ML16200A091: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 320: | Line 320: | ||
T th sand mat e n sed site co m W R plant co moff of High w a nd north o f e r Genoa N o a nd area di r rating statio n LACBWR pl a nd area sou t arcel of lan dOverview (F is bordered o ppi River a n f Engineers (is border e y 35. A B y 35, carries y do not use ppi River N a s from LA C brook tro u e s south of t hite Descrip t c tion provi d i ssioning an d as the confi g n d open la n 2 0.1402. | T th sand mat e n sed site co m W R plant co moff of High w a nd north o f e r Genoa N o a nd area di r rating statio n LACBWR pl a nd area sou t arcel of lan dOverview (F is bordered o ppi River a n f Engineers (is border e y 35. A B y 35, carries y do not use ppi River N a s from LA C brook tro u e s south of t hite Descrip t c tion provi d i ssioning an d as the confi g n d open la n 2 0.1402. | ||
ommissioni n s, structures s above a d e ved from b a o rs in the "s: W ater Reacto r Plan at mile 678. | ommissioni n s, structures s above a d e ved from b a o rs in the "s: W ater Reacto r Plan at mile 678. | ||
6 g is approxi nly rail roa d e an Sea Le v T he covered e rial dredge d m prises a to m prising onl y way 35. Ot h f the LACB W o. 1 Station (r ectly south n (Genoa N ant, t h of G-3, w d to the east o F igure 8-2) i o n the nort h nd Highway (USACE) R o e d on the w B urlington N commercia lthis rail lin a tional Wil d CBWR, is t u t and sturg h e LACBW R t ion After U d es a sum m d site closu r g uration of t nd areas at n g of the Cl aand comp o e pth of 3 fe e asements lo c"En d-State."r 6 on the Mimately 300 | 6 g is approxi nly rail roa d e an Sea Le v T he covered e rial dredge d m prises a to m prising onl y way 35. Ot h f the LACB W o. 1 Station (r ectly south n (Genoa N ant, t h of G-3, w d to the east o F igure 8-2) i o n the nort h nd Highway (USACE) R o e d on the w B urlington N commercia lthis rail lin a tional Wil d CBWR, is t u t and sturg h e LACBW R t ion After U d es a sum m d site closu r g uration of t nd areas at n g of the Cl aand comp o e pth of 3 fe e asements lo c"En d-State."r 6 on the Mimately 300 | ||
: d. The Rea c v el (AMS Lland consis t d from the M t al of 163.5 y 1.5 acres. | : d. The Rea c v el (AMS Lland consis t d from the M t al of 163.5 y 1.5 acres. | ||
her promine n WR plant, w (G-1) coal (a of LACB W No. 3 Fossil S where the IS F o f Highway illustrates th h by the Mis s 35. The U | her promine n WR plant, w (G-1) coal (a of LACB W No. 3 Fossil S where the IS F o f Highway illustrates th h by the Mis s 35. The U | ||
Line 353: | Line 353: | ||
arding majo r ts, no sign i d. Subseq u garding the n t Descripti o ion 8.2. Th ealley, with t w enty-seven r ial dredge d nding at ele veast and th rimarily of f s containing a tely 130 fe e e y (ACS) r e cities and V e e noa, locate d for La Cros r non Count y i River, inc w Albin, I A rtion of Ve r 3.5 acres, it ine to the e site include s owned an d A CBWR fa c t he site. A n e et of any L A s used for r e p traffic (e.g | arding majo r ts, no sign i d. Subseq u garding the n t Descripti o ion 8.2. Th ealley, with t w enty-seven r ial dredge d nding at ele veast and th rimarily of f s containing a tely 130 fe e e y (ACS) r e cities and V e e noa, locate d for La Cros r non Count y i River, inc w Albin, I A rtion of Ve r 3.5 acres, it ine to the e site include s owned an d A CBWR fa c t he site. A n e et of any L A s used for r e p traffic (e.g | ||
.). There is There is a pr decommis ificant impa uent section s environm e o n e 163.5 acre t he Reactor acres of the d from the M vations ran g h e riprap on fill material s higher perc e t below gro u e port (11) p r e rnon Count y d 1 mile no rse, the large | .). There is There is a pr decommis ificant impa uent section s environm e o n e 163.5 acre t he Reactor acres of the d from the M vations ran g h e riprap on fill material s higher perc e t below gro u e port (11) p r e rnon Count y d 1 mile no rse, the large | ||
: y. There a rluding Ren o A (populat i r non Count yis relativel y e ast, USAC E s G-3, a co a d operated b y cilities. Th e n elementary A CBWR st r e creational | : y. There a rluding Ren o A (populat i r non Count yis relativel y e ast, USAC E s G-3, a co a d operated b y cilities. Th e n elementary A CBWR st r e creational | ||
: p. barges of c a public bo p ortion (Po o sioning acti v cts b eyond s in this c h e ntal effec t e site is loca t Building l o site were f o M ississippi R ging from 6the shore o s (fine sandentages of c u nd surface rovides the | : p. barges of c a public bo p ortion (Po o sioning acti v cts b eyond s in this c h e ntal effec t e site is loca t Building l o site were f o M ississippi R ging from 6the shore o s (fine sandentages of c u nd surface rovides the | ||
: y. The esti m rth of LAC Bst Wisconsi n r e also num o township, ion 513), l o y on the east y isolated a s E property t a l-fired 379 M y Dairyland e closest to w school is l o r ucture. p urposes (b o c oal are deli vat landing o o l 9) of the U v ities those hapter t s of ted in ocated o rmed River. 36 to of the s and c oarse (10). most m ated B WR; n city erous MN o cated bank s it is t o the M We (12). w n is o cated oating v ered o n the U pper La Cros s License T Revisio n Mississi p for hunt i Genoa Nmile 679 long loc k public a c through Highwa y No. 8. 8.5.2.C The cli m continen triver val l Lock an d of the i nfrom 60 winter m the aver a summer s The ave r range fr o month f o The blu ff winds a t monthly experien c tornado oF3 (max icenter in j 8.5.3.T 8.5.3.1.The site i dissecte d varies b e river lev e Highwa y Prior to c lying w e dredged to const r s e Boiling W Termination n 0 ppi River N a i ng, fishing N ational Fis h.2, is appro x k and dam s ccess to an oNovembe r. y 35 approx i Climate m ate at the L tal climate w l ey location d Dam No. 8 nformation f to 90 o F d u m onths of D e age temper a s eason (15). | : y. The esti m rth of LAC Bst Wisconsi n r e also num o township, ion 513), l o y on the east y isolated a s E property t a l-fired 379 M y Dairyland e closest to w school is l o r ucture. p urposes (b o c oal are deli vat landing o o l 9) of the U v ities those hapter t s of ted in ocated o rmed River. 36 to of the s and c oarse (10). most m ated B WR; n city erous MN o cated bank s it is t o the M We (12). w n is o cated oating v ered o n the U pper La Cros s License T Revisio n Mississi p for hunt i Genoa Nmile 679 long loc k public a c through Highwa y No. 8. 8.5.2.C The cli m continen triver val l Lock an d of the i nfrom 60 winter m the aver a summer s The ave r range fr o month f o The blu ff winds a t monthly experien c tornado oF3 (max icenter in j 8.5.3.T 8.5.3.1.The site i dissecte d varies b e river lev e Highwa y Prior to c lying w e dredged to const r s e Boiling W Termination n 0 ppi River N a i ng, fishing N ational Fis h.2, is appro x k and dam s ccess to an oNovembe r. y 35 approx i Climate m ate at the L tal climate w l ey location d Dam No. 8 nformation f to 90 o F d u m onths of D e age temper a s eason (15). | ||
r age annual r om 3 to 5 in c or the remai n f s of the Mi s t the site w h average w i ced tornado s o ccurred 27 imum wind j ured one p e T opo g raph y Topo g i s located w d uplands. | r age annual r om 3 to 5 in c or the remai n f s of the Mi s t the site w h average w i ced tornado s o ccurred 27 imum wind j ured one p e T opo g raph y Topo g i s located w d uplands. | ||
F e tween 21/2 a e l. The LA C y 35. Figure constructio ntlands. Th esands from t r uction, the a W ater Reacto r Plan ational Wild l and recreati h Hatchery.x imately 0. | F e tween 21/2 a e l. The LA C y 35. Figure constructio ntlands. Th esands from t r uction, the a W ater Reacto r Plan ational Wild l and recreati h Hatchery.x imately 0. | ||
6 s tructure ow o bservation The Stat e imately 1/2 m L a Crosse r with cold w iof the site. | 6 s tructure ow o bservation The Stat e imately 1/2 m L a Crosse r with cold w iof the site. | ||
8 site with a f or the past uring the m o e cembe r 20 1ture is appr rainfall is 3 5 ches per mo n n der of the y s sissippi Ri v h ere the va ind speeds | 8 site with a f or the past uring the m o e cembe r 20 1ture is appr rainfall is 3 5 ches per mo n n der of the y s sissippi Ri v h ere the va ind speeds | ||
: s. On Apri l.4 miles aw a speeds 158-e rson and ca u , Geolo gy a n g raphy ithin the Mi F rom La Cro and 41/2 mile C BWR site i 8-4 provid e n of the LA C e property g r t he Mississi p area was gr a r life & Fish R onal activit | : s. On Apri l.4 miles aw a speeds 158-e rson and ca u , Geolo gy a n g raphy ithin the Mi F rom La Cro and 41/2 mile C BWR site i 8-4 provid e n of the LA C e property g r t he Mississi p area was gr a r life & Fish R onal activit | ||
: i. Lock an d 6 miles nort h n ed and op eplatfor m , o p e of Wisco n m ile north o r egion of W i nters and h o The USA C a rchived we a year (May onths of Ju n 1 4 to Febru aoximately 2 5.2 inches. | : i. Lock an d 6 miles nort h n ed and op eplatfor m , o p e of Wisco n m ile north o r egion of W i nters and h o The USA C a rchived we a year (May onths of Ju n 1 4 to Febru aoximately 2 5.2 inches. | ||
Line 365: | Line 365: | ||
is located b e e s a Topogr a CBWR faci l rade was th e ppi River. | is located b e e s a Topogr a CBWR faci l rade was th e ppi River. | ||
D a ded to a re l 8-7 R efuge just s i es (13). Fu r d Dam No.h of the sit e e rated by th e pen from d a n sin also m of the LAC B W isconsin a n o t summers CE maintain s ather infor m 2014 to M a n e through A ary 2015. | D a ded to a re l 8-7 R efuge just s i es (13). Fu r d Dam No.h of the sit e e rated by th e pen from d a n sin also m of the LAC B W isconsin a n o t summers CE maintain s ather infor m 2014 to M a n e through A ary 2015. | ||
C 2 0 o F in the M onthly pre c p ring and su m hannel the w o rth-south a y 6 to 10 m a category F 4 Genoa vill a o rnado that o e n $500,000 ogy ver Valley, w e du Chien, The valley etween two v a phy Map o f lity, the site en increase d D uring grad e l atively flat s outh of the rther south a 8, located | C 2 0 o F in the M onthly pre c p ring and su m hannel the w o rth-south a y 6 to 10 m a category F 4 Genoa vill a o rnado that o e n $500,000 ogy ver Valley, w e du Chien, The valley etween two v a phy Map o f lity, the site en increase d D uring grad e l atively flat s outh of the rther south a 8, located | ||
: e. The da m e USACE (awn to dus k m aintains a BWR site, a nd at the L A and extre m s an active w mation for th e ay 2015) in d A ugust 201 4 C ity data co mwinter mo n cipitation a v m mer seaso n w inds at the L are from th e m ph. The 4 (maximu m a ge center. | : e. The da m e USACE (awn to dus k m aintains a BWR site, a nd at the L A and extre m s an active w mation for th e ay 2015) in d A ugust 201 4 C ity data co mwinter mo n cipitation a v m mer seaso n w inds at the L are from th e m ph. The 4 (maximu m a ge center. | ||
o ccurred 6. | o ccurred 6. | ||
Line 386: | Line 386: | ||
"uire site-sp e c ts as repor t activities a r are identifie d nmental iss u nal judgme ble impact o k ely, existin g impact can n s eriously da m n clusion ide n by the NU R l power pla n t assessme nthis proces s vities speci f a t the v ity in within nd the areas y that e t/day BWR roach s ue is e ," or b y the " e cific ted in r e not d. u e are nt to on the g and n ot be m age ntifies R EG-n t and nt for s is to fic to La Cros s License T Revisio n LACB Widentifie d evaluati oOffs i 35 y eAqu a sensi tTerr e of se nThre a threa tEnvi r 35 y eCult u histo r 8.6.2.R 8.6.2.1.During d in accor d of the R a exposur e 2,000 m r also be mprogram Radiatio nmaterial s In Augu s of the st a 1994 wi t allowed levels at | "uire site-sp e c ts as repor t activities a r are identifie d nmental iss u nal judgme ble impact o k ely, existin g impact can n s eriously da m n clusion ide n by the NU R l power pla n t assessme nthis proces s vities speci f a t the v ity in within nd the areas y that e t/day BWR roach s ue is e ," or b y the " e cific ted in r e not d. u e are nt to on the g and n ot be m age ntifies R EG-n t and nt for s is to fic to La Cros s License T Revisio n LACB Widentifie d evaluati oOffs i 35 y eAqu a sensi tTerr e of se nThre a threa tEnvi r 35 y eCult u histo r 8.6.2.R 8.6.2.1.During d in accor d of the R a exposur e 2,000 m r also be mprogram Radiatio nmaterial s In Augu s of the st a 1994 wi t allowed levels at | ||
Protecti o exposur e significa nremoval (SSCs). s e Boiling W Termination n 0 WR are then | Protecti o exposur e significa nremoval (SSCs). s e Boiling W Termination n 0 WR are then | ||
: d. The scr e o n: te land use a ears, since t h a tic ecology tive areas. | : d. The scr e o n: te land use a ears, since t h a tic ecology tive areas. | ||
estrial Ecolo nsitive area s a tened and t ened and e n ronmental J ears. ural and Hi ric landmar k R adiolo g ica l Occu p decommissi o dance with t h a diation Pro es and main t rem/yr Tota l m aintained Aand proce d n Work Per m s incorporat e st 1987, Dai r abilized and t h the com mfor the dec athe facility | estrial Ecolo nsitive area s a tened and t ened and e n ronmental J ears. ural and Hi ric landmar k R adiolo g ica l Occu p decommissi o dance with t h a diation Pro es and main t rem/yr Tota l m aintained Aand proce d n Work Per m s incorporat e st 1987, Dai r abilized and t h the com mfor the dec athe facility | ||
.on Program e during th e n t contribut o and packa g W ater Reacto r Plan reviewed a e ening iden t activities: c h h e FES was i affected by g y affected b s. endangered n dangered s p J ustice: cha n storic Reso u k designatio n l Effects of D pational Ra d o ning, Solut i h e license s p tection Pro g tain occupa t l Effective D A s Low As R dures will e mits (RWP) e effective r a r yland plac edefueled fa c mencement o ay of most | .on Program e during th e n t contribut o and packa g W ater Reacto r Plan reviewed a e ening iden t activities: c h h e FES was i affected by g y affected b s. endangered n dangered s p J ustice: cha n storic Reso u k designatio n l Effects of D pational Ra d o ning, Solut i h e license s p tection Pro g tain occupa t l Effective D A s Low As R dures will e mits (RWP) e effective r a r yland plac edefueled fa c mencement o ay of most | ||
: s. This dela y and ALAR A e decommis s ors to occup ging of rem a r and the acti v tified the f o h anges in de m i ssue d. activities b e by activitie s species: c h pecies that h n ges in de m u rce impac t n s and other Decommiss i d iation Expo ions will co n pecification s g ram are to tional work e D ose Equiv a Reasonably A ensure that involving p o a diological c ed LACBW R c ility). LA C of incremen t short-lived r y, combine d A measures , s ioning of L ational dos e a ining Reac 8-10 v ities that m o llowing po mographics e yond the o p s beyond the hanges in l o have occurre d m ographics t s beyond t cultural res o i onin g sure ntinue to i m s and the re q control radi a e r exposure s a lent (TEDE A chievable (work spec i otential ra d i a controls. R in a SAF S CBWR rema i t al decomm i radionuclide s d with the e f , minimized LACBWR t from remaitor Buildin g m ay requir e otential area s and zoning t p erational ar e operationa l o cal flora a n d in the pas t and socio e t he operati o ources. mplement a R q uirements o ation hazar d s to less th a E). Dose to (ALARA). i fications, d a tion expos u S TOR condi tined in a fu l i ssioning ac t s , which su b ffective imp l the actual t o date. It ining disma n g Structure s e site-specif i s for additi o t hat have oc ea; changes l area; chan g n d fauna a n t 35 years. | : s. This dela y and ALAR A e decommis s ors to occup ging of rem a r and the acti v tified the f o h anges in de m i ssue d. activities b e by activitie s species: c h pecies that h n ges in de m u rce impac t n s and other Decommiss i d iation Expo ions will co n pecification s g ram are to tional work e D ose Equiv a Reasonably A ensure that involving p o a diological c ed LACBW R c ility). LA C of incremen t short-lived r y, combine d A measures , s ioning of L ational dos e a ining Reac 8-10 v ities that m o llowing po mographics e yond the o p s beyond the hanges in l o have occurre d m ographics t s beyond t cultural res o i onin g sure ntinue to i m s and the re q control radi a e r exposure s a lent (TEDE A chievable (work spec i otential ra d i a controls. R in a SAF S CBWR rema i t al decomm i radionuclide s d with the e f , minimized LACBWR t from remaitor Buildin g m ay requir e otential area s and zoning t p erational ar e operationa l o cal flora a n d in the pas t and socio e t he operati o ources. mplement a R q uirements o ation hazar d s to less th a E). Dose to (ALARA). i fications, d a tion expos u S TOR condi tined in a fu l i ssioning ac t s , which su b ffective imp l the actual t o date. It ining disma n g Structure s e site-specif i s for additi o t hat have oc ea; changes l area; chan g n d fauna a n t 35 years. | ||
