ML18032A628: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 09/30/1987
| issue date = 09/30/1987
| title = Discharge Monitoring Rept for Sept 1987
| title = Discharge Monitoring Rept for Sept 1987
| author name = BROOKS R H
| author name = Brooks R
| author affiliation = TENNESSEE VALLEY AUTHORITY
| author affiliation = TENNESSEE VALLEY AUTHORITY
| addressee name =  
| addressee name =  

Revision as of 01:58, 18 June 2019

Discharge Monitoring Rept for Sept 1987
ML18032A628
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 09/30/1987
From: Brooks R
TENNESSEE VALLEY AUTHORITY
To:
References
NUDOCS 8711020365
Download: ML18032A628 (26)


Text

i~~REGULATORY INFORMATION DISTRIBUTION SYSl~M (BIDS)ACCESSION NBR: 8711020365 DOC.DATE: 87/09/30 NOTARIZED:

NO.DOCKET FACIL: 50-259 Browns Ferry Nuclear Power Station>Unit 1>Tennessee 0500025'P 50-260 Browns Ferry Nuclear Power Station>Unit 2>Tennessee 05000260 50296 Browns Ferry Nuclear Powef Station>Unit 3>Tennessee 05000296 AUTH.NAME AUTHOR AFFILIATION BROOKS>R.H.'Tennessee Valley Authority RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Discharge monitor ing rept 0or Sept 1987.DIBTRIBUTIQN CODE: IEEBD CQPIEB RECEIVED;LTR GENCL/SIZE: TITLE: Environmental Monitoring Rept (per Tech Specs)NOTES: Zwolinski 3 cy.1 cy ea to: Axelrad>Ebneter>S.Richardson>

Liaw>Q.Zech>OI>OIA.Zwolinski 3 cy.icy ea to: Axelrad>Ebneter>S.Richardson>

Li aw>Q.Zec h>OI>OIA.Zwolinski 3 cy.icy ea to: Axelrad>Ebneter>S.Richardson>

Liaw>G.Zech>OI>OIA.05000259 05000260 05000296 RECIPIENT ID CODE/NAME JAMERSON>C GEARS>G INTERNAL: ACR S AEOD/DSP/TPAB N T/ADE REQ FILE 01 COPIES LTTR ENCL REC IP IENT ID CODE/NAME PD STANG>J 1 AEOD/DOA ARM TECH ADV NRR/DREP/RPB RES DEPY QI RQN2/DRSS/EPRPB COPIES LTTR ENCL 1 4 1 EXTERNAL: LPDRNOTES: NRC PDR TOTAL NUMBER OF COPIES REQUIRED: LTTR 2 ENCL 38

