| | number = ML14133A677 | | | number = ML14133A677 |
| | issue date = 05/13/2014 | | | issue date = 05/13/2014 |
| | title = Vogtle, Unit 1 - Cycle 19 Core Operating Limits Report | | | title = Cycle 19 Core Operating Limits Report |
| | author name = Pierce C R | | | author name = Pierce C R |
| | author affiliation = Southern Co, Southern Nuclear Operating Co, Inc | | | author affiliation = Southern Co, Southern Nuclear Operating Co, Inc |
Line 16: |
Line 16: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:CharlesR.PierceRegulatory AffairsDirectorMAY132014DocketNos.:50-424SouthernNuclearOperating Company,Inc.40Inverness CenterParkwayPostOfficeBox1295Birmingham,AL35201Tel205.992.7872 Fax205,992.7601U.S.NuclearRegulatory Commission ATTN:DocumentControlDeskWashington,D.C.20555-0001 VogtleElectricGenerating PlantUnit1Cycle19CoreOperating LimitsReportLadiesandGentlemen: | | {{#Wiki_filter:Charles R.Pierce Regulatory Affairs Director MAY13 2014 Docket Nos.: 50-424 Southern Nuclear Operating Company, Inc.40 Inverness Center Parkway Post Office Box 1295 Birmingham,AL35201 Tel 205.992.7872 Fax 205,992.7601U.S.Nuclear Regulatory Commission ATTN: Document Control Desk Washington,D.C.20555-0001 Vogtle Electric Generating Plant Unit 1 Cycle 19 Core Operating Limits Report Ladies and Gentlemen: |
| NL-14-0753 Inaccordance withTechnical Specification 5.6.5.d,SouthernNuclearOperating CompanysubmitstheenclosedCoreOperating LimitsReport(COLR)forVogtle ElectricGenerating Plant(VEGP)Unit1Cycle19,Version1.ThislettercontainsnoNRCcommitments.Ifyouhaveanyquestions, pleasecontactKenMcElroyat(205)992-7369. | | NL-14-0753 In accordance with Technical Specification 5.6.5.d, Southern Nuclear Operating Company submits the enclosed Core Operating Limits Report(COLR)forVogtle Electric Generating Plant (VEGP)Unit1 Cycle 19, Version 1.This letter containsnoNRC commitments.Ifyou have any questions, please contact Ken McElroy at (205)992-7369.Respectfully submitted. |
| Respectfully submitted. | | C.R.Pierce Regulatory Affairs Director CRP/GLS/ |
| C.R.PierceRegulatory AffairsDirectorCRP/GLS/ | |
|
| |
|
| ==Enclosure:== | | ==Enclosure:== |
|
| |
|
| CoreOperating LimitsReport,VEGPUnit1Cycle 19,Version1 U.S.NuclearRegulatory Commission NL-14-0753 Page2SouthernNuclearOperating CompanyMr.S.E.Kuczynski,
| | Core Operating Limits Report,VEGPUnit1Cycle 19, Version 1 U.S.Nuclear Regulatory Commission NL-14-0753 Page 2 Southern Nuclear Operating CompanyMr.S.E.Kuczynski, Chairman, President&CEOMr.D.G.Bost, Executive Vice President&Chief Nuclear OfficerMr.T.E.Tynan, Vice President-Vogtle1&2Mr.B.L Ivey, Vice President-Regulatory AffairsMr.D.R.Madison, Vice President-Fleet OperationsMr.B.J.Adams, Vice President-EngineeringMr.S.C.Waldrup, Regulatory Affairs Manager-Vogtle RType: CVC7000 U.S.Nuclear Regulatory CommissionMr.V.M.McCree, Regional AdministratorMr.R.E.Martin,NRR Senior Project Manager-Vogtle 1&2Mr.L.M.Cain, Senior Resident Inspector-Vogtle1&2 Vogtle Electric Generating Plant Unit 1 Cycle 19 Core Operating Limits Report Enclosure Core Operating Limits Report, VEGP Unit 1 Cycle 19, Version 1 VOGTLE ELECTRIC GENERATING PLANT (VEGP)UNIT1CYCLE 19 CORE OPERATING LIMITS REPORT Version 1 February 2014 Westinghouse Non-ProprietaryClass3 APPENDIX A VOGTLE ELECTRIC GENERATINGPLANT(VEGP) |
| : Chairman, President&CEOMr.D.G.Bost,Executive VicePresident
| | UNIT1CYCLE 19 CORE OPERATING LIMITS REPORT (COLR)Version 1 February 2014 CORE OPERATING LIMITS REPORT.VEGP UNIT 1 CYCLE 19 FEBRUARY 2014 1.0 CORE OPERATING LIMITS REPORTThisCore OperatingLimitsReport(COLR)forVEGPUnit1Cycle 19hasbeen prepared in accordancewiththerequirements ofTechnicalSpecification5.6.5. |
| &ChiefNuclearOfficerMr.T.E.Tynan,VicePresident | | The TechnicalRequirementaffectedbythisreportislistedbelow: |
| -Vogtle1&2Mr.B.LIvey,VicePresident | | 13.1.1 SHUTDOWN MARGIN-MODES 1 and 2 The TechnicalSpecificationsaffectedbythisreportarelistedbelow: |
| -Regulatory AffairsMr.D.R.Madison,VicePresident | | |
| -FleetOperationsMr.B.J.Adams,VicePresident | | ====3.1.1 SHUTDOWN==== |
| -EngineeringMr.S.C.Waldrup,Regulatory AffairsManager-VogtleRType:CVC7000U.S.NuclearRegulatory CommissionMr.V.M.McCree,RegionalAdministratorMr.R.E.Martin,NRR SeniorProjectManager-Vogtle1&2Mr.L.M.Cain,SeniorResidentInspector-Vogtle1&2 VogtleElectricGenerating PlantUnit1Cycle19CoreOperating LimitsReportEnclosure CoreOperating LimitsReport,VEGPUnit1Cycle19,Version1 VOGTLEELECTRICGENERATING PLANT(VEGP)UNIT1CYCLE 19COREOPERATING LIMITSREPORTVersion1February2014 Westinghouse Non-ProprietaryClass3APPENDIXAVOGTLEELECTRICGENERATINGPLANT(VEGP) | | MARGIN-MODES3,4 and 5 3.1.3 Moderator Temperature Coefficient |
| UNIT1CYCLE19COREOPERATING LIMITSREPORT(COLR)Version1February2014 COREOPERATING LIMITSREPORT.VEGPUNIT1CYCLE19FEBRUARY20141.0COREOPERATING LIMITSREPORTThisCoreOperatingLimitsReport(COLR)forVEGPUnit1Cycle 19hasbeenpreparedinaccordancewiththerequirements ofTechnicalSpecification5.6.5.
