Clinch River ESP - (External_Sender) June 6 NRC Clinch River Site Visit
ML18159A231
Person / Time
Site: Clinch River
Issue date: 05/29/2018
From:
- No Known Affiliation
To:
References
+reviewed
Download: ML18159A231 (3)


Text

ClinchRiverESPHFNPEm Resource From: Casey, Kevin E <kecasey@tva.gov>

Sent: Tuesday, May 29, 2018 2:16 PM To: Kratchman, Jessica; Kugler, Andrew; 'olivier.lareynie@asn.fr'; 'philip.meyer@pnnl.gov';

Mikula, Olivia; Rankin, Jennivine; Wright, Megan Cc: Fetter, Allen; Sutton, Mallecia; Dozier, Tamsen; Schiele, Raymond Joseph; Stout, Daniel Paul; Brellenthin, John B

Subject:

[External_Sender] June 6 NRC Clinch River Site Visit Attachments: NRC Environmental Visit Itinerary 05-23-18.pdf

All, Attached is the itinerary for the June 6 NRC Environmental Visit to TVAs Clinch River Site. We will meet at the Melton Hill Dam parking lot closest to the dam at 0800 to begin the tour. As noted, the tour will include observation of Alternate Site 8 from the Melton Hill Dam overlook, drive through Alternate Site 2 and the potential barge landing area, and then begin a tour of the Clinch River Site with stops as noted on the itinerary. The itinerary is only a guide and can be adjusted as needed and/or as discussions or weather dictate. It is our understanding Mr. Meyer will join us at the CRN site around 1000.

Please wear sturdy hiking boots/shoes, long pants, and a long sleeve shirt and hat are recommended. Hardhats are not required for this visit. A safety briefing and pre-job brief will be held at the Melton Hill dam.

The Melton Hill Dam is located off Interstate 40 West from Knoxville, exiting at state road 95 North, exit 364. Proceed north on 95 about 1.5 miles and turn right onto Woodlawn Road (at the Melton Hill Dam sign) prior to crossing the Clinch River bridge. The parking lot to meet in is the second lot on the left.

If you have any questions prior to the visit, please pass them through Allen Fetter. If you have any questions on the day of the visit, my cell number is included below.

Kevin E. Casey SMR Project - Licensing Tennessee Valley Authority 1101 Market Street Chattanooga, TN 37402 423-751-3642(w) 423-774-6548(c) kecasey@tva.gov 1

Hearing Identifier: ClinchRiver_ESP_HF_NonPublic Email Number: 528 Mail Envelope Properties (788aace8aa3f4527ad4536f03fc6483e)

Subject:

[External_Sender] June 6 NRC Clinch River Site Visit Sent Date: 5/29/2018 2:16:09 PM Received Date: 5/29/2018 2:16:39 PM From: Casey, Kevin E Created By: kecasey@tva.gov Recipients:

"Fetter, Allen" <Allen.Fetter@nrc.gov>

Tracking Status: None "Sutton, Mallecia" <Mallecia.Sutton@nrc.gov>

Tracking Status: None "Dozier, Tamsen" <Tamsen.Dozier@nrc.gov>

Tracking Status: None "Schiele, Raymond Joseph" <rjschiele@tva.gov>

Tracking Status: None "Stout, Daniel Paul" <dpstout@tva.gov>

Tracking Status: None "Brellenthin, John B" <jbbrellenthin@tva.gov>

Tracking Status: None "Kratchman, Jessica" <Jessica.Kratchman@nrc.gov>

Tracking Status: None "Kugler, Andrew" <Andrew.Kugler@nrc.gov>

Tracking Status: None

"'olivier.lareynie@asn.fr'" <olivier.lareynie@asn.fr>

Tracking Status: None

"'philip.meyer@pnnl.gov'" <philip.meyer@pnnl.gov>

Tracking Status: None "Mikula, Olivia" <Olivia.Mikula@nrc.gov>

Tracking Status: None "Rankin, Jennivine" <Jennivine.Rankin@nrc.gov>

Tracking Status: None "Wright, Megan" <Megan.Wright@nrc.gov>

Tracking Status: None Post Office: tva.gov Files Size Date & Time MESSAGE 1539 5/29/2018 2:16:39 PM NRC Environmental Visit Itinerary 05-23-18.pdf 15653 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received:

Itinerary TIME ACTIVITY COMMENT 0800 Meet at Melton Hill Dam Parking Lot x Safety briefing x Transfer to tour vehicles 0815 - 0900 Drive to overlook, observe and discuss Alternate Site 8 0900- 0915 Drive to Alternate Site 2 x Meet ORR Escort, Ernest Ryan 0915 - 1000 Observe and discuss Alternate Site 2 1000 - 1200 CRN Site Tour - stops include: x Break x Rail Spur x Barge Landing Area x Propose Discharge Location x Big Hole x Run-off Holding Ponds 1200 - 1300 Lunch x Lunch provided x CRN Trailer x ESPA Overview Presentation 1300 - 1400 Continue CRN Site Tour - stops include: x Transfer to 4-WD Trucks x Former Met Tower Location x Proposed Intake Pumping Station Location 1400 - 1500 Reconvene at CRN Trailers x Break x Final questions x Debrief 1500 - 1600 Adjourn x Stop at Aquifer Pump Test Location on exit x Return to cars and hotel/airport DRAFT - 05/23/2018 - DRAFT Page l 3