| number = ML101620416
| number = ML101620416
| issue date = 03/28/2010
| issue date = 03/28/2010
| title = Summer 2005-301 Draft Sim/In-Plant JPMs (Section 5)
| title = 2005-301 Draft Sim/In-Plant JPMs (Section 5)
| author name =  
| author name =  
| author affiliation = NRC/RGN-II
| author affiliation = NRC/RGN-II

Revision as of 08:25, 13 April 2019

2005-301 Draft Sim/In-Plant JPMs (Section 5)
ML101620416
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 03/28/2010
From:
NRC/RGN-II
To:
Pacific Gas & Electric Co
References
50-395/05-301, JPSF-025NRC 50-395/05-301
Download: ML101620416 (132)


Text

v.C. SUMMER NUCLEAR STATION JOB PERFORMANCE MEASURE ]PM JPSF-025NRC START AND LOAD "A" EMERGENCY DIESEL GENERATOR APPROVAL:

APPROVAL DATE: REV NO: 6 CANDIDATE EXAMINER:

THIS JPM IS NOT APPROVED Tuesday, December 06, 2005 Page 1 of12 TASK: 064-003-01-01 LOAD THE DIESEL GENERATOR TASK STANDARD:

Examinee trips diesel due to overload.

The use of applicable Human Performance Tools (3-way communications, self checking, peer checking, phonetic alphabet, etc) and industrial safety practices meets expectations.

PREFERRED EVALUATION LOCATION SIMULATOR

REFERENCES:

SSCB-IV-7 SOP-306 TOOLS: Calculator PREFERRED EVALUATION METHOD PERFORM DIESEL GENERATOR POWER FACTOR, CURRENT VS. LOAD EMERGENCY DIESEL GENERATOR SOP-306, EMERGENCY DIESEL GENERATOR EVALUATION TIME 25 TIME CRITICAL No lOCFR55: 45(a)8 CANDIDATE:

TIME START: TIME FINISH: PERFORMANCE RATING: SAT: UNSAT: QUESTION GRADE: PERFORMANCE EXAMINER:

SIGNATURE DATE COMMENTS:

Tuesday, December 06, 2005 Page 2 0/12 INSTRUCTIONS TO OPERATOR READ TO OPERATOR:

WHEN I TELL YOU TO BEGIN, YOU ARE TO PERFORM THE ACTIONS AS DIRECTED IN THE INITIATING CUES. I WILL DESCRIBE THE GENERAL CONDITIONS UNDER WHICH THIS TASK IS TO BE PERFORMED AND PROVIDE THE NECESSARY TOOLS WITH WHICH TO PERFORM THIS TASK. BEFORE STARTING, I WILL EXPLAIN THE INITIAL CONDITIONS, WHICH STEPS TO SIMULATE OR DISCUSS, AND PROVIDE INITIATING CUES. WHEN YOU COMPLETE THE TASK SUCCESSFULLY, THE OBJECTIVE FOR THIS JOB PERFORMANCE MEASURE WILL BE SATISFIED.

SAFETY CONSIDERATIONS:

INITIAL CONDITION:

The plant is operating at 100% power with normal AC power available to all buses. It is A2 Maintenance Work Week. Relay testing is in progress on 1 DA which has necessitated the removal of 1 DA from NORMAL and EMERGENCY feed. Station and Operations Management have given approval for this work due to recent OE concerning maintenance of these relays. "A" DIG is to be started and loaded onto bus 1 DA. Bus 1 DA will then be divorced from its NORMAL and EMERGENCY power sources until completion of testing. All pre-start check steps have been completed.

INITIATING CUES: CRS directs starting and loading of "A" DIG per SOP-306,Section IV.A, Steps 2.2.j thru 2.5. HAND jPM BRIEFING SHEET TO OPERATOR AT THIS TIME! Tuesday, December 06, 2005 Page 3 0/12

]PM BRIEFING SHEET OPERATOR INSTRUCTIONS:

SAFETY CONSIDERATIONS:

INITIAL CONDITION:

The plant is operating at 100% power with normal AC power available to all buses. It is A2 Maintenance Work Week. Relay testing is in progress on 1 DA which has necessitated the removal of 1 DA from NORMAL and EMERGENCY feed. Station and Operations Management have given approval for this work due to recent OE concerning maintenance of these relays. "A" DIG is to be started and loaded onto bus 1 DA. Bus 1 DA will then be divorced from its NORMAL and EMERGENCY power sources until completion of testing. All pre-start check steps have been completed.

INITIATING CUES: CRS directs starting and loading of "A" DIG per SOP-306,Section IV.A, Steps 2.2.j thru 2.5. HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU FEEL THAT YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK. Tuesday, December 06, 2005 Page 4 oJ12 STEPS CR SEQ STEP: 1 STEP STANDARD:

No Yes Depress the GEN RELAYS RESET Pushbutton DG A GEN RELAYS RESET Pushbutton is Depressed CUES: SAT COMMENTS:

CR SEQ STEP: 2 No Yes Momentarily place the EXCITER Switch to RESET CUES: COMMENTS:

CR SEQ STEP: 3 UNSAT STEP STANDARD:

DG A EXCITER SWITCH taken to RESET STEP STANDARD:

SAT UNSAT No Yes Ensure DG A AUTOSTART NOT READY (XCP-DG A AUTO START NOT READY alarm is 636 1-2) Annunciator is clear clear CUES: SAT UNSAT COMMENTS:

Tuesday, December 06, 2005 PageS of12 CR SEQ No No CUES: STEP: 4 Verify AnQunciator XCP-636 1-2, DG A AUTOSTART NOT READY, is clear. COMMENTS:

CR SEQ No No STEP: 5 The READY FOR AUTO START light is illuminated at the DIG Local Control Panel STEP STANDARD:

Verifies Annunciator XCP-636 1-2, DG A AUTOSTART NOT READY, is clear. STEP STANDARD:

SAT UNSAT Calls the IB operator and verifies the "READY FOR AUTO START" light is lit at the "A" DIG Local Control Panel. CUES: SAT CUE: When requested, as the IB operator, inform the operator that the "READY FOR UNSAT AUTO START" light is lit at the "A" DIG Local Control Panel. COMMENTS:

CR SEQ STEP: 6 Ye Yes Place "A" Diesel Generator TEST switch to START. CUES: COMMENTS:

Tuesday, December 06, 2005 STEP STANDARD:

Momentarily rotates "A" Diesel Generator TEST switch to the START position.

SAT UNSAT Page 60f12 CR SEQ STEP: 7 No Yes Verify DIG starts and accelerates to 58.9 -61.1 Hertz and 6800-7600 volts. CUES: STEP STANDARD:

DG A VOLTS indicates 6800-7600 volts and FREQUENCY indicates 58.9 -61.1 Hertz. SAT CUE: For purposes of time compression, examiner should inform examinee that 10 UNSAT minutes has elapsed since the DIG was started. This in reference to Note 2.4 in the procedure

.. COMMENTS:

CR SEQ No No CUES: STEP: 8 Ensure VOLT REG switch is in AUTO. COMMENTS:

CR SEQ STEP: 9 Ye Yes Place the DG A SYNC SEL switch in DSL. CUES: COMMENTS:

Tuesday, December 06, 2005 STEP STANDARD:

VOLT REG switch for the 'A' DIG indicates AUTO. STEP STANDARD:

SAT UNSAT DG A SYNC SEL switch indicates DSL. SAT UNSAT Page 7 of 12 CR SEQ No No CUES: STEP: 10 Monitor voltage on 1 DA SYNC VOLTS and SYNC VOLTS. COMMENTS:

CR SEQ Ye No CUES: STEP: 11 Adjust SYNC VOLTS to slightly higher than 1 DA SYNC VOLTS using VOLT REG RAISE LOWER. NOTE: Only critical if adjustment is necessary.

COMMENTS:

CR SEQ Ye No CUES: STEP: 12 Adjust Diesel Generator "A" frequency to cause synchroscope to rotate slowly in the FAST direction using SPEED switch. COMMENTS:

Tuesday, December 06, 2005 STEP STANDARD:

Locates 1 DA SYNC VOLTS and SYNC VOLTS meters and monitors voltage. STEP STANDARD:

SAT UNSAT VOLT REG RAISE LOWER switch used to adjust DG 'A' SYNC VOLTS slightly higher than 1 DA SYNC VOLTS. Only critical if adjustment is necessary.

STEP STANDARD:

SAT UNSAT DG 'A' SPEED switch used to adjust DIG speed so that SYNCHROSCOPE rotates slowly in the FAST direction.

SAT UNSAT Page 8 of12 CR SEQ STEP: 13 Ye Yes When synchroscope is in proper position, close BUS 1 DA DG FEED breaker. CUES: COMMENTS:

CR SEQ STEP: 14 STEP STANDARD:

When synchroscope is between 11 o'clock and 12 o'clock, closes BUS 1 DA DG FEED breaker. STEP STANDARD:

SAT UNSAT No Yes Verify breaker 1 DA DG FEED breaker closed. Bus 1 DA DG FEED breaker indicates red light ON, green light OFF. CUES: COMMENTS:

CR SEQ STEP: 15 No Yes Using the SPEED Switch, adjust load as necessary while monitoring KILOWATTS Meter, AMPS Meter and KILOVARS Meter CUES: STEP STANDARD:

SAT UNSAT DG A SPEED Switch is used to adjust KILOWATTS Meter, AMPS Meter and KILOVARS Meter as necessary.

Should raise load to between 850 and 1000 KW. SAT CUE: For purposes of time compression, examiner should inform examinee that 10 UNSAT minutes has elapsed after raising load to between 850 and 1000 KW .. COMMENTS:

Tuesday, December 06, 2005 Page 9 of 12 CR SEQ No No CUES: STEP: 16 Place DIG 'A' SYNC SEL switch in OFF. COMMENTS:

CR SEQ No Yes CUES: STEP: 17 Using the VOLT REG RAISE-LOWER Switch, adjust KILOVARS COMMENTS:

CR SEQ STEP: 18 STEP STANDARD:

DG A SYNC SEL switch indicates OFF. STEP STANDARD:

SAT UNSAT DG A VOLT REG RAISE-LOWER Switch is used to adjust KILOVARS STEP STANDARD:

SAT UNSAT No Yes Utilizing Enclosure C, estimate the present load Uses Enclosure C to estimate current 1 DA on 1 DA. KW loading (approximately 2850 plus or minus 50 KW). CUES: SAT UNSAT COMMENTS:

Tuesday, December 06, 2005 Page 100/12 TRAIN A EQUIPMENT KW RATINGS KW EQUIPMENT RATING EQUIPMENT Component Cooling Water Pump --Slow (Y) A = 205 RBCUs --Slow (N) Fast (N) Fast (Y = 1) Service Water Pump A = 531 AB Charcoal Exhaust Fan Service Water Booster Pump (No) FHB Exhaust Fan Charging Pump A=686 HVAC Chilled Water Pump RHR Pump (No) HVAC Chiller Emergency Feedwater Pump (No) XMC 1DA2X RB Spray Pump (No) XMC1DA2Y Spent Fuel Cooling Pump 50 XMC1DA2Z UPS Inverter 106 XMC1EA1X Pzr Backup Heaters (No) TOTAL L _____________


Note 1: The actual KW Rating may be varied by adjusting the number of heaters in service. SOP-306 ENCLOSURE C PAGE 1 OF 1 REVISION 16 KW RATING 187 (2) = 204 46 A=40 280 180 142 107 77 :::::2850 KW CHG A CR SEQ STEP: 19 No Yes Using the SPEED Switch, adjust DG A load until the estimated XSW1 DA load is being carried by DG A. CUES: STEP STANDARD:

Operator attempts to increase load and will be unable to control KW since the DIG will malfunction.

Indicated KW will increase to approximately 5000 KW with the operator unable to control DIG load. SAT CUE: For purposes of time compression, examiner should inform examinee that 10 UNSAT minutes has elapsed. The A DIG load will increase due to the inserted malfunction once load increase is started .. COMMENTS:

CR SEQ STEP: 20 Ye Yes Operator trips the "A" DG CUES: CUE: Examiner ends the JPM at this point COMMENTS:

Examiner ends JPM at this point. Tuesday, December 06, 2005 STEP STANDARD: "A" DG is tripped SAT UNSAT Page 11 of12 JPM SETUP SHEET ]PM NO: JPSF-025NRC DESCRIPTION:

START AND LOAD "A" EMERGENCY DIESEL GENERATOR IC SET: 10 (100% INSTRUCTIONS:

1. When student is ready; RUN 2. Insert malfunction when examinee raises from 950 KW to 2250 KW (514 RPM-518 RPM over 10 minutes.)

COMMENTS:

JPM Initial Condition of "Cylinder Monitoring" was intentionally used to prevent requiring STP-125.002 attachments from having to be available.

Also to prevent having to have a stopwatch available.

This is too much effort to test the same skills as in SOP-306. Tuesday, December 06, 2005 Page 12 of 12

v.C. SUMMER NUCLEAR STATION JOB PERFORMANCE MEASURE ]PM JPSF-059 ALTERNATE ISOLATION OF RUPTUREDS/G

('e' MSIV) APPROVAL:

APPROVAL DATE: REV NO: 11 CANDIDATE EXAMJNER:

THIS JPM IS NOT APPROVED Tuesday, December 06, 2005 Page 1 of12 TASK: TASK STANDARD:

The 'e' S/G is completely isolated from the 'A' and 'B' S/G's per EOP-4.0, steps 3.a -3h, and step 3.i alternate actions. The use of applicable Human Performance Tools (3-way communications, checking, peer checking, phonetic alphabet, etc.) and industrial safety practices meets expectations.

