ML16054A424: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
| number = ML16054A424
| number = ML16054A424
| issue date = 01/26/2016
| issue date = 01/26/2016
| title = Monticello - Revision 33 to the Updated Final Safety Analysis Report, Section 10, Plant Auxiliary Systems
| title = Revision 33 to the Updated Final Safety Analysis Report, Section 10, Plant Auxiliary Systems
| author name =  
| author name =  
| author affiliation = Northern States Power Co, Xcel Energy
| author affiliation = Northern States Power Co, Xcel Energy
Line 21: Line 21:
Revision 22 USAR 10.1MONTICELLO UPDATED SAFETY ANALYSIS REPORT Page 1 of 1SECTION 10PLANT AUXILIARY SYSTEMS I/mab10.1Summary Description10.1.1Introduction This section describes the reactor and plant auxiliary systems that provideoperational convenience but which are not integral portions of the reactor, power
Revision 22 USAR 10.1MONTICELLO UPDATED SAFETY ANALYSIS REPORT Page 1 of 1SECTION 10PLANT AUXILIARY SYSTEMS I/mab10.1Summary Description10.1.1Introduction This section describes the reactor and plant auxiliary systems that provideoperational convenience but which are not integral portions of the reactor, power


conversion equipment or their safety systems. Included are reactor auxiliaries,
conversion equipment or their safety systems. Included are reactor auxiliaries, plant services and cooling systems.FOR ADMINISTRATIVE USE ONLYResp Supv:CNSTP Assoc Ref:
 
SR:2yrs N Freq: USAR-MANARMS:USAR-10.01Doc Type:Admin Initials:Date:
plant services and cooling systems.FOR ADMINISTRATIVE USE ONLYResp Supv:CNSTP Assoc Ref:
SR:2yrsNFreq:USAR-MANARMS:USAR-10.01Doc Type:Admin Initials:Date:
9703 SECTION 1010.210.2.1
9703 SECTION 1010.210.2.1


Line 67: Line 65:
SECTION 1010.5
SECTION 1010.5


Revision 22USAR 10.FIGURESMONTICELLO UPDATED SAFETY ANALYSIS REPORT Page 1 of 4SECTION 10PLANT AUXILIARY SYSTEMS I/jmrFIGURESFOR ADMINISTRATIVE USE ONLYResp Supv:CNSTP Assoc Ref:
Revision 22USAR 10.FIGURESMONTICELLO UPDATED SAFETY ANALYSIS REPORT Page 1 of 4SECTION 10PLANT AUXILIARY SYSTEMS I/jmr FIGURESFOR ADMINISTRATIVE USE ONLYResp Supv:CNSTP Assoc Ref:
SR:2yrsNFreq:USAR-MANARMS:USAR-10.FIGURESDoc Type:Admin Initials:Date:
SR:2yrs N Freq: USAR-MANARMS:USAR-10.FIGURESDoc Type:Admin Initials:Date:
9703 Revision 22USAR 10.FIGURESMONTICELLO UPDATED SAFETY ANALYSIS REPORT Page 2 of 4 I/jmrFigure  10.2-1  Reactor Refueling System - Pictorial Revision 22USAR 10.FIGURESMONTICELLO UPDATED SAFETY ANALYSIS REPORT Page 3 of 4 I/jmrFigure  10.2-6  Shutdown Cooling Mode - RHR System Simplified P&ID Revision 22USAR 10.FIGURESMONTICELLO UPDATED SAFETY ANALYSIS REPORT Page 4 of 4 I/jmrFigure  10.3-7  Principal Safe Shutdown SystemsDIVISION I DIVISION IIREACTOR PROTECTION SYSTEM CRD (SCRAM)SYSTEM INITIATION SIGNALSSAFETY RELIEF VALVESCORE SPRAY-BSUPPRESSION POOL COOLING-B MONITORING INSTRUMENTS-BREQUIRED AUXILIARY SUPPORT SYSTEMS-BCORE SPRAY-A
9703 Revision 22USAR 10.FIGURESMONTICELLO UPDATED SAFETY ANALYSIS REPORT Page 2 of 4 I/jmrFigure  10.2-1  Reactor Refueling System - Pictorial Revision 22USAR 10.FIGURESMONTICELLO UPDATED SAFETY ANALYSIS REPORT Page 3 of 4 I/jmrFigure  10.2-6  Shutdown Cooling Mode - RHR System Simplified P&ID Revision 22USAR 10.FIGURESMONTICELLO UPDATED SAFETY ANALYSIS REPORT Page 4 of 4 I/jmrFigure  10.3-7  Principal Safe Shutdown SystemsDIVISION I DIVISION IIREACTOR PROTECTION SYSTEM CRD (SCRAM)SYSTEM INITIATION SIGNALSSAFETY RELIEF VALVESCORE SPRAY-BSUPPRESSION POOL COOLING-B MONITORING INSTRUMENTS-BREQUIRED AUXILIARY SUPPORT SYSTEMS-BCORE SPRAY-A