economic s t onal areas; c R adiation Pr of 10 CFR 2 0 ds, avoid ac c an the admi n workers an d The LACB W designs, wo r u re or handl i t ion (a peri o l ly SAFST O t ivities. T h b sequently rlementation and project eis anticipat e ntlement act i s, Systems, i c evaluatio n o nal site-sp e curred in th e in designat i g es in desig n n d designati o t atus in the c hanges in otection Pr o 0. The obje c cidental rad i nistrative li m d the public WR work c o r k package s i ng of radio a o d of safe st o O R conditio n h is period o f r educed rad i of the Rad i e d radiation ed that the ivities will band Compo n are e cific e past ion of nation o n of past local ogram c tives iation m it of must o ntrol s and active orage n until f time i ation iation dose most be the o nents La Cros s License T Revisio n Table 8 Secti o8.6.2 8.6.3.1 8.6.3.2 8.6.3.3 8.6.3.4 8.6.3.5 8.6.3.6 8.6.3.7 8.6.3.8 8.6.3.9 8.6.3.18.6.3.1 28.6.3.1 3 8.6.3.1 48.6.3.1 58.6.3.1 68.6.3.1 78.6.3.1 88.6.3.1 98.6.3.2 0 s e Boiling W Termination n 0 8-1 Sum mPowe o n Radiol o Activit i worker s Activit i Radiol o Onsite l Offsite Water U Water Q Surfac e Groun d Air Qu a Aquati c Activit i Activit i Terrest r Activit i Activit i Threat e Occup a1 Socioe c 2 Enviro n 3 Cultur a Activit i Activit i 4 Aesthe t 5 Noise 6 Irretrie v 7 Traffic 8 ISFSI c 9 VCC c oimpact s 0 Rail li n offsite) W ater Reacto r Plan m ar y of the r Facilities Envir o o gical ies resulting i s ies resulting i o gical Accid e l and use acti v land use acti v U se Q uality e water d wate r a lity c Ecology ies within th e ies beyond th rial Ecology ies within th e i es beyond th ened and End a ational Issues c onomic nmental Justi c al and Histori c ies within th e ies beyond th t ics v able Resour c and Transpo r construction: | economic s t onal areas; c R adiation Pr of 10 CFR 2 0 ds, avoid ac c an the admi n workers an d The LACB W designs, wo r u re or handl i t ion (a peri o l ly SAFST O t ivities. T h b sequently rlementation and project eis anticipat e ntlement act i s, Systems, i c evaluatio n o nal site-sp e curred in th e in designat i g es in desig n n d designati o t atus in the c hanges in otection Pr o 0. The obje c cidental rad i nistrative li m d the public WR work c o r k package s i ng of radio a o d of safe st o O R conditio n h is period o f r educed rad i of the Rad i e d radiation ed that the ivities will band Compo n are e cific e past ion of nation o n of past local ogram c tives iation m it of must o ntrol s and active orage n until f time i ation iation dose most be the o nents La Cros s License T Revisio n Table 8 Secti o8.6.2 8.6.3.1 8.6.3.2 8.6.3.3 8.6.3.4 8.6.3.5 8.6.3.6 8.6.3.7 8.6.3.8 8.6.3.9 8.6.3.18.6.3.1 28.6.3.1 3 8.6.3.1 48.6.3.1 58.6.3.1 68.6.3.1 78.6.3.1 88.6.3.1 98.6.3.2 0 s e Boiling W Termination n 0 8-1 Sum mPowe o n Radiol o Activit i worker s Activit i Radiol o Onsite l Offsite Water U Water Q Surfac e Groun d Air Qu a Aquati c Activit i Activit i Terrest r Activit i Activit i Threat e Occup a1 Socioe c 2 Enviro n 3 Cultur a Activit i Activit i 4 Aesthe t 5 Noise 6 Irretrie v 7 Traffic 8 ISFSI c 9 VCC c oimpact s 0 Rail li n offsite) W ater Reacto r Plan m ar y of the r Facilities Envir o o gical ies resulting i s ies resulting i o gical Accid e l and use acti v land use acti v U se Q uality e water d wate r a lity c Ecology ies within th e ies beyond th rial Ecology ies within th e i es beyond th ened and End a ational Issues c onomic nmental Justi c al and Histori c ies within th e ies beyond th t ics v able Resour c and Transpo r construction: | ||
Line 416: | Line 416: | ||
of LACBW R o active Was t o ntinue to r eaminated e q lt. Material s radioactiveassociated p p ackaging, s e from LA C will be loade M N where made in ac c associated nd dismantl e ties. The ac l so be appl i ecommissio n N UREG-058 6 l ess at LA C uipment fail u t he LACB W categorized a stible materi anon-fuel re l A n analysis o ning was p r The NUR E R. te equire the d quipment, t o s that canno t e waste. Th procedures, S shipment an d C BWR will b d into appr o the waste c c ordance wi twith an air b ement of S S cidents disc u i cable duri n n ing accide n 6. Howeve r C BWR due t ure, human e W R site and s a s follows: | of LACBW R o active Was t o ntinue to r eaminated e q lt. Material s radioactiveassociated p p ackaging, s e from LA C will be loade M N where made in ac c associated nd dismantl e ties. The ac l so be appl i ecommissio n N UREG-058 6 l ess at LA C uipment fail u t he LACB W categorized a stible materi anon-fuel re l A n analysis o ning was p r The NUR E R. te equire the d quipment, t o s that canno t e waste. Th procedures, S shipment an d C BWR will b d into appr o the waste c c ordance wi twith an air b ement of S S cidents disc u i cable duri n n ing accide n 6. Howeve r C BWR due t ure, human e W R site and s a s follows: | ||
a ls, l ated radiol o of potential p r ovided in t h E G-0586 ac c disposal of o ols, clothin g t be free rel e rough the p S olutions e n d control of b e shipped t opriate cont a c ontainer w i t h Departm e borne S Cs in u ssed n g the n ts at r, the to the e rror, stored ogical public h e D-c ident large g and e ased roper n sures solid t o the ainers ill be e nt of La Cros s License T Revisio n Transpo r Waste C o 8.6.2.5.Followi n radiolog iremaini n(excludi n radiolog ilicense w Chapter 6criteria. | a ls, l ated radiol o of potential p r ovided in t h E G-0586 ac c disposal of o ols, clothin g t be free rel e rough the p S olutions e n d control of b e shipped t opriate cont a c ontainer w i t h Departm e borne S Cs in u ssed n g the n ts at r, the to the e rror, stored ogical public h e D-c ident large g and e ased roper n sures solid t o the ainers ill be e nt of La Cros s License T Revisio n Transpo r Waste C o 8.6.2.5.Followi n radiolog iremaini n(excludi n radiolog ilicense w Chapter 6criteria. | ||
8.6.3.N 8.6.3.1.The env i within s e The LA C existing L to b e co nslips are onsite r aactivitie s parking a to occur Several s roadway sincludin gremediat 636 foot waste st r No sig nactivitie scomply w regulato r In accor d onsite ar e 8.6.3.2.Only ar e and lice n and de m s e Boiling W Termination n 0 r tation (DO T o ntrol Speci Radi o n g the co m ical surveys n g in b ackf i n g the ISFS I i cal conditio will be termi 6 provide t h N on-radiolo g Onsit e ironmental i e ction 4.3.1 o CBWR dec o LACBWR l nducted wit h being cons t a il line will | 8.6.3.N 8.6.3.1.The env i within s e The LA C existing L to b e co nslips are onsite r aactivitie s parking a to occur Several s roadway sincludin gremediat 636 foot waste st r No sig nactivitie scomply w regulato r In accor d onsite ar e 8.6.3.2.Only ar e and lice n and de m s e Boiling W Termination n 0 r tation (DO T o ntrol Speci Radi o n g the co m ical surveys n g in b ackf i n g the ISFS I i cal conditio will be termi 6 provide t h N on-radiolo g Onsit e ironmental i e ction 4.3.1 o CBWR dec o LACBWR l nducted wit h being cons t a il line will | ||
: s. Contain e a nd equipm e in a manner structures s u s and rail l i g piping an d ed, as nece s elevation w r eam. nificant env s are anticip a w ith applic a r y requirem e dance with t e considere d Offsi t e as within t h nse terminat i molition equi p W ater Reacto r Plan T) regulatio nalist (WCS) o logical Crit e m pletion of will be per f illed struct u I) meets the ns are dem o nate d , with he method o gical Effect s e Land Use impact asso c of NUREG-0 ommissioni n icensed pro p hin the LSE tructed. Th e be modifie d ers will be u e nt/containesimilar to w u ch as the S ines, will r e d tunnels, b e ssary. All o t w ill be rem oironmental ated. In ad d able United e nts. t he guidanc e d as "Small. | : s. Contain e a nd equipm e in a manner structures s u s and rail l i g piping an d ed, as nece s elevation w r eam. nificant env s are anticip a w ith applic a r y requirem e dance with t e considere d Offsi t e as within t h nse terminat i molition equi p W ater Reacto r Plan T) regulatio nalist (WCS) o logical Crit e m pletion of will be per f illed struct u I) meets the ns are dem o nate d , with he method o gical Effect s e Land Use impact asso c of NUREG-0 ommissioni n icensed pro p hin the LSE tructed. Th e be modifie d ers will be u e nt/containesimilar to w u ch as the S ines, will r e d tunnels, b e ssary. All o t w ill be rem oironmental ated. In ad d able United e nts. t he guidanc e d as "Small. | ||
"te Land Use he existing s ion activiti e pment, was t r n s. If Clas sfacility in A e ria for Licedecontami n formed to d u re baseme n unrestricted o nstrated to b the excepti o o logy for d e s of Decom m ciated with 0 586 to be g n g project i s perty previo u footprint. | "te Land Use he existing s ion activiti e pment, was t r n s. If Clas sfacility in A e ria for Licedecontami n formed to d u re baseme n unrestricted o nstrated to b the excepti o o logy for d e s of Decom m ciated with 0 586 to be g n g project i s perty previo u footprint. | ||
Line 440: | Line 440: | ||
S ons. Sanit apermitted s nistration B u water runo f riodically m ground area w ay after pr o w ith NURE G o se portions w ater genera l b odies of w a th surface a e generally a h e Mississi p n d practice s consin Poll u II Industrial to the Miss Manage m e n c ommissioni n p acted area s y. ce to Off-si t d the groun d y the routin g roundwate r ndwater co n s (five pair e B) are situat e ntercept an d ints. e d to cool h as been eli m are expecte d ial impacts Small." a ry wastes a sanitary wa s uilding and a f f is divert e m onitore d f o surroundin g o cessing thr u G-0586, the p of the nat u lly refers t o a ter are the M a nd ground w a pplicable t o p pi River ar e s have bee n utant DischStorm Wat e sissippi Riv e nt Practices n g operat i s undergoin t e Dose Ca l dwater mo n n e sampling r samples a r n ditions are e d wells: M W e d around t h d detect co n operating p m inate d. d from the i mto surface a re collecte d s te hauler. | S ons. Sanit apermitted s nistration B u water runo f riodically m ground area w ay after pr o w ith NURE G o se portions w ater genera l b odies of w a th surface a e generally a h e Mississi p n d practice s consin Poll u II Industrial to the Miss Manage m e n c ommissioni n p acted area s y. ce to Off-si t d the groun d y the routin g roundwate r ndwater co n s (five pair e B) are situat e ntercept an d ints. e d to cool h as been eli m are expecte d ial impacts Small." a ry wastes a sanitary wa s uilding and a f f is divert e m onitore d f o surroundin g o cessing thr u G-0586, the p of the nat u lly refers t o a ter are the M a nd ground w a pplicable t o p pi River ar e s have bee n utant DischStorm Wat e sissippi Riv e nt Practices n g operat i s undergoin t e Dose Ca l dwater mo n n e sampling r samples a r n ditions are e d wells: M W e d around t h d detect co n operating p m inate d. d from the i mto surface a re collecte d s te hauler. | ||
a sanitary h o e d directly t o r oil shee n g the facilit y u an oil sep a potential i m u ral enviro n o streams, r i Mississippi R w ater quali o LACBW R e controlled u n implemen targe Elimi n e r General P e r will be g r (BMP) fo r ions. Dg remediati o l culation M n itoring pro gof 10 perm r e obtained t at low and W-200A/B; he key LAC B ntamination plant syste m m plementati and ground w d in a This olding t o the n and y thru arator m pacts nment i vers, River ty in R with u nder t ed at nation Permit reatly r soil D uring o n or anual g ra m. anent twice high MW-BWR from ms at on of w ater La Cros s License T Revisio n 8.6.3.5.The env i 0586 ha s LACB W require m BMP to m sources sfrom the Fugitive demoliti o controll e Radiatio n excessiv e suppress iDemolit i specific a Appropr i extende dimpacte d No adve ractivitie s consider e 8.6.3.6.The en vNUREG-impact. | a sanitary h o e d directly t o r oil shee n g the facilit y u an oil sep a potential i m u ral enviro n o streams, r i Mississippi R w ater quali o LACBW R e controlled u n implemen targe Elimi n e r General P e r will be g r (BMP) fo r ions. Dg remediati o l culation M n itoring pro gof 10 perm r e obtained t at low and W-200A/B; he key LAC B ntamination plant syste m m plementati and ground w d in a This olding t o the n and y thru arator m pacts nment i vers, River ty in R with u nder t ed at nation Permit reatly r soil D uring o n or anual g ra m. anent twice high MW-BWR from ms at on of w ater La Cros s License T Revisio n 8.6.3.5.The env i 0586 ha s LACB W require m BMP to m sources sfrom the Fugitive demoliti o controll e Radiatio n excessiv e suppress iDemolit i specific a Appropr i extende dimpacte d No adve ractivitie s consider e 8.6.3.6.The en vNUREG-impact. | ||
The aqu a House a t approxi m disturbe d decomm i fauna in removal Various these aq u included Plans fo requipme n Solution s perform e s e Boiling W Termination n 0 Air Q ironmental i s been deter m WR complies ments of the W minimize f u s uch as the facility. dust will o n of concrd demolitio n n Protectio n e or harmf u ion by misti n i on equipm e ations whic h i ate Health a d periods of d by exhaust rse impacts | The aqu a House a t approxi m disturbe d decomm i fauna in removal Various these aq u included Plans fo requipme n Solution s perform e s e Boiling W Termination n 0 Air Q ironmental i s been deter m WR complies ments of the W minimize f u s uch as the facility. dust will o n of concrd demolitio n n Protectio n e or harmf u ion by misti n i on equipm e ations whic h i ate Health a d periods of d by exhaust rse impacts | ||
: s. Consequ e ed "Small." | : s. Consequ e ed "Small." | ||
Aqua t vironmental | Aqua t vironmental | ||
Line 453: | Line 453: | ||
A stud ymacroch i and cha n& Fish R perform e subsequ efossil st a require a construc t aquatic a The pot e 0586 an d The pot e and cons 8.6.3.7.The env i b een det e No kno w decomm i appropri a The lan dthe form afrom th e prevalen t operatio n onsite h a addition, that the d to the so udemoliti oanticipat e s e Boiling W Termination n 0 continue t o n s. s pecies ca ntion or sur v here are so m yfish, etc.) | A stud ymacroch i and cha n& Fish R perform e subsequ efossil st a require a construc t aquatic a The pot e 0586 an d The pot e and cons 8.6.3.7.The env i b een det e No kno w decomm i appropri a The lan dthe form afrom th e prevalen t operatio n onsite h a addition, that the d to the so udemoliti oanticipat e s e Boiling W Termination n 0 continue t o n s. s pecies ca ntion or sur v here are so m yfish, etc.) | ||
i the vicinity e d at LACB W of the i m irus), fresh w n nel catfish (R efuge Pool e d in 1980. | i the vicinity e d at LACB W of the i m irus), fresh w n nel catfish (R efuge Pool e d in 1980. | ||
e nt shutdow n a tion, has fu r a ny operati o tion, demoli a reas beyon d ential impac t d considered ential impac tidered to be Terre s ironmental i m e rmined to b wn terrestr i i ssioning p r a te BMPs a r d around L A a tion of ab o e Mississip p t in surroun d n s associate d abitats for m with the s h direct heav y uth, no dire c on activities e d impact t o W ater Reacto r Plan o be a prior i n threaten n vival rate, a m e known a q n Vernon C of the LAC WR have n o mpingement water drum | e nt shutdow n a tion, has fu r a ny operati o tion, demoli a reas beyon d ential impac t d considered ential impac tidered to be Terre s ironmental i m e rmined to b wn terrestr i i ssioning p r a te BMPs a r d around L A a tion of ab o e Mississip p t in surroun d n s associate d abitats for m with the s h direct heav y uth, no dire c on activities e d impact t o W ater Reacto r Plan o be a prior i n threaten n vival rate, a m e known a q n Vernon C of the LAC WR have n o mpingement water drum | ||
((Ictalurus p u 9 navigatio n It was d e n of LACB W rther reduce d ons resultin g tion, materi a d the site bo u t s to the aq uto be "Sma l t s to the aq u"Small." | ((Ictalurus p u 9 navigatio n It was d e n of LACB W rther reduce d ons resultin g tion, materi a d the site bo u t s to the aq uto be "Sma l t s to the aq u"Small." | ||
strial Ecolo g m pact eval u be generally i al exotic o roject area. | strial Ecolo g m pact eval u be generally i al exotic o roject area. | ||
Line 534: | Line 534: | ||
W U.S. Army C t tp://www.m t tp://www.c i W ater Reacto r Plan Regulatory i cense Term iwer Compa n ptember 197 2 wer Cooper a R eport - Ju nRegulatory e ration of t h- April 1980Regulatory EIS) on De c 0 02. wer Cooper a o ning Activi t ons GG-EO-rt for Octob e ons LC-RS-r t for June t h e r Review, " | W U.S. Army C t tp://www.m t tp://www.c i W ater Reacto r Plan Regulatory i cense Term iwer Compa n ptember 197 2 wer Cooper a R eport - Ju nRegulatory e ration of t h- April 1980Regulatory EIS) on De c 0 02. wer Cooper a o ning Activi t ons GG-EO-rt for Octob e ons LC-RS-r t for June t h e r Review, " | ||
A r ich, Hydro g B ureau, 200 c ensus.gov/ | A r ich, Hydro g B ureau, 200 c ensus.gov/ | ||
p wer Cooper a Wildlife Ser vorps of Eng i m vp.usace.a r ity-data.co m r Commissio n i nation Plan n y, DPC-E D 2. a tive, Envir o n e 15, 1973. Commissio n he La Crosse . Commissio n commission i a tive, LAC B ties Report | p wer Cooper a Wildlife Ser vorps of Eng i m vp.usace.a r ity-data.co m r Commissio n i nation Plan n y, DPC-E D 2. a tive, Envir o n e 15, 1973. Commissio n he La Crosse . Commissio n commission i a tive, LAC B ties Report | ||
(-313196-R S e r and Nove m PN-164017-h ru August 2 Atomic Jou r geological C 8-2012 Am e programs-s u ative - http: | (-313196-R S e r and Nove m PN-164017-h ru August 2 Atomic Jou r geological C 8-2012 Am e programs-s u ative - http: | ||
/vice - http:// | /vice - http:// | ||
Line 565: | Line 565: | ||
c tor (LACB W- February 2 shes at Dair y f Wisconsin | c tor (LACB W- February 2 shes at Dair y f Wisconsin | ||
-v e Species | -v e Species | ||
-, Endangere d l. r otection, E n gered_Speci eProgram - | -, Endangere d l. r otection, E n gered_Speci eProgram - | ||
: p. o n - a ctor's wast e//www.ope n w.census.go v http://ww.n p org/. G oose Islan d o. a Site Upda t//www.wisc d Liquefacti o r non Count y W R) 2 009. y land Powe r-La Crosse | : p. o n - a ctor's wast e//www.ope n w.census.go v http://ww.n p org/. G oose Islan d o. a Site Upda t//www.wisc d Liquefacti o r non Count y W R) 2 009. y land Powe r-La Crosse | ||
-- Vernon C o d, Proposed n dangered e s/index.asp x e gets new h o n-public-v/. p s.gov/nr/. | -- Vernon C o d, Proposed n dangered e s/index.asp x e gets new h o n-public-v/. p s.gov/nr/. |
Revision as of 02:30, 27 April 2019
ML16200A091 | |
Person / Time | |
---|---|
Site: | La Crosse File:Dairyland Power Cooperative icon.png |
Issue date: | 06/27/2016 |
From: | LaCrosseSolutions |
To: | Office of Nuclear Material Safety and Safeguards |
References | |
Download: ML16200A091 (37) | |
Text
LA CROSSE BOILIN G WATER REACTOR LICENSE TERMINATION PLAN CHAPTER 8 SUPPLEMENT TO THE ENVIRONMENTAL REPORT
La Cros s License T Revisio n 8.Sup 8.1.8.1.8.1.8.2.8.2.8.3.8.4.8.5.8.5.8 8
8 8.5.
