ML17229A059: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 10/03/1996
| issue date = 10/03/1996
| title = Forwards Results of self-assessment Conducted from May to Sept 1996 Covering Areas of Safety Assessment/Corrective Actions,Operations,Engineering,Maint,Plant Support & Mgt Policies
| title = Forwards Results of self-assessment Conducted from May to Sept 1996 Covering Areas of Safety Assessment/Corrective Actions,Operations,Engineering,Maint,Plant Support & Mgt Policies
| author name = STALL J A
| author name = Stall J
| author affiliation = FLORIDA POWER & LIGHT CO.
| author affiliation = FLORIDA POWER & LIGHT CO.
| addressee name =  
| addressee name =  

Revision as of 07:06, 19 June 2019

Forwards Results of self-assessment Conducted from May to Sept 1996 Covering Areas of Safety Assessment/Corrective Actions,Operations,Engineering,Maint,Plant Support & Mgt Policies
ML17229A059
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 10/03/1996
From: Stall J
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17229A060 List:
References
L-96-263, NUDOCS 9610080053
Download: ML17229A059 (3)


Text

CATEGORY j.REGULAT'I INFORMATION DZSTRIBUTION+ISTEM (RIDE)ACCESSION NBR:9610080053 DOC.DATE: 96/10/03 NOTARIZED:

NO FACIL:50-335 St.Lucie Plant, Unit 1, Florida Power a Light Co.50-389 St.Lucie Plant, Unit 2, Florida Power&Light Co.AUTH.NAME AUTHOR AFFILIATION STALLFJ.A.

Florida Power S Light Co.RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)DOCKET I 05000335 05000389

SUBJECT:

Forwards results of self-assessment conducted from May to Sept 1996 covering areas of safety assessment/corrective actions, operations, engineering,maint,plant support&mgt policies.DISTRIBUTION CODE: AOOID COPIES RECEIVED:LTR i ENCL$SIZE:/+53 TITLE: OR Submittal:

General Distribution NOTES: T E RECIPIENT ID CODE/NAME PD2-3 LA WIENS,L.INTERNAL: ACRS NRR/DE/EMCB NRR/DSSA/SPLB NUDOCS-ABSTRACT EXTERNAL: NOAC COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME PD2-3 PD FILE CENTER 0 5R B NRR/DSSA/SRXB OGC/HDS3 NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 0 0 D 0 NOTE TO ALL NRIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE.TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DZSTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 13 ENCL 12 I P E 4 4 I Florida Power&Light Company, P.O.Box 128, Fort Pierce, FL 34854-0128 October 3, 1996 L-96-263 10 CFR 50.4 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.20555 RE: St.Lucie Units 1 and 2 Docket Nos.50-335 and 50-389 Completi In response to a series of events at our St.Lucie plant, site management directed that a self-assessment of the operations at St.Lucie be conducted.

Critical self-assessments provide a good approach for an organization to return its performance to a standard of excellence.

The purpose of this letter is to transmit the results of the self-assessment.

The St.Lucie self-assessment was conducted from May to September 1996.It covers the areas of safety assessment/corrective actions, operations, engineering, maintenance, plant support, and management policies.The assessment period covered approximately two and one half years of operation (January 1994 to June 1996).The attached assessment identifies some fundamental issues that are being addressed.

The management initiatives to address these issu'es will be finalized by October 11, 1996.We will provide you with a copy of these initiatives upon completion.

Although St.Lucie remains a good performer, as noted in our last ratings from the NRC, we will not be satisfied until our standards of excellence are met.The attached self-assessment was designed to be critical of the plant's performance and does not focus on areas of strength.Its purpose was to identify areas of improvement so St.Lucie can return to its outstanding level of performance as one of the best plants in the nuclear industry.We are making progress to improve our performance and the self-assessment has assisted us in these efforts.A St.Lucie Plant status meeting is scheduled in Atlanta on November 12, 1996.We plan to more fully discuss the results of our self-assessment at that meeting.Very truly yours, J.A.Stall Vice President St.Lucie Plant JAS/GRM cc: Stewart D.Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, St.Lucie Plant/jK)i'I 9SSOOSOO5S 9zfOOS PDRi ADQCK 05000335 P FDR an FPL Group company