SUPPRESSION POOL COOLING-A MONITORING INSTRUMENTS-AREQUIRED AUXILIARY SUPPORT SYSTEMS-A RCICHPCIMINIMUM REQUIRED SYSTEMS LPCISHUTDOWN COOLINGALTERNATE SHUTDOWNCOOLING SECTION 10  
SUPPRESSION POOL COOLING-A MONITORING INSTRUMENTS-AREQUIRED AUXILIARY SUPPORT SYSTEMS-A RCIC HPCI MINIMUM REQUIRED SYSTEMS LPCI SHUTDOWN COOLINGALTERNATE SHUTDOWN COOLING SECTION 10  


Revision 22 USAR 10.1MONTICELLO UPDATED SAFETY ANALYSIS REPORT Page 1 of 1SECTION 10PLANT AUXILIARY SYSTEMS I/mab10.1Summary Description10.1.1Introduction This section describes the reactor and plant auxiliary systems that provideoperational convenience but which are not integral portions of the reactor, power
Revision 22 USAR 10.1MONTICELLO UPDATED SAFETY ANALYSIS REPORT Page 1 of 1SECTION 10PLANT AUXILIARY SYSTEMS I/mab10.1Summary Description10.1.1Introduction This section describes the reactor and plant auxiliary systems that provideoperational convenience but which are not integral portions of the reactor, power


conversion equipment or their safety systems. Included are reactor auxiliaries,
conversion equipment or their safety systems. Included are reactor auxiliaries, plant services and cooling systems.FOR ADMINISTRATIVE USE ONLYResp Supv:CNSTP Assoc Ref:
 
SR:2yrs N Freq: USAR-MANARMS:USAR-10.01Doc Type:Admin Initials:Date:
plant services and cooling systems.FOR ADMINISTRATIVE USE ONLYResp Supv:CNSTP Assoc Ref:
SR:2yrsNFreq:USAR-MANARMS:USAR-10.01Doc Type:Admin Initials:Date:
9703 SECTION 1010.210.2.1
9703 SECTION 1010.210.2.1