8.5.8 8
8 8.5.4 8.6.8.6.
8.6.8 8
8 8
8 8.6.8 8
8 8
8 8
8 8
8 8
8 8
8 8
8 s e Boiling W Termination n 0 plement to t Introductio n 1.Purpos 2.Backg rSite Locati o 1.Site D eRemaining Impacts to t La Crosse B 1.Geogr a.5.1.1.Sit e.5.1.2.Po p.5.1.3.Sit e 2.Climat e 3.Topog r.5.3.1.To p.5.3.2.Ge o.5.3.3.Sei 4.Hydro lEnvironme n 1.Summ a 2.Radiol o.6.2.1.Oc c.6.2.2.Of f.6.2.3.En v.6.2.4.St o.6.2.5.Ra d 3.Non-r a.6.3.1.On s.6.3.2.Of f.6.3.3.W a.6.3.4.W a.6.3.5.Ai r.6.3.6.Aq u.6.3.7.Te r.6.3.8.Th r.6.3.9.Oc c.6.3.10.C o.6.3.11.S o.6.3.12.E n.6.3.13.C u.6.3.14.A e.6.3.15.N o W ater Reacto r Plan t he Environ m n .................
e .................
r oun d ..........
o n and Desc r e scription A fDismantle m t he Post-Sh u Boiling Wat e a phy and De m e Location a n p ulation ......
e Access, L a e .................
r aphy, Geol o p ography ....
o logy ..........smology .....
l ogy and Hy d ntal Effects o ary ..............
ogical Effec t c upational R f site Radiati o vironmental rage and Di s diological C r a diological E site Land U s fsite Land U ater Use .......
ater Quality .
r Quality .....
uatic Ecolo g rrestrial Eco l reatened or E c upational I s o st...............
ocioeconom i nvironment a ultural, Hist o e sthetics .....
o ise.............
r TABLE O mental Repo r...................
....................
....................
.r iption ........
.f ter Unrestri m ent and De c u tdown Dec o e r Reactor E m ography ..
.n d Descript i...................
.a nd and Wat
...................
.o gy and Sei s...................
....................
....................
.d rogeology
.o f Decomm i...................
.t s of Deco m R adiation Ex p o n Exposur eEffects of A s posal of L o riteria for L i Effects of D e s e ................
.se (in the V i...................
....................
....................
.g y................
.l ogy ............
.E ndangered ssues/Safet y...................
.ic Impacts ...
.al Justice .....
.o ric, and Ar c...................
....................
.8-i OF CONT E r t ................
....................
....................
....................
....................
.cted Releas e commission i o mmissioni nnvironment
...................
.i on ..............
....................
.er Use ........
....................
.smology......
....................
....................
....................
....................
.issioning ....
....................
.mmissioning
.p osure ........
.e and Monit o A ccidents an d o w-Level R a i cense Term e commissio n...................
.i cinity) .......
....................
....................
....................
....................
....................
.Species ......
.y ..................
....................
....................
....................
.c heological R...................
....................
.E NTS ...................
....................
....................
....................
....................
.e .................
.i ng Activiti e n g Activities Descriptio n...................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
.o ring ...........
.d Decommi s a dioactive W m ination .......
.n ing ............
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
.R esources ..
....................
....................
....................
....................
....................
....................
....................
....................
.e s ................
. Report (PS D n ..................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
.s sioning Ev e W aste ...........
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
.DAR) .........
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
.e nts ............
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
.... 8-1... 8-1... 8-1... 8-1... 8-2... 8-3... 8-5... 8-5... 8-6... 8-6... 8-6... 8-6... 8-6... 8-7... 8-7... 8-7... 8-8... 8-8... 8-8... 8-9... 8-9. 8-10. 8-10. 8-12. 8-12. 8-13. 8-14. 8-14. 8-14. 8-14. 8-15. 8-16. 8-17. 8-17. 8-18. 8-19. 8-20. 8-20. 8-20. 8-21. 8-21. 8-22. 8-22 La Cros s License T Revisio n 8 8 8 8.7.8.7.8 8 8.7.8.8.8.9. Table 8-1 Figure 8-Figure 8-Figure 8-Figure 8-Figure 8- s e Boiling W Termination n 0 .6.3.16.Ir r.6.3.17.T r.6.3.18.C u Overview o 1.Federa l.7.1.1.Nu c.7.1.2.U.S 2.Federa l Conclusion References 1Summ a Nucle a-1Site R e-2Site O v-3LACB W-4Topog r-5Groun d W ater Reacto r Plan retrievable R r affic and T r umulative I m o f Regulatio n l Requirem e clear Regul a S. Environm e l, State and L...................
...................
a ry of the E n ar Power Fa c e gional Loc a v erview .......
W R Buildin g r aphical Ma p d water Sam p r R esources ....
.r ansportatio n m pacts .........
.ns Governin g e nts .............
.atory Comm ental Protec t L ocal Requi
...................
....................
.LIST nvironment a c ilities ........
.LIST O a tion ............
....................
.g s ...............
.p .................
.p ling Wells ii ...................
.n .................
....................
.g Decommi s...................
.ission .........
.t ion Agenc yrements .....
....................
....................
.OF TABL E al Impacts fr o...................
.O F FIGUR E...................
....................
....................
....................
.- LACBW R...................
....................
....................
.s sioning Ac t...................
....................
.y ..................
....................
....................
....................
.E S om Decom m...................
.RES ...................
....................
....................
....................
.R Site ..........
....................
....................
....................
.tivities and S...................
....................
....................
....................
....................
....................
.m issioning
...................
....................
....................
....................
....................
....................
....................
....................
....................
.Site Release
...................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
.. 8-23. 8-23. 8-238-24. 8-24. 8-24. 8-25. 8-25. 8-25. 8-26. 8-11. 8-28. 8-29. 8-30. 8-31. 8-32 La Cros s License T Revisio nACS AEC AMSL ALARA BGS BMP BWR DOE DOT D-Plan/ PSDAR EPA ER FESW FRS G-1 G-3 GEIS GMU ISFSI LACB W LSE LTP MWe MWt NPDES NRC ODCM OSHA PCB PSDAR RWP s e Boiling W Termination n 0 AmerAtom Abov e As L o Belo w Best M Boili n Depa r Depa r Deco m Envir o Envir o Fuel E Final Geno a Geno a Gene r Geog r Indep WR La C r LAC B Licen Mega w Mega w Natio n Nucl e Off-S Occu p Polyc h Post-S Radi a W ater Reacto r Plan LIST OF i can Comm u i c Energy C e Mean Sea o w As Reas o w Ground S u Managemen t ng Water Re rtment of E n rtment of Tr a mmissionin g onmental P r onmental R e Element Sto r Radiation S u a No. 1 Stat i a No. 3 Fos s ric Environ m r aphic Man a endent Spe n r osse Boilin g B WR Site E nse Terminat i w atts Electr i w atts Ther m nal Pollutan t ear Regulato r i te Dose Ca l pational Saf e hlorinated B S hutdown D ation Work P r ACRONY M u nity Surve yommission Level o nably Achi e u rface t Practices acto r n ergy a nsportatio n g Plan/Post S rotection Ag e e port rage Well urvey i on sil Station mental Impa c agement Un i n t Fuel Stor a g Water Rea c n closure i on Plan i c m al t Discharge ry Commis s l culation M a e ty and Hea l B iphenyl ecommissio Permit 8-iii M S AND A B y e vable n S hutdown A e ncy ct Statemen t i t age Installati o c to r Elimination ion a nual l th Adminis t ning Activi t B BREVIA Tctivities Re p t on System tration ties Report TIONS p ort La Cros s License T Revisio n RCRA REMP RPV SAFST O SSC TEDE TSCA USACE USEPA VCC WCS WDNR WPDES s e Boiling W Termination n 0 Reso u Radi o React O R SAFe Struc t Total Toxi c Unite d Unite d Verti c Wast eWisc oWisc o W ater Reacto r Plan u rce Conser v o logical Env i or Pressure V STORage tures, Syste m Effective D o Substance C d States Ar m d States En v cal Concrete e Control S p o nsin Depar t o nsin Pollut a r v ation and R ironmental M V essel ms and Com p o se Equival e C ontrol Act m y Corps of vironmental P Cask ecialists tment of Na t a nt Dischar g 8-iv R ecovery Ac t M onitoring P p onents e nt Engineers P rotection A t ural Resou r g e Eliminati o t P rogra m A gency rces o n System La Cros s License T Revisio n 8.S 8.1.I n In acco r R egulat o Nuclear describi n specific d Reactor (8.1.1.P This ch a R eport, L describi n specific Termina t detailed d b etween activitie s The sup ppredicte d Environ m (NURE G(GEIS) o LACBW R Plan/PS D to be p eactivitie s 8.1.2.B LACB W Water R U.S. At o 1973, th e April 30 , electrica l Charact eLimited disposal consisti n(FESW)
Septemb s e Boiling W Termination n 0 S uppleme n n troductio n rdance wit h ory Guide 1.
Power Rea c n g any new decommissi o (LACBWR)P urpose a pter supple m L a Crosse B n g any new decommis s t ion Plan (L description othose acti v s. plement dis c d by the U n mental Stat e G-0191) (4);
o n Decom m R Decommi s D AR) (6).
T erformed fr o s. B ack g round W R consists eactor (BW R omic Energ y e reactor an d , 1987, whe n l output.
T rization Sur vdismantle m of the Rea c n g of 333 s p to dry cask e r 19, 2012.
W ater Reacto r Plan n t to the E n h the requi 179, Stand a ctors (1), t hinformatio n o ning and s isite. m ents the 1 B oiling Wate rinformatio n s ioning an d L TP). This of the remai vities and t h c usses whet h n ited States ement relate d NUREG-0 5 m issioning o f ssioning Pl a T his chapter om time of of a single R) construc t Commissi o d its fuel w e n it was sh u T he plant w v ey for SA F m ent activiti e c tor Pressu r p ent fuel as sstorage at t h On Marc h r E nvironm erements o f a rd Format his chapter p n or signifi c ite closure a 1 972 Dairyl a r Reactor (E n or signific a d license tsupplement
, ning decom m h e environ m h er the acti vNuclear R e d to operat i 5 86, Supple f Nuclear F a n and Pos t discusses d esubmittal o Allis-Chal m t ed in 1967 o n (AEC).
T e re transferr e u t down b ec w as placed i FSTOR was c es were st a r e Vessel (R s emblies, w a he on-site In d h 12, 2014, D 8-1 e ntal Rep o f 10 CFR 5 0 and Cont e p rovides a s c ant environ m activities pe r a nd Power E R) (2), wh i a nt environ m termination
, including r missioning a m ent, and th e v ities and t h e gulatory C o i on of La Cment 1, "G e Facilities", N t-Shutdown e commissio n f this LTP m ers design eas a demo n T he plant w a ed to Dairy l ause of eco n i n SAFST O c ompleted i n arted in 19 9 R PV) in M a a s transferr e d ependent S D airylan d s u o rt 0.82 (a)(9)(i i e nts for Lic supplement m ental cha n rformed at t Cooperativ e i ch was revi m ental chan activities r eference t o a nd site clo s e likely en v heir impacts ommission (C ross Boilin g e neric Envi r Novembe r 2 Decommiss i ning activit i until the c o ed 50 mega w n stration re a as commiss i l an d. It wa snomic reas o OR on Aug u n October 1 9 94, includi n ay 2007. A ed from the pent Fuel S t ubmitted a r i)(A) and tense Termi nto the env i n ge associa t t he La Cros s e (Dairylan d sed on June n ges associa t presented i o LTP Chap sure activiti e vironmental are bounde (NRC) NU R g Water Re a r onmental I 2 002 (5); a n ioning Acti v i es, with a f o ompletion o w att electri c a ctor in con j i oned in No v s operated b y o ns due to i t u st 7, 1991.
9 95. ng the rem oll of the s p Fuel Elem e t orage Insta l evision of t h t he guidan c nation Pla n i ronmental r t ed with the s e Boiling W d) Environ m 15, 1973 (3 t ed with th ein this Li c p ter 3, provi es, the inter aimpact of d by the i m R EG-0191, F actor, Apri l I mpact Stat e n d the Dair y vities Repo r o cus on acti vf site resto r c (MWe) B o j unction wi t v embe r 196 9 y Dairylan d t s small siz e An initia l o val and o f pent nuclear e nt Storage llation (ISF S h e LACB W ce of ns for report site-W ater m enta l 3), by e site-c ense des a action those mpacts F inal 1980 e ment yland r t (D-vities ration oiling t h the 9. In d until e an d l Site ff-site fuel, Well S I) by W R D-La Cros s License T Revisio n Plan/PS D characte r concludi n Energy S o Survey R Charact e As state d was doc u 1987. L A environ m support o LACB W noted in 1,155 M W known a LACB W the gen e decomm i located i that this
Elk Riv elicense t e The late s"The en dismantl e specific a this Sup p potential Offs iAqu aTerr eThre aSoci oEnvi r 8.2.S LACB W Mississi p south of site loca t coordina t s e Boiling W Termination n 0 DAR to the N rization wa s n g on Aug u o lutions is d Report for O e rization Su r d in the D-P l umented in ACBWR d e mental impa o f the Augu s W R, dated A pthe ER an d We WNP-2 as Columbi a WR is a muc h e ric environ m i ssioning i m n Elk Rive rdecommiss i e r facility w a e rmination i n st D-Plan/P S vironmenta l ement activ i ally evaluate plement as aenvironme n te land use a a tic ecology estrial ecolo g a tened and e oeconomic ronmental j u ite Locatio n W R is locate d ppi River, a bthe city of L tion, includi n t es for LA C W ater Reacto r Plan N RC that a c s performe d ust 6, 2015.
documented i O ctober an d rvey Report f l an/PSDAR ,a suppleme n e commissio n ct not pre v s t 7, 1991, D pril 21, 198 0 d NUREG-0 BWR ope r a Generati n h smaller re a mental ass e m pact of a s m r , Minnesot a i oning was c a s another A n 1974 (9).
S DAR docu m l impact o f i ties is SM A d in the GE a basis for m ntal impacts activities as to activit i g y as to acti v e ndangered s u stice" n and Desc r d in south w bout 1 mile L a Crosse, W n g nearby p C BWR are l r ccounts for t d by Ener g The result s i n two sepa r d November f or June thr u , "Review o f n t to the E n n ing and dis m viously eval u Decommissi o 0." This rev 0 586. The r ated by W a n g Station, actor compa r essment. N mall 58.2 m e a , which wa s c ompleted s a Allis-Chalm e m ent (issued fall compl e A LL as deter m IS. As stat e m eeting the r enot determi n i es beyond t h v ities beyon d s pecies ription western Wis c south of th e W I. The Si trominent fe a l ongitude 9 8-2 the completi g y Solutions s of the sit e r ate reports, L 2014 Fiel d u August 20 1 f post-opera t nvironmenta l mantlement uated in th e o ning Order iew include d reference B a shington P u owned and red to WNP-N UREG-058 6 e gawatt the r s dismantle d afely with l i ers reactor, ain March 2 0 e ted or pla n m ined by t h ed in the G E equirement s n ed in the G h e operatio n d the operat i c onsin, in V e Village o f te Regional atures such 1 o , 13', 53.
3 i on of the s pcommenci n e characteri z L ACBWR R d Work (7)15 Field W o a ting license l Report fo r activities h a e NRC's E n or NURE G d the evalu a BWR facili t u blic Powe r operated b-2, its impa c 6 also pro v rmal (MWt) d between 1 i ttle risk to w a superheate 0 14) conclu d nned LAC B h e GEIS. L A E IS, license e s in 10 CFR G EIS are: nal are a i onal area V ernon Cou n fGenoa, WI Location gr as highway s35" West a p ent fuel tra n ng on Oct o zation surv e adiological and LACB W o rk (8). stage envir o r LACBWR a ve resulted nvironment a G-0191 relat e ation of imp a t y in NUR E r Supply S y b y Energy N cts fall withi n vided infor mBWR dem o 971 and 19 7 w orkers an d d test BW R ded the foll o B WR deco m A CBWR de c es can rely o50.83(a)(6)
(n ty, on the e and appro x aphic (Figu r s , rivers an d a nd latitude n sfe r. Addi t o be r 9, 201 4 e ys perform e Characteri z W R Radiol o onmental i m dated Dec e in no signi f a l Assessm e e d to operat i a cts against EG-0586 w a ystem (plan t N orthwest).
n the envel o mation abo u o nstration r e 74. It was n d the public.
R , which ach o wing: mmissionin g commission i on informat i (ii). Site-sp e east shore o ximately 19 m re 8-1) sho w d lakes. Th e 43 o, 33', 3 tional 4 and ed by z ation o gical m pacts ember f icant e nt in i on of those a s the t now As o pe of u t the e actor n oted The ieved g and ing is i on in e cific of the miles ws the e map 6.22" La Cros s License T Revisio n North. T The Rea cthe carg o 639 feet Mississi pfilled wi tThe lice n LACB Wthe plant the l aform ethe l a gene r the Lthe l athe p a The Site The site i Mississi p Corps o f The site Highwa y Highwa ycurrentl y Mississi p2.4 mile s mussels, 0.75 mil e 8.2.1.S This se c decomm i defined a piping a n 10 CFR 2 The dec o b uilding s structure be remo v and flo o structure s e Boiling W Termination n 0 The site is a ctor Buildin g o-carrying-o n Above M e ppi River.