~~'I III.II ,1 gl ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT DISCHARGE MONITORING REPORT Tennessee Valley Authority BROWNS FERRY NUCLEAR PLANT DSiV 101-Di%+user Di scharge Structure NPDES 4 AL0022080 PARAM FLOW pH gamb.Riper Pownst>earn Pownst>earn downstream Temnerature Rl se AVG 6.0 24hr Av Max 24hr Av Max 6hr Avera e Hour 1 Max 24hr Av Ma<9.0 s u 90.0 92.0 93.0 10.0 FREQ.Cont.1/wk Continuous Continuous Continuous Continuous Continuous C'0 14 16 P%0 22 1267.2 7.3 1267.2 1267.2 1267.2 1267.2 1267.2 1267.2 1267.2 1267.2 1 26 0 L'7 1267.2 1267~2 1267.2 7.8 1267.2 1267.2 1267.2 1~67.2 1267.2 1.67.2 1267.2 81.7 81.6 81.2 81.3 81.0 SO.T 80.3 81.0 81.0 80 BO.'.79.8 80.4 80.4 80.0 80.3 S0.3 79.2 78o2 77.7 81.7 81.6 81.3 81~3 80.7 80.4 80.0 80.6 81.2 81~4 QO Q 80.6 80.2 SO.4 80.6 80.1 80.0 SO.0 79.2 I 8~77.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 S2.1 82.5 81.4 81.1 80.1 81.0 81.7 82.0 81.?81.6 80.7 81.2 81.0 80.1 SO.0 80.6 79, 8 78.9 78.4 78.1 0~2 0,2 0.1-0,2 0-0.1 0.3 0.4 0 0.5 0.5 0.4 0.3 0.1 0 0.0 0.5 24 gC 27 1 267 1267.2 1267.2 1267.2 1267.2 7.8 77.1 76.4 76.3 76.8 7b.8 77.6 77.2 76.9 76.9 76.7 0.0 0.0 0.0 0.0 0~0 77.9 77.4 78.7 77.6 76.8 0'0.'?0.'?0.6 0 28 29 MIN 1267.2 1267.2 7.5 1267.2 1267.2 7.8 1267.2 76.4 76.2 75.9 81.7 79.4 76.5 76.1 Tb.0 81.7 79.4 0.0 0.0 0.0 0.0 0.0 76.3 76 75.7 82.7 79.9 0.1 0.0 0.3 0.9 0.3 informati on~the-i nformati on submi Cted is~Co Che best of my knowledge and belief, true~accurate, and complete.I am a~are Chat C'here are signi ficant penalti es for submitting false i nformation~

including Che possibi lity of fi ne and i m pri sonment for knowing vi o l ati ons.ORIGlNAL SKIED BX'on-i*le Offi c',ALP.H, WQQKS 87ii020365 870930 PDR ADOCK 05000259 R , PDR OI;T 3 V 1987 ib, cer i fy under penalty of law that this document and all attachments were prepared under the di recti on or supervision i n accordance wi th a system designed Co assure that qualified personnel properly gather and evaluate Che information submitted.

Based on my inquiry of'he person or persons who manage Che system~or Chose persons directl y responsi ble for gathering the 0 t'I 0" Q'I Jh)

ALABAMA DEP ENT OF ENVIRONMENTAL MA MENT DISCHARGE MONITORING REPORT Tennessee Valley Authority BROWNS FERRY NUCLEAR PLANT DSN 102-Sedimentation Pond PARAM MAX UNITS FLOW pH MIN.6.0 9.0 s u 05G 20 m/l TSS 30 100 m/l NPDES 4 AL0022080 COMMENTS 1/RELEASE 1/RELEASE 1/RELEASE 2/RELEASE 10 12 15 18 22 25 27 29 30 MAX AVG MIN TOTAL 0.292000 0.292000 0.292000 0.292000 8.0 8.0 8.0 I certi f y under penalty of law that thi s document and all attachments wer e prepared under the direction or supervision in accordance wi tb a system designed to assure that qualified personnel properly gather and evaluate the information submitted.

Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gatheri ng the i nformati on~the information submitted i s~to the best of my knowledge and belief, true, accurate~and complete.I am aware that there are si gni fi cant penalties for submitting false i nformati on, including the possibility of fine and imprisonment for knowi ng violations.

Signature of Responsible Offi cial Bate:

~t~'dl~A ALABAMA DEPARTMENT OF ENYIRONMENTAL MANAGEMENT DISCHAR6E MONITORINS REPORT Tennessee Ya)ley Authority BROWNS FERRY NUCLEAR PLANT DSN 103-Unit 1,2,3 Turbine Station Sump 1987 NPDES 4 AL0022080 PARAM AYS UNITS FREQ.FLOW MGD 1/WEEK 08(6 15 20 m/1 1/WEEK TSS 30 100 m/1 1/WEEK COMMENTS 0.017000 10 O.599000 12 16 0.274000 19 20 21 22 23 25 26 27 28 0.278000 5 10 30 0.599000 0.292000 5 10 I certify under penalty of law that this document and all attachments were prepared under the di recti on or supervision in accordance with a system designed to assure Chat qualified, personnel properly gather and evaluate the information submitted.

