ML18072A403

From kanterella
Jump to navigation Jump to search
NRC Staff Hearing File Update 4 and Schedule Update Information
ML18072A403
Person / Time
Site: Clinch River
Issue date: 03/13/2018
From: Hove A
NRC/OGC
To: Sue Abreu, Gary Arnold, Paul Ryerson
Atomic Safety and Licensing Board Panel
SECY RAS
References
52-047-ESP, ASLBP 17-954-01-ESP-BD01, RAS 54244
Download: ML18072A403 (6)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, DC 20555 - 0001 March 13, 2018 Administrative Judge Administrative Judge Paul S. Ryerson, Chair Dr. Sue H. Abreu Atomic Safety and Licensing Board Panel Atomic Safety and Licensing Board Panel Mail Stop T-3 F23 Mail Stop T-3 F23 U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Washington, DC 20555-0001 Administrative Judge Dr. Gary S. Arnold Atomic Safety and Licensing Board Panel Mail Stop T-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 In the Matter of TENNESSEE VALLEY AUTHORITY (Clinch River Nuclear Site Early Site Permit Application)

Docket No. 52-047-ESP

Dear Administrative Judges:

Pursuant to the Atomic Safety and Licensing Boards Initial Scheduling Order, dated December 7, 2017, the staff of the U.S. Nuclear Regulatory Commission (Staff) herein notifies the Licensing Board and the parties that the hearing file has been updated for this proceeding.

Also, the Staff herein notifies the Board of new information regarding the planned publication date for the draft environmental impact statement (DEIS).

This is the NRC staffs fourth hearing file and mandatory disclosures update. Materials in the hearing file may be accessed through the Agencywide Documents Access and Management System (ADAMS). An index containing the ADAMS accession number, date, and title or description of each item in the update is appended hereto as Attachment 1.

On or about March 23, 2018, the documents identified in the hearing file may be accessed through ADAMS or through the Electronic Hearing Docket (EHD), which may be accessed at https://adams.nrc.gov/ehd/. The hearing file update will be contained in the Staff Discovery Materials tab of the EHD, in a sub-folder entitled, Clinch River Hearing File, Update 4 in the Clinch River Nuclear Site ESP" folder. Any party who seeks access to a document listed in the NRC staff hearing file index prior to it populating the publicly available folder may contact NRC staff counsel.

Judge Ryerson March 13, 2018 Judge Arnold Judge Abreu Further, pursuant to 10 C.F.R. § 2.336(c), attached is the Affidavit of Allen Fetter, certifying that all relevant materials required by this section have been disclosed, and that the disclosures are accurate and complete as to documents identified by March 8, 2018.

The NRC Staff notes that it has made a good faith effort to identify and characterize all documents meeting the criteria of 10 C.F.R. § 2.336(b), as modified by the Agreement of the Parties Regarding Mandatory Discovery Disclosures, dated November 8, 2017, and 10 C.F.R.

§ 2.1203 in this proceeding. In identifying these documents, the Staff does not concede their relevance to the issues to be decided in this proceeding.

Finally, the Staff would like to inform the Board that the Staff anticipates publishing the DEIS earlier than it initially expected. The Staff currently expects to publish the DEIS in the mid-April to early-May 2018 time frame, and will have more definitive information regarding a precise date by the time of the next hearing file update to the Board.

Sincerely,

/Signed (electronically) by/

Ann Hove Counsel for NRC Staff

Enclosures:

Attachment 1 - Hearing File Index, Update 4 Affidavit of Allen Fetter cc w/Encls.: Service List

Attachment 1 - Clinch River Nuclear Site ESP Hearing File Index Update 4 - March 13, 2018 Accession Document ID# Title Number Date 04-001 Supplemental Information Related to Environmental Report Figures in Support of Early Site Permit ML18010A067 09/05/2017 Application for Clinch River Nuclear Site.04-002 Meeting between the U.S. Nuclear Regulatory Commission (NRC) and Tennessee Valley Authority ML17352A028 01/08/2018 (TVA) to Discuss Topics Associated With TVA's Early Site Permit Application for the Clinch River Nuclear Site [Cultural Resources and Transportation].04-003 ML17226A023 01/09/2018 Clinch River Nuclear Site ESP, Summary Report for the Full Scope Environmental Audit.04-004 11/13/17 Summary of Meeting between the U.S. Nuclear Regulatory Commission (NRC) and ML18010A322 01/16/2018 Tennessee Valley Authority (TVA) to Discuss Topics Associated With TVA's ESP Application for the Clinch River Nuclear Site [References for the DEIS and Safety Hydrology]