T th sand mat e n sed site co m W R plant co moff of High w a nd north o f e r Genoa N o a nd area di r rating statio n LACBWR pl a nd area sou t arcel of lan dOverview (F is bordered o ppi River a n f Engineers (is border e y 35. A B y 35, carries y do not use ppi River N a s from LA C brook tro u e s south of t hite Descrip t c tion provi d i ssioning an d as the confi g n d open la n 2 0.1402.
ommissioni n s, structures s above a d e ved from b a o rs in the "s: W ater Reacto r Plan at mile 678.
6 g is approxi nly rail roa d e an Sea Le v T he covered e rial dredge d m prises a to m prising onl y way 35. Ot h f the LACB W o. 1 Station (r ectly south n (Genoa N ant, t h of G-3, w d to the east o F igure 8-2) i o n the nort h nd Highway (USACE) R o e d on the w B urlington N commercia lthis rail lin a tional Wil d CBWR, is t u t and sturg h e LACBW R t ion After U d es a sum m d site closu r g uration of t nd areas at n g of the Cl aand comp o e pth of 3 fe e asements lo c"En d-State."r 6 on the Mimately 300
- d. The Rea c v el (AMS Lland consis t d from the M t al of 163.5 y 1.5 acres.
her promine n WR plant, w (G-1) coal (a of LACB W No. 3 Fossil S where the IS F o f Highway illustrates th h by the Mis s 35. The U
.ock Island D w est b y th e N orthern-S a l freight al o e. The site dlife & Fis h t he Genoa eon. On t h R plant, the r Unrestricte d m ary of the re activities.
the remaini nthe time o ass 1 areas o o nents) will e t below gra d c ated below
" This ap p 8-3 ssissippi Ri vfeet from t h ctor Buildin g L), or 19 fe t ed of the ri v Mississippi R acres whic h The site is n t site featu r w hich includ a nd later oil
)WR, which c Station [G-3 FSI is locate d 35, across fr e boundary o s issippi Riv e.S. Lock &
D istrict, is l o e Mississip p a nta Fe rai l o ng the east eis bordered h Refuge Po oNational F i h e southwe s r e is a publi c d Release final con d The "End-S n g below gr of license t e o f the plantinclude the de (designatthe 636 fo o proach will v e r above t h h e Mississip p g stands on et above t h v er edge an d River. h is owned baccessed b y res include:
es the site s
) fueled po w c ontains an 3]), located d , and from LACB Wof the licen s e r an d a nar rDam No. 8, o cate d appro p i River a nl line, loc a e rn portion oto the sout hol 9 area.
F i sh Hatcher ystern corne r c boat launc h dition of th e State" for L A o und b ackfi l ermination m (the on-sit e demolition,ed as 636 f o o t elevation apply to t h h e mouth o f pi River an dfilled land a he normal d low forest a b y Dairylan d y a road on witchyard a w er plant (re m operational approximat e W R. sed site.
r ow strip of managed bximately 0.
6 nd bordered ated betwe e of the site.
h by a seg m F urther sou t y , which r a r of the sit e hing ramp w e site at t h ACBWR de c lled b uildin g meeting the e radiologic a removal a n o ot AMSL).
leaving on l he followi n f the Ohio R d 475 feet w e a t an elevati elevation o areas which d, with the a the south s i a nd the site o m oved in 19 350 MWe ely 175 feet land betwe e b y the U.S.
A 6 miles upst r on the ea s en the site Passenger t m ent of the U t h, approxi m a ises endan g e, approxi m w ith a parkin g he conclusi o commission i gs, structurerequireme n ally contami n n d disposal o All system s l y concrete n g building s R iver. est of on of f the were actual i de of of the 89), fossil from e n the Army ream. st by and trains U pper m ately gered m ately g lot. o n of i ng is s and n ts of n ated of all s will walls s and La Cros s License T Revisio nReac tWas tVent iPipe Was tTurb iLow Mai n The deb r disposal.Figure 8-structurewill be d and stru c require r e G-3 Cri b structure potential
the LTP The b el ofilled wi t Departmbackfille The str udismantl eAdmLAC BOutf aG-3 C coal wate rElec tPave d plant After all process a and the s s e Boiling W Termination n 0 t or Buildin g te Treatmen t ilation Stac k and Ventila t t e Gas Tank i ne Buildin g Specific Ac t n tenance Eat ris generate d -3 shows t hs and comp o demolished a c tures asso c e medial act i b House, wil l s at depths g removal.
F Chapter 3.
o w grade str u th suitable cent of Natu r d , returned t u ctures outs e d an d will r i nistration B BWR Crib H all diffuser d C oal Plant a n barge wash i r systems a n trical Switc h d roadways area. demolition as described s urrounding W ater Reacto r Plan g , t Building, k , t ion Tunnel s Vault, g and Turbi n tivity (LSA
)Shack. d from dem o h e key LA C onents, oth e and remove d ciated with G ions; theref o l remain int a g reater than F urther info r uctures to r e clean soil, s a r al Resourc e t o grade, se eide of the remain on si Building, inc l H ouse, incl u discharge pi p n d all assoc i i ng station t n d piping, h yar d , and, and the Bu rand remed i in Chapte r open land r s , n e Office Bu i) Storage B ulition and r e C BWR buil d er than the L d to a depth o G-3 are ex p ore, no reme d a ct and fun c3 foot belo w rmation on t e main in th e a nd and/or o e s (WDNR) e ded an d ap p"LACBW Rte. These i n l uding asso c u ding fire pr o p ing, extend i iated buildi n t o the nort h rlington No r i ation activ i 5 of this L Tareas withi n 8-4 i lding, u ilding, and emoval oper a dings at the LACBWR A of at least 3 pected to be diation is pl a ctional for G w grade wil l t he approac h e "End Stat e other suitab l regulations p ropriate ero R Site Encl n clude: ciated sanita r o tection pip i i ng 110 feet n gs, wareho u h of the pla n rthern-Santa ities are co m T P, will be p n its license ations will bsite. All o Administrati o feet below g e radiologic a a nned and t h G-3 power o p l be assesse d h to the var i e" such as b l e me d ia, a s. The rest o sion control losure" (LS r y sewer an d ing systems,into the Mi s uses and su p n t and all a sFe rail line m plete, a F i performed t o d boundari e be segregate d o n-site LA C on Building grade. Non e a lly impact e h ese structu r p erations.
A d for radiol o ious buildin basement fo u s allowable o re d areas o n s will be est E) are not d water syst e ssissippi Ri v p port structu r ssociated s a and spur i n i nal Radiati o o demonstra t es, with the d for recycl i C BWR buil d and Crib H e of the buil e d such tha t res, includi n Any contami n ogical impa c n gs is provi d undations wunder Wisc n the site wablishe d. expected t ems and pip i v e r , res, includi n anitary sewe r nto the LAC B on Survey (t e that LAC Bexception o i ng or dings, House, dings t they n g the nated c t and d ed in w ill be onsin w ill be t o be i ng, n g the r and BWR (FRS) B WR of the La Cros s License T Revisio n ISFSI fa 10 CFR 2 dry stor a dry stor a Isolation remediat control mcompro mequipme n access. I there is n survey a r Several s support t supporti n 8.3.R To date, removal RPV inco rFES WVari o RPV , Puri fVari o Chapter 3remediat achieve t 8.4.I m As prev i decomm i associat e b y the p rNU RNU R Chapter 3 schedule footprint s e Boiling W Termination n 0 a cility, co m 2 0.1402. A s age casks an ge within t h and contr o ion activitie measures w mised by t h nt. Open l a I solation an d n o risk of re reas that ha v services suc h t he ISFSI m n g the adjac e R emainin g D several key of the follo w and associ a re monitor g u W stored co m o us system p , and prima r fication, Sea l o us Turbine 3 of this LT ion activiti e t he "End-St a m pacts to t h i ously note d i ssioning o p e d with dec o reviously iss u R EG-0191, a n R EG-0586. 3 of the L T d to be co m). The i d en t W ater Reacto r Plan m ply with s part of the d transferre d e ISFSI unt i ol measures s. These ac t will be imp l h e potential and areas, a c d control m e-contaminat v e been rele a h as sanitar y m onitoring a e nt G-3 foss i Dismantlemdismantle m wing compo n ated reactor uide tubes, e mponents s u p iping and c ry systems s u l Injection a n and auxilia r P provides d es currently b a te" conditi o h e Post-Sh u d , the D-P l p erations at t ommissioni n ued environ m nd T P identifi e m pleted pri o tified activit i r the radiol odecommiss i d to the ISF il it is transf e will be im p t ivities will lemented t o for re-co n ccess roads a e asures will ion from de ased from th e y sewer serv i a nd security i l station w h ent and De c m ent and dec o n ents: component s etc.), uch as fuel s h components u ch as the C n d Main Ste ry systems.
d etailed des c b eing perfo r on. utdown Dec o l an/PSDAR, the site and n g the site h a mental imp a es the dis m o r to the u n i es are not s 8-5 ogical crite r i oning proc e SI. It is ex p erred to the D p lemented f o be complet e o ensure th e ntamination a nd bounda rremain in ecommissio n e license.
i ces and ele c operations.
hich will re m c ommissio n ommissioni n s (e.g. fuel h rouds, cont r associated ontrol Rod D a m. c riptions of rmed and t h ommissioni n amended concluded t ave already act statemen t mantlement a nrestricted r eignificantly ria for un r ess, all spen t pected that t Department following th ed prior to s t e final rad i as result r ies will be ffect throug h n ing. These c trical servi c There ar e m ain in plac e n in g Activit i ng activities shrouds, co r ol rods, an d with the F o D rive Mech athe dismant he remainin g n g Activiti ein March 2 that the pot e been postul a t s, specifica l a nd decont a elease of t hdifferent fr o restricted u t nuclea r fu e t his spent f u of Energy (De conclusio n t arting the F i ological c o of access b posted wit hhout FRS a cmeasures a r ce will rema e three pota b e. ies have occur r ntrol ro d s, s d start-up so u o rced Circul a anisms, De clement, dec o g activities t e s Report (P014, descri b e ntial envir oated in, an d lly: amination a c h e site (exc l om those or i use specifi e e l was loade d u el will rem a D OE). n of radiol o FRS process.
onditions ar e b y personn e h signs restr i ctivities an d r e not requi r in in operat i b le wells o n r ed, includi n steam separ a urces, and a tion syste m c ay Heat, Pr i ontaminatio n t o be execu t PSDAR) b ed the pl a onmental i m d will be bo u ctivities th a l uding the I i ginally disc u e d in d into ain in o gical The e not el or icting d until red in i on to n site n g the ators, m , the imary n and ted to a nned m pacts u nded a t are ISFSI ussed La Cros s License T Revisio n in the D-will be didentifie d provide decomm i 8.5.L 8.5.1.G 8.5.1.1.The site Vernon C 300 feet by fillin g The site 642 feet Mississi p silts) un d sands an d 8.5.1.2.The U.S reliable ctotal po p 744 for Snear the small to w (populat i5 miles s 8.5.1.3.The LA C of the M b ounded north, a n electric p This sta t Genoa, l o within t h The are a and fres h to the G-site, loc a s e Boiling W Termination n 0 -Plan/PSDA d efined duri n d in the D-additional i ssioning.
L a Crosse B o G eo g raph y a Site Llocation an d County, Wi s from the ea s g in river e dis relativel y AMSL b o u ppi River to d erlain by fi n d gravels.
B Popu l. Census B u census data f p ulation in 2 S toddard, lo cplant, loca t w ns west o ion 397), lo outhwest.
Site A C BWR prop e M ississippi R by the Mi s nd a wildlife p ower statio n tion is locat e o cated appr o h e town. Th e a of the Mis s h water fish i-3 station lo a ted approxi m W ater Reacto r Plan R. Althou g n g decomm i-Plan/PSDA R evaluation o ilin g Wat e a nd Demo gr L ocation and d descriptio n s consin, in t s t bank of th e d ge and low y flat with t h u nded by th ethe west.
T ne to mediu m B edrock is e n lation ureau, Ame r f or nearby W 2 013 was 25 cated 7 mile s ted 17 miles o f the plant cated 3 mi l Access, Lan d erty is locat e River. Alth o s sissippi Ri vand fish re f n complete d e d to the s o oximately 1 m e re are no r e s issippi Riv e i ng) and co m cated south m ately 4,00 0 r gh additiona l i ssioning pl R have be eand info r er Reactor E r aph y Descriptio n n were disc u the Mississi p e Mississip p forest area s he reactor f e railroad tr T he geolog y m sands wit h ncountered a rican Com m W isconsin v i8 for the V i s N of the p l N; and 30 , across the es northwe d and Water ed in the fa r o ugh the sit e ver to the w f uge to the s d in 1969, w outh, adjace n m ile to the n e sidences wi t er adjacent t mmercial ba r of the LA C 0 feet south o 8-6 l details reg a a nning effo r en identifie d rmation re g E nvironme n n ussed in sect i ppi River V p i River. T w s with mate r facilities sta n acks to the y consists p r h some soil s a t approxim a m unity Surv e illages and c illage of G e l ant; 51,522
, 329 for Ve r Mississipp i s t, and Ne w U se r western po r e area is 16 3 west, a rail l i s outh. The s w hich is also nt to the L A n ortheast of t t hin 2,000 f e to the site i s r ge and ship C BWR plant)o f the plant.
arding majo r ts, no sign i d. Subseq u garding the n t Descripti o ion 8.2. Th ealley, with t w enty-seven r ial dredge d nding at ele veast and th rimarily of f s containing a tely 130 fe e e y (ACS) r e cities and V e e noa, locate d for La Cros r non Count y i River, inc w Albin, I A rtion of Ve r 3.5 acres, it ine to the e site include s owned an d A CBWR fa c t he site. A n e et of any L A s used for r e p traffic (e.g
.). There is There is a pr decommis ificant impa uent section s environm e o n e 163.5 acre t he Reactor acres of the d from the M vations ran g h e riprap on fill material s higher perc e t below gro u e port (11) p r e rnon Count y d 1 mile no rse, the large
- y. There a rluding Ren o A (populat i r non Count yis relativel y e ast, USAC E s G-3, a co a d operated b y cilities. Th e n elementary A CBWR st r e creational
- p. barges of c a public bo p ortion (Po o sioning acti v cts b eyond s in this c h e ntal effec t e site is loca t Building l o site were f o M ississippi R ging from 6the shore o s (fine sandentages of c u nd surface rovides the
- y. The esti m rth of LAC Bst Wisconsi n r e also num o township, ion 513), l o y on the east y isolated a s E property t a l-fired 379 M y Dairyland e closest to w school is l o r ucture. p urposes (b o c oal are deli vat landing o o l 9) of the U v ities those hapter t s of ted in ocated o rmed River. 36 to of the s and c oarse (10). most m ated B WR; n city erous MN o cated bank s it is t o the M We (12). w n is o cated oating v ered o n the U pper La Cros s License T Revisio n Mississi p for hunt i Genoa Nmile 679 long loc k public a c through Highwa y No. 8. 8.5.2.C The cli m continen triver val l Lock an d of the i nfrom 60 winter m the aver a summer s The ave r range fr o month f o The blu ff winds a t monthly experien c tornado oF3 (max icenter in j 8.5.3.T 8.5.3.1.The site i dissecte d varies b e river lev e Highwa y Prior to c lying w e dredged to const r s e Boiling W Termination n 0 ppi River N a i ng, fishing N ational Fis h.2, is appro x k and dam s ccess to an oNovembe r. y 35 approx i Climate m ate at the L tal climate w l ey location d Dam No. 8 nformation f to 90 o F d u m onths of D e age temper a s eason (15).
r age annual r om 3 to 5 in c or the remai n f s of the Mi s t the site w h average w i ced tornado s o ccurred 27 imum wind j ured one p e T opo g raph y Topo g i s located w d uplands.
F e tween 21/2 a e l. The LA C y 35. Figure constructio ntlands. Th esands from t r uction, the a W ater Reacto r Plan ational Wild l and recreati h Hatchery.x imately 0.
6 s tructure ow o bservation The Stat e imately 1/2 m L a Crosse r with cold w iof the site.
8 site with a f or the past uring the m o e cembe r 20 1ture is appr rainfall is 3 5 ches per mo n n der of the y s sissippi Ri v h ere the va ind speeds
- s. On Apri l.4 miles aw a speeds 158-e rson and ca u , Geolo gy a n g raphy ithin the Mi F rom La Cro and 41/2 mile C BWR site i 8-4 provid e n of the LA C e property g r t he Mississi p area was gr a r life & Fish R onal activit
- i. Lock an d 6 miles nort h n ed and op eplatfor m , o p e of Wisco n m ile north o r egion of W i nters and h o The USA C a rchived we a year (May onths of Ju n 1 4 to Febru aoximately 2 5.2 inches.
M n th in the s p ear. ver Valley c h lley runs n o are typical l l 30, 1954, a ay from the 216 mph) t o u sed betwe e n d Seismol o ssissippi Ri v sse to Prairi s in width.
is located b e e s a Topogr a CBWR faci l rade was th e ppi River.
D a ded to a re l 8-7 R efuge just s i es (13). Fu r d Dam No.h of the sit e e rated by th e pen from d a n sin also m of the LAC B W isconsin a n o t summers CE maintain s ather infor m 2014 to M a n e through A ary 2015.
C 2 0 o F in the M onthly pre c p ring and su m hannel the w o rth-south a y 6 to 10 m a category F 4 Genoa vill a o rnado that o e n $500,000 ogy ver Valley, w e du Chien, The valley etween two v a phy Map o f lity, the site en increase d D uring grad e l atively flat s outh of the rther south a 8, located
- e. The da m e USACE (awn to dus k m aintains a BWR site, a nd at the L A and extre m s an active w mation for th e ay 2015) in d A ugust 201 4 C ity data co mwinter mo n cipitation a v m mer seaso n w inds at the L are from th e m ph. The 4 (maximu m a ge center.
o ccurred 6.
6 and $5,000, w here the v aapproximat ewalls rise s valleys on e fthe site. location c o d through th e e manipulat i ground sur f site which h a re public l a on the Mis m is a 110 fe 14). This fa c k during the highway w across fro m A CBWR si t m es influenc e weather stat e Genoa, W dicated tem p 4 and 45 to m piled for G n ths and rea c verages in th e ns and from LACBWR s e north and Genoa, W I m wind speeOn June 5, 6 miles awa y 000 in dam a alley is deep ely 40 mile s s harply 500 e ither side o f o nsisted of m e depositio n i on and site f ace. The r e has limited a a nd areas a n sissippi Ri v et wide, 60 0cility also amonths of w ayside off m Lock and te is typical e d because o ion at the n eI area. A r e peratures ra n-5 o F duri n G enoa show s c hes 72 o F i e Genoa, W I1 to 3 inch e ite. Predo m the south.