| | |
| TheTechnicalRequirementaffectedbythisreportislistedbelow:
| | ====3.1.5 Shutdown==== |
| 13.1.1SHUTDOWNMARGIN-MODES1and2TheTechnicalSpecificationsaffectedbythisreportarelistedbelow: | | Bank Insertion Limits 3.1.6 Control Bank Insertion Limits 3.2.1HeatFluxHotChannelFactor-Fq(Z)3.2.2 Nuclear Enthalpy Rise Hot Channnel Factor-f'^ah 3.2.3 Axial Flux Difference |
| 3.1.1SHUTDOWNMARGIN-MODES3,4and53.1.3Moderator Temperature Coefficient 3.1.5ShutdownBankInsertion Limits3.1.6ControlBankInsertion Limits3.2.1HeatFluxHotChannelFactor | | |
| -Fq(Z)3.2.2NuclearEnthalpyRiseHotChannnelFactor-f'^ah3.2.3AxialFluxDifference 3.9.1BoronConcentration Page1of11 COREOPERATING LMITSREPORT.VEGPUNIT1CYCLE19FEBRUARY20142.0OPERATING LIMITSThecycle-specificparameterlimitsforthespecificationslistedinSection1.0arepresentedinthefollowingsubsections.TheselimitshavebeendevelopedusingNRC-approvedmethodologiesincludingthosespecifiedin TechnicalSpecification5.6.5. | | ====3.9.1 Boron==== |
| 2.1SHUTDOWNMARGIN-MODES1and2 (Technical Requirement 13.1.1)2.1.1TheSHUTDOWNMARGINshallbegreaterthanorequalto 1.30percentAk/k.2.2SHUTDOWNMARGIN-MODES3.4and5(Specification 3.1.n2.2.1TheSHUTDOWNMARGINshallbegreaterthanorequaltothelimitsshowninFigures 1and2.2.3Moderator Temperature Coefficient (Specification 3.1.3)2.3.1TheModerator Temperature Coefficient (MTC)limitsare: | | Concentration Page 1 of 11 CORE OPERATING LMITS REPORT.VEGP UNIT 1 CYCLE 19 FEBRUARY 2014 2.0 OPERATING LIMITSThecycle-specificparameterlimitsforthespecificationslistedinSection1.0arepresentedinthefollowingsubsections.TheselimitshavebeendevelopedusingNRC-approvedmethodologiesincludingthosespecifiedin TechnicalSpecification5.6.5. |
| TheBOL/ARO/HZP-MTC shallbelesspositivethan+0.7x10"^Ak/k/°Fforpowerlevelsupto70%RTPwithalinearrampto0 Ak/k/°Fat100%RTP.TheEOL/ARO/RTP-MTC shallbelessnegativethan-5.50x10"^Ak/k/°F.'
| | |
| 2.3.2TheMTCSurveillance limitsare;The300ppm/ARO/RTP-MTCshouldbelessnegativethanorequalto | | ===2.1 SHUTDOWN=== |
| -4.75X10-"Ak/k/°F.' | | MARGIN-MODES1and2 (Technical Requirement 13.1.1)2.1.1TheSHUTDOWNMARGINshallbegreaterthanorequalto 1.30 percent Ak/k.2.2 SHUTDOWN MARGIN-MODES 3.4 and 5 (Specification 3.1.n 2.2.1 The SHUTDOWNMARGINshallbegreaterthanorequaltothelimitsshowninFigures 1 and 2.2.3 Moderator Temperature Coefficient (Specification 3.1.3)2.3.1 The Moderator Temperature Coefficient (MTC)limitsare: |
| The60ppm/ARO/RTP-MTC shouldbelessnegativethan-5.35x10"^Ak/k/°F.'where:BOLstandsfor Beginning ofCycleLife AROstandsforAllRodsOutHZPstandsforHotZeroTHERMALPOWEREOLstandsforEnd ofCycleLife RTPstandsforRATEDTHERMALPOWER'Applicable forfull-power T-average of584.1to587.1°F,Page2of11 COREOPERATING LIMITSREPORT.VEGPUNIT1CYCLE19FEBRUARY2014ShutdownBankInsertionLimits(Specification3.1.5) 2.4.1Theshutdownbanksshallbe withdrawntoapositiongreaterthanorequalto225steps.ControlBankInsertionLimits (Specification 3.1.6)2.5.1Thecontrolrodbanksshallbelimitedin physicalinsertionasshownin Figure3.HeatFluxHotChannelFactor-Fn/Zt(Specification 3.2.1)2.6.1Fo(Z)<-5K(Z)for?>0.5Fo(Z)<-^K(Z)forP<0.5where:P=-THERMALPOWERRATEDTHERMALPOWER2.6.2F^'"'=2.502.6.3K(Z)isprovidedin Figure4.KiZ)2.6.4Fo(Z)<-2IlJ.forP>0.5P-W{Z)F^"^-KCZ)Fo(Z)<-^forP50.50.5-W^Z)2.6.5W(Z)valuesareprovidedinTable2.2.6.6TheFq(Z)penaltyfactorsareprovidedinTable1.Page3of11 COREOPERATTNG LIMITSREPORT.VEGPUNIT1CYCT.F.192.7NuclearEnthalpyRiseHotChannelFactor-F(Specification3.2.2) 2.7.1SFi"(I+where:P=THERMALPOWERRATEDTHERMALPOWER2.7.2F^'-=\.65 2.1.3PF^=0.3FEBRUARY2014AxialFlux Difference (Specification 3.2.3)2.8.1TheAxialFluxDifference (AFD)Acceptable OperationLimitsare providedinFigure5.
| | The BOL/ARO/HZP-MTC shall be less positive than+0.7 x 10"^Ak/k/°F for powerlevelsupto70%RTPwithalinearrampto0 Ak/k/°F at 100%RTP.The EOL/ARO/RTP-MTC shall be less negative than-5.50 x 10"^Ak/k/°F.'2.3.2 The MTC Surveillance limits are;The300ppm/ARO/RTP-MTCshouldbelessnegativethanorequalto |
| BoronConcentration (Specification 3.9.1)2.9.1Theboronconcentration shallbegreaterthanorequalto1880ppm.^^Thisconcentrationboundsthecondition ofkeii^0.95(allrodsinlessthemostreactiverod)andsubcriticality(allrodsout)overtheentirecycle.This concentrationincludesadditionalboronto addressuncertainties andB'depletion.