PREFERRED EVALUATION LOCATION SIMULATOR

REFERENCES:

EOP-4.0 TOOLS: EOP-4.0 EVALUATION TIME 20 CANDIDATE:

PERFORMANCE RATING: SAT: PREFERRED EVALUATION METHOD PERFORM STEAM GENERATOR TUBE RUPTURE TIME CRITICAL NO lOCFR55: 45(A}6 TIME START: TIME FINISH: UNSAT: QUESTION GRADE: PERFORMANCE EXAMINER:

SIGNATURE DATE COMMENTS:

Tuesday, December 06, 2005 Page 2 0/12 INSTRUCTIONS TO OPERATOR READ TO OPERATOR:

WHEN I TELL YOU TO BEGIN, YOU ARE TO PERFORM THE ACTIONS AS DIRECTED IN THE INITIATING CUES. I WILL DESCRIBE THE GENERAL CONDITIONS UNDER WHICH THIS TASK IS TO BE PERFORMED AND PROVIDE THE NECESSARY TOOLS WITH WHICH TO PERFORM THIS TASK. BEFORE STARTING, I WILL EXPLAIN THE INITIAL CONDITIONS, WHICH STEPS TO SIMULATE OR DISCUSS, AND PROVIDE INITIATING CUES. WHEN YOU COMPLETE THE TASK SUCCESSFULLY, THE OBJECTIVE FOR THIS JOB PERFORMANCE MEASURE WILL BE SATISFIED.

SAFETY CONSIDERATIONS:

INITIAL CONDITION:

The 'C' Steam Generator has experienced a tube rupture. The crew has taken actions through step 2 of EOP-4.0. INITIATING CUES: The CRS has directed the isolation of the RUPTURED S/G per EOP-4.0, step 3. HAND ]PM BRIEFING SHEET TO OPERATOR AT THIS TIME! Tuesday, December 06, 2005 Page 3 of12

]PM BRIEFING SHEET OPERATOR INSTRUCTIONS:

SAFETY CONSIDERATIONS:

INITIAL CONDITION:

The 'G' Steam Generator has experienced a tube rupture. The crew has taken actions through step 2 of EOP-4.0. INITIATING CUES: The GRS has directed the isolation of the RUPTURED S/G per EOP-4.0, step 3. HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU FEEL THAT YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK. Tuesday, December 06, 2005 Page 4 of 12 STEPS CR SEQ STEP: STEP STANDARD:

No Yes Place 'C' Steamline power relief in manual and 'C' Steam line PWR RELIEF SETPT controller closed. indicates manual and O. CUES: COMMENTS:

CR SEQ STEP: 2 No Yes Adjust 'C' Steam line power relief setpoint controller to 8.85. CUES: COMMENTS:

CR SEQ STEP: 3 No Yes Align 'C' Steam line power relief for power relief operation.

CUES: COMMENTS:

Tuesday, December 06, 2005 STEP STANDARD:

SAT UNSAT 'C' Steamline PWR RELIEF SETPT controller indicates 8.85 (1150 psig). STEP STANDARD:

SAT UNSAT "C' Steam line Power Relief mode switch indicates PWR REL and the setpoint controller indicates AUTO. SAT UNSAT Page 5 of12 CR SEQ No No CUES: STEP: 4 Place both steam dump interlock switches to bypass interlock.

COMMENTS:

CR SEQ STEP: 5 No Yes Verify the 'C' steamline power relief indicates closed. CUES: COMMENTS:

CR SEQ STEP: 6 STEP STANDARD:

Both STM DUMP INTERLOCK switches indicate BYP INTLK when RCS Tavg <552"F. STEP STANDARD:

SAT UNSAT PCV-2020 indicates red light OFF, green light ON. STEP STANDARD:

SAT UNSAT Ye Yes Isolate the TDEFP steam supply from 'C' S/G. PVG-2030 STM SPLY TO TD EFP TRN A (B) indicates closed. AO deenergizes XVG-2802B at XMC-1 DB2Y and closes XVG-2802B locally. CUES: SAT NOTE: Operator may have already closed XVG-2802B from MCB lAW OAP-103.4.

UNSAT Annunciators 622 2-3 and 623 2-3 are expected alarms for TFEFP Suto Start Defeated.

COMMENTS:

Tuesday, December 06, 2005 Page 60/12 CR SEQ STEP: 7 No Yes Isolate blowdown from the ruptured 8/G. CUES: COMMENTS:

CR SEQ STEP: 8 No Yes Isolates main steam drains from 'e' 8/G. CUES: COMMENTS:

CR SEQ STEP: 9 No Yes Attempts to close PVM-2801 e. CUES: STEP STANDARD:

PVG-503e indicates red light OFF, green light ON. STEP STANDARD:

SAT UNSAT PVT -2843e and PVT -2877B indicate red light OFF, green light ON. STEP STANDARD:

SAT UNSAT Notes M81V 'e' still indicates red light ON, green light OFF. Operator may send someone out to locally close "e" M81V while proceeding.

COMMENTS:

SAT UNSAT Tuesday, December 06, 2005 Page 70i12 CR SEQ STEP: 10 Ye Yes Close MSIVs for 'A' and 'B' S/G's. CUES: COMMENTS:

CR SEQ STEP: 11 Ye Yes Verify MS Isolation Bypass valves closed. CUES: COMMENTS:

CR SEQ STEP: 12 Ye Yes Isolate main steam to aux steam. CUES: COMMENTS:

Tuesday, December 06, 2005 STEP STANDARD:

PVM-2801A&B, MS ISOLATION VALVE, indicates red light OFF and green light ON. STEP STANDARD:

SAT UNSAT Verifies PVM-2869A (B) (C) have closed indication (red light off and green light lit). STEP STANDARD:

SAT UNSAT Closes PCV-2058, MS TO AUX STM, indicates red light OFF and green light ON. SAT UNSAT Page8of12 CR SEQ STEP: 13 Ye Yes Isolate sealing steam. CUES: COMMENTS:

CR SEQ STEP: 14 Ye Yes Close main turbine stop valve before seat drains. CUES: COMMENTS:

CR SEQ STEP: 15 Ye Yes Isolate steam to deaerator.

CUES: COMMENTS:

Tuesday, December 06, 2005 STEP STANDARD:

Closes MVG-1701 , STEAM SEAL FEED VLV, indicates red light OFF and green light ON. STEP STANDARD:

SAT UNSAT Closes MVG-2896A-D, SV-1 (2,3,4) BSD, indicates red light OFF and green light ON. STEP STANDARD:

SAT UNSAT Places IPV-2231, MS/PEGGING STM TO DEAERATOR, controller in MAN and output of 0%. SAT UNSAT Page 9 0/12 CR SEQ STEP: 16 No Yes Isolate steam to MSRs. CUES: COMMENTS:

CR SEQ STEP: 17 Ye Yes Ensure steam dumps closed. CUES: COMMENTS:

CR SEQ STEP: 18 Ye Yes Ensure main steam drains are closed. CUES: COMMENTS:

Tuesday, December 06, 2005 STEP STANDARD:

As MSR DCS, MVG-2811 and XVG-2807 indicate closed. STEP STANDARD:

SAT UNSAT Places STM DUMP CNTRL controller in MAN and output of 0% and STM DUMP MODE SELECT switch to STM PRESS. STEP STANDARD:

SAT UNSAT The following valve switches are in AUTO with red light OFF and green light ON: PVT-2870, TO MSR A&B DRN, PVT-2851 A-D, MS LINES TO TURB DRN, PVT-2713A-D, STEAM DUMP DRN BYP, PVT-2838A,B, HDR DRNS. Notes PVT-2875, To MSR A&B DRN indicates mid-position.

SAT UNSAT Page 100f 12 CR SEQ STEP: 19 Ye Yes Direct Turbine Building operator to complete ATT. 1, including alternate isolation for PVT-2875. CUES: STEP STANDARD:

Turbine Building operator acknowledges and completes ATT. 1, including local valve XVT -2872. Booth operator acknowledges as TB operator, to perform An. 1 of EOP-4.0 including alternate isolation for PVT-2875 if directed.

SAT UNSAT COMMENTS:

Examiner ends JPM at this point. Tuesday, December 06, 2005 Page 11 of 12 JPM SETUP SHEET ]PM NO: JPSF-059 DESCRIPTION:

ALTERNATE ISOLATION OF RUPTURED S/G ('C' MSIV) IC SET: 10 or 328 INSTRUCTIONS:

1. Activate MAL-RCS002C
2. RUN 180 seconds SEVERITY=450 RAMP=30 (SGTR ON 'C' S/G) 3. Manual SI and perform actions of EOP-1.0 & EOP-4.0 up through step 2. 4. Throttle EFW flow to 'C' S/G when> 30% level. 5. FREEZE 6. Activate MAL-MSS006C OVR-MS077B SELECT = FAIL TO CLOSE ('C' MSIV FAIL TO CLOSE) SELECT=ON (2875 INDICATION FAILS TO MIDPOSITION)

(2872 is not modeled but the booth operator can tell the control room it is closed because the drain is not open) 7. RUN 5 seconds and acknowledge annunciators

8. When student is ready: RUN 9. Local Operator Actions when instructed:

Steam Drain Valves: VLV-MS042P SEVERITY=O (2875(2872)

LOA-FWM027 SEVERITY=-15 (IPV-2232

-Sparging Steam to DA) Trigger #2 LOA-MSS033 SELECT =RACK OUT (RACK OUT BKR FOR MVG-2802B (STM SUPPLY TO TDEFP)) COMMENTS:

Tuesday, December 06, 2005 Page 12 of 12

v.C. SUMMER NUCLEAR STATION JOB PERFORMANCE MEASURE ]PM JPSF-012NRC DROPPED ROD RECOVERY APPROVAL:

APPROVAL DATE: REV NO: 0 CANDIDATE EXAMINER:

THIS JPM IS NOT APPROVED Tuesday, December 06, 2005 Page 1 of 10 TASK: 000-003-05-01 TASK STANDARD:

RESPOND TO DROPPED CONTROL ROD Manual reactor trip inserted after second control rod drops. The use of applicable Human Performance Tools (3-way communications, self checking, peer checking, phonetic alphabet, etc) and industrial safety practices meets expectations.

PREFERRED EVALUATION LOCATION SIMULATOR PREFERRED EVALUATION METHOD PERFORM

REFERENCES:

AOP-403.6 DROPPED CONTROL ROD TOOLS: AOP-403.6 (TO RECORD AFFECTED BANK HEIGHTS and to provide engineering numbers for limitations on rod withdrawal rates) EVALUATION TIME 15 TIME CRITICAL No IOCFR55: CANDIDATE:

TIME START: TIME FINISH: PERFORMANCE RATING: SAT: UNSAT: QUESTION GRADE: PERFORMANCE EXAMINER:

SIGNATURE COMMENTS:

Tuesday, December 06, 2005 45(A)5 DATE Page 2 of 10 INSTRUCTIONS TO OPERATOR READ TO OPERATOR:

WHEN I TELL YOU TO BEGIN, YOU ARE TO PERFORM THE ACTIONS AS DIRECTED IN THE INITIATING CUES. I WILL DESCRIBE THE GENERAL CONDITIONS UNDER WHICH THIS TASK IS TO BE PERFORMED AND PROVIDE THE NECESSARY TOOLS WITH WHICH TO PERFORM THIS TASK. BEFORE STARTING, I WILL EXPLAIN THE INITIAL CONDITIONS, WHICH STEPS TO SIMULATE OR DISCUSS, AND PROVIDE INITIATING CUES. WHEN YOU COMPLETE THE TASK SUCCESSFULLY, THE OBJECTIVE FOR THIS JOB PERFORMANCE MEASURE WILL BE SATISFIED.

SAFETY CONSIDERATIONS:

INITIAL CONDITION:

Plant was operating at 75% power with all controls in automatic when control rod "F2" dropped due to a blown fuse. The blown fuse was replaced in the 1 AC power cabinet. Actions of AOP-403.6 have been completed through Step 10. INITIATING CUES: CRS has directed NROATC to recover control rod "F-2" per AOP-403.6, starting with Step 11. HAND JPM BRIEFING SHEET TO OPERATOR AT THIS TIME! Tuesday, December 06, 2005 Page 3 ofl0 jPM BRIEFING SHEET OPERATOR INSTRUCTIONS:

SAFETY CONSIDERATIONS:

INITIAL CONDITION:

Plant was operating at 75% power with all controls in automatic when control rod IF2" dropped due to a blown fuse. The blown fuse was replaced in the 1 AC power cabinet. Actions of AOP-403.6 have been completed through Step 10. INITIATING CUES: CRS has directed NROATC to recover control rod IF-2" per AOP-403.6, starting with Step 11. HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU FEEL THAT YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK. Tuesday, December 06, 2005 Page 4 oflO STEPS CR SEQ STEP: STEP STANDARD:

No Yes Record Step Counter readings for both groups Step counter reading for both groups in of the affected bank. Control Bank "A" have been recorded as 230 steps. CUES: COMMENTS:

CR SEQ No Yes CUES: STEP: 2 Record PIA Converter Reading. STEP STANDARD:

SAT UNSAT PIA converter reading has been recorded.

Booth operator gives examinee PIA converter reading of 230 steps. COMMENTS:

SAT UNSAT CR SEQ STEP: 3 Ye Yes Rotate ROD CNTRL BANK SEL switch clockwise to the affected bank position.

CUES: COMMENTS:

Tuesday, December 06, 2005 STEP STANDARD:

ROD CNTRL BANK SEL Switch has been rotated clockwise to the CBA position.

SAT UNSAT Page 5 of 10 CR SEQ STEP: 4 No Yes Manually reset Demand Step Counter for the affected group to zero. CUES: COMMENTS:

CR SEQ STEP: 5 Ye Yes Place all Lift Coil Disconnect Switches for the affected bank, except switches for the dropped rod, to the ROD DISCONNECTED position.

STEP STANDARD:

The step counter for Bank A GROUP 1 has been reset to zero. STEP STANDARD:

SAT UNSAT All lift coil disconnect switches for Control Bank "A" rods, except Rod "F-2", have been placed in the ROD DISCONNECTED position.