I area has r ds 207-260 1980, a cat e y from the v i a ges. ly cut into h s south, the vto 600 feet f the bluff e a m arshes and n of hydraul ipreparation e sulting gra d a ccess n d the v er at 0 feet llows April State Dam of a of the earby eview n ging n g the s that i n the I area e s per m inant The r arely mph) e gory illage highly v alley from a st of low-i cally prior d e for La Cros s License T Revisio n the LA C access r o 8.5.3.2.LACB W of the C e of the W b edrock i Generall y to 130 f e Valley. Dreshba cPrecamb r (BGS). A 509 feet river sho 8.5.3.3.Many fa u capable i conditio nin the si t nuclear p any evi d Therefor Seismic a 2008 all 8.5.4.H Hydrolo g Ground w 25 feet B Mississi p the Miss i the west towards ground wfossil st asome pe r flooding.Hydraul ithe shall o structure s e Boiling W Termination n 0 BWR site i s o ad along th e Geol o WR is locate d e ntral Lowl a W isconsin D o i n this regio n y , the local get of glacial These unc o c h Group (r ian crystal l A t the subj e AMSL nea rreline. Seis m u lts have b e i n accordan c n s in the sit e t e region, b u p ower plant d ence of ca p e, capable f a a ctivity (m a occurred ov e Hy drolo gy a g y and hy d w ater beneat h B GS and the ppi River.
T i ssippi Rive r and dischar gthe west b u w ater elevati o a tion, it app e r iods where
. i c conductiv i o w sands th a of the shal l W ater Reacto r Plan s generally f e eastern bo u o gy d on the east a nd Physiog rme and the n dips less t h g eology is d outwash an onsolidated d Upper Ca m line rocks e ect site, the b r the Reacto r m ology een mappe d c e with 10 C e vicinity th a ut investigat isites in the pable faulti n a ulting does a gnitudes ra n er 180 mile s nd H y dro ge d rogeologic a h the site i s water table T herefore, c h r. Groundw g es into the M ut then may on measure m ears that th ethe gradie n ity is influe n at were hyd r l ow soils w o r flat with gr a u ndary of th e bank of the raphic Prov i western fla n h an 20 feet p d escribed as a d fluvial de p deposits are mbrian). T h e ncountere d bedrock sur f r Building a d in the site C FR 100, A at represent i ons of all o region, in a d n g. Additi o not need to nging from 3 s from the si t e ology al informa t s first enco u aquifer is i n hanges in th e a ter in the s h Mississippi turn and fl o m ents colle c ere is a slig h nts are reve r nced by the s raulically dr e o uld not lik e 8-8 a de level at e site to the r Mississipp i i nce (16).
T nk of the Wi per mile to t h approximat e p osits on th eunderlain b h e Dreshba c d at approx i face is enco u and slopes t o region. N o Appendix A.
hazard to t hf these faul t d dition to s t onally, the a be consider e 3.5 to 5.4) t h t e and did n o t ion was p untered at d e n strong hy d e water tabl e h allow depo R iver. The o w parallel c ted during h t downwar rsed and th i soil structur e e dged, depo ely influenc eapproximat eriprap alon g i River in th e The site is l o i sconsin Ar c h e southwe s ely 15 feet o e east flood p b y flat lying ch Group i imately 65 0 u ntered at a n o approxima t o ne of thes e Per the N h e facility.
N t s during th e tudies for th e area is one o ed in the an a hat has bee n ot impact th e primarily o b e pths rangi n draulic com m e elevation asits and fill m deeper gro uto the rive rroutine sa m r d vertical g i s is likely de and grain sited, and c o e groundwa t ely 639 feet g the river s h e Wisconsi n ocated on th e ch. The sed i s t. f hydraulic f plain of the Msandstone a i s then un d 0 feet belo w n elevation tely 501 fee e faults are N RC, "Ther e Numerous f e course of v e LACBW R of relativel y alysis of thi s n recorded b e plant site o btained fro m n g from app m unication w a re depende n material lik e u ndwater is a r. Based o n m pling in su p gradient. H o due to high size distrib u ompacted o n t er flow dir e AMSL fro m hore. n Driftless s e e southwest imentary str a fill overlyin g M ississippi R and shales o derlain by d w ground s u of approxi m t AMSL ne aconsidered e are no ge o f aults are m a v alidating s e R, have not f y low seis m s site" (17).
etween 197 5 o r operation s m Referen c roximately with the adj nt on the st a ely flows to w also likely t o n a review o p port of th e o wever, the rriver stage s ution. Beca u n site, the in t ection. Ho w m the ection flank a ta or g 100 River of the d ense u rface mately ar the to be o logic a pped everal f ound micity. 5 and s. c e 10. 15 to acent age of wards o flow of the e G-3 r e are s and u se of t ernal w ever, La Cros s License T Revisio nthe nati v anisotro p the hori z these la y The vel o gradient.across t h the grou n range) e v 8.6.E 8.6.1.S The eva lfollows t includes consider e"Large."
evaluati o For tho s evaluati o 1) T N i d 2) A 3) P d 4) A e s e n a d a v t h 5) A A concl uthe level 0586 ev athe form e Table 8-1 LACB W screen t h s e Boiling W Termination n 0 v e sands un d py of the aq u ontal direct iers. o city of gro u The gradi e h e site it is l i ndwater vel o v en though t h E nvironme n ummar y l uation of t h t he approac hidentificati o e d to be ge n If identifi e o n in NURE G s e environ m o n, a standar d The issue or N UREG-019 d entified in t A pplicable r e otential im pescribed.
A n evaluati o stimate or d nvironment d ditional m i v oided, a d e he resource o A conclusio n usion is deri v of signific a aluation. N o e r G-1 coal/
o 1 was used WR. It is ex c h e issues t W ater Reacto r Plan d erlying the u ifer would i on than in t h undwater fl o ent of the w akely that th e o city across he hydrauli c ntal Effects o h e environm e h and metho d o n of enviro n eric, it is a e d as generi c G-0586 whi c m ental issu d approach iactivity is s 1 and D-Pl a t hese docu m e gulations, p pacts from d e o n is perfo r determine w hconsidering itigation me a etermination or attribute. is reached.
ved from th e ance of the ote that the e o il fueled p o as the ba s cerpted fro m o identify r hydraulic fi be more pe r he vertical d o w is directl y ater table is e water tabl e the site is c conductivi t o f Decomm i e ntal effects d ology outl inmental iss u a ssigned a s c , the envir o c h conclude s es or dec o i s followed.
summarize d , a n/PSDAR.
ments. ermits, limi t ecommissio n rmed. Thi s h ether the a the availa b a sures that cis made as e evaluation impacts. S i environment a o wer plant w s is for the m Table 6.1 o site-specifi c 8-9 fi ll would li k rmeable an d d irection. T h y related to influenced b e has a very also relativ e t y could sup p i ssionin g (or impact s i ned and de s ues as eithe r ignificance onmental i m s that the o v ommissioni n It is summ a including a Note that m t s or other r e ning activiti e s includes ctivity is li k b le informat i c an be take nto whether steps sum m ite-specific i al impacts o w as not cons isite specifi c of NUREG-0 c issues.
D k ely provid e d have a hig h his decrease s both the h y b y the topo g low gradie n e ly slow (i.
e port faster fl s) of the de c scribed in N r generic or level of eit h mpact is con s verall impac t ng activitie s arized as fol l a summary o m any deco m e gulatory re q es relating t oanalysis an kely to mak e ion. If an i m n are evalu athe impact i m arized abo v issues are n o f the operat i idered in thi s c environ m e 0586. The f Decommiss i e sufficient h er hydraul i s the vertic a ydraulic con g raphy and w n t. Therefo r e., in the in c flow. commission i N UREG-058 6site-specifi c her "Small,"s idered to b e t significanc e s that req u l ows: of the impa c mmissioning quirements a o the enviro n n d professio n e a noticea b m pact is li k ated. If an i is likely to s ve. The con ot bounded i ng G-3 coa l s review. e ntal impac t f irst step in i oning acti vstructure th a i c conductiv al transport w ductivity a n with the flat re, it is likel y c hes and fe e i ng of LAC B 6. This app r c. If the is s" "Moderat e e bounded b e is "Small.
"uire site-sp e c ts as repor t activities a r are identifie d nmental iss u nal judgme ble impact o k ely, existin g impact can n s eriously da m n clusion ide n by the NU R l power pla n t assessme nthis proces s vities speci f a t the v ity in within nd the areas y that e t/day BWR roach s ue is e ," or b y the " e cific ted in r e not d. u e are nt to on the g and n ot be m age ntifies R EG-n t and nt for s is to fic to La Cros s License T Revisio n LACB Widentifie d evaluati oOffs i 35 y eAqu a sensi tTerr e of se nThre a threa tEnvi r 35 y eCult u histo r 8.6.2.R 8.6.2.1.During d in accor d of the R a exposur e 2,000 m r also be mprogram Radiatio nmaterial s In Augu s of the st a 1994 wi t allowed levels at
Protecti o exposur e significa nremoval (SSCs). s e Boiling W Termination n 0 WR are then
- d. The scr e o n: te land use a ears, since t h a tic ecology tive areas.
estrial Ecolo nsitive area s a tened and t ened and e n ronmental J ears. ural and Hi ric landmar k R adiolo g ica l Occu p decommissi o dance with t h a diation Pro es and main t rem/yr Tota l m aintained Aand proce d n Work Per m s incorporat e st 1987, Dai r abilized and t h the com mfor the dec athe facility
.on Program e during th e n t contribut o and packa g W ater Reacto r Plan reviewed a e ening iden t activities: c h h e FES was i affected by g y affected b s. endangered n dangered s p J ustice: cha n storic Reso u k designatio n l Effects of D pational Ra d o ning, Solut i h e license s p tection Pro g tain occupa t l Effective D A s Low As R dures will e mits (RWP) e effective r a r yland plac edefueled fa c mencement o ay of most
- s. This dela y and ALAR A e decommis s ors to occup ging of rem a r and the acti v tified the f o h anges in de m i ssue d. activities b e by activitie s species: c h pecies that h n ges in de m u rce impac t n s and other Decommiss i d iation Expo ions will co n pecification s g ram are to tional work e D ose Equiv a Reasonably A ensure that involving p o a diological c ed LACBW R c ility). LA C of incremen t short-lived r y, combine d A measures , s ioning of L ational dos e a ining Reac 8-10 v ities that m o llowing po mographics e yond the o p s beyond the hanges in l o have occurre d m ographics t s beyond t cultural res o i onin g sure ntinue to i m s and the re q control radi a e r exposure s a lent (TEDE A chievable (work spec i otential ra d i a controls. R in a SAF S CBWR rema i t al decomm i radionuclide s d with the e f , minimized LACBWR t from remaitor Buildin g m ay requir e otential area s and zoning t p erational ar e operationa l o cal flora a n d in the pas t and socio e t he operati o ources. mplement a R q uirements o ation hazar d s to less th a E). Dose to (ALARA). i fications, d a tion expos u S TOR condi tined in a fu l i ssioning ac t s , which su b ffective imp l the actual t o date. It ining disma n g Structure s e site-specif i s for additi o t hat have oc ea; changes l area; chan g n d fauna a n t 35 years.
economic s t onal areas; c R adiation Pr of 10 CFR 2 0 ds, avoid ac c an the admi n workers an d The LACB W designs, wo r u re or handl i t ion (a peri o l ly SAFST O t ivities. T h b sequently rlementation and project eis anticipat e ntlement act i s, Systems, i c evaluatio n o nal site-sp e curred in th e in designat i g es in desig n n d designati o t atus in the c hanges in otection Pr o 0. The obje c cidental rad i nistrative li m d the public WR work c o r k package s i ng of radio a o d of safe st o O R conditio n h is period o f r educed rad i of the Rad i e d radiation ed that the ivities will band Compo n are e cific e past ion of nation o n of past local ogram c tives iation m it of must o ntrol s and active orage n until f time i ation iation dose most be the o nents La Cros s License T Revisio n Table 8 Secti o8.6.2 8.6.3.1 8.6.3.2 8.6.3.3 8.6.3.4 8.6.3.5 8.6.3.6 8.6.3.7 8.6.3.8 8.6.3.9 8.6.3.18.6.3.1 28.6.3.1 3 8.6.3.1 48.6.3.1 58.6.3.1 68.6.3.1 78.6.3.1 88.6.3.1 98.6.3.2 0 s e Boiling W Termination n 0 8-1 Sum mPowe o n Radiol o Activit i worker s Activit i Radiol o Onsite l Offsite Water U Water Q Surfac e Groun d Air Qu a Aquati c Activit i Activit i Terrest r Activit i Activit i Threat e Occup a1 Socioe c 2 Enviro n 3 Cultur a Activit i Activit i 4 Aesthe t 5 Noise 6 Irretrie v 7 Traffic 8 ISFSI c 9 VCC c oimpact s 0 Rail li n offsite) W ater Reacto r Plan m ar y of the r Facilities Envir o o gical ies resulting i s ies resulting i o gical Accid e l and use acti v land use acti v U se Q uality e water d wate r a lity c Ecology ies within th e ies beyond th rial Ecology ies within th e i es beyond th ened and End a ational Issues c onomic nmental Justi c al and Histori c ies within th e ies beyond th t ics v able Resour c and Transpo r construction:
l o nstruction f o s (onsite) ne upgrade an d r Environm e onmental Iss u in occupation i n dose to the e nts v ities v ities e operational a e operational e operational a e operational a ngered Spe c c e c Resource I m e operational a e operational ces r tation land use imp a or the ISFSI:
l d extension (o 8-11 e ntal Impac t u e al dose to public a rea area a rea area c ies mpacts a rea area acts (onsite) land use o nsite and ts from De c NURE G 0586 (GEIS) Yes Yes Yes Yes No Yes Yes Yes Yes Yes No Yes No No Yes Yes No Yes No Yes Yes Yes Yes No No No commission i G-) Impa c Small Small Small Small Site-speSmall Small Small Small Small Site-spe Small Site-spe Site-speSmall Small Site-spe Small Site-speSmall Small Small Small Site-spe Site-spe Site-spe i n g Nuclea r c t Significan ccific cific cific cific cific cific cific cific cific r c e La Cros s License T Revisio nNUREG-The cur restimate d dose for b ounded 8.6.2.2.Dairylan (REMP) environ m the radi o decomm iof 10 C F to adher e public d o consider e The onl y liquid w a piping" wcollectio n through t discharg eof the cprotectio LACB W bounded The gas emeteoro l noble ga s or expos u gaseous r 8.6.2.3.
Decom mthis anal y conduct e Fuel Ac c decomm ithe min i LACB W otherwis e The dec o and cont Protecti o s e Boiling W Termination n 0 -0586 esti m rent occupa t d to be 130.
3 the decom m by NURE G Offsi t d implemen t at LACB W m ent in and a o active gas e i ssioning ac t FR 50, Appe n e to these l ose from de c ed as "Smal l y authorized aste from t h w hich is a p a n system p u t he East T u e s to the inl e c u rrent and n in accor WR to date c oby the eval u e ous pathw a l ogical cond i s, the gaseo u u re pathwa y releases. Envir o m issioning a c y sis has co n e d and prov i cident Anal y i ssioning an dmal radioa c WR site is i n e involving a ommissioni namination l e o n and Safe t W ater Reacto r Plan m ated that 1, tional expe n 3 Rem, whi c missioning w G-0586 and t h t e Radiation t ed a regula t WR which p a round the e e ous (airbo r t ivities do n ndix I, or th limits throu g commission i l." effluent rel e h e LACBW R art of the G-3 umps are no t urbine build i et of the liq ufuture Ra ddance with o nclude tha t u ation in N U a y (which i i tions durin g u s pathway c y. Routine a onmental E f ccident anal y n tinued duri n i ded in reg u y sis" have n o d with spen t ctive materi n sufficient f a significan t n g of radio a evels remai n t y and Heal r 874 Rem w i n ded and d o c h is well be l will meet th e h e impact is Exposure a n tory compli a p rovided a n nvirons of t h r ne) and li qot exceed t h e fuel cycle ghout the c o i ng is boun d ease pathwa y R site to the 3 circulatin g t operable.
T ing sump u s u id waste m o diation Pro t 10 CFR 2 0 t the public e UREG-0586, i ncludes no b g the time o f consists of a a i r samples a ffects of Ac c ysis is inte g n g shutdow n u lar updates o ted that "
w t nuclear fu eal resulting for any pot t adverse ef fe a ctively con t n ing at LA C t h Program s 8-12 i ll be need e o se expecte l ow the NU R e regulator yconsidered nd Monitori n a nt Radiolo g n nual report he site. Th e q uid efflue n he concentra tdose limits o urse of th e ded by the c r y for the dis Mississipp i g water disc h T he only li q s ing an air o onitor, whic h tection and 0 and 10 C F exposure as which con c ble gas an d f the release.
airborne par t are collected c idents and D gral to the l i n and deco m to the D-P l with conside r e l now store d from LA C e ntial even t fe ct on publi c t aminated S CBWR. Wo r s for LAC B e d to deco m ed to comp l R EG-0586 e y standards oas "Small."
n g g ical Enviro n s with ass e e REMP pro g n t releases d ation limits oof 40 CFR e decommi s riteria in N Ucharge of tr e i River is th r h arge syste m q uid effluen t operated pu m h is still ope r REMP at FR 50, Ap pa result of d c ludes the i m d particulat
- e. Due to pl a ticulate only to determi n Decommissi o i censing de s mmissioning
.l an/PSDAR , ration for th d in the ISF S C BWR oper a t to result i c health an dSCs will i n r ker safety i B WR which m mission a s l ete the de c estimate. A s of 10 CFR 2 nmental Mo essments of gram provi d d uring plan t of 10 CFR 2 0 190. Soluti o s sioning.
C U REG-0586 e ated and fi l h rough the "
s m. Currentl y t discharges m p. The a i r able. Cont i LACBW R pendix I. R E decommissi o mpact is min i e) analysis i a nt shutdow n and presen t n e the dose d oning Even t s ign basis f
- o. Post-fuel
, within sece current st a S I, this anal y ation and r i n exceedin g d safety."
nvolve the h is addresse d rely on A L s ingle unit B c ommissioni n s the occupa t 2 0, it is the r o nitoring Pr othe radiol o des assuranc e t operation s 0 , the dose l o ns will co n C onsequentl yand the imp ltered radio a seal well/di f y , the liquid wat LACBW R ir operated p i nue d appli c R ensures p EMP repor t o ning activi t imal. is subject t o n and cessat i ts a minor r e d ue to radio a t s o r LACBW Raccident an a tion "Plant a ge of LAC B ysis confirmemaining o n g dose lim i h ighest dose d in the Rad i L ARA princ BWR. ng is t ional r efore ogram o gical e that s and limits n tinue y , the pact is active ffuser w aste R are pump cation p ublic ts for ties is o the i on of elease active R and alysis Post-BWR s that n the its or rates iation iples.