| | -4.75 X 10-" Ak/k/°F.'The 60 ppm/ARO/RTP-MTC should be less negative than-5.35 x 10"^Ak/k/°F.'where:BOLstandsfor Beginning ofCycleLife ARO stands for All Rods Out HZP stands for Hot Zero THERMAL POWEREOLstandsforEnd ofCycleLife RTP stands for RATED THERMAL POWER'Applicable for full-power T-average of 584.1 to 587.1°F, Page2of11 CORE OPERATING LIMITS REPORT.VEGP UNIT 1 CYCLE 19 FEBRUARY 2014 ShutdownBankInsertionLimits(Specification3.1.5) 2.4.1 The shutdownbanksshallbe withdrawntoapositiongreaterthanorequalto225steps.ControlBankInsertionLimits (Specification 3.1.6)2.5.1The controlrodbanksshallbelimitedin physical insertionasshownin Figure 3.HeatFluxHotChannelFactor-Fn/Zt (Specification 3.2.1)2.6.1 Fo(Z)<-5 K(Z)for?>0.5 Fo(Z)<-^K(Z)for P<0.5 where:P=-THERMAL POWER RATED THERMAL POWER 2.6.2 F^'"'=2.502.6.3K(Z)isprovidedin Figure 4.KiZ)2.6.4 Fo(Z)<-2 IlJ.for P>0.5P-W{Z)F^"^-KCZ)Fo(Z)<-^forP50.50.5-W^Z)2.6.5W(Z)valuesareprovidedinTable2.2.6.6The Fq(Z)penalty factors are provided in Table 1.Page 3 of 11 CORE OPERATTNG LIMITS REPORT.VEGP UNIT 1 CYCT.F.192.7NuclearEnthalpyRiseHotChannelFactor-F(Specification3.2.2) 2.7.1 S Fi"(I+where:P=THERMAL POWER RATED THERMAL POWER 2.7.2 F^'-=\.65 2.1.3 PF^=0.3 FEBRUARY 2014AxialFlux Difference (Specification 3.2.3)2.8.1 The Axial Flux Difference (AFD)Acceptable OperationLimitsare providedinFigure5. |
| Page4of11 COREOPERATING LIMITSREPORT.VEGPUNIT1CYCLE19Table1Fq(Z)penaltyfactorCycleBumup(MWD/MTU)Fq(Z)PenallyFactor 1.03481.03911.04171.04231.04101.03661.03081.02481.02001.02001.02041.02621.02611.02441.02141.0200FEBRUARY2014Notes:1.ThePenalty Factor,tobeappliedtoFq(Z)in accordancewithSR3.2.1.2,isthe maximumfactorbywhichFq(Z)isexpectedtoincreaseovera39EFPDinterval(surveillance intervalof31EFPDplusthemaximum allowableextensionnottoexceed25%
| | Boron Concentration (Specification 3.9.1)2.9.1 The boron concentration shall be greater than or equal to 1880 ppm.^^Thisconcentrationboundsthecondition of keii^0.95(allrodsinlessthemostreactiverod)andsubcriticality(allrodsout)overtheentirecycle.This concentrationincludesadditionalboronto address uncertainties and B'depletion. |
| ofthesurveillanceintervalperSR3.0.2)startingfromthebumupatwhichtheFq(Z)was determined.2.Linearinterpolationisadequateforintermediatecyclebumups.3.Forallcycle burnupsoutsidetherangeofthetable,a penallyfactorof1.020shallbeused.Pagesof11 COREOPERATING LIMITSREPORT.VEGPUNIT1CYCLE19AxialPoint57-61Elevation (feet)12.072-11.267 11.06610.86510.66410.46210.26110.0609.8599.6589,4569.2559.0548.8538.6528.4508.2498.0487.8477.6467.4447.2437.0426.8416.6406.4386.2376.0365.8355.6345.4325.2315.0304.8294.6284.4264.2254.0243.8233.6223.4203.219 3.0182.8172.6162.4142.2132.0121.8111.6101.4081.2071.0060.805-0.000 Table2RAOCwrz)150MWD/MTU1.00001.3172131621.30181.28081.26151.24671.25031.2444L23731.22781.21681.20201.18931.19001.18891.19181.19401.19351.19141.18671.18021.17241.16331.15291.14521.14011.13441.13211.13091.13171.13861.14771.15611.16401.17101.17701.18261.18721.19251.19851.20571.21901.23371.24761.26161.27551.28931.30241.31491.32691.33801.00003000MWD/MTU1.00001.34951.34401.33501.31671.29121.26831.24311.21301.19791.18931.17631.166Z1.16701.17241.17611.17831.17801.17611.1728I.I6741.16041.15231.14591.13931.13261.12791.12521.12251.1258 1.13781.14841.15871.16831.17751.18561.19301.19941.20651.21591.22411.23771.25621.27941.30581.33281.35951.38581.41051.43361.45501.4742l.OOOOTopandBottom5PointsExcludedperTechnical Specification B3.2.1.12000MWD/MTU1.00001.32791.32441.3164I.30S11.29191.27751.26141.24381.23841,2286 1.21651.20921.21411.22301.22901.23321.23441.23361.23151.22591.21781.20831.19881.18961.18011.16961.16081.15601.15901.16431.17061.17531.17901.18151.18291.18331.18221.1795 1.17631.1722I.I7651.18891.20201.21491.22791.23991.25141.26271.27371.28431.29431.0000FEBRUARY20420000MWD/MTU1.00001.27281.26651.25611.24381.22941.21891.2150IJi0961.21441.22721.23591.23971.24261.24381.25001.25911.26701.28001.28951.29441.29501.29311.28901.28191.27191.25961.24781.24001.23491.23491.23481.23441.23331.23021.22541.21911.21001.19851.18611.17651.17761.18901.20191.21471.22751.23861.24911.26011.27141.28281.2945l.OOOOTheseW(Z)valuesareconsistentwithFigure5,andarevalidover tlieHFPTavgtemperaturerangefrom 584.1to587.1°F.Page6of11 COREOPERATING LIMITSREPORT.VEGPUNIT1CYCLE19FEBRUARY2014FIGURE1REQUIREDSHUTDOWNMARGINFORMODES3AND4(FOURLOOPSFILLEDANDVENTEDANDATLEASTONEREACTORCOOLANTPUMPRUNNING)"S3-°O2.0gmACCEPTABLE OPERATING REGION(2400,3.lb)IREQUIREDSHUTDOWNMARGIN(lioo,i.2b)UNACCEPTABLE OPERATING REGION(65d,1.3^0)50010001500RCSBORONCONCENTRATION (ppm)Page?of11 ACCEPTABLE OPERATING REGIONREQUIREDSHUTDOWNMARGINRCSBO1250,a.8B)0200N(ppm)(2$00Li.9phPage8of COREOPERATING LIMITSREPORT.VEGPUNIT1CYCLE19FEBRUARY2014FIGURESRODBANKINSERTION LIMITSVERSUS%OFRATEDTHERMALPOWER(FullyWithdrawn
| | Page 4 of 11 CORE OPERATING LIMITS REPORT.VEGP UNIT 1 CYCLE 19 Table 1 Fq(Z)penalty factor Cycle Bumup (MWD/MTU)Fq(Z)PenallyFactor 1.0348 1.0391 1.0417 1.0423 1.0410 1.0366 1.0308 1.0248 1.0200 1.0200 1.0204 1.0262 1.0261 1.0244 1.0214 1.0200 FEBRUARY 2014 Notes:1.ThePenalty Factor,tobe appliedtoFq(Z)in accordancewithSR3.2.1.2,isthe maximum factor by which Fq(Z)is expected to increase overa39 EFPD interval (surveillance interval of 31 EFPD plusthemaximum allowableextensionnottoexceed25% |
| )S180111h160mS<S140O120HHWg100<<80iiisaiaiaiyiigBSgS^^S SSS'Se'SSSSSSSSSSSSSSSSSSSI | | of the surveillanceintervalperSR3.0.2)startingfromthebumupatwhichtheFq(Z)was determined.2.Linearinterpolationisadequateforintermediatecyclebumups.3.Forallcycle burnupsoutsidetherangeofthetable,a penallyfactorof 1.020shallbe used.Pages of 11 CORE OPERATING LIMITS REPORT.VEGP UNIT 1 CYCLE 19 Axial Point 57-61 Elevation (feet)12.072-11.267 11.066 10.865 10.664 10.462 10.261 10.060 9.859 9.658 9,456 9.255 9.054 8.853 8.652 8.450 8.249 8.048 7.847 7.646 7.444 7.243 7.042 6.841 6.640 6.438 6.237 6.036 5.835 5.634 5.432 5.231 5.030 4.829 4.628 4.426 4.225 4.024 3.823 3.622 3.420 3.219 3.018 2.817 2.616 2.414 2.213 2.012 1.811 1.610 1.408 1.207 1.006 0.805-0.000 Table 2 RAOC wrz)150 MWD/MTU 1.0000 1.3172 13162 1.3018 1.2808 1.2615 1.2467 1.2503 1.2444 L2373 1.2278 1.2168 1.2020 1.1893 1.1900 1.1889 1.1918 1.1940 1.1935 1.1914 1.1867 1.1802 1.1724 1.1633 1.1529 1.1452 1.1401 1.1344 1.1321 1.1309 1.1317 1.1386 1.1477 1.1561 1.1640 1.1710 1.1770 1.1826 1.1872 1.1925 1.1985 1.2057 1.2190 1.2337 1.2476 1.2616 1.2755 1.2893 1.3024 