ML18163A400: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 06/12/2018
| issue date = 06/12/2018
| title = NRC Staff Hearing File Update 7
| title = NRC Staff Hearing File Update 7
| author name = Hove A N
| author name = Hove A
| author affiliation = NRC/OGC
| author affiliation = NRC/OGC
| addressee name = Abreu S H, Arnold G S, Ryerson P S
| addressee name = Abreu S, Arnold G, Ryerson P
| addressee affiliation = NRC/ASLBP
| addressee affiliation = NRC/ASLBP
| docket = 05200047
| docket = 05200047

Revision as of 02:59, 17 June 2019

NRC Staff Hearing File Update 7
ML18163A400
Person / Time
Site: Clinch River
Issue date: 06/12/2018
From: Hove A
NRC/OGC
To: Sue Abreu, Gary Arnold, Paul Ryerson
Atomic Safety and Licensing Board Panel
SECY RAS
References
52-047-ESP, ASLBP 17-954-01-ESP-BD01, RAS 54328
Download: ML18163A400 (6)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, DC 20555

- 0001 June 12, 2018 Administrative Judge Paul S. Ryerson, Chair Atomic Safety and Licensing Board Panel Mail Stop T

-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555

-0001 Administrative Judge Dr. Gary S. Arnold Atomic Safety and Licensing Board Panel Mail Stop T

-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555

-0001 Administrative Judge Dr. Sue H. Abreu Atomic Safety and Licensing Board Panel Mail Stop T

-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 In the Matter of TENNESSEE VALLEY AUTHORITY (Clinch River Nuclear Site Early Site Permit Application) Docket No. 52

-047-ESP

Dear Administrative Judges:

Pursuant to the Atomic Safety and Licensing Board's "Initial Scheduling Order," dated December 7, 2017, the staff of the U.S. Nuclear Regulatory Commission ("Staff") herein notifies the Licensing Board and the parties that the hearing file has been provided for this proceeding. This is the NRC staff's seventh hearing file and mandatory disclosures update. Materials in the hearing file may be accessed through the Agencywide Documents Access and Management System ("ADAMS").

An index containing the ADAMS accession number, date, and title or description of each item in the initial disclosure is appended hereto as Attachment 1.

On or about June 22, 2018, the documents identified in the hearing file may be accessed through ADAMS or through the Electronic Hearing Docket ("EHD"), which may be accessed at https://adams.nrc.gov/ehd/. The hearing file will be contained in the "Staff Discovery Materials" tab of the EHD, in a sub

-folder entitled, "Clinch River Hearing Fil e, Update 7" in the "Clinch River Nuclear Site ESP" folder. Any party who seeks access to a document listed in the NRC staff hearing file index prior to it populating the publicly available folder may contact NRC staff counsel.

Judge Ryerson June 12 , 2018 Judge Arnold Judge Abreu Further, pursuant to 10 C.F.R. § 2.336(c), attached is the Affidavit of Allen Fetter, certifying that all relevant materials required by this section have been disclosed, and that the disclosures are accurate and complete as to document s i dentified by June 8 , 2018. Finally, the NRC Staff notes that it has made a good faith effort to identify and characterize all documents meeting the criteria of 10 C.F.R. § 2.336(b), as modified by the "Agreement of the Parties Regarding Mandatory Discovery Disclosures," dated November 8, 2017, and 10 C.F.R.

§ 2.1203 in this proceeding. In identifying these documents, the Staff does not concede their relevance to the issues to be decided in this proceeding.

Sincerely, /Signed (electronically) by/

Ann Hove Counsel for NRC Staff

Enclosures:

Attachment 1

- Hearing File Index, Update 7 Affidavit of Allen Fetter cc w/Encls.: Service List

- Clinch River Nuclear Site ESP Hearing File Index Update 7

- June 12 , 2018 ID# Accession Number Document Date Title 07-001 ML18159A214 05/04/2018 2018/05/04 Clinch River ESP

- [External_Sender] CNL 076 CRN Update to SSAR Section 17.5, Quality Assurance.07-002 ML18124A116 05/04/2018 Update to Site Safety Analysis Report Section 17.5, "Quality Assurance," in Support of Early Site Permit Application for Clinch River Nuclear Site.07-003 ML18159A236 05/08/2018 2018/05/08 Clinch River ESP

- [External_Sender] NRC Environmental CRN Visit.07-004 ML18159A238 05/08/2018 2018/05/08 Clinch River ESP

- [External_Sender] RE: Emailing: Draft ACRS Agenda_Clinch River ESP 20180515.docx.07-005 ML18159A240 05/08/2018 2018/05/08 Clinch River ESP

- Emailing: Draft ACRS Agenda_Clinch River ESP_20180515.docx.07-006 ML18159A235 05/10/2018 2018/05/10 Clinch River ESP

- Designated Federal Official for ACRS meetings: Quynh Nguyen, email: Quynh.Nguyen@nrc.gov (EOM).07-007 ML18159A228 05/11/2018 2018/05/11 Clinch River ESP