04-005 Minutes of the Advisory Committee on Reactor Safeguards Regulatory Policies and Practices ML18019A843 01/17/2018 Subcommittee Meeting - November 15, 2017.04-006 ML18023A205 01/23/2018 NRC-2007 - TN5141--NRC 2007 NUREG 1555 ESRP.04-007 Submittal of Environmental Report References in Support of Early Site Permit Application for Clinch ML18036A346 01/25/2018 River Nuclear Site.04-008 ML18064A196 02/07/2018 2018/02/07 Clinch River ESP - RE: FW: Updated Schedule for Alan 04-009 ML18064A210 02/07/2018 2018/02/07 Clinch River ESP - [External_Sender] FW: Updated Schedule for Alan 04-010 2018/02/09 Clinch River ESP - Draft RAI pertaining to Section 17.5, Quality Assurance Program ML18064A205 02/09/2018 Description (RAI Number 12, eRAI-8798)04-011 ML18064A206 02/12/2018 2018/02/12 Clinch River ESP - Re: [External_Sender] DRAFT NRC ACRS Review Schedule 04-012 2018/02/12 Clinch River ESP - Re: [External_Sender] RE: [External_Sender] DRAFT NRC ACRS ML18064A213 02/12/2018 Review Schedule 04-013 2018/02/12 Clinch River ESP - [External_Sender] RE: [External_Sender] DRAFT NRC ACRS ML18064A212 02/12/2018 Review Schedule 04-014 ML18064A215 02/12/2018 2018/02/12 Clinch River ESP - [External_Sender] DRAFT NRC ACRS Review Schedule 04-015 ML18064A055 02/13/2018 2018/02/13 Clinch River ESP - Clinch River: Met Question on Vector WD and Scalar WS04-016 2018/02/14 Clinch River ESP - [External_Sender] FW: Clinch River: Met Question on Vector WD ML18064A056 02/14/2018 and Scalar WS04-017 Replacement Pages for Response to Request for Additional Information Related to Emergency ML18052A085 02/20/2018 Planning Exemption Requests in Support of Early Site Permit Application for Clinch River Nuclear Site.04-018 2018/02/21 Clinch River ESP - [External_Sender] CNL-18-019 CRN Replacement Pages for RAI ML18064A219 02/21/2018 Related to EP Expemtion Requests04-019 2018/02/23 Clinch River ESP - Revised draft RAI pertaining to Section 17.5, Quality Assurance ML18064A217 02/23/2018 Program Description (RAI Number 12, eRAI-8798)

Accession Document ID# Title Number Date 04-020 2018/02/26 Clinch River ESP - [External_Sender] RE: TVA - NRC Clinch River ESPA Weekly ML18064A218 02/26/2018 Telecon 04-021 2018/02/26 Clinch River ESP - addendum to: Clinch River: Met Question on Vector WD and Scalar ML18064A053 02/26/2018 WS04-022 2018/03/05 Clinch River ESP - FW: CNL-18-019 CRN Replacement Pages for RAI Related to EP ML18064A220 03/05/2018 Expemtion Requests

March 13, 2018 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )

)

TENNESSEE VALLEY AUTHORITY ) Docket Nos. 52-047-ESP

)

(Clinch River Nuclear Site) )

AFFIDAVIT OF ALLEN FETTER CONCERNING MANDATORY DISCLOSURE REQUIREMENT OF 10 C.F.R. § 2.336(b)

I, Allen Fetter, do hereby state as follows:

1. I am employed as a Senior Project Manager in the U.S. Nuclear Regulatory Commissions (NRC) Office of New Reactors. I currently serve as a project manager for the Clinch River Nuclear Site Early Site Permit (ESP) Application review.
2. I hereby certify that all relevant materials required to be disclosed pursuant to 10 C.F.R. §§ 2.336 (b) and (c) and 2.1203(a)(1) in the captioned proceeding have been disclosed, and that the disclosures are accurate and complete for documents identified as of March 8, 2018.
3. I declare under penalty of perjury that the foregoing is true and correct to the best of my knowledge, information and belief.

Executed in Accord with 10 CFR 2.304(d)

Allen Fetter U.S. Nuclear Regulatory Commission Senior Project Manager, Office of New Reactors (301) 415-8556 Allen.Fetter@nrc.gov Washington, DC 20555-0001 Date signed: March 13, 2018 Executed in Rockville, Maryland this 13th day of March, 2018

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )

)

TENNESSEE VALLEY AUTHORITY ) Docket Nos. 52-047-ESP

)

(Clinch River Nuclear Site) )

CERTIFICATE OF SERVICE I hereby certify that copies of the foregoing Letter to the Atomic Safety and Licensing Board regarding the Clinch River Nuclear Site Hearing File Update 4, including: Attachment 1 -

Clinch River Nuclear Site ESP Hearing File Index, NRC Staff Disclosure - Update 4; and Affidavit of Allen Fetter, dated March 13, 2018, in the above-captioned proceeding have been served upon the Electronic Information Exchange, the NRCs E-Filing System, this 13th day of March, 2018.

/Signed (electronically) by/

Ann Hove Counsel for the NRC Staff U.S. Nuclear Regulatory Commission Office of the General Counsel Mail Stop - O-14 A44 Washington, DC 20555 Telephone: (310) 415-0963 E-mail: Ann.Hove@nrc.gov Date of signature: March 13, 2018