1.3149 1.3269 1.3380 1.0000 3000 MWD/MTU 1.0000 1.3495 1.3440 1.3350 1.3167 1.2912 1.2683 1.2431 1.2130 1.1979 1.1893 1.1763 1.166Z 1.1670 1.1724 1.1761 1.1783 1.1780 1.1761 1.1728 I.I674 1.1604 1.1523 1.1459 1.1393 1.1326 1.1279 1.1252 1.1225 1.1258 1.1378 1.1484 1.1587 1.1683 1.1775 1.1856 1.1930 1.1994 1.2065 1.2159 1.2241 1.2377 1.2562 1.2794 1.3058 1.3328 1.3595 1.3858 1.4105 1.4336 1.4550 1.4742 l.OOOO Top and Bottom 5 Points Excluded per Technical Specification B3.2.1.12000 MWD/MTU 1.0000 1.3279 1.3244 1.3164 I.30S1 1.2919 1.2775 1.2614 1.2438 1.2384 1,2286 1.2165 1.2092 1.2141 1.2230 1.2290 1.2332 1.2344 1.2336 1.2315 1.2259 1.2178 1.2083 1.1988 1.1896 1.1801 1.1696 1.1608 1.1560 1.1590 1.1643 1.1706 1.1753 1.1790 1.1815 1.1829 1.1833 1.1822 1.1795 1.1763 1.1722 I.I765 1.1889 1.2020 1.2149 1.2279 1.2399 1.2514 1.2627 1.2737 1.2843 1.2943 1.0000 FEBRUARY 20 4 20000 MWD/MTU 1.0000 1.2728 1.2665 1.2561 1.2438 1.2294 1.2189 1.2150 IJi096 1.2144 1.2272 1.2359 1.2397 1.2426 1.2438 1.2500 1.2591 1.2670 1.2800 1.2895 1.2944 1.2950 1.2931 1.2890 1.2819 1.2719 1.2596 1.2478 1.2400 1.2349 1.2349 1.2348 1.2344 1.2333 1.2302 1.2254 1.2191 1.2100 1.1985 1.1861 1.1765 1.1776 1.1890 1.2019 1.2147 1.2275 1.2386 1.2491 1.2601 1.2714 1.2828 1.2945 l.OOOOTheseW(Z)valuesareconsistentwithFigure5,andarevalidover tlie HFP Tavg temperaturerangefrom 584.1 to 587.1°F.Page 6 of 11 CORE OPERATING LIMITS REPORT.VEGP UNIT 1 CYCLE 19 FEBRUARY 2014 FIGURE 1 REQUIRED SHUTDOWN MARGIN FOR MODES3AND4 (FOUR LOOPS FILLED AND VENTEDANDAT LEAST ONE REACTOR COOLANT PUMP RUNNING)"S 3-°O 2.0 g m ACCEPTABLE OPERATING REGION (2400, 3.lb)I REQUIRED SHUTDOWN MARGIN (lioo, i.2b)UNACCEPTABLE OPERATING REGION (65d, 1.3^0)50010001500RCSBORON CONCENTRATION (ppm)Page?of 11 ACCEPTABLE OPERATING REGION REQUIRED SHUTDOWN MARGIN RCS BO 1250, a.8B)0 200 N (ppm)(2$00L i.9ph Page 8 of CORE OPERATING LIMITS REPORT.VEGP UNIT 1 CYCLE 19 FEBRUARY 2014 FIGURES ROD BANK INSERTION LIMITS VERSUS%OF RATED THERMAL POWER (Fully Withdrawn)S 180 111 h 160 m S<S 140 O 120 H H W g 100<<80iiisaiaiaiyiigBSgS^^S SSS'Se'SSSSSSSSSSSSSSSSSSSI |
| !i3:sBwmmmumuutS3 BaianmHHHB | | !i3: sB wmmmumuut S3 BaianmHHHB |
| >0304050607080POWER(%ofRatedThermalPower)*Fullywithdrawn shallbethecondition wherecontrolrodsareatapositionwithintheintervalS225and<231stepswithdrawn. | | >0 30 40 50 60 70 80POWER(%of Rated Thermal Power)*Fully withdrawn shall be the condition where control rods areata position within the interval S225and<231 steps withdrawn. |
| NOTE:TheRodBank Insertion Limitsarebasedonthe controlbankwithdrawal sequenceA,B,C,Dandacontrol banktip-to-tip distanceof115steps.Page9of11 COREOPERATING LIMITSREPORT.VEGPUNIT1CYCLE19oO0.6FEBRUARY2014FIGURE4K(Z)-NORMALIZEDFq(Z)ASAFUNCTIONOFCOREHEIGHTFQ=2.50COREHT.K(Z)0.001.006.001.0012.0.92546COREHEIGHT(feet)Page10of11 COREOPERATING LIMITSREPORT.VEGPUNIT1CYCLE19FEBRUARY2014FIGURE5AXIALFLUXDIFFERENCE LIMITSASAFUNCTIONOF%RATEDTHERMALPOWERFORRAOCrt80<u^70dP50(+10,100)UNACCBPTMLE(-30,50)-40-30-20-100102030AXIALFLUXDIFFERENCE (percentAl)PageIIOfII}} | | NOTE:TheRodBank Insertion Limitsarebasedonthe control bank withdrawal sequence A, B,C,Dandacontrol bank tip-to-tip distance of 115 steps.Page 9 of 11 CORE OPERATING LIMITS REPORT.VEGP UNIT 1 CYCLE 19 o O 0.6 FEBRUARY 2014 FIGURE 4K(Z)-NORMALIZEDFq(Z)ASA FUNCTION OF CORE HEIGHT FQ=2.50 CORE HT.K(Z)0.00 1.00 6.00 1.00 12.0.925 4 6 CORE HEIGHT (feet)Page 10 of 11 CORE OPERATING LIMITS REPORT.VEGP UNIT 1 CYCLE 19 FEBRUARY 2014 FIGURE 5 AXIAL FLUX DIFFERENCE LIMITS AS A FUNCTION OF%RATED THERMAL POWER FORRAOC rt 80<u^70 dP 50 (+10, 100)UNACCBPTMLE(-30, 50)-40-30-20-10 0 10 20 30 AXIAL FLUX DIFFERENCE (percent Al)Page II Of II}} |
|
---|
Category:Fuel Cycle Reload Report
MONTHYEARNL-24-0366, Core Operating Limits Report, Cycle 26, Version 12024-10-25025 October 2024 Core Operating Limits Report, Cycle 26, Version 1 NL-24-0350, Core Operating Limits Report, Cycle 24, Version 22024-09-25025 September 2024 Core Operating Limits Report, Cycle 24, Version 2 NL-23-0611, Core Operating Limits Report, Cycle 11 Version 12023-07-19019 July 2023 Core Operating Limits Report, Cycle 11 Version 1 NL-23-0330, Core Operating Limits Report, Cycle 25, Version 12023-04-26026 April 2023 Core Operating Limits Report, Cycle 25, Version 1 NL-22-0273, Core Operating Limits Report, Cycle 23, Version 12022-04-12012 April 2022 Core Operating Limits Report, Cycle 23, Version 1 NL-21-0962, Core Operating Limits Report, Cycle 24, Version 12021-10-26026 October 2021 Core Operating Limits Report, Cycle 24, Version 1 ML21046A0962021-02-15015 February 2021 Core Operating Limits Report, Cycle 1, Version 3 ND-21-0084, (VEGP) Unit 3 - Affidavits of Brian H. Whitley & Zachary S. Harper2020-12-11011 December 2020 (VEGP) Unit 3 - Affidavits of Brian H. Whitley & Zachary S. Harper NL-20-1130, Core Operating Limits Report, Cycle 22, Version 22020-09-29029 September 2020 Core Operating Limits Report, Cycle 22, Version 2 NL-20-0415, Vogle, Unit 1, Core Operating Limits Report Cycle 23 Version 32020-04-13013 April 2020 Vogle, Unit 1, Core Operating Limits Report Cycle 23 Version 3 NL-18-1356, Core Operating Limits Report, Cycle 22, Version 12018-10-30030 October 2018 Core Operating Limits Report, Cycle 22, Version 1 NL-17-1757, Core Operating Limits Report, Cycle 20, Version 12017-11-0202 November 2017 Core Operating Limits Report, Cycle 20, Version 1 NL-17-1063, Core Operating Limits Report, Cycle 21 Version 12017-06-0606 June 2017 Core Operating Limits Report, Cycle 21 Version 1 NL-16-0597, Cycle 19 Core Operating Limits Report, Version 22016-04-20020 April 2016 Cycle 19 Core Operating Limits Report, Version 2 NL-15-2014, Submittal of Core Operating Limits Reports2015-11-0202 November 2015 Submittal of Core Operating Limits Reports NL-15-1602, Cycle 19 Core Operating Limits Report Version 22015-08-21021 August 2015 Cycle 19 Core Operating Limits Report Version 2 NL-14-1719, Cycle 18 Core Operating Limits Report, Version 12014-10-30030 October 2014 Cycle 18 Core Operating Limits Report, Version 1 NL-14-0753, Cycle 19 Core Operating Limits Report2014-05-13013 May 2014 Cycle 19 Core Operating Limits Report ML14133A6772014-05-13013 May 2014 Cycle 19 Core Operating Limits Report NL-14-0753, Vogtle, Unit 1 - Cycle 19 Core Operating Limits Report2014-05-13013 May 2014 Vogtle, Unit 1 - Cycle 19 Core Operating Limits Report NL-13-0646, Cycle 17 Core Operating