La Cros s License T Revisio n The safe release o During d addition in NUR E decomm i LACB W potential
reductio nDec oPrior Radi o Operatio n and serv i in the IS FRadi oExpl oLoss Natu rHum The pub laccident s dose co n Plan/PS Danalysis i 8.6.2.4.The dec ovolumes b ulk deb are, and impleme nthe appr o and liquiThe maj o Energy S o and truc k transferr e s e Boiling W Termination n 0 ty of the p u f radioactiv e decommissi oto maintena n EG-0586 as s i ssioning o f W R are boun d consequen c n of the tota l ontaminatio nradioactive o active dec a n al acciden t i ce conditio n F SI, operati o o active was t o sions and/
oof contami n ral phenom e an caused e v lic dose con s s during dec o nsequences f D AR and re s i s therefore b Stora g ommissioni nof low lev e ris material s will contin u n tation of t h o priate segr e d radioactiv o rity of the o lutions dis p ked to a r a e d to a rail c W ater Reacto r Plan ublic is prin e materials d oning, Soluti n ce, waste m s ociated wi t f LACBW R d ed by the c es associat e l radionucli d n efforts ma dwaste ship m ay. s during de c ns. With th e o nal accide n te transporta t o r fires asso c n ation contr o e na, an d vents extern a sequences r e ommissioni n from accide n s ulted in do s b ounding fo g e and Disp o n g of LAC B el radioactiv s such as co n u e to be dis p h e Waste M a e gation, cla se wastes. Class A lo w posal site in a il trans-loa d car. Rail a n r cipally rela t d uring deco m ons will per f management , t h immedia t R. Conseq uaccident ev a e d with tho s d e inventory de before de c m ents, an d commissioni e spent nucl e n ts during de t ion accide n ciated with e ol, al to LACB W e ported in N n g ranged fr o n ts during L s e ranging frr the decom m o sal of Low
-B WR has, a e waste, in c ncrete, met a p ositioned a anagement P s sification, p w level radi o Clive, Uta h d facility i n n d truck sh i 8-13 t ed to pote n mmissionin g f orm decon t , and survei l te dismantli n uently, the p a luation pre se accidents at LACBW R commission i ng could re s e ar fuel re mcommissio n nts, xplosive an d WR. N UREG-058 6 om 0.02 to 0 LACBWR d e om 0.027 t o missioning o-Level Radi o a nd will c o c luding cont a a l and aspha l as low level rogram and p rocessing, p o active wast e h. Waste w n Winona, M ipments are ntial hazards g operations.
tamination a n llance activi t n g would a l potential d e sented in N would be l R fro m: i ng, sult from eq u moved from t n ing can be c d/or combu s 6 for onsite, 0.96 rem.
A e commissio n o 0.065 rem.
of LACBW R o active Was t o ntinue to r eaminated e q lt. Material s radioactiveassociated p p ackaging, s e from LA C will be loade M N where made in ac c associated nd dismantl e ties. The ac l so be appl i ecommissio n N UREG-058 6 l ess at LA C uipment fail u t he LACB W categorized a stible materi anon-fuel re l A n analysis o ning was p r The NUR E R. te equire the d quipment, t o s that canno t e waste. Th procedures, S shipment an d C BWR will b d into appr o the waste c c ordance wi twith an air b ement of S S cidents disc u i cable duri n n ing accide n 6. Howeve r C BWR due t ure, human e W R site and s a s follows:
a ls, l ated radiol o of potential p r ovided in t h E G-0586 ac c disposal of o ols, clothin g t be free rel e rough the p S olutions e n d control of b e shipped t opriate cont a c ontainer w i t h Departm e borne S Cs in u ssed n g the n ts at r, the to the e rror, stored ogical public h e D-c ident large g and e ased roper n sures solid t o the ainers ill be e nt of La Cros s License T Revisio n Transpo r Waste C o 8.6.2.5.Followi n radiolog iremaini n(excludi n radiolog ilicense w Chapter 6criteria.
8.6.3.N 8.6.3.1.The env i within s e The LA C existing L to b e co nslips are onsite r aactivitie s parking a to occur Several s roadway sincludin gremediat 636 foot waste st r No sig nactivitie scomply w regulato r In accor d onsite ar e 8.6.3.2.Only ar e and lice n and de m s e Boiling W Termination n 0 r tation (DO T o ntrol Speci Radi o n g the co m ical surveys n g in b ackf i n g the ISFS I i cal conditio will be termi 6 provide t h N on-radiolo g Onsit e ironmental i e ction 4.3.1 o CBWR dec o LACBWR l nducted wit h being cons t a il line will
- s. Contain e a nd equipm e in a manner structures s u s and rail l i g piping an d ed, as nece s elevation w r eam. nificant env s are anticip a w ith applic a r y requirem e dance with t e considere d Offsi t e as within t h nse terminat i molition equi p W ater Reacto r Plan T) regulatio nalist (WCS) o logical Crit e m pletion of will be per f illed struct u I) meets the ns are dem o nate d , with he method o gical Effect s e Land Use impact asso c of NUREG-0 ommissioni n icensed pro p hin the LSE tructed. Th e be modifie d ers will be u e nt/containesimilar to w u ch as the S ines, will r e d tunnels, b e ssary. All o t w ill be rem oironmental ated. In ad d able United e nts. t he guidanc e d as "Small.
"te Land Use he existing s ion activiti e pment, was t r n s. If Clas sfacility in A e ria for Licedecontami n formed to d u re baseme n unrestricted o nstrated to b the excepti o o logy for d e s of Decom m ciated with 0 586 to be g n g project i s perty previo u footprint.
S e existing r a d and refur b u nloaded a n r laydown, s w hen the fac i Switchyard, emain at lic elow the 63 t her system s oved during changes a s dition to NR C States Envi r e presented
" (in the Vici n ite licensed e s (such as t te container 8-14 s B/C wast e A ndrews, Te xnse Termin a n ation, dis memonstrate t n ts, any re muse criteri a be below th e o n of the ar e emonstratin g missionin g onsite land generically c s located a n usly used f o Some onsite ail line sup p bished with n d loaded o n storage, sta g i lity was op eAdministra tense termi n6 foot elev a s and comp o the decom m s sociated w C requirem e ronmental P rin NUREG-n ity) b oundary wemporary s t s, etc.). O f e is identifi e x as. a tion mantlement t hat the dos m aining pip i a specified i n e unrestricte ea around th g complian c uses has beonsidered a s n d executed or power ge n e roads have p orted the o p a rail spur n site. Onsi g ing and w a erational.
t ion Buildin g nation. Sub ation will be o nents as w e m issioning p w ith the si t e nts, d ecom m rotection A g-0586, the p will be used torage and s f the 163.5 a e d, it will band reme d se from resi d i ng and so i n 10 CFR 2 0 e d use criter ie ISFSI. L T ce with the een determi n s a "Small" i within the n eration; all been refur b p eration of t to support d ite activitie s a ste loading g , Crib Ho u surface bas e e radiologic a e ll as all str u p rocess and te-specific d m issioning a gency (US E potential im p to support d staging area s acre site, a b b e shipped t diation acti v d ual radioa c i ls at LAC B 0.1402. Aft e ia, the 10 C F T P Chapte r 5unrestricte d ned by the N impact. boundary o work is ex p bished. No b the facility.
decommissi o s such as v e are and co n u se as well a ement struc t ally assesse d uctures abo v disposed o f decommissi o a ctivities wil E PA) and W p acts to lan d decommissi o s for remed i bout 1.5 acr e t o the vities, ctivity BWR er the FR 50 5 and d use NRC, of the pected barge The oning e hicle n tinue a s all tures, d and v e the f as a oning l also W DNR d use o ning i ation es are La Cros s License T Revisio n located Appropr icontami n These mimpacts activitie s Land in t within a Upper M Crosse-B County h water q u located w b asin la nsome of t The clo s north of with a p o valley b e Decom m the Ref u southern traffic e n decomm i 8.6.3.3.LACB W Slough tpredomi n Mississi p the reac tsystems. Water p u to be pr o For a di towns a n river wa t in Lansi n river w a40 miles The LA C well at t h Potable w s e Boiling W Termination n 0 w ithin the i ate isolati o nation from m easures wil lassociated w s at LACB W t he vicinity five-mile r Mississippi R B ad Axe Ri v has establis h ality and pr o within the B n d use is agr i the agricult u sest munici pthe site, acr o o pulation o f elow the eas t m issioning a c ge at the s o end of the n tering or le i ssioning ac t Wate r W R is locate d tributary ex t n ant water u ppi River as tor, river w a River wat e ulled from o n cessed onsi t stance of 4 0 nd cities alo n t er for indus t ng, Iowa, a b ater for ind u downstrea m C BWR site h e site. Th e w ater use d u W ater Reacto r Plan fence-encl o o n and co n the LSE ar e l also be m o w ith the u s W R. of the LAC B radius, appr o River Natio n v er Basin W a h ed a Land &o tection of t B ad Axe Ri v i cultural an d u ral land to r pality to the oss from th e 258 consist t ern bluff.
c tivities are n o uthern bou nsite will be aving the si t ivities and t r Use d on the sho r t ends along u sage durin gcondensate ater is not c er does sup p n site wells w t e and disch a 0 miles do w ng the Missi s t rial purpos e bout 15 mil e u strial purp o m. has its ow n e locations o uring decom m r o sed LSE, ntrol measu r ea to the a d o nitored to e se of offsit e B WR site i s o ximately o nal Wildlif e a tershed as a& Water Re s t he environ m v er Watersh e d over 50%
o recreational l LACBWR e north-sout hs of various not being p e n dary of theminimally i te. Conseq u the potential res of the M ithe LACB W g the oper a cooling wat c urrently b e p ly the Lo w w ill support arged in acc o wnstream of s sippi River es, excludin g e s downstre a o ses betwe e n potable w a of all wells m issioning o 8-15 where mos t r es will b e djacent LA C e nsure their e lands are s predominane third is e & Fish R a Geograph i s ource Man m ent within e d. Approx of the land i s l and use, si m site is the h running H residences, rformed in a site. Also
, impacted d u uently, the oimpacts to l i ssissippi R i WR site fo r a tion of LA C er. With th e e ing used a s w Pressure a ndecommiss i o rdance wit hthe site, vi rare obtaine d g the adjace n am of the s i e n the LA C a te r supply, (active and o perations i s t work is e instituted C BWR prop e r effectiven eanticipated a ntly r ural a n water and b R efuge. W D i c Manage m agement Pl athis GMU. imately 36
%s forested.
T m ilar to othe rvillage of G H ighway 35.
farms, and a ny land are
, public acc e u ring deco m offsite land l and use off s i ver. The M r 3,000 fee t CBWR wa s e plant shut d s a cooling nd High Pr e i oning task s h the site's s rtually all m d from grou n n t G-3 fossi l i te. There a C BWR site provided t h abandoned)s not expec texpected t o to preven t erty as wel l e ss. Thus, nfrom the d n d undevelo bottomland s D NR has d e m ent Unit (G M a n (18), ad d The comm u% of the La T here is an i n r parts of ru r G enoa, appr This small a few retail as adjacent t ess to the b mmissioning areas are n o s ite are con s M ississippi R i t from nort h s the use o f d own and f umedium f o essure servi c s and this w a tate dischar g m unicipal w und water.
Tl plant, is t h a re no othe r and Prairi e h rough a si n)are illustra t ted to be sig o be cond u t the spre a l as offsite a n o environ m decommissi o ped. Of th e s included i n esignated t h M U) and V e dressing lan d unity of Ge n Crosse-Ba d n creasing s h ral Wiscons ioximately 1rural com m businesses i t o the site o r oat launch a by rail and o t affected b sidered "Sm a ive r and its h to south.
f water fro m u el removed or reactor o r c e water sys a ter will co n ge permits.
w ater suppli e The nearest u h e coal-fired r known us e e du Chien , n gle ground w t ed in Figur e nificantly g r u cted. a d of areas. m ental oning e area n the he La ernon d use, noa is d Axe hift of in. 1 mile m unity i n the r near at the truck by the a ll." Thief The m the from r fuel tems. ntinue e s for u se of plant ers of , WI, w ater e 8-5. r eater La Cros s License T Revisio nthan the solids h o includes tank tha t Mississi p discolor a downsp o located i n to water u 8.6.3.4.This sec trelated t o ponds, r e to the w e The en v section 4a "Small"At LAC Bits WD N LACB WSystem (and WD N reduced erosion decomm idemoliti o Radiolo g (ODCM)Potentia l onsite m per year elevatio n 201 A/B b uilding s LACB W As the w LACB W No adve r decomm i quality a r s e Boiling W Termination n 0 pota b le wa t o lding tank a sanitary h t services t h ppi River a a tion. Roof o uts or throu n side the L S use are con s Wate r tion evalua t o surface w e servoirs an d e st and the R vironmental 4.3.3 of NU R" impact. BWR, all no NR permits.
W R which m (WPDES) a s NR Waste w through i m and sedi i ssioning, s t o n will be m gical impact
) limits an d l onsite gro u onitoring w efor radiolo g n s. The pla n; MW-202 A s in appro p WR former p r water from W R, the ther m rse impacts i ssioning a c r e bounded b W ater Reacto r Plan t er use duri nand pump e olding tank h e LSE Tur b at outfalls.
drains are e gh the nor m S E. Conse q s idered "Sm a r Quality t es potentia l w ater and g r d lakes. At R efuge wetla nimpact ev a R EG-0586 h a n-radiologi c Water m a m eet the Ge n s well as L A water Permit mplementatiomentation t orm water r m onitored an ds are mini m d assessed t h u ndwater i m e lls at LAC B gical analy s n t's networ k A/B; MW-20riate locati o r ocess areas the Missi s m al impact t o on surface w c tivities. C o by NUREG-r n g plant po ed off by a that service s b ine Buildi n Release a r ither discha r m al effluent r quently, in a c a ll." l project ef f r oundwater.
LACBWR, n ds to the s o aluation ass a s been det e c al water dis anagement p n oa site's W A CBWR's W. In additi o n of appro p control d r un-off fro m d controlled m ized throu g h rough the m pacts are m B WR. Rep is purposes k of down g r 3A/B; and M o ns and qu a and potenti a ssippi is n o o the Missis s w ater and g r o nsequently
,-0586 and c o 8-16 wer operati olocal state s the Admi n ng. Storm r eas are pe r rged to the g release path w c cordance w fects on th o Surface w the nearby b outh. ociated wit h ermined to becharges to t h programs a n WDNR Wis c W DNR Tier I o n, impacts p riate Best d uring dec m active im pif necessar y g h adheren c REMP an d m onitored b y resentative g when grou n radient well s M W-204A/B antity to i n a l release po i o longer us e sippi River h r oundwater a , the potent i o nsidered "
S ons. Sanit apermitted s nistration B u water runo f riodically m ground area w ay after pr o w ith NURE G o se portions w ater genera l b odies of w a th surface a e generally a h e Mississi p n d practice s consin Poll u II Industrial to the Miss Manage m e n c ommissioni n p acted area s y. ce to Off-si t d the groun d y the routin g roundwate r ndwater co n s (five pair e B) are situat e ntercept an d ints. e d to cool h as been eli m are expecte d ial impacts Small." a ry wastes a sanitary wa s uilding and a f f is divert e m onitore d f o surroundin g o cessing thr u G-0586, the p of the nat u lly refers t o a ter are the M a nd ground w a pplicable t o p pi River ar e s have bee n utant DischStorm Wat e sissippi Riv e nt Practices n g operat i s undergoin t e Dose Ca l dwater mo n n e sampling r samples a r n ditions are e d wells: M W e d around t h d detect co n operating p m inate d. d from the i mto surface a re collecte d s te hauler.
a sanitary h o e d directly t o r oil shee n g the facilit y u an oil sep a potential i m u ral enviro n o streams, r i Mississippi R w ater quali o LACBW R e controlled u n implemen targe Elimi n e r General P e r will be g r (BMP) fo r ions. Dg remediati o l culation M n itoring pro gof 10 perm r e obtained t at low and W-200A/B; he key LAC B ntamination plant syste m m plementati and ground w d in a This olding t o the n and y thru arator m pacts nment i vers, River ty in R with u nder t ed at nation Permit reatly r soil D uring o n or anual g ra m. anent twice high MW-BWR from ms at on of w ater La Cros s License T Revisio n 8.6.3.5.The env i 0586 ha s LACB W require m BMP to m sources sfrom the Fugitive demoliti o controll e Radiatio n excessiv e suppress iDemolit i specific a Appropr i extende dimpacte d No adve ractivitie s consider e 8.6.3.6.The en vNUREG-impact.
The aqu a House a t approxi m disturbe d decomm i fauna in removal Various these aq u included Plans fo requipme n Solution s perform e s e Boiling W Termination n 0 Air Q ironmental i s been deter m WR complies ments of the W minimize f u s uch as the facility. dust will o n of concrd demolitio n n Protectio n e or harmf u ion by misti n i on equipm e ations whic h i ate Health a d periods of d by exhaust rse impacts
- s. Consequ e ed "Small."
Aqua t vironmental
-0586 has b atic habitat a t the shore l m ately 110 fe d during th e i ssioning a c the Missis s of the diffu sfresh water u atic enviro 53 species a r the demo l n t by barge.
s will conti n e d within a p W ater Reacto r Plan uality impact eval u m ined to be g with all ap p W DNR and u gitive dust d plant's die s be genera t ete buildin g n and d ism a n, Environm e ul dust emis s n g water wi l e nt will be h will pre v a nd Safety a operation t oemissions.
on air qua l e ntly, the po t ic Ecology impact ev a b een deter m a t LACBW R line to the fe et from th e e initial cotivities is n o s ippi River s er structure
,fish speci enments. A and 19 fami l lition of str u Conseque n nue to mai n p plicable li m r u ation asso c generally ap plicable Fe dthe Wisco n d uring dem o sel generato r ted from v g structures antlement te c e ntal, and S s ions are n o ll be used to operated a n vent excess issessments a o ensure th a l ity are exp etential imp a aluation as s mined to be R includes t hdiffuser str u e shoreline.
nstruction o o t expected and also n e , which shar es, macro-in 1980 stud y l ies (19).
uctures at L n tly, there is ntain WDN R mits. Protec t 8-17 ciated with plicable to L d eral and St a n sin Bureau o o lition and d r s are no lo n v arious dec oand the ex c c hniques, w i S afety and H o t generate dmitigate du nd maintai n i ve exhaust a nd controls a t personne l ected from t a cts to air q u sociated wi t generally a p h e area fro m ucture that Habitats a s o f the facil to disturb e e arby River e s a line wit v ertebrate p y indicated t LACBWR d no impact t o R permits a n tion of the nair quality i LACBWR w a te air qual i of Air Man aecommissio nger in ser v ommissioni n c avation of i th appropri a H ealth staff, d. As nece sst emission s n ed in acc oemissions s will also b e l and the e n t he implem e uality are b o t h aquatic e pplicable t o m the intake extends ou t ssociated w i l ity. How e existing aq utributaries, t h the G-3 f o p opulations, t hat the po p d o not incl u o the shoreli n n d decom m n earby Ref u in section 4 with a "Smal l ity regulati o agement, anning activit i v ice and ha v ng activitie ssoil. Care ate assessm e will be co n ssary, meas u s. ordance wit h from defe c e establishe d nvironment a e ntation of d o unded by N ecology in o LACBW R structure in t t into the M i th this are a e ver, the i m u atic habitat sstreams an d o ssil station, and veget a p ulation of f ude the rem o ne from thi s m issioning o p u ge wetland s.3.4 of NU R l" impact.
o ns, includi nd will impl e i es. Air em i v e been re m s , includin g ful plannin g e nts by Sol u n ducted to e n u res such a s h manufact u c tive equip m d during ex p a re not adv e decommissi o N UREG-058 6 section 4.3 R with a "S m tegral to th e Mississippi R a were previ mplementati o s , their flor a d wetlands.
is not plan n ation exist w f ish near th e o val of wa s s type of act i p erations w i s and habit a R EG-n g the ement i ssion moved g the g and u tions nsure s dust u rer's ment. p ected ersely o ning 6 and .5 of mall" e Crib River ously on of a and The n ed. within e site s te or i vity. ill be ats is, La Cros s License T Revisio n and will operatio n Exotic s reprodu c While t h rusty cra y ones in t conduct e the site.