CUES: SAT As the CRS, examiner should prompt the examinee to disconnect the affected bank. UNSAT Explain that the BOP operator will watch the MCB while he accomplishes this task. COMMENTS:

CR SEQ STEP: 6 STEP STANDARD:

Ye Yes Withdraw the dropped rod: Drive the affected Rod F2 is moving in the outward direction.

bank out. CUES: SAT If rod withdrawal rate is requested "use not greater than 50 step increments not to UNSAT exceed 80% power." Rod Control System Fail Urgent Alarm will alarm. If examinee asks whether to depress the ROD CNTRL ALARM RESET switch, as the CRS, direct him to depress the switch after the rod has been realigned.

Fill in on procedure ahead of time. COMMENTS:

Tuesday, December 06, 2005 Page 6 ofl0 CR SEQ STEP: 7 No Yes Verify dropped rod movement on the digital rod position indicator.

CUES: COMMENTS:

CR SEQ STEP: 8 STEP STANDARD:

DRPI indicator for rod "F-2" in Bank "A" is verified to be moving out in 6 step increments.

STEP STANDARD:

SAT UNSAT No Yes When dropped rod moves 6 steps, then verify ONE ROD ON BOTTOM annunciator is ONE ROD ON BOTTOM annunciator clears. observed to be flashing (in the reset condition).

CUES: COMMENTS:

CR SEQ STEP: 9 No Yes Adjust turbine load to maintain Tavg within +/- 5°F of Tref. STEP STANDARD:

Tavg -Tref within +/- 5°F. SAT UNSAT CUES: SAT No turbine manipulations are required since TAVG will remain within 5°F of Tref. UNSAT COMMENTS:

Tuesday, December 06, 2005 Page 7 of 10 CR SEQ STEP: 10 No Yes Continue Rod withdrawl to the demand position CUES: COMMENTS:

CR SEQ Ye Yes CUES: STEP: 11 Observes that Rod F-2 stops moving at 30 steps and is apparently stuck COMMENTS:

CR SEQ STEP: 12 Ye Yes Places Rod Control Bank SelectorSwitch in manual (lAW immediate operator action from AOP-403.5)

CUES:

COMMENTS:

Tuesday, December 06, 2005 STEP STANDARD:

Not more than 50 step increments or 80% power as determined in step 6 SAT UNSAT STEP STANDARD:

notices that rod F-2 is stuck STEP STANDARD:

SAT UNSAT Rod Control Bank Selector Switch.is in manual SAT UNSAT Page 8 oj 10 CR SEQ STEP: 13 Ye Yes Observes that Rod P-6 drops into the core while rod F-2 remains stuck at approximately30 steps CUES: COMMENTS:

CR SEQ Ye Yes STEP: 14 Inserts a manual reactor trip. STEP STANDARD:

Evaluates as 2 dropped rods. STEP STANDARD:

SAT UNSAT Places the manual reactor trip switch to the TRIP position.

Both Reactor Trip breakers indicate green light ON, red light OFF. All rod bottom lights are lit. CUES: SAT The examinee should insert a manual reactor trip upon observing control rod P6 UNSAT drop. Continuing to withdraw original dropped rod more than 12 steps after the second rod is dropped constitutes failure. COMMENTS:

Examiner ends JPM at this pOint. Tuesday, December 06, 2005 Page 9 of 10 JPM SETUP SHEET ]PM NO: JPSF-012NRC DESCRIPTION:

DROPPED ROD RECOVERY IC SET: 11 (75% INSTRUCTIONS:

1. RUN 2. Activate:

MAL-CRF004F2 SELECT =ST ATIONARY 3. Clear MAL-CRF004F2 after rod drops. (Control rod F2 drops) 4. Control Tavg-Tref deviation within +/-1.5°F with rods in AUTO 5. Place rod control in MANUAL 6. FREEZE 7. When student is ready: RUN 8. When control rod F2 is withdrawn to approximately 30 steps, insert: Trig #1 MAL-CRF007F2 SELECT =UNTRIPPABLE (Rod F2 sticks) When Rod Control is placed in Manual -Trig #2. MAL-CRF004P6 SELECT =STATIONARY COMMENTS: (Control rod P6 drops) Report PIA Converter reading is 230 steps. If a rate of rod withdrawal is requested from engineering, "use not more than 50 step increments not to exceed 80% power." Tuesday, December 06, 2005 Page 10 of 10 AOP-403.6 REVISION 2 DROPPED CONTROL ROD ACTION/EXPECTED RESPONSE 7. Provide Reactor Engineering with[} following information:

Time rod dropped: T-15 min Dropped rod location:

F-2 Initial Reactor power level: 75% Current Reactor power level: 75% Current QPTR: 1.005 8. Determine and correct the cause 0 the failure NOTE -Step 9 ALTERNATIVE ACTION This Step must be completed before continuing with Step 10 9. Obtain the following information fro Reactor Engineering:

10. Power level at which recovery is to be performed:

< 80% Rate of control rod movement during recovery:

50 steps If necessary, reduce Reactor pown to the power level determined in SreP 9. REFER TO GOP-4, POWER OPERATION (MODE 1). PAGE 3 OF7

v.C. SUMMER NUCLEAR STATION JOB PERFORMANCE MEASURE ]PM JPS-020NRC SECURE NORMAL LETDOWN AND PLACE EXCESS LETDOWN IN SERVICE APPROVAL:

APPROVAL DATE: REV NO: 1 CANDIDATE EXAMINER:

THIS JPM IS NOT APPROVED Tuesday, December 06, 2005 Page 1 of9 TASK: 004-01 6-01 -01 ESTABLISH EXCESS LETDOWN TO VOLUME CONTROL TANK(VCT)

OR REACTOR COOLANT DRAIN TANK(RCDT)

TASK STANDARD:

Excess letdown flow is established with final excess letdown HX outlet temperature

< 165°F. PREFERRED EVALUATION LOCATION SIMULATOR

REFERENCES:

SOP-102 TOOLS: EVALUATION TIME 15 CANDIDATE:

PERFORMANCE RATING: SAT: PREFERRED EVALUATION METHOD PERFORM CHEMICAL AND VOLUME CONTROL SYSTEM TIME CRITICAL No lOCFR55: 45(A)7 TIME START: TIME FINISH: UNSAT: QUESTION GRADE: PERFORMANCE EXAMINER:

SIGNATURE DATE COMMENTS:

Tuesday, December 06, 2005 Page 2 0/9 INSTRUCTIONS TO OPERATOR READ TO OPERATOR:

WHEN I TELL YOU TO BEGIN, YOU ARE TO PERFORM THE ACTIONS AS DIRECTED IN THE INITIATING CUES. I WILL DESCRIBE THE GENERAL CONDITIONS UNDER WHICH THIS TASK IS TO BE PERFORMED AND PROVIDE THE NECESSARY TOOLS WITH WHICH TO PERFORM THIS TASK. BEFORE STARTING, I WILL EXPLAIN THE INITIAL CONDITIONS, WHICH STEPS TO SIMULATE OR DISCUSS, AND PROVIDE INITIATING CUES. WHEN YOU COMPLETE THE TASK SUCCESSFULLY, THE OBJECTIVE FOR THIS JOB PERFORMANCE MEASURE WILL BE SATISFIED.

SAFETY CONSIDERATIONS:

INITIAL CONDITION:

Plant is at 75% power with all controls in AUTO. A letdown line leak has occurred.

INITIATING CUES: The Control Room Supervisor directs removing Normal letdown from service per SOP-1 02, IV.N and establishing excess letdown to the RCDT per SOP-102, IV.C. HAND JPM BRIEFING SHEET TO OPERATOR AT THIS TIME! Tuesday, December 06, 2005 Page30f9 jPM BRIEFING SHEET OPERATOR INSTRUCTIONS:

SAFETY CONSIDERATIONS:

INITIAL CONDITION:

Plant is at 75% power with all controls in AUTO. A letdown line leak has occurred.

INITIATING CUES: The Control Room Supervisor directs removing Normal letdown from service per SOP-102, IV.N and establishing excess letdown to the RCDT per SOP-102, IV.C. HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU FEEL THAT YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK. Tuesday, December 06, 2005 Page 4 of9 STEPS CR SEQ STEP: STEP STANDARD:

Ye Yes Ensure the following Orifice Isolation Valves 8149A, 8149B, & 8149C (green light on & are closed: PVT-8149A, LTDN ORIFICE A ISOL red light off) (6244-4 alarms for RML-1 (45 gpm), PVT-8149B, LTDN ORIFICE B ISOL Trouble. This is expected alarm for (60 gpm). PVT -8149C, L TDN ORIFICE C ISOL letdown isolation (60 gpm). CUES: SAT COMMENTS:

CR SEQ STEP: 2 No Yes Close PVT-8152, LTDN LINE ISOL. CUES: COMMENTS:

CR SEQ STEP: 3 No Yes Place FCV-122, CHG FLOW, in MAN and close. CUES: COMMENTS:

Tuesday, December 06, 2005 UNSAT STEP STANDARD:

8152 (green light on & red light off STEP STANDARD:

122 indicates closed SAT UNSAT SAT UNSAT PageS of9 CR SEQ 4 No Yes If necessary, close the following Charging Line Isolation Valves: a. MVG-8107, CHG LINE ISOL. b. MVG-8108, CHG LINE ISOL. CUES: STEP STANDARD:

not performed SAT Cue operator that closing these valves is not necessary.

Verifies CCW in service UNSAT perSOP-110.

COMMENTS:

CR SEQ No No CUES: STEP: 5 Checks Core Thermal power. STEP STANDARD:

Core power determined to be less than 2898 Mwt. SAT cue the operator that the initial conditions for Establishing Excess Letdown have UNSAT been met COMMENTS:

CR SEQ STEP: 6 No Yes Ensure HCV-137 closed. CUES: COMMENTS:

Tuesday, December 06, 2005 STEP STANDARD:

HCV-137, XS LTDN HX, controller indicates 0% demand. SAT UNSAT Page 60/9 CR SEQ Ye No CUES: STEP: 7 Place excess letdown to RCDT. STEP STANDARD:

PVM-8143, XS LTDN TO VCT OR RCDT, indicates RCDT position.

Examiners (as CRS) directs operator to send excess letdown to the RCDT. COMMENTS:

SAT UNSAT CR SEQ No No STEP: 8 Ensure MVG-9583 is open. STEP STANDARD:

MVG-9583, FROM XS L TDN HX, indicates red light ON, green light OFF. CUES: SAT NOTE: step 2.3 N/A because ther is no Phase A isolation signal and step 2.4 is N/A UNSAT because Excess letdown is being aligned to the RCDT. COMMENTS:

CR SEQ STEP: 9 Ye Yes Opens PVT-8153 and PVT-8154, XS LTDN ISOL. CUES: COMMENTS:

Tuesday, December 06, 2005 STEP STANDARD:

PVT-8153 and 8154, XS LTDN ISOL, indicates red light ON, green light OFF. SAT UNSAT Page 70f9 STEP: 10 STEP STANDARD:

CR SEQ No No Directs the building operator to locally monitor communicates direction to building operator RCDT level and pump operation at XPN0007 CUES: COMMENTS:

CR SEQ STEP: 11 Ye Yes Establishes excess letdown flow. CUES: STEP STANDARD:

SAT UNSAT Slowly increases demand on HCV-137 XS L TDN HX CNTRL with final TI-139, XS LETDOWN HX OUT TEMP < 165°F and XS L TDN TEMP HI annunciator not in alarm. SAT NOTE: Receipt of the XS L TDN/RCDT HX CCW OUT TEMP HI annunciator is not UNSAT grounds for failure of the JPM, but temperature must be reduced below 165°F before completing the JPM satisfactorilly.

COMMENTS:

CR SEQ STEP: 12 No Yes Checks proper RCP #1 sealleakoff flow. CUES: COMMENTS:

Examiner ends JPM at this point. Tuesday, December 06, 2005 STEP STANDARD:

Checks FR-154A & B RCP SL LKOFF HI & LO RANGE normal (0.2 -5.0 gpm). SAT UNSAT Page 8 of9 JPM SETUP SHEET JPM NO: JPS-020NRC DESCRIPTION:

SECURE NORMAL LETDOWN AND PLACE EXCESS LETDOWN IN SERVICE IC SET: 11 (75% INSTRUCTIONS:

1. RUN 2. Initialte 5 GPM letdown line leak 3. FREEZE 4. When student is ready: RUN COMMENTS:

Tuesday, December 06, 2005 Page90f9

v.C. SUMMER NUCLEAR STATION JOB PERFORMANCE MEASURE ]PM JPS-068 SHIFT COMPONENT COOLING WATER TRAINS APPROVAL:

APPROVAL DATE: REV NO: 7 CANDIDATE EXAMINER:

THIS JPM IS NOT APPROVED Tuesday, December 06, 2005 Page 1 of 16 TASK: 008-021-01-01 SWITCH COMPONENT COOLING WATER TRAINS TASK STANDARD:

The 'B' CCW pump is supplying non-essential loads in slow speed. CCW flow to non-essentials is not interrupted. "C" CCW is aligned to "B" Train. 'B' charging pump is running. 'A' Train CCW is aligned to essential loads. The use of applicable Human Performance Tools (3-way communications, self checking, peer checking, phonetic alphabet, etc) and industrial safety practices meets expectations.

PREFERRED EVALUATION LOCATION SIMULATOR

REFERENCES:

TOOLS: SOP-102 SOP-118 EVALUATION TIME CANDIDATE:

PERFORMANCE RATING: 25 SAT: PREFERRED EVALUATION METHOD PERFORM CHEMICAL AND VOLUME CONTROL SYSTEM COMPONENT COOLING SYSTEM TIME CRITICAL No lOCFR55: 45(a)8 TIME START: TIME FINISH: UNSAT: QUESTION GRADE: PERFORMANCE EXAMINER:

SIGNATURE DATE COMMENTS:

Tuesday, December 06, 2005 Page 2 of 16 INSTRUCTIONS TO OPERATOR READ TO OPERATOR:

WHEN I TELL YOU TO BEGIN, YOU ARE TO PERFORM THE ACTIONS AS DIRECTED IN THE INITIATING CUES. I WILL DESCRIBE THE GENERAL CONDITIONS UNDER WHICH THIS TASK IS TO BE PERFORMED AND PROVIDE THE NECESSARY TOOLS WITH WHICH TO PERFORM THIS TASK. BEFORE 'STARTING, I WILL EXPLAIN THE INITIAL CONDITIONS, WHICH STEPS TO SIMULATE OR DISCUSS, AND PROVIDE INITIATING CUES. WHEN YOU COMPLETE THE TASK SUCCESSFULLY, THE OBJECTIVE FOR THIS JOB PERFORMANCE MEASURE WILL BE SATISFIED.