Based on my inquiry of Che person or persons who manage Che system~or Chose persons di rectl y responsi bl e for gat*eri ng Che information~

Che i nformation submitted is~Co Che best of my knowledge and belief, true, accurate~and complete.I am aware that there are signi fi cant penalti es for submitting false'information, including Che possibility of fine and i mprisonment for knowing violations.

Signature of Pesponsible Offi cial Date:

iI~44 a N~t 4 4 ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT DISCHARGE MONITORING REPORT Tennessee Valley Authority BROWNS FERRY NUCLEAR PLANT DSN 104-Liquid Radwaste MONTH Seotember 1987 NPDES 4 AL0022080 AVG MAX 15 20 TSS 30 100 LDT/TSS 30 100 LDT/OZcG Copper 1.0 Iron 1.0 UNITS m/L m/L m/L m/L m/L FREQ.1/BATCH 0.031061 0.016456 0.021917 2/wk 13 2/wk 1/BATCH 1/BATCH 1/BATCH 1/BATCH 0.028533 0.026774 5 10 12 15 16 17 0.026068 0.030158 0.0.6939 0.028786 0.022507 0.009178 0.015270 14 5 26 18 0.036270 20 0.020382 24 25 0.029536 0.029536 0.023784 0.028533 28 29 MAX AVG 0.030994 0.019214 0.036270 0.025095 5<1 14 7<1 26 certi fy under penalty of law that this document and all attachments were prepared under Che direction or supervision in accordance with a system desi gned Co assure Chat quali fied personnel properl y gather and evaluate the information submitted.

Based on my inquiry of Che person or persons who manage Che system~or Chose persons di rectl y responsi bl e for gatheri ng Che informati on~Che information submitted is~Co Che best of my knowledge and belief, true~accurate~and complete.I am aware that there are si gni fi cant penalties for submi Cti ng false i nformation~

including the possibility of fi ne and i mpri sonment for knowi ng violations.

Si gnature of Pesponsi ble Offi cial Date:

~~("

ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT DISCHARGE MONITORING REPORT Tennessee Valley Authority BROWNS FERRY NUCLEAR PLANT DSN 105-Residual Heat Removal Service Water PARAM AVG MAX UNITS FREQ.FLOW MGD 1/MEEK 1987 TEMP 1/MEEK COMMENTS NPDES 0 AL0022080 4 NO FLOW NQ FLQM 14 f 8 NO FLOW 19 2f 24 25 NO FLOW 27 28 30 MAX I certify under penalty of law Chat this document and all attachments were prepared under the direction or supervision in accordance with a system designed Co assure Chat quali fied personnel properly gaCher and evaluate Che information submitted.

Based on my i nqui ry of the person or persons who manage Che system~or Chose persons directly responsi ble for gathering the information~

the information submitted is~Co the best of my knowledge and belief~true~accurate~and complete.I am aware Chat Chere are significant penalti es for submitti ng false information, including Che possibili ty of fi ne and i mpri sonment for knowi ng vi olati ons.Signature of Responsi ble Official Date.

ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT DISCHARGE MONITORING REPORT Tennessee Valley Authority BROWNS FERRY NUCLEAR PLANT DSN 106-Condenser Cooling Water Station Sump 1987 NPDES¹AL0022080 PARAM AVG MAX UNITS FLOW MGD 1/MEEK 0.000000 15 20 m/1 1/MEE'K TSS 30 100 m/1 1/MEEK COMMENTS DISCHARGE ROUTED TO SEDIMENTATION POND FOR ENTIRE REPORTING PERIOD.O.OOOOOO 13 14 15 0.000000 19 22 25 26 27 28 0.000000 30 AVG 0.000000 0.000000 I certify under penalty of law that this document and all attachments were prepared under Che direction or supervision in accordance with a system designed Co assure that qualified personnel proper 1 y gather and evaluate the information submitted.