Limits Reports2013-04-0505 April 2013 Cycle 17 Core Operating Limits Reports NL-12-2622, Unit 1 Cycle 18 Core Operating Limits Report2012-12-19019 December 2012 Unit 1 Cycle 18 Core Operating Limits Report NL-11-2044, Cycle 16 Version 2 Core Operating Limits Report2011-10-26026 October 2011 Cycle 16 Version 2 Core Operating Limits Report NL-11-0919, Cycle 17 Core Operating Limits Report2011-05-16016 May 2011 Cycle 17 Core Operating Limits Report NL-10-1213, Cycle 15 Version 3 Core Operating Limits Report2010-06-28028 June 2010 Cycle 15 Version 3 Core Operating Limits Report NL-10-0662, Unit 2 Cycle 15 Version 2 Core Operating Limits Report2010-04-0202 April 2010 Unit 2 Cycle 15 Version 2 Core Operating Limits Report NL-10-0389, Cycle 15 Core Operating Limits Report2010-03-17017 March 2010 Cycle 15 Core Operating Limits Report NL-09-1588, Cycle 16 Core Operating Limits Report, Rev. 0, & Rev. 12009-10-26026 October 2009 Cycle 16 Core Operating Limits Report, Rev. 0, & Rev. 1 NL-08-1651, Supplement to Unit 2 Cycle 14 Core Operating Limits Report, Rev 02008-10-31031 October 2008 Supplement to Unit 2 Cycle 14 Core Operating Limits Report, Rev 0 NL-07-0744, Cycle 13 Core Operating Limits Report, Rev. 02007-04-11011 April 2007 Cycle 13 Core Operating Limits Report, Rev. 0 NL-07-0012, Revision 1 of Unit 1 Cycle 14 Core Operating Limits Report2007-01-30030 January 2007 Revision 1 of Unit 1 Cycle 14 Core Operating Limits Report NL-06-2319, Cycle 14 and Unit 2 Cycle 12 - Core Operating Limits Reports2006-10-20020 October 2006 Cycle 14 and Unit 2 Cycle 12 - Core Operating Limits Reports NL-06-1092, Cycle 13 Core Operating Limits Report2006-05-31031 May 2006 Cycle 13 Core Operating Limits Report NL-06-0151, Cycle 13 Core Operating Limits Report2006-01-31031 January 2006 Cycle 13 Core Operating Limits Report NL-05-2061, Revision 1 of Unit 1 Cycle 13 Core Operating Limits Report2005-11-18018 November 2005 Revision 1 of Unit 1 Cycle 13 Core Operating Limits Report NL-05-1739, Cycle 12 Core Operating Limits Report2005-09-30030 September 2005 Cycle 12 Core Operating Limits Report NL-05-0533, Cycle 13 Core Operating Limits Report2005-03-21021 March 2005 Cycle 13 Core Operating Limits Report NL-04-0623, Cycle 11 Core Operating Limits Report2004-04-28028 April 2004 Cycle 11 Core Operating Limits Report NL-03-1078, Cycle 11 Core Operating Limits Report2003-05-13013 May 2003 Cycle 11 Core Operating Limits Report ML0230202852002-10-16016 October 2002 Cycle 10 Core Operating Limits Report ML0209301632002-03-28028 March 2002 Cycle 11 Core Operating Limits Report 2024-09-25
[Table view] Category:Letter
MONTHYEARNL-24-0385, Request for Action Matrix Deviation Due to Recent Events Impacting the Unplanned Scram with Complications Performance Indicator2024-10-31031 October 2024 Request for Action Matrix Deviation Due to Recent Events Impacting the Unplanned Scram with Complications Performance Indicator IR 05000424/20240032024-10-30030 October 2024 – Integrated Inspection Report 05000424/2024003 and 05000425/2024003 NL-24-0386, License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Air Storage Tanks Response to Request for Additional Information2024-10-28028 October 2024 License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Air Storage Tanks Response to Request for Additional Information NL-24-0392, Response to Requests for Additional Information Related to Proposed Alternative GEN-ISI-AL T-2024-0022024-10-28028 October 2024 Response to Requests for Additional Information Related to Proposed Alternative GEN-ISI-AL T-2024-002 NL-24-0366, Core Operating Limits Report, Cycle 26, Version 12024-10-25025 October 2024 Core Operating Limits Report, Cycle 26, Version 1 ML24297A6482024-10-23023 October 2024 5 to the Updated Final Safety Analysis Report, Technical Specification Bases Changes, Technical Requirements Manual Changes, Summary Report and Revised NRC Commitments Report ML24269A2502024-09-26026 September 2024 Acknowledgement of the Withdrawal of the Requested Exemption and License Amendment Request to Remove Tier 1 and Tier 2* Requirements NL-24-0369, Withdrawal of License Amendment Request and Exemption Request: Remove Tier 1 and Tier 2 Requirements2024-09-25025 September 2024 Withdrawal of License Amendment Request and Exemption Request: Remove Tier 1 and Tier 2 Requirements NL-24-0350, Core Operating Limits Report, Cycle 24, Version 22024-09-25025 September 2024 Core Operating Limits Report, Cycle 24, Version 2 ML24243A0072024-09-10010 September 2024 – Correction of Amendment Nos. 223 and 206 Regarding Revision to Technical Specifications to Adopt TSTF-339-A, Relocate Technical Specification Parameters to the COLR Consistent with WCAP-14483 NL-24-0337, Interim 10 CFR 21.21(a)(2) Report Regarding Operation Technology, Inc., ETAP Software Error in Transient Stability Program2024-09-0909 September 2024 Interim 10 CFR 21.21(a)(2) Report Regarding Operation Technology, Inc., ETAP Software Error in Transient Stability Program ML24102A2642024-09-0909 September 2024 – Exemption Request Regarding Final Safety Analysis Report Update Schedule (EPID L-2024-LLE-0013) - Letter ML24249A2942024-09-0606 September 2024 Correction of Amendment Nos. 218 and 201 Regarding Revision to Technical Specifications to Use Online Monitoring Methodology 05200025/LER-2024-002, Manual Reactor Protection System and Automatic Safeguards Actuation Due to an Unexpected Change in Position of a Main Feedwater Pump Minimum Flow Control Valve2024-09-0505 September 2024 Manual Reactor Protection System and Automatic Safeguards Actuation Due to an Unexpected Change in Position of a Main Feedwater Pump Minimum Flow Control Valve IR 05000424/20240052024-08-26026 August 2024 Updated Inspection Plan for Vogtle Electric Generating Plant, Units 1 and 2 - Report 05000424/2024005 and 05000425/2024005 ML24235A1952024-08-22022 August 2024 Updated Inspection Plan for Vogtle Electric Generating Plant, Units 3 and 4 - Report 05200025/2024005 and 05200026/2024005 IR 05000424/20244012024-08-15015 August 2024 4 - Security Baseline Inspection Report 05000424-2024401, 05000425-2024401, 05200025-2024402, and 05200026-2024403 - Cover Letter NL-24-0299, Exemption Request: Final Safety Analysis Report Update Schedule, Response to Request for Additional Information2024-08-14014 August 2024 Exemption Request: Final Safety Analysis Report Update Schedule, Response to Request for Additional