the team's questions or queries during this inspection. 3. Copies of the list of questions submitted by the team members and the status/resolution of the information requested (provide daily during the inspection to each team member). 4. List of plant modifications, including a brief description of the modification scope, which were approved and/or implemented from the date the license renewal application was submitted to the date the renewed license was issued. 5. A copy of licensee responses and/or evaluations for NRC Generic Communications associated with license renewal and that were issued after the renewed license was granted. 6. Description of instances where scope expansion was required based on the initial examination of structures, systems and components. Please describe the logic to select the scope expansion and any resulting changes to the aging management program. If you have questions regarding the information requested, please contact the lead inspector.