Based on my inquiry of Che person or persons who manage Che system~or those persons di rectl y responsible for gathering Che i nformati on~Che i nformati on submi tted i s~to the best of my knowledge and beli'ef, true, accurate, and complete.I am a~are that there are signi ficarit penalties for submitti ng false i nformation~

including the possi bi li ty of fine and i mpri sonment for knowing vi olati ons./Signature of Responsi ble Official'aCe:

1~-g~gg~1 tT<tC.td\*l ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT DISCHARGE MONITORING REPORT Tennessee Valley Authority BRONNS FERRY NUCLEAR PLANT DSN 107-Unit 3 Control Bldg.Drain PARAM 1987 TSS NPDES 0 AL0022080 MlAX UNITS FREQ.MGD 1/NEEK 0.002800 20 m/l 1/NEEK 5 100 m/l 1/NEEK COMMENTS 0.002800 5 15 16 17 18 0.002200 20 0.002070 24 27 28 29 30 AVG 0.000769 0.002800 0.002128 9 2 certi fy under penalty of law that this document and all attachments were prepared under Che direc i on or supervision in accordance wi th a system designed Co assure Chat quali fied personnel properly gather and evaluate the information submitted.

Based on my inquiry of the person or persons who manage the system~or Chose persons di rectl y responsible for gathering the information, the informati on submitted is~to Che best of my knowledge and belief~true, accurate, and complete.I am aware Chat there are significant penalties for submi Cting false information~

including the possibi li ty of fi ne and i mpri sonment for knowi ng violations.

Signature of Responsible Official Date:

<1$r-\.+-~+el+Wa\~la 1 Ih I 4t, ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT DISCHARGE MONITORING REPORT Tennessee Valley Authority BROWNS FERRY NUCLEAR PLANT DSN 108-Diesel Bldg.Sump Units 1 5 2 AVG MAX UNITS FREQ.FLOW 1/WEEK 1987 15 20 m/1 1/WEEK TSS 30 100 m/1 1/WEEK NPDES 4 AL0022080 COMMENTS NO RELEASE 10 NO RELEASE 14 15 16 17 NO RELEASE 19 24 25 26 NO RELEASE n8 MAX AVG NO RELEASE 2'erti fy under penalty of law Chat this document and all attachments were prepared under Che direction or supervision in accordance wi Ch a system designed Co assure that qualified personnel properl y gather and evaluate Che i nformation submi Cted.Based on my i nquiry of'the p'erson or persons who manage Che system~or those persons di rectl y responsible for gathering the information, C*e informati on submi Cted is.to the best of my knowledge and belief~true~accurate~and complete.I am aware Chat there are significant penalties for submitting false information~

includi ng the possibility of fine and imprisonment for knowing violations.

Si gnat ure of Responsibl e Official Bate:

II AA~4 j-tO 7%I t,t~'5 5, ALABAMA DEPA TMENT OF ENVIRONMENTAL MA EMENT DISCHARGE MONITORING REPORT Tennessee Valley Authority BROWNS FERRY NUCLEAR PLANT DSN 109-Diesel Bldg.Sump Unit PARAM AVG MAX UNITS FREQ.FLOW MGD 1/WEEK 1987 m/1 1/WEEK TSS 100 m/l 1/WEEK NPDES 0 AL0022080 COMMENTS NO RELEASE 5 9 NO RELEASE 10 12 16 NO RELEASE 18 19 NO RELEASE 25 26 27 29 30 MAX AVG NO RELEASE E certi fy under penalty of law that this document and all attachments were prepared under the direction or supervision in accordance with a system designed to assure that quali fied personnel properly gather and evaluate the i nformati on submitted.