- [External_Sender] Slide Deck for TVA ACRS Presentation on May

15.07-008 ML18129A169 05/15/2018 May 15, 2018

- Presentation to the Advisory Committee on Reactor Safeguards Subcommittee: Safety Review of the Clinch River Nuclear Site Early Site Permit, SSAR Section 15.0.3, Accident Analysis.07-009 ML18129A167 05/15/2018 May 15, 2018 - Presentation to the Advisory Committee on Reactor Safeguards Subcommittee: Safety Review of the Clinch River Nuclear Site Early Site Permit, SSAR Section 2.1 and 2.2 Demography/Geography/Site Hazards.07-010 ML18129A168 05/15/2018 May 15, 2018

- Presentation to the Advisory Committee on Reactor Safeguards Subcommittee: Safety Review of the Clinch River Nuclear Site Early Site Permit, SSAR Section 3.5.1.6, Aircraft Hazards.07-011 ML18159A232 05/18/2018 2018/05/18 Clinch River ESP

- [External_Sender] RE: Change in site visit attendees

- Phillip Meyer in Tamsen Dozier's place.07-012 ML18159A233 05/18/2018 2018/05/18 Clinch River ESP

- Change in site visit attendees

- Phillip Meyer in Tamsen Dozier's place.07-013 ML18159A408 05/22/2018 2018/05/22 Clinch River ESP

- Clinch River Audit Summary of Part 6 Exemptions and Departures Emergency Planning.07-014 ML18122A344 05/22/2018 Summary Report For The Regulatory Audit Of Clinch River Nuclear Early Site Permit Application Part 6 Exemptions And Departures, Emergency Planning Exemptions.07-015 ML18159A417 05/24/2018 "2018/05/24 Clinch River ESP

- [External_Sender] RE: RE: RE: Consultation pursuant to 10 C.F.R.07-016 ML18159A231 05/29/2018 2018/05/29 Clinch River ESP

- [External_Sender] June 6 NRC Clinch River Site Visit.07-017 ML18159A220 05/29/2018 2018/05/29 Clinch River ESP

- [External_Sender] RE: NRC Inspection April 16

- April 20 2018.07-018 ML18159A414 05/30/2018 2018/05/30 Clinch River ESP

- [External_Sender] Re: Consultation re: Clinch River.07-019 ML18159A218 05/31/2018 2018/05/31 Clinch River ESP

- RE: June 6 NRC Clinch River Site Visit.07-020 ML18143B478 06/01/2018 Inspection Report for Quality Assurance Implementation of Clinch River Nuclear Site Early Site Permit Application.07-021 ML18158A183 06/05/2018 Comment (10) of David LeClear on Early Site Permit Application: Tennessee Valley Authority; ID# Accession Number Document Date Title Clinch River Nuclear Site.07-022 ML18152A867 06/05/2018 Handouts for the 5 Jun 2018 Public Meeting to Discuss the Draft Environmental Impact Statement for an Early Site Permit at the Clinch River Nuclear Site.07-023 ML18162A194 06/08/2018 2018/06/08 Clinch River ESP

- [External_Sender] RE: Clinch River.

June 12, 2018 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of ) ) TENNESSEE VALLEY AUTHORITY ) Docket Nos.

52-047-ESP ) (Clinch River Nuclear Site) ) AFFIDAVIT OF ALLEN FETTER CONCERNING MANDATORY DISCLOSURE REQUIREMENT OF 10 C.F.R. § 2.336(b)

I, Allen Fetter, do hereby state as follows:

1. I am employed as a Senior Project Manager in the U.S. Nuclear Regulatory Commission's (NRC) Office of New Reactors. I currently serve as a project manager for the Clinch River Nuclear Site Early Site Permit ("ESP") Application review. 2. I hereby certify that all relevant materials required to be disclosed pursuant to 10 C.F.R. §§ 2.336 (b) and (c) and 2.1203(a)(1) in the captioned proceeding have been disclosed, and that the disclosures are accurate and complete for documents identified as of June 8 , 2018. 3. I declare under penalty of perjury that the foregoing is true and correct to the best of my knowledge, information and belief. Executed in Accord with 10 CFR 2.304(d)

Allen Fetter U.S. Nuclear Regulatory Commission Senior Project Manager, Office of New Reactors (301) 415-8556 Allen.Fetter@nrc.gov Washington, DC 20555

-0001 Date signed: June 12, 2018 Executed in Kirkland , Washington this 12th day of June, 2018 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of ) ) TENNESSEE VALLEY AUTHORITY ) Docket Nos.

52-047-ESP ) (Clinch River Nuclear Site) ) CERTIFICATE OF SERVICE I hereby certify that copies of the foregoing Letter to the Atomic Safety and Licensing Board regarding the Clinch River Nuclear Site Hearing File Update 7, including: Attachment 1

- Clinch River Nuclear Site ESP Hearing File Index, NRC Staff Disclosure

- Update 7; and Affida vit of Allen Fetter, dated June 12, 2018, in the above

-captioned proceeding have been served upon the Electronic Information Exchange, the NRC's E-Filing System, this 12th day of June , 2018. /Signed (electronically) by/

Ann Hove Counsel for NRC Staff U.S. Nuclear Regulatory Commission Office of the General Counsel Mail Stop

- O-14 A44 Washington, DC 20555 Telephone:

(301) 415-0963 E-mail: Ann.Hove@nrc.gov Date of signature: June 12 , 2018