SAFETY CONSIDERATIONS:

INITIAL CONDITION:

The plant is in Mode 1. "A" Train CCW is the active loop with "N CCW pump running in slow speed. "B" Chilled Water Pump and Chiller have been started in preparation for starting "B" Charging Pump. INITIATING CUES: CRS directs NROATC to perform an active CCW loop switchover to "B" Train for "A" Train maintenance per SOP-118. HAND JPM BRIEFING SHEET TO OPERATOR AT THIS TIME! Tuesday, December 06, 2005 Page 3 of 16 jPM BRIEFING SHEET OPERATOR INSTRUCTIONS:

SAFETY CONSIDERATIONS:

INITIAL CONDITION:

The plant is in Mode 1. "A" Train CCW is the active loop with "A" CCW pump running in slow speed. "B" Chilled Water Pump and Chiller have been started in preparation for starting "B" Charging Pump. INITIATING CUES: CRS directs NROATC to perform an active CCW loop switchover to "B" Train for "A" Train maintenance per SOP-118. HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU FEEL THAT YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK. Tuesday, December 06, 2005 Page 4 of 16 STEP: 1 STEP STANDARD:

STEPS CR SEQ No No Places XPP-001 C, PUMP C, TRAIN A and Places 'c' CCW pump Train A and Train B TRAIN B ('C' CCW pump) in PULL-TO-LOCK.

switch in PULL-TO-LOCK.

CUES: COMMENTS:

CR SEQ No No STEP: 2 Align XPP-001 C, PUMP C, to Train B per Attachment VB with the exception of racking in XSWIDB-II, CC PUMP C XPP0001 C-CC. STEP STANDARD:

SAT UNSAT Directs AO to align 'C' CCW pump to the 'B' loop. AO completes Attachment VB of SOP-118. CUES: SAT Booth operator initiates batch file CCCW2B. After amber "B SELECTED" light comes UNSAT on for the 'c' CCW pump Transfer Switch on 'B' Train; as the Auxiliary Operator, booth operator reports Attachment VB is complete, except for racking in the 'C' pump breaker on 'B' Train. COMMENTS:

CR SEQ STEP: 3 STEP STANDARD: No No Ensure MVB-9503B, CC TO RHR HX B, (CCW Verifies MVB-9503B, CC TO RHR HX B to the 'B' RHR heat exchanger) is open. open with indication of red light ON and green light OFF. CUES: SAT UNSAT COMMENTS:

Tuesday, December 06, 2005 Page 50f16 CR SEQ STEP: 4 Ye Yes Start one of the following in slow speed: XPP-0001 B, PUMP B CUES: COMMENTS:

STEP: 5 STEP STANDARD:

Starts 'B' CCW Pump running in slow speed with red indicating light ON and green light OFF. Notes that starting amps decay to normal running current. STEP STANDARD:

SAT UNSAT CR SEQ Ye No Start MVB-9503B, CC TO RHR HX B, stroking Places control switch for MVB-9503B in in the closed direction.

CLOSE. Observes valve in mid-position.

CUES: SAT Per CAUTION 2.3.c and 2.3.d (SOP-118, III.B): Failure to complete Step 2.3.d in a UNSAT timely manner after reducing RHR Heat Exchanger Flow will result in a loss of flow through the running CCW Pump or excessive flow perturbations in the CCW non-essential loop. NOTE TO EVALUATOR:

Steps 5 -8 of this JPM will be performed concurrently in rapid succession.

COMMENTS:

Tuesday, December 06, 2005 Page 6 of 16 CR SEQ STEP: 6 Ve Ves When flow, as indicated on FI-7044, HX B FLOW GPM, is between 5000 gpm and 4000 gpm, perform the following in rapid succession:

CUES: 1) Open MVB-9687B/9525B, LP B ESSEN LOAD ISOL. 2) Open MVB-9524B/9526B, LP B ESSEN LOAD ISOL. COMMENTS:

CR SEQ STEP: 7 Ve Ves When flow, as indicated on FI-7044, HX B FLOW GPM, is between 5000 gpm and 4000 gpm, perform the following in rapid succession:

CUES: 1) Close MVB-9524A19526A, LP A ESSEN LOAD ISOL. 2) Close MVB-9687 Al9525A, LP A ESSEN LOAD ISOL. COMMENTS:

Tuesday, December 06, 2005 STEP STANDARD: (Align non-essential loads to 'B' train CCW.) Places control for MVB-9524B/9526B AND MVB-9687B/9525B, LP B NON-ESSEN LOAD ISOL to OPEN, with indication of red light ON and green light OFF. STEP STANDARD:

SAT UNSAT (Isolate non-essential loads from 'A' train CCW.) Places control switches for MVB-9524A19526A AND MVB-9687A19525A, LP A NON-ESSEN LOAD ISOL to CLOSE, with indication of red light OFF and green light ON. SAT UNSAT Page 7 of 16 CR SEQ Ye No CUES: STEP: 8 When flow, as indicated on FI-7044, HX B FLOW GPM, is between 5000 gpm and 4000 gpm, perform the following in rapid succession:

1) Open MVB-9503A, CC TO RHR HX A. COMMENTS:

STEP: 9 STEP STANDARD: (Align CCW TO 'A' RHR heat exchanger.)

Places control switch for MVB-9503A, CC TO RHR HX A to OPEN with indication of red light ON and green light OFF. STEP STANDARD:

SAT UNSAT CR SEQ No No Rack in XSW1 OB11, CC PUMP C XPP0001 C-Racked up in slow speed. Green light ON. CC CCW PUMP C to complete Attachment VB ("C" CCW Pump breaker on 'B' train). CUES: COMMENTS:

CR SEQ STEP: 10 STEP STANDARD:

SAT UNSAT No No Place XPP-0001 C, PUMP C, TRAIN B in After-Places 'c' CCW pump, Train "B" switch in Stop. After-Stop.

CUES: SAT UNSAT COMMENTS:

Tuesday, December 06, 2005 Page 8 of 16 CR SEQ No No CUES: STEP: 11 Locally verify greater than 1 gpm sample flow on RML-2B, CCW Liquid Monitor. Booth Operator reports that RML-2B flow is 5.0 gpm. COMMENTS:

CR SEQ No No CUES: STEP: 12 Ensure the following valves have not automatically closed due to high flow: 1) MVG-9625, CC TO RB 2) MVG-9626, CC TO RB 3) MVG-9583, FROM XS L TDN HX 4) MVT-9593A(B)(C), FROM RCP A(B)(C)THERM BARR COMMENTS:

CR SEQ Ye Yes STEP: 13 Transfer the inservice Charging Pump to Train B per SOP-1'02.

STEP STANDARD:

AO reports greater than 1 gpm flow through RML-2B. STEP STANDARD:

SAT UNSAT The red light is ON and the green light is off for all the following: MVG-9625, MVG-9626, MVG-9583, MVG-9593A,B,&C.

STEP STANDARD:

SAT UNSAT Initiates SOP-102,Section III.F, Shifting Operating Charging Pumps CUES: SAT Evaluator may need to cue operator that the Initial Conditions of SOP-102, Section UNSAT III.F may be considered complete.

Cue operator that 10 days have elapsed since previous Charging Pump run. COMMENTS:

Tuesday, December 06, 2005 Page 9 of 16 CR SEQ STEP: 14 No Yes If XSW1 DB 15, CHARGING INJ PUMP XPP0043B-CS, is racked down, then initiate Attachment VD. CUES: STEP STANDARD:

No action required as this breaker is racked up. Operator notes green light on 'B' Charging Pump breaker. Step 2.1 of SOP-102 is N/A because it has been out of service for 10 days. COMMENTS:

SAT UNSAT CR SEQ STEP: 15 STEP STANDARD:

No Yes Ensure XPP-43B-PP1, CHG PP B AUX OIL PP, Observes that red light for XPP-43B-PP1 is is running. ON and green light is OFF. CUES: SAT COMMENTS:

CR SEQ STEP: 16 No Yes Ensure Train B Component Cooling is operating per SOP-118. CUES: COMMENTS:

Tuesday, December 06, 2005 UNSAT STEP STANDARD:

Since this action was just previously accomplished, operator should simply check off this step. SAT UNSAT Page 10 of 16 CR SEQ STEP: 17 No Yes Ensure Train B Chill Water is operating per SOP-501. CUES: COMMENTS:

CR SEQ STEP: 18 STEP STANDARD: Operator should verify that 'B' chilled water pump and chiller are operating.

STEP STANDARD:

SAT UNSAT No Yes Verify IPI00152A, CHARGING PUMP B Directs AB Lower Level to report suction SUCTION PRESS IND, indicates pump suction pressure on IPI00152A.

pressure is greater than 15 psig (AB-388).

CUES: SAT When requested, Booth Operator reports that charging header suction pressure is UNSAT 55 psig. COMMENTS:

CR SEQ STEP: 19 No Yes Start XPP-0043B, PUMP B. CUES: COMMENTS:

Tuesday, December 06, 2005 STEP STANDARD:

Places control switch for XPP-0043B in START and allows switch to spring-return to After-Start (mid-position).

Notes breaker red light ON and green light OFF. Also observes starting current decays to normal running current. SAT UNSAT Page 11 of16 CR SEQ No Yes CUES: STEP: 20 Verify XPP-43B-PP1, CHG PP B AUX OIL PP, stops automatically when the Charging PUMP Comes up to full speed. COMMENTS:

CR SEQ STEP: 21 STEP STANDARD:

Observes that red light goes OFF for XPP-43B-PP1 and that green light goes ON. STEP STANDARD:

SAT UNSAT No Yes Monitor the following to verify proper pump Notes that running current is around 42 CUES: operation:

amps, discharge pressure on PI-121 is around 2700 psig, and that status light for 1) Charging Pump B running current is XVG-9684B-CC shows green light OFF between 30 amps and 50 amps. and red light ON. 2) PI-121, CHG PRESS PSIG, is between 2650 psig and 2850 psig. 3) XVG-9684B-CC, CCW TO CHG PP B, is open. SAT UNSAT COMMENTS:

Tllesday, December 06, 2005 Page 12 of 16 CR SEQ STEP: 22 STEP STANDARD:

Ye Yes Stop the Charging Pump being removed from Places the control switch for 'A' Charging service. Pump breaker to STOP and allows it to spring-return to After-Stop (mid-position).

Notes that running current drops to ZERO. Places the "CCW/CHG Pump warning tag" on the control switch for 'A' Charging Pump breaker. CUES: SAT NOTE TO EVALUATOR:

Transfer of "CCW/CHG Pump warning tag is NOT critical.

UNSAT COMMENTS:

CR SEQ No Yes CUES: STEP: 23 Verify PI-121, CHG PRESS PSIG, is between 2650 psig and 2850 psig. COMMENTS:

Tuesday, December 06, 2005 STEP STANDARD:

Observes that discharge pressure on PI-121 is around 2700 psig. SAT UNSAT Page 13 of16 CR SEQ No Yes CUES: STEP: 24 Monitor the following for proper pump operation:

1) LR-459, PZR% LEVEL & LEVEL SP. 2) FI-130A, RCP A INJ FLO GPM. 3) FI-127A, RCP B INJ FLO GPM. 4) FI-124A, RCP C INJ FLO GPM. COMMENTS:

CR SEQ STEP: 25 STEP STANDARD:

Observes Pressurizer Level is about 60%, and all three seal injection flow rates are approximately 8.2 gpm. STEP STANDARD:

SAT UNSAT No Yes Align Component Cooling as required by SOP-Operator returns to SOP-118 to complete 118. swapover of active loop. CUES: COMMENTS:

CR SEQ Ye No STEP: 26 Secure the running Train A Component Cooling Water Pump in the off going active loop: 1) XPP-0001A, PUMP A STEP STANDARD:

SAT UNSAT Places control switch for XPP-0001 A, in STOP and allows it to spring-return to After-Stop (mid-position).

Places "CHARGING PUMP IN SERVICE" tag on the control switch for 'B' CCW Pump breaker. CUES: SAT NOTE TO EVALUATOR:

Transfer of "CHARGING PUMP IN SERVICE" tag is NOT UNSAT critical.

COMMENTS:

Tuesday, December 06, 2005 Page 14 of 16 CR SEQ STEP: 27 No Yes Ensure XPP-58A(B)(C), CCBP A(B)(C) are aligned as follows: 1) One pump is in AUTO and operating.

2) One pump is in AUTO and not operating.
3) One pump is OFF. CUES: COMMENTS:

Examiner ends JPM at this point. Tuesday, December 06, 2005 STEP STANDARD:

Checks status of XPP-58A(B)(C)

Notes that CCBP A is running with the control switch in AUTO and the red light ON and green light OFF. Notes that the control switch for CCBP B is in AUTO and the red light is OFF and green light ON. Notes that the control switch for CCBP C is in OFF and the red light is OFF and green light ON. SAT UNSAT Page 15 oj 16 JPM SETUP SHEET JPM NO: JPS-068 DESCRIPTION:

SHIFT COMPONENT COOLING WATER TRAINS IC SET: 10 or 324 INSTRUCTIONS:

1. RUN 2. Start 'B' Chilled Water Pump and 'B' HVAC Chiller 3. When student is ready: RUN 4. When AO requested by student to complete Attachment VIB of SOP-118, enter the following:

RUN BATCH FILE CCCW2B LOA-CCW045 SELECT =RACK IN (RACK UP 'C' CCW PUMP BREAKER ON "B" TRAIN) COMMENTS:

Tuesday, December 06, 2005 Page 16 of 16 v.C. SUMMER NUCLEAR STATION JOB PERFORMANCE MEASURE ]PM JPSF-083 RESPOND TO LOSS OF SECONDARY HEAT SINK APPROVAL:

APPROVAL DATE: REV NO: 7 CANDIDATE EXAMINER:

THIS JPM IS NOT APPROVED Tuesday, December 06, 2005 Page 1 of11 TASK: 311-006-06-01 RESPONSE TO LOSS OF SECONDARY HEAT SINK TASK STANDARD:

Condensate flow has been established to at least one S/G via the FRV bypass valves by dumping steam via the condenser steam dumps (Power Reliefs if C-9 not available).

