ML090150537: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 2: | Line 2: | ||
| number = ML090150537 | | number = ML090150537 | ||
| issue date = 01/13/2009 | | issue date = 01/13/2009 | ||
| title = | | title = SIT Document Request (01-13-2009) | ||
| author name = | | author name = | ||
| author affiliation = NRC/RGN-II | | author affiliation = NRC/RGN-II |
Revision as of 04:58, 17 April 2019
ML090150537 | |
Person / Time | |
---|---|
Site: | Brunswick |
Issue date: | 01/13/2009 |
From: | NRC/RGN-II |
To: | |
References | |
Download: ML090150537 (2) | |
Text
Brunswick SIT Document Request (01-13-2009)
All documents are requested in electronic form (MS Office or PDF files) unless specified hard copy. Request all attached documents for any NCRs or WOs requested.
- 1. Latest copy of Diesel Timeline - December 28 through Present.
- 2. Copies of the following WOs: a. 1471867
- b. 1472140 c. 1472328 d. 1472329 e. 1472336 f. 1472343 g. 1472349 h. 1472345
- i. 1472944 j. 1472346 k. 1472763 l. 1472947 m. 1472945
- n. 1472966 o. 1472965 p. 1472963 q. 1472978 r. 1033642-01
- s. 1472971 t. 1473214
- 3. Copies of the following NCRs: a. 312500
- b. 312819 c. 312969 d. 312916 e. 312868 f. 312876
- g. 312500 h. 312854 i. 312971 j. 312973
- 6. WOs, Modification Packages, Post-Maintenance Test results, NCRs, and 50.59 evaluation or screening related to installation of set screws on DG 3 right side air distributor plates.
- 8. Copy of WOs and any post-maintenance testing documents related to replacement of fuel rack limiter components on DG 4 in June 2007 and DG 3 in October 2008.
- 9. Last 8 years of component replacement history and any related NCRs on the fuel rack limiters.
- 10. Copies of any root cause or apparent cause analyses performed in the last 4 years related to problems with the DGs.
- 11. Copies of any NCRs in the last 8 years related to air quality or contamination in the DG air start system.
- 12. Any vendor recommendations or guidance received concerning (a) air start distributor issues and (b) fuel rack limiters.
- 13. Copy of DG Vendor Manual
- 14. Hard copy of drawing of DG fuel rack limiter
- 17. Copies of all letters from EDG vendor and/or diesel manufacturer
- 18. Reliability and availability data of each EDG trended over the last three years.
- 19. Explanation of NSW pumps control circuit. This could be provided via phone conversation or interview.
- 21. Motor data sheet for the NSW pump.
- 22. Copies of operating experience (OE) reviews on the fuel rack limit cylinder and the starting air distributor.
- 23. Design basis documentation or vendor documentation that describes events during EDG starting at cranking.
- 24. Design basis documentation or vendor documentation that establishes basis for timing of the fuel rack limiter.