Line 121: Line 117:
SECTION 1010.5
SECTION 1010.5


Revision 22USAR 10.FIGURESMONTICELLO UPDATED SAFETY ANALYSIS REPORT Page 1 of 4SECTION 10PLANT AUXILIARY SYSTEMS I/jmrFIGURESFOR ADMINISTRATIVE USE ONLYResp Supv:CNSTP Assoc Ref:
Revision 22USAR 10.FIGURESMONTICELLO UPDATED SAFETY ANALYSIS REPORT Page 1 of 4SECTION 10PLANT AUXILIARY SYSTEMS I/jmr FIGURESFOR ADMINISTRATIVE USE ONLYResp Supv:CNSTP Assoc Ref:
SR:2yrsNFreq:USAR-MANARMS:USAR-10.FIGURESDoc Type:Admin Initials:Date:
SR:2yrs N Freq: USAR-MANARMS:USAR-10.FIGURESDoc Type:Admin Initials:Date:
9703 Revision 22USAR 10.FIGURESMONTICELLO UPDATED SAFETY ANALYSIS REPORT Page 2 of 4 I/jmrFigure  10.2-1  Reactor Refueling System - Pictorial Revision 22USAR 10.FIGURESMONTICELLO UPDATED SAFETY ANALYSIS REPORT Page 3 of 4 I/jmrFigure  10.2-6  Shutdown Cooling Mode - RHR System Simplified P&ID Revision 22USAR 10.FIGURESMONTICELLO UPDATED SAFETY ANALYSIS REPORT Page 4 of 4 I/jmrFigure  10.3-7  Principal Safe Shutdown SystemsDIVISION I DIVISION IIREACTOR PROTECTION SYSTEM CRD (SCRAM)SYSTEM INITIATION SIGNALSSAFETY RELIEF VALVESCORE SPRAY-BSUPPRESSION POOL COOLING-B MONITORING INSTRUMENTS-BREQUIRED AUXILIARY SUPPORT SYSTEMS-BCORE SPRAY-A
9703 Revision 22USAR 10.FIGURESMONTICELLO UPDATED SAFETY ANALYSIS REPORT Page 2 of 4 I/jmrFigure  10.2-1  Reactor Refueling System - Pictorial Revision 22USAR 10.FIGURESMONTICELLO UPDATED SAFETY ANALYSIS REPORT Page 3 of 4 I/jmrFigure  10.2-6  Shutdown Cooling Mode - RHR System Simplified P&ID Revision 22USAR 10.FIGURESMONTICELLO UPDATED SAFETY ANALYSIS REPORT Page 4 of 4 I/jmrFigure  10.3-7  Principal Safe Shutdown SystemsDIVISION I DIVISION IIREACTOR PROTECTION SYSTEM CRD (SCRAM)SYSTEM INITIATION SIGNALSSAFETY RELIEF VALVESCORE SPRAY-BSUPPRESSION POOL COOLING-B MONITORING INSTRUMENTS-BREQUIRED AUXILIARY SUPPORT SYSTEMS-BCORE SPRAY-A


SUPPRESSION POOL COOLING-A MONITORING INSTRUMENTS-AREQUIRED AUXILIARY SUPPORT SYSTEMS-A RCICHPCIMINIMUM REQUIRED SYSTEMS LPCISHUTDOWN COOLINGALTERNATE SHUTDOWNCOOLING}}
SUPPRESSION POOL COOLING-A MONITORING INSTRUMENTS-AREQUIRED AUXILIARY SUPPORT SYSTEMS-A RCIC HPCI MINIMUM REQUIRED SYSTEMS LPCI SHUTDOWN COOLINGALTERNATE SHUTDOWN COOLING}}

Latest revision as of 05:04, 3 April 2019

Revision 33 to the Updated Final Safety Analysis Report, Section 10, Plant Auxiliary Systems
ML16054A424
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 01/26/2016
From:
Northern States Power Co, Xcel Energy
To:
Office of Nuclear Reactor Regulation
Shared Package
ML16054A376 List:
References
L-MT-16-004
Download: ML16054A424 (78)


Text

SECTION 10

Revision 22 USAR 10.1MONTICELLO UPDATED SAFETY ANALYSIS REPORT Page 1 of 1SECTION 10PLANT AUXILIARY SYSTEMS I/mab10.1Summary Description10.1.1Introduction This section describes the reactor and plant auxiliary systems that provideoperational convenience but which are not integral portions of the reactor, power

conversion equipment or their safety systems. Included are reactor auxiliaries, plant services and cooling systems.FOR ADMINISTRATIVE USE ONLYResp Supv:CNSTP Assoc Ref:

SR:2yrs N Freq: USAR-MANARMS:USAR-10.01Doc Type:Admin Initials:Date:

9703 SECTION 1010.210.2.1

10.2.2

10.2.3

10.2.4

10.2.5

10.2.6

SECTION 1010.310.3.1

10.3.2

10.3.3

10.3.4

10.3.5 10.3.6

10.3.7

10.3.8

10.3.9

10.3.10

10.3.11

SECTION 1010.410.4.1

10.4.2

10.4.3

10.4.4

SECTION 1010.5

Revision 22USAR 10.FIGURESMONTICELLO UPDATED SAFETY ANALYSIS REPORT Page 1 of 4SECTION 10PLANT AUXILIARY SYSTEMS I/jmr FIGURESFOR ADMINISTRATIVE USE ONLYResp Supv:CNSTP Assoc Ref:

SR:2yrs N Freq: USAR-MANARMS:USAR-10.FIGURESDoc Type:Admin Initials:Date:

9703 Revision 22USAR 10.FIGURESMONTICELLO UPDATED SAFETY ANALYSIS REPORT Page 2 of 4 I/jmrFigure 10.2-1 Reactor Refueling System - Pictorial Revision 22USAR 10.FIGURESMONTICELLO UPDATED SAFETY ANALYSIS REPORT Page 3 of 4 I/jmrFigure 10.2-6 Shutdown Cooling Mode - RHR System Simplified P&ID Revision 22USAR 10.FIGURESMONTICELLO UPDATED SAFETY ANALYSIS REPORT Page 4 of 4 I/jmrFigure 10.3-7 Principal Safe Shutdown SystemsDIVISION I DIVISION IIREACTOR PROTECTION SYSTEM CRD (SCRAM)SYSTEM INITIATION SIGNALSSAFETY RELIEF VALVESCORE SPRAY-BSUPPRESSION POOL COOLING-B MONITORING INSTRUMENTS-BREQUIRED AUXILIARY SUPPORT SYSTEMS-BCORE SPRAY-A

SUPPRESSION POOL COOLING-A MONITORING INSTRUMENTS-AREQUIRED AUXILIARY SUPPORT SYSTEMS-A RCIC HPCI MINIMUM REQUIRED SYSTEMS LPCI SHUTDOWN COOLINGALTERNATE SHUTDOWN COOLING SECTION 10

Revision 22 USAR 10.1MONTICELLO UPDATED SAFETY ANALYSIS REPORT Page 1 of 1SECTION 10PLANT AUXILIARY SYSTEMS I/mab10.1Summary Description10.1.1Introduction This section describes the reactor and plant auxiliary systems that provideoperational convenience but which are not integral portions of the reactor, power

conversion equipment or their safety systems. Included are reactor auxiliaries, plant services and cooling systems.FOR ADMINISTRATIVE USE ONLYResp Supv:CNSTP Assoc Ref:

SR:2yrs N Freq: USAR-MANARMS:USAR-10.01Doc Type:Admin Initials:Date:

9703 SECTION 1010.210.2.1

10.2.2

10.2.3

10.2.4

10.2.5

10.2.6

SECTION 1010.310.3.1

10.3.2

10.3.3

10.3.4

10.3.5 10.3.6

10.3.7

10.3.8

10.3.9

10.3.10

10.3.11

SECTION 1010.410.4.1

10.4.2

10.4.3

10.4.4

SECTION 1010.5

Revision 22USAR 10.FIGURESMONTICELLO UPDATED SAFETY ANALYSIS REPORT Page 1 of 4SECTION 10PLANT AUXILIARY SYSTEMS I/jmr FIGURESFOR ADMINISTRATIVE USE ONLYResp Supv:CNSTP Assoc Ref:

SR:2yrs N Freq: USAR-MANARMS:USAR-10.FIGURESDoc Type:Admin Initials:Date:

9703 Revision 22USAR 10.FIGURESMONTICELLO UPDATED SAFETY ANALYSIS REPORT Page 2 of 4 I/jmrFigure 10.2-1 Reactor Refueling System - Pictorial Revision 22USAR 10.FIGURESMONTICELLO UPDATED SAFETY ANALYSIS REPORT Page 3 of 4 I/jmrFigure 10.2-6 Shutdown Cooling Mode - RHR System Simplified P&ID Revision 22USAR 10.FIGURESMONTICELLO UPDATED SAFETY ANALYSIS REPORT Page 4 of 4 I/jmrFigure 10.3-7 Principal Safe Shutdown SystemsDIVISION I DIVISION IIREACTOR PROTECTION SYSTEM CRD (SCRAM)SYSTEM INITIATION SIGNALSSAFETY RELIEF VALVESCORE SPRAY-BSUPPRESSION POOL COOLING-B MONITORING INSTRUMENTS-BREQUIRED AUXILIARY SUPPORT SYSTEMS-BCORE SPRAY-A

SUPPRESSION POOL COOLING-A MONITORING INSTRUMENTS-AREQUIRED AUXILIARY SUPPORT SYSTEMS-A RCIC HPCI MINIMUM REQUIRED SYSTEMS LPCI SHUTDOWN COOLINGALTERNATE SHUTDOWN COOLING