Based on my inquiry of the person or persons who manage the system~or those persons di rectl y responsible for gathering the i nformati on~the information submitted i s~to the best of my knowledge and beli ef~true~accurate~and complete.E am a~are that there are si gni fi cant penalti es for submitting false information, including the possibility of fi ne and imprisonment for knowing vi ol ati ons.Signature of Responsible Official Date:

&It eV h.(~WP s'{C~t ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT DISCHARGE MONITORING REPORT Tennessee Valley Authority BROWNS FERRY NUCLEAR PLANT DSN 110-Unit 1 Zc=Oflice Bldg.Drain AVG MAX UNITS FREQ.FLOW MGD 1/WEEK 0.000750 1987 20 m/l 1/WEEK TSS 30 100 m/1 1/WEEK NPDES 4 AL0022080 COMMENTS 10 0.003744 13 as 17 0.003100 19 20 2f 0.000370 24 WC'6 27 30 MAX 0.073980 0.073980 0.016389 5 I certi fy under penalty of law Chat this document and all attachments were prepared under the direction or supervision in accordance with a system designed Co assure that qualified personnel properly gather and eval uate C*e information submitted..

Based on my inquiry of Che person or persons who manage the system~or Chose persons di rectl y responsible for gathering the information~

Che information submi tted is~Co the best of my knowledge and belief, tr ue, accurate, and complete.I am aware Chat there are signi fi cant penalties for submi tti ng false information, including the possibility of fine and i mpri sonment for knowi ng vi ol ati ons.Signature of Responsible Official Bate:

>.'I I I%,~\J t+I*

ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT DISCHARGE MONITORING REPORT Tennessee Valley Authority BROWNS FERRY NUCLEAR PLANT DSN all-Sewage Treatment Lagoon PARAM AVG MAX UNITS FREQ FLOW 5/WEEK TSS m/l 2/MONTH BOD5 30 45 m/I 2/MONTH NPDES 4 AL0022080 COMMENTS NO D ISCHARGE FOR ENTIRE MONTH aa a2 a5 a7 as 19 20 21 22 24 QC 27 28 MAX certi fy under penalty of law Chat this document and all attachments were prepared under Che direction or supervision in accordance with a system designed Co assure Chat qualified personnel properly gather and evaluate Che information submi Cted.Based on my inquiry of the person or persons who manage the system, or Chose persons di rect l y responsible for gatheri ng the information, Che information submitted is~Co Che best of my knowledge and beli ef, true~accurate, and complete.I am aware that there are si gni fi cant penalties for submitting false informati on~including the possi bi li t'y of fine and i mpri sonment for knowing violations.

Signature of Responsi bI e Official Bate:

Descri tion of Dischar e-Discharge Serial Number ill (Sewage Treatment Effluent)-On September 8, 1987, sewage was observed discharging to the intake forebay via the yard drainage system.Cause and Period of the Noncom liance-The noncompliance was caused by fouled electrodes on air ejector system.This caused the ejectors to stop operating resulting in a backup of sewage that overflowed from manholes to the yard drainage system.This discharge lasted for approximately 20 minutes with an estimated 750 gallons being discharged.

Ste s Taken to Reduce Eliminate and Prevent Recurrence of the Noncom liance-The station was operated manually to stop the discharge.

The two electrodes in the system were pulled and serviced.On October 10, 1987, a request to increase the preventative maintenance frequency to once per month was submitted.

Descri tion of Dischar e-Discharge Serial Number 107 (Unit 3 Control Building Drain)-On September 30, 1987, the discharge from DSN 107 had an oil and grease concentration of 23 mg/L exceeding the maximum permit limit of 20 mg/L.Cause and Period of the Noncom liance-A mathematical error, undetected until preparation of the Discharge Monitoring Report, indicated the oil and grease concentration was within permit limits.This resulted in no investigation of noncompliance and no immediate followup sampling.In routine samples on October 7, 1987 the oil and grease concentration was<5 mg/L and the suspended solids concentration was 2 mg/L.Ste s Taken to Reduce Eliminate and Prevent Recurrence of the Noncom liance-Normal procedure following a noncomplying sample is to resample.If the second sample is also out of limits, the sump discharge is discontinued.

The person responsible for the error has been instructed in the proper calcuation method.

4 C