PREFERRED EVALUATION LOCATION SIMULATOR

REFERENCES:

EOP-15.0 TOOLS: EOP-15.0 EVALUATION TIME 20 CANDIDATE:

PERFORMANCE RATING: SAT: PREFERRED EVALUATION METHOD PERFORM RESPONSE TO LOSS OF SECONDARY HEAT SINK TIME CRITICAL No lOCFR55: 45(A)7 TIME START: TIME FINISH: UNSAT: QUESTION GRADE: PERFORMANCE EXAMINER:

SIGNATURE DATE COMMENTS:

Tuesday, December 06, 2005 Page 2 of11 INSTRUCTIONS TO OPERATOR READ TO OPERATOR:

WHEN I TELL YOU TO BEGIN, YOU ARE TO PERFORM THE ACTIONS AS DIRECTED IN THE INITIATING CUES. I WILL DESCRIBE THE GENERAL CONDITIONS UNDER WHICH THIS TASK IS TO BE PERFORMED AND PROVIDE THE NECESSARY TOOLS WITH WHICH TO PERFORM THIS TASK. BEFORE STARTING, I WILL EXPLAIN THE INITIAL CONDITIONS, WHICH STEPS TO SIMULATE OR DISCUSS, AND PROVIDE INITIATING CUES. WHEN YOU COMPLETE THE TASK SUCCESSFULLY, THE OBJECTIVE FOR THIS JOB PERFORMANCE MEASURE WILL BE SATISFIED.

SAFETY CONSIDERATIONS:

INITIAL CONDITION:

Plant has experienced a trip from 100% due to a feedwater isolation with no EFW available.

EOP-15.0 (Loss of Secondary Heat Sink) has been entered and steps 1-7 have been completed.

INITIATING CUES: The CRS directs operator to respond to loss of secondary heat sink per EOP-15.0, starting with Step 8. HAND jPM BRIEFING SHEET TO OPERATOR AT THIS TIME! Tuesday, December 06, 2005 Page 3 0/11 jPM BRIEFING SHEET OPERATOR INSTRUCTIONS:

SAFETY CONSIDERATIONS:

INITIAL CONDITION:

Plant has experienced a trip from 100% due to a feedwater isolation with no EFW available.

EOP-15.0 (Loss of Secondary Heat Sink) has been entered and steps 1-7 have been completed.

INITIATING CUES: The CRS directs operator to respond to loss of secondary heat sink per EOP-15.0, starting with Step 8. HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU FEEL THAT YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK. Tuesday, December 06, 2005 Page 4 of 11 STEPS CR SEQ STEP: 1 No Yes Ensure one condensate pump is running CUES: Cue operator to keep 'A' Condensate pump running. COMMENTS:

CR SEQ STEP: 2 No Yes Ensure two FWBP's are running CUES: Cue operator to keep 'A'& 'B' FWBPs running. COMMENTS:

CR SEQ STEP: 3 No Yes Ensure FW FCV's are closed. CUES: COMMENTS:

Tuesday, December 06, 2005 STEP STANDARD:

'A' Condensate pump indicates red light ON, green light OFF. 'B' and 'C' Condensate pumps indicate red light OFF, green light ON. STEP STANDARD:

SAT UNSAT 'A' and 'B' FWBPs indicate red light ON, green light OFF. 'e' and 'D' FWBP indicate red light OFF, green light ON. STEP STANDARD:

SAT UNSAT FCV-478, 488, and 498 indicate red light OFF, green light ON. SAT UNSAT Page 5 of 11 CR SEQ STEP: 4 No Yes Place FW bypass contollers in manual and close. CUES: COMMENTS:

CR SEQ STEP: 5 Ye Yes Bypass FWIV signal. CUES: STEP STANDARD:

FCV-3321 ,3331 ,3341 controller red MAN light is lit and demand is O. STEP STANDARD:

SAT UNSAT Directs CB Operator to perform step 8e of EOP-15.0.

NOTE: Booth Operator (as CB Operator) will bypass FWIVs and bypasses.

COMMENTS:

SAT UNSAT CR SEQ STEP: 6 No Yes Verify no steam line isolation signal. CUES: COMMENTS:

Tuesday, December 06, 2005 STEP STANDARD:

RB PRESS HI-2 STM LINE ISOL (XCP-612 2-1) is not lit. SAT UNSAT Page 6 of 11 CR SEQ STEP: 7 Ye Yes Close the 'A' and 'C' MSIV's. CUES: STEP STANDARD:

PVM-2801 A & C indicate red light OFF, green light ON. SAT Prompt the student that the 'B' S/G will be used to establish a heat sink. NOTE: A UNSAT Safety Injection signal may be generated during this step. COMMENTS:

CR SEQ Ye No CUES: STEP: 8 Open the 'B' MS Isolation Bypass Valve. STEP STANDARD:

Both MAIN STEAM ISOL VALVES RESET TRAIN A(B) momentarily depressed.

PVM-2869B indicates red light ON, green light OFF. SAT NOTE: This step is only performed and therefore only critical if the 'B' MSIV closes UNSAT on a Isolation signal during the previous step. COMMENTS:

CR SEQ STEP: 9 No Yes Place FW switches in automatic.

CUES: COMMENTS:

Tuesday, December 06, 2005 STEP STANDARD:

PVG-1611A(B)(C) and FCV-3321,3331,3341 Train A and B switches indicate AUTO. SAT UNSAT Page 7 of II CR SEQ STEP: 10 Ye Yes Reset SI. CUES: STEP STANDARD:

Momentarily places both SI RESET TRAIN A(B) switches to the RESET position.

SAT NOTE: If SI signal has NOT been generated by this time, student must wait >60 UNSAT seconds to reset if the SI signal is generated later in procedure.

COMMENTS:

CR SEQ STEP: 11 No Yes Verify the condenser is available.

CUES: COMMENTS:

CR SEQ STEP: 12 No Yes Open MFP turbine drain valves. CUES: STEP STANDARD:

C-9 status light is bright. STEP STANDARD:

SAT UNSAT MOV 5A indicates red light ON, green light OFF. SAT Cue student that the 'A' MFP will be used to establish a heat sink. NOTE: Student UNSAT only required to open drain valve for the 'A' MFP. COMMENTS:

Tuesday, December 06, 2005 PageS of11 CR SEQ STEP: 13 No Ves Reset the 'A' MFP. STEP STANDARD:

FWP A TRIP/RESET switch momentarily taken to reset. Student notes 'A' MFP will not reset. CUES: SAT NOTE: MFP will not reset due to the 'B' Train FW isolation signal. Attempting to start UNSAT another MFP would not constitute a failure. COMMENTS:

CR SEQ Ve No CUES: STEP: 14 Bypass the steam dump interlock when Tavg is <552°F (P12 interlock bright). STEP STANDARD:

Both STM DUMP INTERLOCK Switches taken to the BVP INTLK position.

NOTE: Only performed/critical if Tavg decreases below 552°F. COMMENTS:

SAT UNSAT CR SEQ STEP: 15 STEP STANDARD:

Ve Ves Establish flowpath to the 'B' S/G (Opens FVC-FCV-3331 controller indicates full open. 3331. CUES: COMMENTS:

Tuesday, December 06, 2005 SAT UNSAT Page 90/11 CR SEQ STEP: 16 STEP STANDARD:

Ye Yes Depressurize the 'B' S/G via the steam dumps STM DUMP MODE SELECT Switch and establish FW flow to the 'B' S/G. indicates STM PRESS. STM DUMP CNTRL Controller adjusted to full open Bank 1 steam dumps. Flow indicated to "B" SG on FI-486/487.

CUES: SAT NOTE: If C-9 is not available, the student may perform alternate steps to dump UNSAT steam via the Power Reliefs. COMMENTS:

Examiner ends JPM at this point. Tuesday, December 06, 2005 Page 100/11 JPM SETUP SHEET jPM NO: JPSF-083 DESCRIPTION:

RESPOND TO LOSS OF SECONDARY HEAT SINK IC SET: 10 or 325 INSTRUCTIONS:

1. Activate MAL-FWM003A, 003B, 003C (EFW Pump Trip) MAL-PCS013B SELECT= INADVERTANT INIT (Inadvertent FW isolation

('B' Train)) 2. RUN 3. Perform Immediate Actions of EOP-1.0 after reactor trip. 4. When S/G NR levels <20%: Manually secure all three RCPs. FREEZE 5. When examinee is ready: RUN 7. When requested to bypass the FW isolation signals, enter the following:

LOA-FWM040 SELECT = BYPASS LOA-FWM041 SELECT= BYPASS LOA-FWM042 SELECT = BYPASS COMMENTS:

Tuesday, December 06, 2005 Page 11 of 11

v.C. SUMMER NUCLEAR STATION JOB PERFORMANCE MEASURE ]PM JPSF-062 RESPOND TO RHR PUMP VORTEXING APPROVAL:

APPROVAL DATE: REV NO: 4 CANDIDATE EXAMINER:

THIS JPM IS NOT APPROVED Tuesday, December 06, 2005 Page 1 of9 TASK: 000-161-05-01 RESPOND TO RESIDUAL HEAT REMOVAL PUMP VORTEXING TASK STANDARD:

'B' RHR Pump is secured. Transition to AOP-115.5 is recommended.

The use of applicable Human Performance Tools (3-way communications, self checking, peer checking, phonetic alphabet, etc) and industrial safety practices meets expectations.

PREFERRED EVALUATION LOCATION SIMULATOR

REFERENCES:

TOOLS: AOP-115.1 PREFERRED EVALUATION METHOD PERFORM EVALUATION TIME 15 TIME CRITICAL No lOCFR55: 41(b)10 CANDIDATE:

TIME START: TIME FINISH: PERFORMANCE RATING: SAT: UN SAT: QUESTION GRADE: PERFORMANCE EXAMINER:

SIGNATURE DATE COMMENTS:

Tuesday, December 06, 2005 Page 2 of9 INSTRUCTIONS TO OPERATOR READ TO OPERATOR:

WHEN I TELL YOU TO BEGIN, YOU ARE TO PERFORM THE ACTIONS AS DIRECTED IN THE INITIATING CUES. I WILL DESCRIBE THE GENERAL CONDITIONS UNDER WHICH THIS TASK IS TO BE PERFORMED AND PROVIDE THE NECESSARY TOOLS WITH WHICH TO PERFORM THIS TASK. BEFORE STARTING, I WILL EXPLAIN THE INITIAL CONDITIONS, WHICH STEPS TO SIMULATE OR DISCUSS, AND PROVIDE INITIATING CUES. WHEN YOU COMPLETE THE TASK SUCCESSFULLY, THE OBJECTIVE FOR THIS JOB PERFORMANCE MEASURE WILL BE SATISFIED.

SAFETY CONSIDERATIONS:

INITIAL CONDITION:

The plant is in Mode 5 with the RCS at mid-loop conditions.

The 'B' RHR loop is in service. The Mansell Level Monitoring system computer is set up In the simulator.

INITIATING CUES: As the NROATC, respond to plant alarms. HAND ]PM BRIEFING SHEET TO OPERATOR AT THIS TIME! Tuesday, December 06; 2005 Page 3 of9

]PM BRIEFING SHEET OPERATOR INSTRUCTIONS:

SAFETY CONSIDERATIONS:

INITIAL CONDITION:

The plant is in Mode 5 with the RCS at mid-loop conditions.

The 'B' RHR loop is in service. The Mansell Level Monitoring system computer is set up In the simulator.

INITIATING CUES: As the NROATC, respond to plant alarms. HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU FEEL THAT YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK. Tuesday, December 06, 2005 Page 4 0/9 STEPS CR SEQ No No CUES: STEP: 1 Responds to the following annunciator:

XCP 6102-2, RHR LP B FLO LO COMMENTS:

CR SEQ STEP: 2 Ye Yes Close RHR outlet valve. CUES: COMMENTS:

CR SEQ STEP: 3 Ye Yes Throttle FCV-605B to stabilize RHR flow. CUES: STEP STANDARD:

Notes indications of B RHR pump cavitation/vortexing and Implements AOP-115.1. STEP STANDARD:

SAT UNSAT HCV-603B controller setpoint indicates O. STEP STANDARD:

SAT UNSAT FCV-605B controller taken to manual and reduced until RHR pump amps and flow are stable. NOTE: The student should reduce RHR flow until vortexing indications stop. COMMENTS:

SAT UNSAT Tuesday, December 06, 2005 PageS 0/9 CR SEQ STEP: 4 No Yes Monitor the following; CUES: COMMENTS:

STEP: 5 STEP STANDARD:

Monitor flow on FI-6058, FLOW GPM; RHR PUMP '8' AMPS; RCS heatup*rate.