Information 05000425/LER-2024-001, Manual Actuation of the Reactor Protection System Due to a Rod Control Fuse Opening Causing a Misaligned Shutdown Rod2024-08-0909 August 2024 Manual Actuation of the Reactor Protection System Due to a Rod Control Fuse Opening Causing a Misaligned Shutdown Rod ML24218A1842024-08-0707 August 2024 Examination Report and Cover Letter 05200026/LER-2024-001, Manual Reactor Protection System Actuation Due to Procedure Not Optimally Sequenced to Reset the Rapid Power Reduction Signal2024-08-0606 August 2024 Manual Reactor Protection System Actuation Due to Procedure Not Optimally Sequenced to Reset the Rapid Power Reduction Signal ML24212A1442024-08-0101 August 2024 Integrated Inspection Report 05200025/2024002 and 05200026/2024002 IR 05000424/20240022024-07-29029 July 2024 Integrated Inspection Report 05000424/2024002 and 05000425/2024002 IR 05000424/20244042024-07-26026 July 2024 Material Control and Accounting Program Inspection Report 05000424/2024404 and 05000425/2024404 (Cover Letter) NL-24-0126, – Units 3 and 4, License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Action a and SR 3.7.6.62024-07-25025 July 2024 – Units 3 and 4, License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Action a and SR 3.7.6.6 NL-24-0282, License Amendment Request and Exemption Request: Remove Tier 1 and Tier 2* Requirements2024-07-25025 July 2024 License Amendment Request and Exemption Request: Remove Tier 1 and Tier 2* Requirements ML24204A0722024-07-23023 July 2024 Issuance of Amendment No. 225, Regarding LAR to Revise TS 3.7.9 for a one-time Change to Support Nuclear Service Cooling Water Transfer Pump Repairs - Emergency Circumstances NL-24-0286, Emergency Request to Revise Technical Specification 3.7.9 for a One-Time Change to Support a Unit 1 Nuclear Service Cooling Water Transfer Pump Repair2024-07-20020 July 2024 Emergency Request to Revise Technical Specification 3.7.9 for a One-Time Change to Support a Unit 1 Nuclear Service Cooling Water Transfer Pump Repair NL-24-0261, 10 CFR 50.46 ECCS Evaluation Model Annual Report for 20232024-07-19019 July 2024 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2023 ML24191A4562024-07-19019 July 2024 Request for Relief and Alternative Requirements for Squib (Explosively Actuated) Valves First Test Interval ML24194A0342024-07-12012 July 2024 Review of the Refueling Outage 1R24 Steam Generator Tube Inspection Report ML24191A3792024-07-10010 July 2024 – Initial Test Program and Operational Programs Inspection Report 05200026/2024011 NL-24-0227, Proposed Inservice Inspection Alternative GEN-ISI-AL T-2024-03 for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1)2024-07-0303 July 2024 Proposed Inservice Inspection Alternative GEN-ISI-AL T-2024-03 for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) NL-24-0234, Application to Revise Technical Specifications to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown2024-06-28028 June 2024 Application to Revise Technical Specifications to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown NL-24-0143, Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in2024-06-27027 June 2024 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in NL-24-0087, License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Air Storage Tanks2024-06-21021 June 2024 License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Air Storage Tanks NL-24-0201, Proposed Inservice Inspection Alternative GEN-ISI-ALT-2024-002 for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1)2024-06-18018 June 2024 Proposed Inservice Inspection Alternative GEN-ISI-ALT-2024-002 for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) NL-24-0243, Registration of Spent Fuel Cask Use2024-06-18018 June 2024 Registration of Spent Fuel Cask Use ML24163A0632024-06-12012 June 2024 2024 Licensed Operator Re-qualification Inspection Notification Letter Vogtle, Units 3 & 4 ML24155A1772024-06-0505 June 2024 Regulatory Audit in Support of Review of the LAR to Revise Emergency Diesel Generator Frequency and Voltage Ranges for Technical Specification 3.8.1, Surveillance Requirements NL-24-0202, SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations2024-05-24024 May 2024 SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML24094A1402024-05-16016 May 2024 Staff Response to Request for Revision to NRC Staff Assessment of Updated Seismic Hazard Information and Latest Understanding of Seismic Hazards at the Vogtle Plant Site Following the NRC Process for the Ongoing Assessment of Natural Hazard ML24120A1812024-05-13013 May 2024 Request for Withholding Information from Public Disclosure Responses to NRC Request for Additional Information for Refueling Outage IR24 Steam Generator Tube Inspection Report – Enclosure 2 ML24130A2412024-05-13013 May 2024 Integrated Inspection Report 05200025/2024001 and 05200026/2024001 ML24101A2112024-05-11011 May 2024 Expedited Issuance of Amendment No. 198 Change to Technical Specification 5.5.13, Ventilation Filter Testing Program (VFTP) NL-24-0191, Annual Radiological Environmental Operating Reports for 20232024-05-10010 May 2024 Annual Radiological Environmental Operating Reports for 2023 ML24127A2372024-05-0909 May 2024 Initial Test Program and Operational Programs Inspection Report 05200026/2024010 NL-24-0194, Revised Request for Relief and Alternative Requirements for Squib Valves First Test Interval (V34-IST-ALT-03-R1)2024-05-0707 May 2024 Revised Request for Relief and Alternative Requirements for Squib Valves First Test Interval (V34-IST-ALT-03-R1) ML24120A2832024-04-30030 April 2024 Project Manager Reassignment 2024-09-09
[Table view] |
Text
Charles R.Pierce Regulatory Affairs Director MAY13 2014 Docket Nos.: 50-424 Southern Nuclear Operating Company, Inc.40 Inverness Center Parkway Post Office Box 1295 Birmingham,AL35201 Tel 205.992.7872 Fax 205,992.7601U.S.Nuclear Regulatory Commission ATTN: Document Control Desk Washington,D.C.20555-0001 Vogtle Electric Generating Plant Unit 1 Cycle 19 Core Operating Limits Report Ladies and Gentlemen:
NL-14-0753 In accordance with Technical Specification 5.6.5.d, Southern Nuclear Operating Company submits the enclosed Core Operating Limits Report(COLR)forVogtle Electric Generating Plant (VEGP)Unit1 Cycle 19, Version 1.This letter containsnoNRC commitments.Ifyou have any questions, please contact Ken McElroy at (205)992-7369.Respectfully submitted.