A stud ymacroch i and cha n& Fish R perform e subsequ efossil st a require a construc t aquatic a The pot e 0586 an d The pot e and cons 8.6.3.7.The env i b een det e No kno w decomm i appropri a The lan dthe form afrom th e prevalen t operatio n onsite h a addition, that the d to the so udemoliti oanticipat e s e Boiling W Termination n 0 continue t o n s. s pecies ca ntion or sur v here are so m yfish, etc.)
i the vicinity e d at LACB W of the i m irus), fresh w n nel catfish (R efuge Pool e d in 1980.
e nt shutdow n a tion, has fu r a ny operati o tion, demoli a reas beyon d ential impac t d considered ential impac tidered to be Terre s ironmental i m e rmined to b wn terrestr i i ssioning p r a te BMPs a r d around L A a tion of ab o e Mississip p t in surroun d n s associate d abitats for m with the s h direct heav y uth, no dire c on activities e d impact t o W ater Reacto r Plan o be a prior i n threaten n vival rate, a m e known a q n Vernon C of the LAC WR have n o mpingement water drum
((Ictalurus p u 9 navigatio n It was d e n of LACB W rther reduce d ons resultin g tion, materi a d the site bo u t s to the aq uto be "Sma l t s to the aq u"Small."
strial Ecolo g m pact eval u be generally i al exotic o roject area.
re, and will c A CBWR wa s out 27 acres p i Rive r. T ding areas.
d with G-1 m any plant a n hort-term na t constructio n c t impacts t o do not incl u o the shoreli n r i ty when pl a n ative spe c and disease s q uatic invasi ounty, thes e BWR site (o t resulted i n and entrai n (Aplodinotu u nctatus), w n areas fro m etermined t h WR and red u d this impa c g in any i m al and wast e u ndary. uatic ecolog y l l." u atic ecolog y g y uation of ter rapplicable t o o r invasive To minim c ontinue to b s initially di sby filling ri vherefore, t h Given the e and G-3 a s nd animal s p t ure of the w n and demo o any off-sit e u de the rem o n e. 8-18 a nning onsi t c ies and e c s or parasit eve species (e have been n 20). The o p n the introd u nment of t s grunniens
)within the U p m the operati o hat the imp a u ce d intake o c t. Decom m mpingement e staging or y within the y beyond th e r estrial ecol o o LACBW Rspecies h ize the intr o b e followed.
sturbed by t h v er edge an d h e site shor e e xtensive la n s well as L A p ecies, incl u work associ a lition proje c e sensitive s p o val of wast e te dismantl e cosystems d es they ma y (e.g. zebra m n oted in slo u p eration an d u ction of an y the fishes, ), gizzard s h p per Missis s o n of LAC B act was mo o perations, l m issioning o p and entrai n transfer op e site bound a e site bound a o gy in secti o R with a "S m h ave been n oduction o f t he construc t d low fores t eline no lo n n d distu r b an c A CBWR, t h u ding endan gated with d e ct area is se p p ecies are a n e or equip m ement or w a d ue to ag g y transmit t o m ussel, curl y u ghs and la k d decommisy aquatic i nsuch as b l h a d (Doros o sippi River N B WR and G-st likely in s limited to s u p erations ar e nment imp a erations wil l a ry are bou n ary have al s on 4.3.6 of N mall" impact.
n oted to o f exotic or i t ion of the f t areas with nger resembce, constru c h e terrain h g ered or inv ecommissio n parated fro m n ticipated.
S m ent by barg e a ste manag e gressive gr o o native sp e y-leaf pond w kes other th a sioning acti v nvasive spec i luegill (Le p oma cepedi a National W i-3 was previ s ignificant.
u pporting th e e not expec t a cts to fish.
l be perfor m n ded by NU R so been eval u N UREG-058. occur withi n i nvasive sp e f acility, incl umaterial dr eles the sho r c tion and ye aas not sup pasive speci e n ing and th e m the Refug e Since the pl a e , there is al ement owth, ecies. w eed, a n the v ities i es to pomis anum) ildlife ously The e G-3 ted to No med in REG-uated 6 has n the e cies, uding e dged reline ars of p orted es. In e fact e area a nned so no La Cros s License T Revisio n Best Ma n spills res The pot e"Small."
The pot e evaluate d 8.6.3.8.
The pot e and cons A revie w Endang e two spe c which L AA m Miss iA pl a facin No note d due to t hthe exist i River to terrestri a presence been no t Higgins e Likewis eWiscons i Habitat Plimeston e townshi pfor this p The Per e Species l of falco n protecti odelisted hatching decomm i falcon re s e Boiling W Termination n 0 nagement P rulting from ential impa c ential impa c d and consi d Thre a ential impac t idered "Sm a w of the U e red, Propo s cies are desi g ACBWR re s m ussel speci e i ssippi Rive r a nt species, g slopes: T h d adverse i m he siting and i ng G-3 fos sthe west an d a l or aquatic of the Hig g ted. A mu s e ye pearly m e , the North e i n Departm e P rogram (2 2 e cliffs ove r ps within V e p lant species e grine Falco n l ist in 1975 n nesting bo x n (23). Ov e i n 1999 (2 4efforts.
S i ssioning w icovery effo r W ater Reacto r Plan r actices an d equip m ent o cts to terre s cts to the t dered to be "
atened o r En d t s to "Thre a a ll." U.S. Fish a n s ed, and Ca g nated as "
T sides in: es, Higgins r: Endange r Northern m hreatened.
mpacts to aq u operation o f sil station, t h d the rail linhabitats w h gins eye pe a s sel survey o m ussels were e rn monksh o e nt of Agri
- 2) has noted r creeks an d e rnon Count yto be impa c n (Falco pe rand startin g xes at its fa c erall, Peregr 4); however, Since the G ill not inter f r t and popul a r d site proce d o peration.
s trial ecolo g t errestrial e cSmall."
d angered S p a tened" or "
E nd Wildlife ndidate Sp e T hreatened" eye pearl y red. monkshood uatic species f the LACB W he majority o e and High w hich may be arlymussel i of the Thie f found. o od has not culture, Tr athat the No r d streams a n y. This ha b c ted by deco m r egrinus) w e g in 1993, D c ilities, incl u i ne Falcon r Dairyland G-3 facility fere with G
-a tion. 8-19 d ures requir e g y are b ou n c ology bey o pecies E ndangered"Service li s e cies' Coun ty or "Endang ymussel (L a (Aconitum n have been n WR facility
, of the licen s way 35 to th einhabited b yn mussel b e f Slough ri v been noted a de & Con s rthern mon k n d the plant b itat is not p mmissionin g e re put on th eairylan d su p uding at the G r estoration p has continu e will still c-3 operatio n e prompt cl e n ded by N U o nd the sit e" species ar e sting, the F ty Distribut iered" withi n ampsilis hi g n oveboranc e n oted during
, as well as t sed site, situ e east, is de v y threatene d eds in the v i v e r area wa s on or in th e sumer Prot e kshood's ha bis present i present with i g operationse Wisconsi n pported rec o G-3 stack, t o program eff oed to maint c ontinue op e ns or its sta c e anup and r e U REG-058 6 e boundary e bounded b Federally-Li s i on (21) co n n Vernon C o g ginsii), wit h e nse), with plant opera t t he previous uated betwe e v eloped and d or endang e icinity of L A s conducte d e vicinity of ection's En d b itat is leac h i n the Whit e i n or near t
- h. n Endangere d overy effort s o support c h o rts resulted t ain the G-3 erations an d ck, there is emediation o 6 and consi d have also b y NUREG-s ted Threa t ncluded that o unty, the c o h habitat i nhabitat in n t ions. In ge n G-1 facilit y e n the Missi s does not s u ered species.
A CBWR h a d in 1978 a n LACBWR. d angered S p h ed sandston e stown and he LACBW R d and Threa t s with instal l h ick hatchin gin the bird b nesting sit e d the LAC Bno impact t of oil dered been -0586 tened, only o unty n the n orth-neral, y , and s sippi u pport The as not n d no The pecies e and Stark R site tened lation g and being e and BWR t o the La Cros s License T Revisio n 8.6.3.9.Occupat i consider e The env iNUREG-impact. program s also dur iare thos e ergono m Solution s contract o prevent owith fed States O c Typical followin gSafe tSafe tProv iWor k spec i such Obta iInvo l pack aIssui n lesso nHold reinf o 8.6.3.10.A detail eLTP. 8.6.3.11.LACB W efficient with so m s e Boiling W Termination n 0 Occu p i onal issues/
ed "Small."
ironmental i-0586 has b While deco m s addressin g i ng repair a n e related t o m ic, and biol o s is comm i or health an d o ccupationa l eral and st a c cupational Hcontractor g: t y training a s ty emphasis i ding a ll wo r k er training ific worker qas heavy eq u i ning and re v l ving Healt h a ges and pa r n g periodic n s learned.
ing safety s o rce safety e Cost e d discussio n Socio W R was shut to operate.
m e projects W ater Reacto r Plan pational Iss usafety has b impact eval u b een deter m mmissionin g g worker sa f n d refueling o human h e ogical hazar d i tted to de c d safety pro g l injuries an a te regulati o Health and S safety prac t s a part of t h as the first t o r kers with a and requir e qualificatio n uipment de m viewing Sa fe h and Safe t r ticipating i nsafety mess s tan d-down s e vents and l e n of the site economic I mdown in 1 9 By 1994, s oassociated r ues/Safety een evaluat e u ation asso c mined to b e g involves i n f ety were i m outages.
T e alth and s a d s. Radiolo g commission i grams to eff e d illnesses.
o ns includin g S afety Adm i tices and c h e site acces s opic of disc u Health and S e d certificat i n s. Certain s molition fir m fe ty Data Sh e ty staff in n pre-job wa l ages to co m s whenever e ssons learn edecommiss i m pacts 9 87 as the s m ome increm e with the r 8-20 e d to be bou n ciated with generally a p n creased ind u mplemented T he occupat i afety, inclu d gical impact i ng LACB W e ctively con t Contractor g Wisconsi n i nistration (O communicat i s program f o ussion at me S afety book l i ons revie w s pecialty su b m s. e ets for che m reviewing l kdowns, w o m municate a wserious sa f ed site-wide
.i oning proj e mall size o f e ntal decom m removal of nded by N Uoccupation a pplicable t o ustrial activ i during the i onal issues ding impac t t s were disc u WR safely trol hazards health and s n Departme O SHA) req u ions will i n o r all emplo y e etings. let. w prior to a s b contractors m icals boug h and appro v o rk conditio n wareness o f f ety events
. ect costs is p f the plant d m issioning p the RPV i U REG-0586 al issues in o LACBW R i ties and sa fe operation o f and safety ts from ph y u ssed in sec tthrough th ein the work safety prog r e nt of Labo r u irements.
nclude acti o y ees and su b ssignment t o are mobili z h t onsite.
v ing decom m n assessme n f significant occur to c presented in did not mak e p lanning an d in 2007 anand the imp section 4.3.
R with a "S m fety focus, s i f the facilit yimpacts ass y sical, che m t ion 8.6.2.
e applicati oenvironme n r a m s will c o r and the U o ns such a s b-contractor s o tasks req u zed, as nece s m issioning n ts and revie wsafety issue ommunicat e Chapte r 7 o e it econom i d activities b d other m e p act is 10 of mall" imilar y and essed mical, o n of n t and omply United s the s. uiring ssary, work w s. s and e and of this ically began etallic La Cros s License T Revisio n radioacti vcomplet e periodic the ISFS I More a ctimefra m obtained personn eactivitie sincrease d project a n Therefor impact i s 8.6.3.12.The per c Vernon C Crosse) aimpact t o Decom mtranspor t Highwa yrelative t There is impacte dsite spec i 8.6.3.13.A revie w May 201 historica l the plan t Archeol o which w a Also, as along Hi the US A Upper M Axe. T h first nuc lmarker a concern s s e Boiling W Termination n 0 ve compon e e d by 2012.
spikes in w I project) (2 ctive deco m me. Some ofrom outsi d el from the l o s will have a d use of the n d workers w e, the soci o s considered Envir o c entages of C ounty are q and more p o o the greater m issioning a c t equipment y 35 traversi n o rail and tr u no reason d by the dec o ific impact i Cultu r w of the N 5 a nd the W l sites in V e t. The clos e ogical Site n e a s certified bindicated i nghway 35 i nCE Lock a n Mississippi.
T h e third wa s l ear gene r at i t the waysi d associated w W ater Reacto r Plan e nts over t hStaff size a t o r kforce hi r 5). mmissioning of the labor de Wiscons i o cal and re g a short-ter mlocal craft w w ith suppli e oeconomic i"Small." onmental J u low-incom e q uite low, a opulated Wi population, c tivities will and debris.
n g north-so u u ck transpo rto believe ommissioni n s considere d ral, Historic
, National Par k W isconsin H e rnon Count y e st historica l e ar Stoddar d b y the Natio n n NUREG-0 n Vernon C o nd Dam No.
T he second , s adjacent t o i ng plant. I n d e across Hi g w ith having r he past 7 y e t the plant h a r ing to supp oand struc ttasks requ i i n; however
, g ional areas m positive e c w orkforce a e s and servic impact is e v ustice e and mino r approximate l sconsin cou n including s pcause sligh t The truck t u th by the s i rtation as a r ethat low-i n n g project.
d "Small."
, and Arche o k Service N Historical S o y and no st r l site with p r d , WI. locat e n al Park Se r191, the St a o unty. One i 8. It descr i , about 7.5 m o LACBW R n 2009, cre w g hway 35 fr o a public-ac c 8-21 ears. A s m a s graduall y ort specific tural demol i ire speciali z , some of t hsurroundin g conomic im p a nd opportu nes. v aluated to ity groups w l y 3%, and nties furthe r p ecial grou p t increases i traffic will u i te. There e sult of dec o ncome and m Per NURE G o logical Res N ational Re g ociety (29) t h ructures in t h re-historica l e d approxim a r vice in 198 0 ate of Wisc o i s about a h a ibes the ori g m iles south o R and comm e w s erected a om the site (cess marker o m all ISFSI f y been r educ e project nee d i tion is an t zed skills a n h e workforc g the site.
O p act on the nities for lo c be bounde d within the Vlower than r from the L p s, is expect e i n truck traf f use existing will be no e ommissioni n m inority p o G-0586 and ources gister of H t hrough Ma y h e village o l structural rately 7 mile s 0 (30). o nsin has pl a alf mile nor t gin of the p r of the plant,emorates th a new, updat (31). This n e on Dairylan f acility hol ded as opera t ds (e.g. 40 p ticipated i n nd equipme ne will be c o Overall, the d local com m cal business d by NUR E Village of Gthose in lar g LACBWR s i ed. fic to and fr omain street environmen t ng. o pulations w this evalua t Historic Pla c y 2015 iden t f Genoa or w remnants is s north of t h aced three h t h of LACB W resent syste m , highlights t e plant itse l t e d Wiscons i ew location d property.
ding 5 cask s t ions ceased
, personnel st a n the 2016-n t which w i o mprised o f decommissi o m unity due t s es to suppo r E G-0586 an d G enoa as w e ge cities (e.
i te (26) (27)om LACB W routes, pri m tal justice i m will be adv e t ion, the pot e c es (28) th r tified only a within 5 mi lthe Goose I h e LACBW R historical m a W R, overlo o m of locks o the Battle o f lf as Wisco n i n state hist o resolved se c s was , with affing -2017 ill be f craft o ning t o the rt the d the ell as g. La . No WR to marily mpact ersely ential r ough a few l es of Island R site, a rkers oking o n the f Bad n sin's orical c urity La Cros s License T Revisio n Dairylan presents or categ o Land d iprimaril y Land th a the cons t station) w erosion c Based o ntranspor timpact o n 0586 a n Archaeo l 8.6.3.14.The env i 0586 ha sThe imp a disturba ncomplet eremoved River. Tcompleti ThereforNUREG-8.6.3.15.The env i has been LACB W 475 feet north si d south si d hospital s approxi m Noise g eequipme ntempora rcomplet e experien c s e Boiling W Termination n 0 d sent an u nthe control r o rize any pa r i sturbance f o y shipped vi a a t was distu r t ruction an d w ere perfor m c ontrols and n the histo r i c t ation of sy s n cultural, h n d based u logical Res o Aest h ironmental i s been deter m a ct of deco m n ce and dur a e d. Once al l , the aesthe t T he final d e on of the de c e, the envir o-0586 and t h Nois e ironmental idetermined WR is locate d west of the d e and a por t d e. There a r within 1 m mately 1 mil e e neration w i nt. Noise r y and will e , noise leve l c ed during t h W ater Reacto r Plan n used contro l r od an d a r e rt of the LA C or the remo v a rail. rbed for pro j d demolition m ed in acc ostormwater cal informat stem compo nistoric, and a u pon this e o urces are c o hetics impact eval u m ined to be g mmissioning ation. These l of the maj o t ics will im p etermination c ommissio n onmental i m h e impact is impact eval u to b e gener a d on the sh orail roa d li n tion of the U re no reside n mile. The n e to the nort h ill primarily associated woccur pri m ls in the vic i he operatio n r l rod to the W e plica fuel a s CBWR plan t v al of large jects beyon d of the G-1 ordance wi t pollution pr i on present e n ents and w a rcheologic a valuation, t o nsidered "S m u ation asso c generally ap on site aest h impacts ar e or plant stru c p rove slightl y on usage oing. mpact assoc iconsidered "uation asso c ally applica b ore of the M n e. USAC E U pper Missi s nces within 1 earest com m h of the pla nresult fro m w ith decom m marily duri n inity of the L n of the facil i 8-22 W isconsin H s sembly (3 2 t as a histori component s d the nucle afossil stati o th applicabl e e vention pl a e d in NURE G w aste, the d e a l resources.
t he potenti a mall." ciated with aplicable to L h etics (e.g.
v e temporary c tures and b u y b y provid i o f the deco m iated with a e"Small." ciated with n b le to LAC B Mississippi R E land and L s sippi River 1,000 feet o f munity, the nt. m demolitio n m issioning a n g daylight LACBWR s i ty. Historical M u 2); however, ical site.
s will be mi n a r operation a o n an d the c e permits a n a ns. G-0191 an d ecommissio n. Conseque n a l impacts aesthetics i n LACBWR w visual skyli n and will ce a uildings eas t ing a more o mmissioned esthetics is n oise in sec t B WR with a "River, 300 f e L ock and D National W f the station village of G n activities i and shipmen t hours. O n site will be r u seum in M athere is no n imized as t a l areas (e.
g onstruction n d include d d the current n ing will h a n tly, as bou n to Cultur a n section 4.