STEP STANDARD:

SAT UNSAT CR SEQ No No Monitor RCS heatup on TR-413, HOT LEG OF no significantheatup on TR-413 WIDE RNG. CUES: Cue examinee that another operator will perform STP-103.001 COMMENTS:

STEP: 6 STEP STANDARD:

SAT UNSAT CR SEQ No No Verify RCS Hot Leg level elevation is Level verified approximately 430' 10" on GREATER THAN OR EQUAL TO' 430' 8 1/2" Mansell and Mid loop monitors CUES: COMMENTS:

Tuesday, December 06, 2005 SAT UNSAT Page6oJ9 STEP: 7 STEP STANDARD:

CR SEQ Ye No Control Charging and Letdown flow to restore Opens FCV-122 to increase charging flow RCS Hot Leg level elevation to GREATER until level starts to increase THAN 430' 10" (15.5 inches). CUES: COMMENTS:

CR SEQ STEP: 8 No Yes Responds to annunciators XCP-607 3-4 (LD AB SUMP/FD LEVEL HI) and XCP-61 02-2 (RHR LP B FLO LO) CUES: COMMENTS:

CR SEQ STEP: 9 Ye Yes Throttle flow as necessary to stabilize RHR Pump amps with flow GREATER THEN 500gpm. CUES: STEP STANDARD:

SAT UNSAT Notes indications of level decreasing and pump vortexing again STEP STANDARD:

SAT UNSAT Throttle RHR flow to attempt to stabilize RHR Pump amps. NOTE: RHR Pump amps are still unstable and flow is <500 gpm. COMMENTS:

SAT UNSAT Tuesday, December 06, 2005 Page 70/9 CR SEQ STEP: 10 Ye Yes Stop the operating RHR Pump. CUES: COMMENTS:

CR SEQ STEP: 11 STEP STANDARD:

The operating RHR Pump is stopped. STEP STANDARD:

SAT UNSAT No Yes Go to AOP-115.5, Loss Of RHR With The RCS Recommend transition to AOP-115.5.

Not Intact (Mode 5). CUES: Cue: This completes this JPM. COMMENTS:

Examiner ends JPM at this point. Tuesday, December 06, 2005 SAT UNSAT Page 8 of9

"-JPM SETUP SHEET JPM NO: JPSF-062 DESCRIPTION:

RESPOND TO RHR PUMP VORTEXING IC SET: 20 INSTRUCTIONS:

1. Place danger tags on the following components to simulate half-pipe lineup: RB Spray pumps Accumulator Isolation Valves Reactor Coolant Pumps Pressurizer Heaters Reactor Trip Breakers , 2. Set up the Mansell Level Monitoring computer in the simulator
3. If the Half-Pipe concern status board is used, the following information may be posted: Boration flow path: 'B' Charging pump, 115 B suction, 8801 A injection from RWST B/U 'A' Charging Pump, MVG-8104 suction, MVG-8884 injection from BAT Comments:

Maintain 6"-10" above mid-loop Applicable procedures:

AOP-115.1

-RHR Pump Vortexing AOP-115.5

-Loss of RHR with RCS Not Intact 4. Activate OVR-AA028 SELECT=ON (Override Radiation Monitoring Panel Annunciators)

5. RUN 6. Insert MAL-RHR005B Severity = 1500 7. When RHR pump cavitation starts and RHR LOOP A FLO LO annunciator is in alarm, delete RHR005B 8. Run for 5 minutes to get good trend on mid loop monitors.

FREEZE 9. Select RCS Trend from ZZMENU on MCB1 IPCS screen. 10. Energize the Audio Count Rate Circuit. 11. Do not take simulator to run until student says he/she is ready to begin JPM. 1 O. When student has begun to recover level, reinsert MAL-RHR005B SEVERITY = 1500 (RHR bypass line leak), SET = Trigger #1. Tuesday, December 06, 2005 Page 9 of 9 11. If necessary, Increase MAL-RHROOSB severity until flow is stabilized at <SOO gpm or cannot be stabilized to force them into AOP-11S.S.

COMMENTS:

V.C. SUMMER NUCLEAR STATION JOB PERFORMANCE MEASURE JPM JPS-072NRC RESPOND TO SOURCE RANGE CHANNEL FAILURE APPROVAL:

APPROVAL DATE: REV NO: 1 CANDIDATE EXAMINER:

THIS JPM IS NOT APPRO VED Tuesday, December 06, 2005 Page 1 of9 TASK: 000-032-05-01 RESPOND TO SOURCE RANGE INSTRUMENTATION CHANNEL FAILURE TASK STANDARD:

N-32 (the failed channel) is in a BYPASS condition, fuel movement has been stopped, and all fuel is stored in a safe location.

PREFERRED EVALUATION LOCATION SIMULATOR

REFERENCES:

AOP-401.9 PREFERRED EVALUATION METHOD PERFORM SOURCE RANGE CHANNEL FAILURE TOOLS: Supply examinee with AOP-401.9 and ARPs for 620 4-1 and 620 4-3 as they are earned EVALUATION TIME 10 TIME CRITICAL No lOCFR55: 45(A)4 CANDIDATE:

TIME START: TIME FINISH: PERFORMANCE RATING: SAT: UNSAT: QUESTION GRADE: PERFORMANCE EXAMINER:

SIGNATURE DATE COMMENTS:

Tuesday, December 06, 2005 Page 2 0/9 INSTRUCTIONS TO OPERATOR READ TO OPERATOR:

WHEN I TELL YOU TO BEGIN, YOU ARE TO PERFORM THE ACTIONS AS DIRECTED IN THE INITIATING CUES. I WILL DESCRIBE THE GENERAL CONDITIONS UNDER WHICH THIS TASK IS TO BE PERFORMED AND PROVIDE THE NECESSARY TOOLS WITH WHICH TO PERFORM THIS TASK. BEFORE STARTING, I WILL EXPLAIN THE INITIAL CONDITIONS, WHICH STEPS TO SIMULATE OR DISCUSS, AND PROVIDE INITIATING CUES. WHEN YOU COMPLETE THE TASK SUCCESSFULLY, THE OBJECTIVE FOR THIS JOB PERFORMANCE MEASURE WILL BE SATISFIED.

SAFETY CONSIDERATIONS:

INITIAL CONDITION:

Plant is in mode 6 with refueling in progress and RCS temperature at 120°F. Fuel movement is in progress with assembly J-9 being moved. This JPM will be simulated in the control room. INITIATING CUES: CRS directs operator to respond as expected to MCB Annunciators for the indicated plant conditions . HAND JPM BRIEFING SHEET TO OPERATOR AT THIS TIME! Tuesday, December 06, 2005 Page 3 0/9

]PM BRIEFING SHEET OPERATOR INSTRUCTIONS:

SAFETY CONSIDERATIONS:

INITIAL CONDITION:

Plant is in mode 6 with refueling in progress and RCS temperature at 120°F. Fuel movement is in progress with assembly J-9 being moved. This JPM will be simulated in the control room. INITIATING CUES: CRS directs operator to respond as expected to MCB Annunciators for the indicated plant conditions HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU FEEL THAT YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK. Tuesday, December 06, 2005 Page 4 of9 STEPS CR SEQ STEP: Ye Yes Stop all core alterations.

STEP STANDARD:

Stops fuel movement in progress.

Notify RE on headset and RB coordinator.

CUES: SAT CUE: N 32 Meter to zero. Instrument Power N32 off. Non operate light, level trip UNSAT light, high flux shutdown light, bistable trip spare light. Annunciators 6204-1 and 620 4-3 are received COMMENTS:

CR SEQ STEP: 2 No Yes Stop all positive reactivity additions CUES: COMMENTS:

CR SEQ STEP: 3 Ye Yes Check at least 1 Source Range channel operable CUES: STEP STANDARD:

Any dilution or cooldown in progress stopped. STEP STANDARD:

SAT UNSAT Verifies normal/expected indication on N-31 at MCB or NIS panels. SAT CUE: Instrumental Power light on control powerlight on. N31 reads about 20 cps.UNSAT COMMENTS:

Tuesday, December 06, 2005 PageS of9 CR SEQ STEP: 4 STEP STANDARD:

Ye Yes Check if RB evacuation alarm has actuated.

SR HI FLUX AT SHUTDN annunciator is lit. CUES: CUE: RB coordinator reports that the RB evacuation alarm is sounding COMMENTS:

SAT UNSAT CR SEQ No No CUES: STEP: 5 Inform plant personnel that the Reactor Building evacuation alarm was spurious, and evacuation of the RB is NOT required.

COMMENTS:

CR SEQ Ye Yes CUES: STEP: 6 Bypass level trip for N-32 CUE: Level trip bypass light lit. COMMENTS:

Tuesday, December 06, 2005 STEP STANDARD:

Personnel

& RB coordinator notified.

Announcement made that the alarm is invalid .. STEP STANDARD:

SAT UNSAT Set LEVEL TRIP switch for N-32 to BYPASS. Level trip bypass light lit. SAT UNSAT Page6of9 CR SEQ STEP: 7 No Yes Verify N-32 is bypassed.

CUES: STEP STANDARD:

IR & SR TRIP BYP annunciator (XCP-620 4-5) is in alarm. CUE:IR & SR TRIP BYP annunciator (XCP-620 4-5) is in alarm. COMMENTS:

SAT UNSAT CR SEQ STEP: 8 STEP STANDARD:

No Yes Block the HIGH FLUX AT SHUTDOWN for N-Verifies HIGH FLUX AT SHUTDOWN 32. switch for N-32 positioned to BLOCK. CUES: COMMENTS:

CR SEQ No No CUES: STEP: 9 Monitors an operable NI channel. CUE: N31 reads about 20 CPS COMMENTS:

Tuesday, December 06, 2005 Verifies SR HIGH FLUX AT SHUTDN Block (XCP-620-4-4) annunciator is lit. STEP STANDARD:

SAT UNSAT Monitors N-31 and notes that it is reading as expected for current plant conditions.

SAT UNSAT Page 70/9 CR SEQ STEP: 10 STEP STANDARD:

No Yes Ensure NR-45 is selected to operable channel Verifies NR-45 selected to N-31 channel. CUES: COMMENTS:

CR SEQ No No CUES: STEP: 11 Dispatch I&C to determine the cause of the N32 failure COMMENTS:

Examiner ends JPM at this point. Tuesday, December 06, 2005 STEP STANDARD:

I&C contacted SAT UNSAT SAT UNSAT Page8of9 JPM SETUP SHEET jPM NO: JPS-072NRC DESCRIPTION:

RESPOND TO SOURCE RANGE CHANNEL FAILURE IC SET: INSTRUCTIONS:

1. RUN 2. Initial conditions plant is in mode 6 and moving fuel. 5. FREEZE 6. When student is ready 7. RUN 8. Activate OVR-NI053 SELECT=OFF (Blown Instrument Power Fuse on N32.) (MAL???) THESE SETUP INSTRUCTIONS ARE N/A FOR SIMULATING IN THE MAIN CONTROL ROOM. COMMENTS:

Tuesday, December 06, 2005 Page 90f9

-

v.C. SUMMER NUCLEAR STATION JOB PERFORMANCE MEASURE ]PM JPP-055NRC LOCALLY START THE TURBINE DRIVEN EMERGENCY FEEDWATER PUMP AND THROTTLE EMERGENCY FEEDWATER FLOW AS DIRECTED APPROVAL:

APPROVAL DATE: REV NO: 0 CANDIDATE EXAMINER:

THIS JPM IS NOT APPROVED Tuesday, December 06, 2005 Page 1 of11 TASK: 061-001-05-04 LOCAL EMERGENCY START OF TURBINE DRIVEN EMERGENCY FEEDWATER PUMP Turbine Driven Emergency Feedwater Pump is started locally per FEP-4.0, ENCLOSURE F and speed increased to > 4,000 rpm. Flow control valves IFV-3536, IFV-3546, & IFV-3556 are throttled to maintain SG WR levels between 50% and 60%. Enclosure F steps 2 -4 must be completed within 30 minutes of implementation.

The use of applicable Human Performance Tools (3-way communications, self checking, peer checking, phonetic alphabet, etc) and industrial safety practices meets expectations.

PREFERRED EVALUATION LOCATION PLANT

REFERENCES:

AOP-600.1 FEP-4.0 TOOLS: FEP-4.0, ENCLOSURE F EVALUATION TIME 25 CANDIDATE:

PERFORMANCE RATING: SAT: PREFERRED EVALUATION METHOD SIMULATE CONTROL ROOM EVACUATION CONTROL ROOM EVACUATION DUE TO FIRE TIME CRITICAL NO lOCFR55: 45(a)7 TIME START: TIME FINISH: UNSAT: QUESTION GRADE: PERFORMANCE EXAMINER:

SIGNATURE DATE COMMENTS:

Tuesday, December 06, 2005 Page 2 0/11 INSTRUCTIONS TO OPERATOR READ TO OPERATOR:

WHEN I TELL YOU TO BEGIN, YOU ARE TO PERFORM THE ACTIONS AS DIRECTED IN THE INITIATING CUES. I WILL DESCRIBE THE GENERAL CONDITIONS UNDER WHICH THIS TASK IS TO BE PERFORMED AND PROVIDE THE NECESSARY TOOLS WITH WHICH TO PERFORM THIS TASK. BEFORE STARTING, I WILL EXPLAIN THE INITIAL CONDITIONS, WHICH STEPS TO SIMULATE OR DISCUSS, AND PROVIDE INITIATING CUES. WHEN YOU COMPLETE THE TASK SUCCESSFULLY, THE OBJECTIVE FOR THIS JOB PERFORMANCE MEASURE WILL BE SATISFIED.

SAFETY CONSIDERATIONS:

Burn Hazard INITIAL CONDITION:

The Control Room has been evacuated due to a fire. Control of the plant has been established from the CREP panel. The Shift Engineer is not available to start the TDEFP. INITIATING CUES: Control Room Supervisor directs the ABUL operator to locally start the TDEFP and to locally throttle EFW flow to maintain SG WR levels between 50% and 60% per FEP-4.0 ENCLOSURE F, Steps 2. thru 4 THIS IS A TIME CRITICAL JPM! AT NO TIME ARE YOU TO OPERATE ANY PLANT EQUIPMENT!