C.R.Pierce Regulatory Affairs Director CRP/GLS/
Enclosure:
Core Operating Limits Report,VEGPUnit1Cycle 19, Version 1 U.S.Nuclear Regulatory Commission NL-14-0753 Page 2 Southern Nuclear Operating CompanyMr.S.E.Kuczynski, Chairman, President&CEOMr.D.G.Bost, Executive Vice President&Chief Nuclear OfficerMr.T.E.Tynan, Vice President-Vogtle1&2Mr.B.L Ivey, Vice President-Regulatory AffairsMr.D.R.Madison, Vice President-Fleet OperationsMr.B.J.Adams, Vice President-EngineeringMr.S.C.Waldrup, Regulatory Affairs Manager-Vogtle RType: CVC7000 U.S.Nuclear Regulatory CommissionMr.V.M.McCree, Regional AdministratorMr.R.E.Martin,NRR Senior Project Manager-Vogtle 1&2Mr.L.M.Cain, Senior Resident Inspector-Vogtle1&2 Vogtle Electric Generating Plant Unit 1 Cycle 19 Core Operating Limits Report Enclosure Core Operating Limits Report, VEGP Unit 1 Cycle 19, Version 1 VOGTLE ELECTRIC GENERATING PLANT (VEGP)UNIT1CYCLE 19 CORE OPERATING LIMITS REPORT Version 1 February 2014 Westinghouse Non-ProprietaryClass3 APPENDIX A VOGTLE ELECTRIC GENERATINGPLANT(VEGP)
UNIT1CYCLE 19 CORE OPERATING LIMITS REPORT (COLR)Version 1 February 2014 CORE OPERATING LIMITS REPORT.VEGP UNIT 1 CYCLE 19 FEBRUARY 2014 1.0 CORE OPERATING LIMITS REPORTThisCore OperatingLimitsReport(COLR)forVEGPUnit1Cycle 19hasbeen prepared in accordancewiththerequirements ofTechnicalSpecification5.6.5.
The TechnicalRequirementaffectedbythisreportislistedbelow:
13.1.1 SHUTDOWN MARGIN-MODES 1 and 2 The TechnicalSpecificationsaffectedbythisreportarelistedbelow:
3.1.1 SHUTDOWN
MARGIN-MODES3,4 and 5 3.1.3 Moderator Temperature Coefficient
3.1.5 Shutdown
Bank Insertion Limits 3.1.6 Control Bank Insertion Limits 3.2.1HeatFluxHotChannelFactor-Fq(Z)3.2.2 Nuclear Enthalpy Rise Hot Channnel Factor-f'^ah 3.2.3 Axial Flux Difference
3.9.1 Boron
Concentration Page 1 of 11 CORE OPERATING LMITS REPORT.VEGP UNIT 1 CYCLE 19 FEBRUARY 2014 2.0 OPERATING LIMITSThecycle-specificparameterlimitsforthespecificationslistedinSection1.0arepresentedinthefollowingsubsections.TheselimitshavebeendevelopedusingNRC-approvedmethodologiesincludingthosespecifiedin TechnicalSpecification5.6.5.
2.1 SHUTDOWN
MARGIN-MODES1and2 (Technical Requirement 13.1.1)2.1.1TheSHUTDOWNMARGINshallbegreaterthanorequalto 1.30 percent Ak/k.2.2 SHUTDOWN MARGIN-MODES 3.4 and 5 (Specification 3.1.n 2.2.1 The SHUTDOWNMARGINshallbegreaterthanorequaltothelimitsshowninFigures 1 and 2.2.3 Moderator Temperature Coefficient (Specification 3.1.3)2.3.1 The Moderator Temperature Coefficient (MTC)limitsare:
The BOL/ARO/HZP-MTC shall be less positive than+0.7 x 10"^Ak/k/°F for powerlevelsupto70%RTPwithalinearrampto0 Ak/k/°F at 100%RTP.The EOL/ARO/RTP-MTC shall be less negative than-5.50 x 10"^Ak/k/°F.'2.3.2 The MTC Surveillance limits are;The300ppm/ARO/RTP-MTCshouldbelessnegativethanorequalto
-4.75 X 10-" Ak/k/°F.'The 60 ppm/ARO/RTP-MTC should be less negative than-5.35 x 10"^Ak/k/°F.'where:BOLstandsfor Beginning ofCycleLife ARO stands for All Rods Out HZP stands for Hot Zero THERMAL POWEREOLstandsforEnd ofCycleLife RTP stands for RATED THERMAL POWER'Applicable for full-power T-average of 584.1 to 587.1°F, Page2of11 CORE OPERATING LIMITS REPORT.VEGP UNIT 1 CYCLE 19 FEBRUARY 2014 ShutdownBankInsertionLimits(Specification3.1.5) 2.4.1 The shutdownbanksshallbe withdrawntoapositiongreaterthanorequalto225steps.ControlBankInsertionLimits (Specification 3.1.6)2.5.1The controlrodbanksshallbelimitedin physical insertionasshownin Figure 3.HeatFluxHotChannelFactor-Fn/Zt (Specification 3.2.1)2.6.1 Fo(Z)<-5 K(Z)for?>0.5 Fo(Z)<-^K(Z)for P<0.5 where:P=-THERMAL POWER RATED THERMAL POWER 2.6.2 F^'"'=2.502.6.3K(Z)isprovidedin Figure 4.KiZ)2.6.4 Fo(Z)<-2 IlJ.for P>0.5P-W{Z)F^"^-KCZ)Fo(Z)<-^forP50.50.5-W^Z)2.6.5W(Z)valuesareprovidedinTable2.2.6.6The Fq(Z)penalty factors are provided in Table 1.Page 3 of 11 CORE OPERATTNG LIMITS REPORT.VEGP UNIT 1 CYCT.F.192.7NuclearEnthalpyRiseHotChannelFactor-F(Specification3.2.2) 2.7.1 S Fi"(I+where:P=THERMAL POWER RATED THERMAL POWER 2.7.2 F^'-=\.65 2.1.3 PF^=0.3 FEBRUARY 2014AxialFlux Difference (Specification 3.2.3)2.8.1 The Axial Flux Difference (AFD)Acceptable OperationLimitsare providedinFigure5.
Boron Concentration (Specification 3.9.1)2.9.1 The boron concentration shall be greater than or equal to 1880 ppm.^^Thisconcentrationboundsthecondition of keii^0.95(allrodsinlessthemostreactiverod)andsubcriticality(allrodsout)overtheentirecycle.This concentrationincludesadditionalboronto address uncertainties and B'depletion.