3 with a "Smal l ne) is limite d a se when de c t of the Mis s o pen view o property w ievaluated t otion 4.3.16 o"Small" im p feet from th e Dam No. 8 a r Wildlife & Fi structures a Genoa, Wis c nvolving h e t of waste i s nce the de c reduced to l e adison, WI w objective t o t he waste w g. associate d of the G-3 d appropriat eapproach f o a ve no signi f n ded by NU R al, Historic, 3.15 of NU R l" impact.
d in terms o f commission i sissippi Riv e o f the Missi s ill be made o be bound e of NUREG-p act. e river ban k re located o sh Refuge o a nd no scho o c onsin is l o e avy constr u s intermitte n commissioni n e vels below w hich o save will be d with fossil e soil o r the f icant R EG- and R EG-f land ing is er are ssippi upon e d by -0586 k , and o n the o n the ols or ocated uction nt and n g is those La Cros s License T Revisio n Due to timpacts decomm iimposed ThereforNUREG-8.6.3.16.The env iNUREG-impact.
During t hefforts w Low lev e disposal addition, Texas. As state d process a and fuel These r edestabili z Therefor b ounded 8.6.3.17.The env iNUREG-impact.
The nu m than durincrease d effect o n b arge tr a support t operatio n Therefor by NUR E 8.6.3.18.Cumulat iimpact o f s e Boiling W Termination n 0 t he distanc e on noise l i ssioning, S by the Vill a e, the envi r-0586 and t hIrretr i ironmental i m-0586 has b he demoliti o will be mad e e l radioacti vsite in Cliv e any Class B d in NURE G are the mate r used for co n esource co m zing. e, the envir o by NURE G Traff i ironmental i-0586 has b mber of ship m i ng the ope d traffic and n traffic flo w affic. The e t he operatin g n s. e, the envir o E G-0586 an dCum u ive impact i s f the action w W ater Reacto r Plan e of the sta t l evels duri n S olutions ag r a ge of Geno a ronmental i h e impact is ievable Res o m pact eval u b een deter m o n and struc
- e. Some m e v e waste ha s e , Utah. T h B/C waste t h G-0586, irret r rials used to n struction m mmitments onmental i m G-0586 and t h c and Trans p impact eval u b een deter m ments and t h ration of t h wear and te w or road w e xisting bar g g G-3 fossil onmental i m d the impac t ulative Impa c s defined th e w hen added r tion from s e ng decomm rees to co m a. mpact asso cconsidered "ources uation assoc i mined to be tural disma n etals from t h s been and his facility h h at is gener a rievable res odecontami n m achinery an d are consid e mpact assoc i h e impact is p ortation uation asso c mined to be he volume o f he facility. ar on road w e ar. There w g e traffic on station and m pact associ t is consider e c ts e impact on to other pa s 8-23 e nsitive rec e issioning a n m ply with a ciated with "Small." iated with ir r generally a p ntlement of h e site are a n will contin u has sufficien t a ted will be s o urces that w nate the facil i d for transp o ered to be iated with i rconsidered ciated with t generally a p f waste shi p Non-radiol o ways. It is a n will be no r athe Thief Sare not asso ated with tr ed as "Smal l the environ s t, present, a e ptors, ther e nd demolit i a ny noise l i noise is e v retrievable r pplicable t o the station, anticipated t o u e to be shi p t space for t s hipped to t h w ould occur ity (e.g., ra g o rtation of mminor and r retrievable "Small." transportati o pplicable t o p ped are gre a ogical impa c nticipated th a adioactive w S lough b ran c ociated with ransportatio n l." nment which a nd reasona b e will be l i ion activiti e imitations (e valuated to r esources in o LACBW R recycling a n o be release p ped to the t he disposal h e WCS fa c during the d gs, solvents, m aterials to aare neithe rresources i s on issues in o LACBW R ater during d cts of trans p at there will waste shipm e c h and the M LACBWR d n is evaluat e h results fro m b ly foreseea b imited temp e s. Durin g e.g. quiet h be bound e section 4.3.
R with a "S m n d asset rec o d as clean s Energy Sol uof this was t c ility in An d decommissi ogases, and t o and from th e r detectabl e s evaluated section 4.3.
R with a "S m decommissi o p ortation in be no signi f e nts execut e M ississippi R decommissi o e d to be bo u m the incre m ble future ac torary g the h ours) ed by 18 of mall" o very scrap. utions te. In drews, oning ools), e site. e nor to be 17 of mall" o ning clude ficant e d via River oning unded m ental t ions.
La Cros s License T Revisio n The cu m decomm iterrestri acumulati v Past, p r decomm i Mississi p resource sactivitie s over timmajor ir r disposal disposal In sum m 8.7.O 8.7.1.F Decom mHan dWor kPubl iLice nWor kLiqu iHaz aHan d Charact e of lead p 8.7.1.1.The maj oare admi nPart 2Part 5Part 5Part 6 s e Boiling W Termination n 0 mulative imp a i ssioning.
T a l ecology.
v e impact.
r oposed a n i ssioning o f ppi river for s listed ab o s are not pro j e , exceed t h r etrievable r eof low le vand will the r ary, the cu m Overview of F ederal Req u m issioning a c d ling, packa g k er radiatio n i c radiation p nse terminat i k er health a n i d and gase o a rdous waste d ling and re m rization an d aint. Nucl e o rity of radi o n istered by t 2 0 - Radiati o 5 0 - Decom m 5 1 - Enviro n 6 1 - Dispos a W ater Reacto r Plan a cts were as hese includ eIrretrievab l nd future f coal-fired p boating. T h o ve were a l jected to si g h e minor i m esource attr i v el radioacti v refore have n mulative imp a Re g ulatio n uirements c tivities that g ing, and sh i n protection, protection, i on and fina l n d safety, o us effluent r generation/
m oval of as b d removal o f ear Regulato r ological act i t he NRC. A o n protectio n m issioning a nmental pro t a l of radioa c r sessed by fi e surface w l e resource sforeseeabl e p ower plan t h e individua l ll determin e g nificantly a c m pact of the i butable to L ve waste. N no cumulati v a ct to site r e n s Governinare subject t ipment of ra d l site releas e releases, disposition,estos, f Polychlori n ry Commis s ivities fall u n A pplicable T i n. activities.
tection. c tive waste.
8-24 rst determi n w ater and gr o s were als o e actions ts and recre a l impacts o f e d to be m i ccumulate e n individual a LACBWR d N o future a c ve effect.
e sources is p r g Decommi t o federal re g dioactive w a e , nated Biphe n ion nder Title 1 0 i tle 10 regul a n ing the res o o undwater, o evaluate d include c o ational use f the LACB W i nor. The p nvironment a activities o n d ecommissi o ctivities wi l rojected to b i ssionin g A c g ulations in c aste, n yls (PCBs)0 of the Co d ations inclu d o urces affec tair quality, d from th e onstruction, of the land W R decom m p ast, presen t al impacts t h n the affect e o ning was t h ll involve r be minor.
ctivities an d clude: ), and Hand l d e of Fede r a d e: t ed by LAC B aquatic ec o e perspecti v operation as access t m issioning o t and futur e h at would in e d resources he use of la n radioactive w d Site Relea s l ing and re m al Regulatio n BWR ology, ve of and t o the o n the e site total, . The n d for w aste s e m oval n and La Cros s License T Revisio nPart 7 thro uPart 7 8.7.1.2.The En v Federal RPart 6Parts Part 1Part 1Parts Part 2Part 7Part 1 8.7.2.FPermits a environ m fall undeWiscWisc Envi rVillaOcc u This inf o intended 8.8.C As previ o decomm i"site-spe potential predicte d (NURE G environ m s e Boiling W Termination n 0 7 1 - Packag u gh 174 also 7 3 - Physic a U.S. E vironmental R egulations 6 1 - Asbest o 122 to 125
-141 - Safe D 1 90 - Radia t 260 to 272
-2 80 - Unde r 761 - Toxic 1 29-132 - C F ederal, Sta t a nd approva l m ental prote cr Federal, S t onsin Depa r onsin Dep a ronmental a n ge of Geno a u pational Sa f o rmation pr o to be all-in c C onclusion ously evalu a i ssioning L A cific" in N Uenvironme n d in and wi l G-0191, NU R m ental chan g W ater Reacto r Plan ing and tra napply). al Protectio n Environmen tProtection Aapply as fol l os Handling
- National P D rinking W a t ion Protect i- Resource C r ground Sto r Substance C C lean Water A t e and Loc a ls from or n o c tion purpo s t ate and loc a rtment of N a artment of n d Occupati o a f ety and He a o vided abo v clusive. a te d in the D A CBWR are U REG-0586 ntal impacts l l be bound e R EG-0586, a ges associat e r n sportation o n of Plants a n tal Protectio A gency (E P l ows: and Remov a Pollutant Di s ater Standar d i on Standar d C onservatio rage Tanks C ontrol Act (A ct a l Require m otifications t s es. Decom m al jurisdictio n a tural Resou r Health S e onal Health, a lth Admini s ve is a gen e D-Plan/PSD A temporary a have been associated w e d by the p a nd D-Plan/
P e d with deco m 8-25 f radioactiv e n d Materials n Agency P A) regulati o a l s charge Eli m d s d s for Nucle a n and Reco v (TSCA) for ments t o state and l m issioning a n include, b u r ces (WDN R ervices, Di v Radiation P s tration (OS H eral overvie w AR, the non-a nd not sign i evaluated a with decom m r eviously is P SDAR). T mmissionin g e waste (reg. ons outline d m ination Sys t a r Power O p v ery Act (R C Polychlorin a l ocal agenci activities a n ut are not li m R) v ision of Protection S e H A) w of the a pradiologica lificant. Th e a nd there is m issioning L ssued envir o Therefore, t h g. g ulations in 4 d in Title 4 0 tem (NPDE S perations CRA) ated Biphe n es are requi r n d related si t m ited to the Public He a ection pplicable re g l environme n e potential is no signific a LACBWR h onmental i m h ere are no n 49 CFR Par t 0 of the Co d S) n yls (PCBs) r ed for safet y t e operation sfollowing:
a lth, Bure a g ulations an d ntal impacts sues identif i ant impact.
h ave already m pact assess m new or signi f t s 171 d e of y and s that au of d not from ied as The been m ents ficant La Cros s License T Revisio n 8.9.R 1. U C 2 2. D R 3. D S 4. U r e C 5. U S N 6. D D 7. E S 8. E S 9. A 10. H 3 11. U h t 12. D 13. U 14. U h t15. h t s e Boiling W Termination n 0 R eferences U.S. Nuclear C ontent of L i 011. D airylan d Po R eactor - Se p Dairyland Poupplement R U.S. Nuclear elated to Op e C ooperative
-U.S. Nuclear tatement (G November 2 0 Dairyland Po Decommissi o E nergySoluti urvey Repo r E nergySoluti urvey Repo r Atomic Pow e H aley & Ald r 0, 2012.
U.S. Census B t tps://www.
c Dairyland Po U.S. Fish &
W U.S. Army C t tp://www.m t tp://www.c i W ater Reacto r Plan Regulatory i cense Term iwer Compa n ptember 197 2 wer Cooper a R eport - Ju nRegulatory e ration of t h- April 1980Regulatory EIS) on De c 0 02. wer Cooper a o ning Activi t ons GG-EO-rt for Octob e ons LC-RS-r t for June t h e r Review, "
A r ich, Hydro g B ureau, 200 c ensus.gov/
p wer Cooper a Wildlife Ser vorps of Eng i m vp.usace.a r ity-data.co m r Commissio n i nation Plan n y, DPC-E D 2. a tive, Envir o n e 15, 1973. Commissio n he La Crosse . Commissio n commission i a tive, LAC B ties Report
(-313196-R S e r and Nove m PN-164017-h ru August 2 Atomic Jou r geological C 8-2012 Am e programs-s u ative - http:
/vice - http://
i neers - rmy.mil/Mis s m/city/Geno a 8-26 n Regulator y s for Nucle a D-3, Environ onmental R e n NUREG-0 Boiling W a n NUREG-0 i ng of Nucle B WR Deco m (D-Plan/PS D S-RP-001, L A m ber 2014 F-001, LAC B 2 015 Field W r nal" - Sept e onceptual S i erican Com m u rveys/acs/n e//www.dair y www.fws.g o s ions/Navig a a-Wisconsin
.y Guide 1.1 7 a r Power Re a nmental Rep o e port, La Cr o 0 191, Final E ater Reactor 0 586, Gener i ear Facilities mmissioning D AR), Revi s A CBWR R a Field Work
-B WR Radiol o W ork - Nov e e mber 24, 2 0 ite Model, F m unity Surv e e ws/data-rel e ynet.com/en e o v/refuge/U pation/Locks D.html. 7 9, Standar d actors, Revi s ort - Lacros s o sse Boilin g Environmen t by Dairyla n i c Environ m, Suppleme n Plan and P o s ion - Marc h a diological C- Novembe r o gical Char a ember 2015.
0 11. F ile No. 387 0 ey. (5-year d e ases.2012.
h e rgy_resour c p per_Missi s Dams/Lock D d Format an d s ion 1 - Jun e s e Boiling W g Water Rea c tal Stateme n n d Power mental Impac t n t 1, Volum e o st Shutdow n h 2014. C haracteriza t r 2015. a cterization 0 5-001 - A u d ata sets) -
h tml. c es/genoa.p h s sippi_River
/Dam8.aspx.
d e W ater c tor, n t t e 1 - n t ion u gust h p. /.
La Cros s License T Revisio n 16. D P W 17. D D 18. V 19. M C D 20. W- 21. U C h t 22. W S 23. D h t 24. W h t 25. H L 26. V r e 27. U 28. N 29. W 30. N S 31. D 2 32. W s e Boiling W Termination n 0 Dame & Mo o otential, La W isconsin fo Dairyland Po Decommissi o V ernon Cou n M cInterny, M C ooperative' s December 1 9 W isconsin D ehttp://dnr.w U.S. Fish an d C andidate S p t tp://www.f w W isconsin D epecies Habi t Dairyland Po t tp://www.d W isconsin D e ttp://dnr.wi.
g H ubbuch, C h L a Crosse Tr i Village of G e ecords.com/
w U.S. Census B National Par k W isconsin H i National Par k ite Ve-502
-Dairyland Po 009. W isconsin H i W ater Reacto r Plan o re, Geotec h Crosse Boil r Gulf Unit e wer Cooper a o ning Plan, r n ty, Land &
W M ichael. C., I s Genoa Sit e 9 80. epartment o f i.gov/lakes/
i d Wildlife S e pecies' Cou n ws.gov/mid w epartment o f tat Program wer Cooper a dairynet.com
/epartment o f g ov/eek/crit t h ris, A nucle a i bune - Jul y e noa, Verno n wisconsin/g e B ureau, Ver n k Service, N a istorical So c k Service, N a- http://nrhp.
wer Cooper a istorical So c r h nical Invest iing Water R e d Nuclear F a tive, LaCr o r evised Nov e W ater Reso u Impingeme n e , Thesis, su b f Natural R e i nvasives.
ervice, Fede r n ty Distribut i w est/endang f Agricultur e- http://datc p a tive, Pereg r/environme n f Natural R e ter/bird/falc o a r option: A y 15, 2012.
n County, W e noa_data.h t n on County , ational Regi c iety - http:/
/ational Regi focus.nps.g o a tive, Powe r ciety, Nucle a 8-27 i gation of G Reactor (LA C F uels Corpo r osse Boiling ember 2003.
urce Manag e nt and Entrai bmitted to U esources, Aq u rally-Listed i on, April 2 0ered/lists/w i e , Trade &
C p.wi.gov/Fa rine Falcon R ntal/falcon_
p e sources, Pe r on.htm. f ter 25 year s W I Public Re c t m. , Wisconsin ster of Hist o/www.wisco stry of Hist o o v/natregse a r for Genera t ar Fuel Asse m G eology, Sei s CBWR) nea r r ation - Oct oWater Rea c. ement Plan
-inment of Fi U niversity o f q uatic Invasi vThreatened, 0 15 - i sc-city.htm l Consumer P r arms/Endan g Restoration program.ph p regrine Falc o s , Genoa re a c ords - http:- http://ww w o ric Places -
o nsinhistory.
o ric Places, G a rchresult.d o t ions, Geno a m bly - http:
/s mology an d r Genoa, Ve r o ber 1973.
c tor (LACB W- February 2 shes at Dair y f Wisconsin
-v e Species
-, Endangere d l. r otection, E n gered_Speci eProgram -
- p. o n - a ctor's wast e//www.ope n w.census.go v http://ww.n p org/. G oose Islan d o. a Site Upda t//www.wisc d Liquefacti o r non Count y W R) 2 009. y land Powe r-La Crosse
-- Vernon C o d, Proposed n dangered e s/index.asp x e gets new h o n-public-v/. p s.gov/nr/.
d Archeolo g te - Decemb onsinhistor y o n y , r - o unty and x. ome, g ical er y.org.
La Cros s License T Revisio n s e Boiling W Termination n 0 W ater Reacto r Plan Fi g r ure 8-1 S 8-28 S ite Re g ion a a l Location
La Cros s License T Revisio n s e Boiling W Termination n 0 W ater Reacto r Plan r Figure 8-2 8-29 2 Site O v v erview L L R L a Crosse Boili n License Termin Revision 0 ng Water Reac t ation Plan o r Figure 8-3 8-30 LACBWR B u u ildin g s La Cros s License T Revisio n s e Boiling W Termination n 0 W ater Reacto r Plan F i r ig ure 8-4 8-31 Topo g rap h hical Map L L R L a Crosse Boili n License Termin Revision 0 ng Water Reac t ation Plan o r Figure 8-5 5 Groundwa t 8-32 t er Samplin g W Wells - LACB W WR Site