HAND JPM BRIEFING SHEET TO OPERATOR AT THIS TIME! Tuesday, December 06, 2005 Page 3 of11 jPM BRIEFING SHEET OPERATOR INSTRUCTIONS:

SAFETY CONSIDERATIONS:

Burn Hazard INITIAL CONDITION:

The Control Room has been evacuated due to a fire. Control of the plant has been established from the CREP panel. The Shift Engineer is not available to start the TDEFP. INITIATING CUES: Control Room Supervisor directs the ABUL operator to locally start the TDEFP and to locally throttle EFW flow to maintain SG WR levels between 50% and 60% per FEP-4.0 ENCLOSURE F, Steps 2. thru 4 A T NO TIME ARE YOU TO OPERATE ANY PLANT EQUIPMENT!

HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU FEEL THAT YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK. Tuesday, December 06, 2005 Page 4 0/11 STEPS CR SEQ STEP: Ye Yes Open XVG-2802B-MS HEADER C EF PUMP TURBINE SUPPLY VLV (IB-435 East Pen.). CUES: COMMENTS:

CR SEQ No No CUES: STEP: 2 Take the emergency stairs to the IB-412 Turbine Driven Emergency Feedwater Pump Room. STEP STANDARD:

Visually checks XVG-2802B-MS HEADER C EF PUMP TURBINE SUPPLY VLVopen, (IB-436 East Pen). STEP STANDARD:

SAT UNSAT Identifies emergency stairs to the IB-412 Turbine Driven Emergency Feedwater Pump Room. SAT Cue operator to indicate where the emergency stairs to the IB-412 Turbine Driven UNSAT Emergency Feedwater Pump Room are located then proceed to the TDEPP room via the normal route through the RCA. COMMENTS:

CR SEQ STEP: 3 Ye Yes If necessary, reset the throttle valve, XVT-02865-MS, EF PUMP TURB MAIN STEAM THROTILE VALVE. CUES: STEP STANDARD:

Visually checks XVT02865-MS, EF PUMP TURB MAIN STEAM THROTTLE VALVE, reset by observing upper limit switch and trip hook engaged.(IB-412).

SAT Cue operator that XVT02865-MS, EF PUMP TURB MAIN STEAM THROTTLE VALVE is reset. UNSAT " COMMENTS:

Tuesday, December 06, 2005 PageS of11 CR SEQ STEP: 4 STEP STANDARD:

No No Ensure XVT02813-MS, EF PUMP TURB STEAM Moves the declutch lever and engages the SUPPLY HDR DRAIN VLV, is open handwheel.

Turns valve handwheel in the close direction and verifies the valve starts to close then fully reopends valve CUES: SAT COMMENTS:

CR SEQ Ye Yes STEP: 5 Open IFV-2030-MS, EF PUMP TURB STEAM SUPPLY FLOW CONT VLV as follows: 1). Close IFV-2030-AV1-MS, IA ISOLATION VALVE FOR IFV-2030-MS.

2). Vent IFV02030PR1-MS, IA SUPPLY PRESS REG FOR IFV-2030-MS.

UNSAT STEP STANDARD:

1). Shuts IFV-2030-AV1-MS, IA ISOLATION VALVE FOR IFV-2030-MS by turning air isolation valve in the clockwise direction. (IB-412 above air tank). 2). Vents IFV-2030-PR1-MS, IA SUPPLY PRESS REG FOR IFV2030-MS by turning the valve T -Bar in the counterclockwise direction.

CUES: SAT Examiner cues operator that IFV-2030 remains closed after closing the IA valve but UNSAT opens when the regulator is vented off. COMMENTS:

Tuesday, December 06, 2005 Page 6 of 11 CR SEQ STEP: 6 STEP STANDARD:

Ye Yes Verify Turbine speed increases to greater Visually verify Turbine Driven Emergency than 4000 RPM on ISI13505, EF PUMP TURBINE Feed Pump Speed by observing ISI13505, TACHOMETER.

EF PUMP TURBINE TACHOMETER, local Tachometer indication (mounted on the Turbine).

Turbine speed indicates

>4000 RPM. CUES: SAT Cue operator that turbine speed is 4200 rpm. COMMENTS:

CR SEQ STEP: 7 No Yes close the following drain valves MS, XVT-2804A-MS, and XVT-2804B-MS CUES: COMMENTS:

CR SEQ STEP: 8 No Yes Isolates Instrument Air to FCV-3536-EF. (IB-423) CUES: UNSAT STEP STANDARD:

2803A, 2804A, & 2804B rotated in the clockwise direction until handwheel movement stops and valve will no longer rotate in the clockwise direction by hand STEP STANDARD:

SAT UNSAT Checks FCV-3536 stem position(IB-423).

Student rotates IFV-3536-AV1-EF in the clockwise direction.

Cues the operator that IFV-3536 is full open. Then (while closing of AV1 valve) cues operator that the handle turns in the clockwise direction then stops. SAT UNSAT COMMENTS:

Tuesday, December 06, 2005 Page 70f11 CR SEQ STEP: 9 No Yes Vent air from the regulator for FCV-3536-EF, (IB-423).

CUES: Cue operator that he hears and feels air blowing. COMMENTS:

CR SEQ STEP: 10 Ye Yes Throttle FCV-3536-EF.

CUES: STEP STANDARD:

Operator opens the regulator vent. STEP STANDARD:

SAT UNSAT Removes locking device. Rotates the handwheel for FCV-3536-EF in the clockwise direction to maintain 50% -60% WR level in A SG. Informs CRS at CREP he has throttled IFV-3536 and awaits further direction SAT NOTE TO EXAMINER:

Ask operator how he/she would establish communcations UNSAT with the CRS at the CREP panel. Cue operator that he feels light resistance in the clockwise direction.

COMMENTS:

CR SEQ STEP: 11 No Yes Isolates Instrument Air to FCV-3546-EF. (IB-423) STEP STANDARD:

Checks FCV-3546 stem position(IB-423).

Student rotates IFV-3546-AV1-EF in the clockwise direction.

CUES: SAT Cues the operator that IFV-3546 is full open. Then (while closing of AV1 valve) UNSAT cues operator that the handle turns in the clockwise direction then stops. COMMENTS:

Tuesday, December 06, 2005 Page 8 ofll CR SEQ STEP: 12 No Yes Vent air from the regulator for FCV-3546-EF, (IB-423).

CUES: Cue operator that he hears and feels air blowing. COMMENTS:

CR SEQ STEP: 13 Ye Yes Throttle FCV-3546-EF.

CUES: STEP STANDARD:

Operator opens the regulator vent. STEP STANDARD:

SAT UNSAT Removes locking device. Rotates the handwheel for FCV-3546-EF in the clockwise direction to maintain 50% -60% WR level in B SG. Informs CRS at CREP he has throttled IFV-3546 and awaits further instruction Cue operator that he feels light resistance in the clockwise direction.

COMMENTS:

SAT UNSAT CR SEQ STEP: 14 No Yes Isolates Instrument Air to FCV-3556-EF. (IB-423) STEP STANDARD:

Checks FCV-3556 stem position(IB-423).

Student rotates I FV -3556-A V1-EF in the clockwise direction.

CUES: SAT Cues the operator that IFV-3556 is full open. Then (while closing of AV1 valve) UNSAT cues operator that the handle turns in the clockwise direction then stops. COMMENTS:

Tuesday, December 06, 2005 Page 9 0/11 CR SEQ STEP: 15 No Yes Vent air from the regulator for FCV-3556-EF, (IB-423).

CUES: Cue operator that he hears and feels air blowing. COMMENTS:

CR SEQ STEP: 16 Ye Yes Throttle FCV-3556-EF.

CUES: STEP STANDARD:

Operator opens the regulator vent. STEP STANDARD:

SAT UNSAT Removes locking device. Rotates the handwheel for FCV-3556-EF in the clockwise direction to maintain 50% -60% WR level in C SG. Informs CRS at CREP he has throttled IFV-3556 and awaits further instructions Cue operator that he feels light resistance in the clockwise direction.

COMMENTS:

SAT UNSAT Examiner ends JPM at this point. Tuesday, December 06, 2005 Page 10 oj 11 JPM SETUP SHEET jPM NO: JPP-055NRC DESCRIPTION:

LOCALLY START THE TURBINE DRIVEN EMERGENCY FEEDWATER PUMP AND THROTTLE EMERGENCY FEEDWATER FLOW AS DIRECTED ICSET: INSTRUCTIONS:

COMMENTS:

Tuesday, December 06, 2005 Page 11 of 11

v.C. SUMMER NUCLEAR STATION JOB PERFORMANCE MEASURE ]PM JPPF-ESTABLISH CHILLED WATER ALTERNATE COOLING TO CHARGING PUMPS APPROVAL:

APPROVAL DATE: REV NO: 6 CANDIDATE EXAMINER:

THIS JPM IS NOT APPROVED Tuesday, December 06, 2005 Page 1 of 12 TASK: 004-003-04-04 ESTABLISH CHILLED WATER ALTERNATE COOLING TO CHARGING PUMPS TASK STANDARD:

Chilled Water alternate cooling is provided to the "B" Charging Pump per AOP-118.1.

The use of applicable Human Performance Tools (3-way communications, self checking, peer checking, phonetic*

alphabet, etc) and industrial safety practices meets expectations.

This JPM is related to PRA event OACC "Operator action to establish alternate COOling to CS pumps". PREFERRED EVALUATION LOCATION PLANT PREFERRED EVALUATION METHOD SIMULATE

REFERENCES:

AOP-118.1 TOTAL LOSS OF COMPONENT COOLING WATER TOOLS: AOP-118.1 Attachment 1 and 1 B FLASHLIGHT EVALUATION TIME 20 TIME CRITICAL NO lOCFR55: 45(a)6 CANDIDATE:

TIME START: TIME FINISH: PERFORMANCE RATING: SAT: UNSAT: QUESTION GRADE: PERFORMANCE EXAMINER:

SIGNATURE DATE COMMENTS:

Tuesday, December 06, 2005 Page 2 of12 INSTRUCTIONS TO OPERATOR READ TO OPERATOR:

WHEN I TELL YOU TO BEGIN, YOU ARE TO PERFORM THE ACTIONS AS DIRECTED IN THE INITIATING CUES. I WILL DESCRIBE THE GENERAL CONDITIONS UNDER WHICH THIS TASK IS TO BE PERFORMED AND PROVIDE THE NECESSARY TOOLS WITH WHICH TO PERFORM THIS TASK. BEFORE STARTING, I WILL EXPLAIN THE INITIAL CONDITIONS, WHICH STEPS TO SIMULATE OR DISCUSS, AND PROVIDE INITIATING CUES. WHEN YOU COMPLETE THE TASK SUCCESSFULLY, THE OBJECTIVE FOR THIS JOB PERFORMANCE MEASURE WILL BE SATISFIED.

SAFETY CONSIDERATIONS:

Be sure to read radiation posting signs prior to entering charging pump rooms. INITIAL CONDITION: A total loss of Component Cooling Water has occurred.

CRS has implemented AOP-118.1.

INITIATING CUES: The CRS directs you, the ABLL, to extablish alternate cooling to the "B" Charging Pump from the Chilled Water System per AOP-118.1 Attachment 1 and 1 B. AT NO TIME ARE YOU TO OPERATE ANY PLANT EQUIPMENT!

HAND }PM BRIEFING SHEET TO OPERATOR AT THIS TIME! Tuesday, December 06, 2005 Page 3 of12

]PM BRIEFING SHEET OPERATOR INSTRUCTIONS:

SAFETY CONSIDERATIONS:

Be sure to read radiation posting signs prior to entering charging pump rooms. INITIAL CONDITION: A total loss of Component Cooling Water has occurred.

CRS has implemented AOP-118.1.

INITIATING CUES: The CRS directs you, the ABLL, to extablish alternate cooling to the "B" Charging Pump from the Chilled Water System per AOP-118.1 Attachment 1 and 1 B. AT NO TIME ARE YOU TO OPERATE ANY PLANT EQUIPMENT!

HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU FEEL THAT YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK. Tuesday, December 06, 2005 Page4of12 STEPS CR SEQ STEP: 1 No Yes Obtain alternate cooling supply hoses and fittings.

CUES: STEP STANDARD:

Hoses and fittings obtained from Dedicated Gang Box (AB-400).

SAT HAVE OPERATOR POINT OUT THE HOSES AND DISCUSS HOW THE LINES WOULD UNSAT BE CONNECTED, VERSUS REMOVING THE EQUIPMENT OUT OF THE GANG BOX. COMMENTS:

CR SEQ STEP: 2 Ye Yes Connect the supply hose. CUES: COMMENTS:

CR SEQ STEP: 3 Ye Yes Connect the return hose. CUES: COMMENTS:

Tuesday, December 06, 2005 STEP STANDARD:

Hose connected using Chicago fittings to IPX09062B-HR-VU, HIGH ROOT TO IPX9062B, AND XVT19647B-CC, CHG PP BOIL CLR AL T CLG WTR SUPPLY VLV. STEP STANDARD:

SAT UNSAT Hose connected using Chicago fittings to IPX09098B-HR-VU, HIGH ROOT TO IPX9098B, AND XVT19648B-CC, CHG PP BOIL CLR AL T CLG WTR RETURN VLV. SAT UNSAT Page 5 0/12 CR SEQ STEP: 4 No Yes Check XVG09657B-CC (AB-400) valve position and record "AS FOUND" on attachment.

STEP STANDARD:

Removes the locking device, attempts to turn XVG09657B-CC in the clockwise direction and records valve position on the attachment.

CUES: SAT Steps 4-21 involve valves that are standard Gate valves. Prompt examinee that UNSAT XVG09657B-CC turns freely in the clockwise direction.

COMMENTS:

CR SEQ Ye Yes CUES: STEP: 5 Close XVG09657B-CC.

COMMENTS:

CR SEQ STEP: 6 No Yes Check XVT19647B-CC (AB-400) valve position and record "AS FOUND" on attachment.

CUES: STEP STANDARD:

Closes XVG09657B-CC, CHG PP BOIL CLR CCW INLET VLV, by rotating the valve handwheel fully in the clockwise direction.

STEP STANDARD:

SAT UNSAT Attempts to turn XVT19647B-CC in the clockwise direction and records valve position on the attachment.