Page 4 of 11 CORE OPERATING LIMITS REPORT.VEGP UNIT 1 CYCLE 19 Table 1 Fq(Z)penalty factor Cycle Bumup (MWD/MTU)Fq(Z)PenallyFactor 1.0348 1.0391 1.0417 1.0423 1.0410 1.0366 1.0308 1.0248 1.0200 1.0200 1.0204 1.0262 1.0261 1.0244 1.0214 1.0200 FEBRUARY 2014 Notes:1.ThePenalty Factor,tobe appliedtoFq(Z)in accordancewithSR3.2.1.2,isthe maximum factor by which Fq(Z)is expected to increase overa39 EFPD interval (surveillance interval of 31 EFPD plusthemaximum allowableextensionnottoexceed25%
of the surveillanceintervalperSR3.0.2)startingfromthebumupatwhichtheFq(Z)was determined.2.Linearinterpolationisadequateforintermediatecyclebumups.3.Forallcycle burnupsoutsidetherangeofthetable,a penallyfactorof 1.020shallbe used.Pages of 11 CORE OPERATING LIMITS REPORT.VEGP UNIT 1 CYCLE 19 Axial Point 57-61 Elevation (feet)12.072-11.267 11.066 10.865 10.664 10.462 10.261 10.060 9.859 9.658 9,456 9.255 9.054 8.853 8.652 8.450 8.249 8.048 7.847 7.646 7.444 7.243 7.042 6.841 6.640 6.438 6.237 6.036 5.835 5.634 5.432 5.231 5.030 4.829 4.628 4.426 4.225 4.024 3.823 3.622 3.420 3.219 3.018 2.817 2.616 2.414 2.213 2.012 1.811 1.610 1.408 1.207 1.006 0.805-0.000 Table 2 RAOC wrz)150 MWD/MTU 1.0000 1.3172 13162 1.3018 1.2808 1.2615 1.2467 1.2503 1.2444 L2373 1.2278 1.2168 1.2020 1.1893 1.1900 1.1889 1.1918 1.1940 1.1935 1.1914 1.1867 1.1802 1.1724 1.1633 1.1529 1.1452 1.1401 1.1344 1.1321 1.1309 1.1317 1.1386 1.1477 1.1561 1.1640 1.1710 1.1770 1.1826 1.1872 1.1925 1.1985 1.2057 1.2190 1.2337 1.2476 1.2616 1.2755 1.2893 1.3024 1.3149 1.3269 1.3380 1.0000 3000 MWD/MTU 1.0000 1.3495 1.3440 1.3350 1.3167 1.2912 1.2683 1.2431 1.2130 1.1979 1.1893 1.1763 1.166Z 1.1670 1.1724 1.1761 1.1783 1.1780 1.1761 1.1728 I.I674 1.1604 1.1523 1.1459 1.1393 1.1326 1.1279 1.1252 1.1225 1.1258 1.1378 1.1484 1.1587 1.1683 1.1775 1.1856 1.1930 1.1994 1.2065 1.2159 1.2241 1.2377 1.2562 1.2794 1.3058 1.3328 1.3595 1.3858 1.4105 1.4336 1.4550 1.4742 l.OOOO Top and Bottom 5 Points Excluded per Technical Specification B3.2.1.12000 MWD/MTU 1.0000 1.3279 1.3244 1.3164 I.30S1 1.2919 1.2775 1.2614 1.2438 1.2384 1,2286 1.2165 1.2092 1.2141 1.2230 1.2290 1.2332 1.2344 1.2336 1.2315 1.2259 1.2178 1.2083 1.1988 1.1896 1.1801 1.1696 1.1608 1.1560 1.1590 1.1643 1.1706 1.1753 1.1790 1.1815 1.1829 1.1833 1.1822 1.1795 1.1763 1.1722 I.I765 1.1889 1.2020 1.2149 1.2279 1.2399 1.2514 1.2627 1.2737 1.2843 1.2943 1.0000 FEBRUARY 20 4 20000 MWD/MTU 1.0000 1.2728 1.2665 1.2561 1.2438 1.2294 1.2189 1.2150 IJi096 1.2144 1.2272 1.2359 1.2397 1.2426 1.2438 1.2500 1.2591 1.2670 1.2800 1.2895 1.2944 1.2950 1.2931 1.2890 1.2819 1.2719 1.2596 1.2478 1.2400 1.2349 1.2349 1.2348 1.2344 1.2333 1.2302 1.2254 1.2191 1.2100 1.1985 1.1861 1.1765 1.1776 1.1890 1.2019 1.2147 1.2275 1.2386 1.2491 1.2601 1.2714 1.2828 1.2945 l.OOOOTheseW(Z)valuesareconsistentwithFigure5,andarevalidover tlie HFP Tavg temperaturerangefrom 584.1 to 587.1°F.Page 6 of 11 CORE OPERATING LIMITS REPORT.VEGP UNIT 1 CYCLE 19 FEBRUARY 2014 FIGURE 1 REQUIRED SHUTDOWN MARGIN FOR MODES3AND4 (FOUR LOOPS FILLED AND VENTEDANDAT LEAST ONE REACTOR COOLANT PUMP RUNNING)"S 3-°O 2.0 g m ACCEPTABLE OPERATING REGION (2400, 3.lb)I REQUIRED SHUTDOWN MARGIN (lioo, i.2b)UNACCEPTABLE OPERATING REGION (65d, 1.3^0)50010001500RCSBORON CONCENTRATION (ppm)Page?of 11 ACCEPTABLE OPERATING REGION REQUIRED SHUTDOWN MARGIN RCS BO 1250, a.8B)0 200 N (ppm)(2$00L i.9ph Page 8 of CORE OPERATING LIMITS REPORT.VEGP UNIT 1 CYCLE 19 FEBRUARY 2014 FIGURES ROD BANK INSERTION LIMITS VERSUS%OF RATED THERMAL POWER (Fully Withdrawn)S 180 111 h 160 m S<S 140 O 120 H H W g 100<<80iiisaiaiaiyiigBSgS^^S SSS'Se'SSSSSSSSSSSSSSSSSSSI
!i3: sB wmmmumuut S3 BaianmHHHB
>0 30 40 50 60 70 80POWER(%of Rated Thermal Power)*Fully withdrawn shall be the condition where control rods areata position within the interval S225and<231 steps withdrawn.
NOTE:TheRodBank Insertion Limitsarebasedonthe control bank withdrawal sequence A, B,C,Dandacontrol bank tip-to-tip distance of 115 steps.Page 9 of 11 CORE OPERATING LIMITS REPORT.VEGP UNIT 1 CYCLE 19 o O 0.6 FEBRUARY 2014 FIGURE 4K(Z)-NORMALIZEDFq(Z)ASA FUNCTION OF CORE HEIGHT FQ=2.50 CORE HT.K(Z)0.00 1.00 6.00 1.00 12.0.925 4 6 CORE HEIGHT (feet)Page 10 of 11 CORE OPERATING LIMITS REPORT.VEGP UNIT 1 CYCLE 19 FEBRUARY 2014 FIGURE 5 AXIAL FLUX DIFFERENCE LIMITS AS A FUNCTION OF%RATED THERMAL POWER FORRAOC rt 80<u^70 dP 50 (+10, 100)UNACCBPTMLE(-30, 50)-40-30-20-10 0 10 20 30 AXIAL FLUX DIFFERENCE (percent Al)Page II Of II