SAT Prompt examinee that XVT19647B-CC does not move in the clockwise direction.

UNSAT COMMENTS:

Tuesday, December 06, 2005 Page6of12 CR SEQ STEP: 7 Ye Yes Open XVT19647B-CC.

CUES: COMMENTS:

CR SEQ STEP: 8 No Yes Check XVT09685B-CC (AB-400) valve position and record "AS FOUND" on attachment.

STEP STANDARD:

Opens XVT19647B-CC, CHG PP BOIL CLR AL T CLG WTR SUPPLY VLV, by rotating the valve handwheel fully in the counter-clockwise direction.

STEP STANDARD:

SAT UNSAT Removes the locking device and attempts to turn XVT09685B-CC in the clockwise direction.

CUES: SAT Prompt examinee that XVT09685B-CC turns freely in the clockwise direction.

UNSAT Student may choose to determine throttled position of the valve. 3.0 turns open. COMMENTS:

CR SEQ STEP: 9 Ye Yes Close XVT09685B-CC.

CUES: COMMENTS:

Tuesday, December 06, 2005 STEP STANDARD:

Closes XVT09685B-CC, CHG PP BOIL CLR CCW OUTLET VALVE, by rotating the valve handwheel fully in the clockwise direction.

SAT UNSAT Page 70f12 CR SEQ STEP: 10 No Yes Check XVT19648B-CC (AB-400) valve position and record "AS FOUND" on attachment.

STEP STANDARD:

Attempts to turn XVT19648B-CC in the clockwise direction.

CUES: SAT Prompt examinee that XVT19648B-CC does not move in the clockwise direction.

UNSAT COMMENTS:

CR SEQ STEP: 11 Ye Yes Open XVT19648B-CC.

CUES: COMMENTS:

CR SEQ STEP: 12 No Yes Check IPX09062B-HR-VU (AB-400) valve position and record "AS FOUND" on attachment.

STEP STANDARD:

Opens XVT19648B-CC, CHG PP BOIL CLR AL T CLG WTR RETURN VLV, by rotating the valve handwheel in the fully counter-clockwise direction.

STEP STANDARD:

SAT UNSAT Attempts to turn IPX09062B-HR-VU in the clockwise direction.

CUES: SAT Prompt examinee that IPX09062B-HR-VU does not move in the clockwise direction.

UNSAT COMMENTS:

Tuesday, December 06, 2005 Page 8 of12 CR SEQ STEP: 13 Ye Yes Open IPX09062B-HR-VU, (AB-400).

CUES: COMMENTS:

CR SEQ STEP: 14 No Yes Check IPX09098B-HR-VU (AB-400) valve position and record "AS FOUND" on attachment.

STEP STANDARD:

Opens IPX09062B-HR-VU, HIGH ROOT TO IPX9062B, by rotating the valve handwheel in the fully counter-clockwise direction.

STEP STANDARD:

SAT UNSAT Attempts to turn IPX09098B-HR-VU, HIGH ROOT TO IPX9062B, in the clockwise direction.

CUES: SAT Prompt examinee that IPX09098B-HR-VU does not move in the clockwise direction.

UNSAT COMMENTS:

CR SEQ STEP: 15 Ye Yes Open IPX09098B-HR-VU (AB-400).

CUES: COMMENTS:

Tuesday, December 06, 2005 STEP STANDARD:

Opens IPX09098B-HR-VU, by rotating the valve handwheel in the fully clockwise direction.

SAT UNSAT Page 9 of 12 CR SEQ STEP: 16 No Yes Check XVT09530B-CC (AB-388) valve position and record "AS FOUND" on attachment.

CUES: STEP STANDARD:

Removes the locking device and attempts to turn XVT09530B-CC in the clockwise direction.

Prompt examinee that XVT09530B-CC turns freely in the clockwise direction.

COMMENTS:

SAT UNSAT CR SEQ STEP: 17 Ye Yes Close XVT09530B-CC.

CUES: COMMENTS:

CR SEQ STEP: 18 No Yes Check XVT19654B-CC (AB-388) valve position and record on attachment.

CUES: STEP STANDARD:

Closes XVT09530B-CC, CCW SPL Y TO CHG PP BOIL CLR BYP VALVE, by rotating the valve handwheel in the fully clockwise direction.

STEP STANDARD:

SAT UNSAT Removes the locking device and attempts to turn XVT19654B-CC in the clockwise direction.

Prompt examinee that XVT19654B-CC turns freely in the clockwise direction.

Student may choose to determine throttled position of the valve. 2.25 turns open. SAT UNSAT COMMENTS:

Tuesday, December 06, 2005 Page 10 of 12 CR SEQ STEP: 19 Ye Yes Open XVT19654B-CC.

CUES: COMMENTS:

CR SEQ STEP: 20 No Yes Check XVT19655B-CC (AB-388) valve position and record "AS FOUND" on attachment.

STEP STANDARD:

Opens XVT19654B-CC, CHG/SI PUMP B OIL CLR CLG WTR INLET VLV, by rotating the valve handwheel in the fully clockwise direction.

STEP STANDARD:

SAT UNSAT Removes the locking device and attempts to turn XVT19655B-CC in the clockwise direction.

CUES: SAT Prompt examinee that XVT19655B-CC turns freely in the clockwise direction.

UNSAT Student may choose to determine "AS FOUND" throttled position.

2.0 turns

open. COMMENTS:

CR SEQ STEP: 21 Ye Yes Open XVT19655B-CC.

CUES:

COMMENTS:

Examiner ends JPM at this point. Tuesday, December 06, 2005 STEP STANDARD:

Opens XVT19655B-CC, CHG/SI PUMP B GB OIL CLR CLG WTR IN VLV, by rotating the valve handwheel fully in the clockwise direction.

SAT UNSAT Page 11 of 12 JPM SETUP SHEET ]PM NO: JPPF-166BNRC DESCRIPTION:

ESTABLISH CHILLED WATER ALTERNATE COOLING TO CHARGING PUMPS ICSET: INSTRUCTIONS:

COMMENTS:

Tllesday, December 06, 2005 Page 12 of 12

v.C. SUMMER NUCLEAR STATION JOB PERFORMANCE MEASURE ]PM JPP-052 STARTUP A BATTERY CHARGER APPROVAL:

DOW APPROVAL DATE: 7/12/2005 REV NO: 8 CANDIDATE EXAMINER:

THIS JPM IS APPROVED Tuesday, December 06,2005 Page 1 of9 TASK: 063-007 04 PLACE A BATTERY CHARGER IN SERVICE TASK STANDARD:

Bus 1 HB is supplied from the swing charger XBC-1 A/1 B. The use of applicable Human Performance Tools (3-way communications, self checking, peer checking, phonetic alphabet, etc) and industrial safety practices meets expectations.

PREFERRED EVALUATION LOCATION PLANT PREFERRED EVALUATION METHOD SIMULATE

REFERENCES:

SOP-311 125 VDC SYSTEM TOOLS: SOP-311 SECTION IV.D (PG. 6) SOP-311 SECTION IV.Q (PGS 27 -29) EVALUATION TIME 15 TIME CRITICAL No lOCFR55: 45(a)8 CANDIDATE:

TIME START: TIME FINISH: PERFORMANCE RATING: SAT: UNSAT: QUESTION GRADE: PERFORMANCE EXAMINER:

SIGNATURE DATE COMMENTS:

Tuesday, December 06, 2005 Page 2 0/9 INSTRUCTIONS TO OPERATOR READ TO OPERATOR:

WHEN I TELL YOU TO BEGIN, YOU ARE TO PERFORM THE ACTIONS AS DIRECTED IN THE INITIATING CUES. I WILL DESCRIBE THE GENERAL CONDITIONS UNDER WHICH THIS TASK IS TO BE PERFORMED AND PROVIDE THE NECESSARY TOOLS WITH WHICH TO PERFORM THIS TASK. BEFORE STARTING, I WILL EXPLAIN THE INITIAL CONDITIONS, WHICH STEPS TO SIMULATE OR DISCUSS, AND PROVIDE INITIATING CUES. WHEN YOU COMPLETE THE TASK SUCCESSFULLY, THE OBJECTIVE FOR THIS JOB PERFORMANCE MEASURE WILL BE SATISFIED.

SAFETY CONSIDERATIONS:

PPE INITIAL CONDITION:

Battery charger 1 B is to be removed from service for scheduled maintenance.

DPN-1 HB must be transferred to swing charger XBC-1 A-1 B. DC OUTPUT and AC INPUT breakers on the swing charger are open. The swing battery charger "B" Train supply breaker from XMC-1 DB2Y is closed and all breakers on XET-4003-ED are open, with the keys in Train 'A' AC & DC. INITIATING CUES: Control room directs startup of the swing charger XBC-1A11 B, connection to bus 1 HB, and removal of 1 B charger from service in accordance with SOP-311. AT NO TIME ARE YOU TO OPERA TE ANY PLANT EQUIPMENT!

HAND ]PM BRIEFING SHEET TO OPERATOR AT THIS TIME! Tuesday, December 06, 2005 Page 3 0/9 JPM BRIEFING SHEET OPERATOR INSTRUCTIONS:

SAFETY CONSIDERATIONS:

PPE INITIAL CONDITION:

Battery charger 1 B is to be removed from service for scheduled maintenance.

DPN-1 HB must be transferred to swing charger XBC-1 A-1 B. DC OUTPUT and AC INPUT breakers on the swing charger are open. The swing battery charger "B" Train supply breaker from XMC-1 DB2Y is closed and all breakers on XET-4003-ED are open, with the keys in Train 'A' AC & DC. INITIATING CUES: Control room directs startup of the swing charger XBC-1A11 B, connection to bus 1 HB, and removal of 1 B charger from service in accordance with SOP-311. AT NO TIME ARE YOU TO OPERATE ANY PLANT EQUIPMENT!

HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU FEEL THAT YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK. Tuesday, December 06, 2005 Page 4 of9 STEPS CR SEQ STEP: 1 Ye Yes Align swing charger (IB-412-Swing Charger Room) to "B" Train. STEP STANDARD:

Closes TRAIN B-AC breaker and Train DC breaker for battery charger 1 A-1 B on XET -4003-ED using key interlocks.

CUES: SAT The keys swap in a criss-cross pattern (Train "A" AC to Train "B" DC and Train "A" UNSAT DC goes to Train "B" AC). If the operator tries to swap AC to AC or DC to DC inform him that the key will not turn. COMMENTS:

CR SEQ STEP: 2 Ye Yes Verifies charger set up for float voltage. . CUES: COMMENTS:

CR SEQ STEP: 3 No Yes Checks the feeder breaker from the swing charger to "B" Train open. CUES: COMMENTS:

Tuesday, December 06, 2005 STEP STANDARD:

Places FLOAT/EQUALIZER Switch in the FLOAT position ON XBC1 A-1 B . STEP STANDARD:

SAT UNSAT Checks DPN-1HB-ED BKR 13, BATTERY CHARGER 1A-1B FEED TO DPN 1HB is in the OFF position.

SAT UNSAT Page 50f9 CR SEQ STEP: 4 Ye Yes Starts up the swing charger. CUES: COMMENTS:

CR SEQ STEP: 5 No Yes Checks output voltage. STEP STANDARD:

Closes the DC OUTPUT (CB2) and AC INPUT (CB1) breakers on battery charger XBC1 A-1 B in the ON position.

STEP STANDARD:

SAT UNSAT Checks DC OUTPUT VOLTMETER stabilizes at 131-137 volts. CUES: SAT When operator points to DC OUTPUT VOLTMETER and indicates expected voltage, UNSAT inform the operator that voltage is 133 volts. COMMENTS:

CR SEQ STEP: 6 No Yes Verifies capacitors charged. CUES: STEP STANDARD:

Waits approximately 5 (to 10) seconds, then checks red indicator lights on capacitor cabinet XPN5294-ED lit. When operator shows location of indicator lights, inform him that light are on. COMMENTS:

SAT UNSAT Tuesday, December 06, 2005 Page 60f9 CR SEQ STEP: 7 Ye Yes Puts swing charger on 1 HB. CUES: In 1 B Battery Charger Room. COMMENTS:

CR SEQ STEP: 8 Ye Yes Removes XBC1 B from service. CUES: STEP STANDARD:

Places DPN-1 HB-ED 13, BATTERY CHARG ER 1 A-1 B FEED to DPN-1 HB in the ON position.

STEP STANDARD:

SAT UNSAT Places breaker DPN-1 HB-ED 11, BATTERY CHARGER 1 B FEED TO DPN1 HB in the OFF position.

When requested, inform examinee of the following initial conditions:

SAT UNSAT The FLOAT/EQUALIZER switch is in the FLOAT position.

The battery charger timer for XBC-1 B is set at 0 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> and 0 minutes. (Section IV.D Step 2.2) COMMENTS:

CR SEQ STEP: 9 No Yes Opens XBC1 B DC OUTPUT and AC INPUT breakers.

STEP STANDARD:

Places DC OUTPUT and AC INPUT breakers on XBC1 B in the OFF position.

CUES: SAT When requested, inform examinee that the "BATT CHGR TRBL" alarm was received UNSAT on the main control board. COMMENTS:

Tuesday, December 06, 2005 Page 70f9 CR SEQ STEP: 10 Ye Yes Verifies swing charger picks up load and establishes a float charge on the battery. CUES: STEP STANDARD:

Verifies Ammeter moves upscale and DC VOLTMETER indicates 133-135 volts on XBC1A-1B.

Cue operator that Swing Charger ammeter indicates 35 amps and voltmeter indicates 134 VDC when requested.

SAT UNSAT COMMENTS:

Examiner ends JPM at this point. Tuesday, December 06, 2005 Page8of9 JPM SETUP SHEET ]PM NO: JPP-052 DESCRIPTION:

STARTUP A BATTERY CHARGER ICSET: INSTRUCTIONS:

COMMENTS:

Tuesday, December 06, 2005 Page 9 of9