ML063380014: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 2: Line 2:
| number = ML063380014
| number = ML063380014
| issue date = 12/13/2006
| issue date = 12/13/2006
| title = Fort Calhoun Station, Unit 1 - Withdrawal of an Amendment Request Revising TSs Pertaining to Volume of Trisodium Phosphate Needed in Containment (TAC No. MC8093)
| title = Withdrawal of an Amendment Request Revising TSs Pertaining to Volume of Trisodium Phosphate Needed in Containment
| author name = Wang A B
| author name = Wang A B
| author affiliation = NRC/NRR/ADRO/DORL/LPLIV
| author affiliation = NRC/NRR/ADRO/DORL/LPLIV

Revision as of 16:26, 10 February 2019

Withdrawal of an Amendment Request Revising TSs Pertaining to Volume of Trisodium Phosphate Needed in Containment
ML063380014
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 12/13/2006
From: Wang A B
NRC/NRR/ADRO/DORL/LPLIV
To: Ridenoure R T
Omaha Public Power District
Wang A B, NRR/DORL/LPL4, 301-415-1445
References
TAC MC8093
Download: ML063380014 (5)


Text

December 13, 2006Mr. R. T. RidenoureVice President - Chief Nuclear Officer Omaha Public Power District Fort Calhoun Station FC-2-4 Adm.

Post Office Box 550 Fort Calhoun, NE 68023-0550

SUBJECT:

FORT CALHOUN STATION, UNIT NO. 1 - WITHDRAWAL OF ANAMENDMENT REQUEST (TAC NO. MC8093)

Dear Mr. Ridenoure:

By letter to the Nuclear Regulatory Commission (NRC) dated August 11, 2005, assupplemented by letter dated November 3, 2005, Omaha Public Power District (OPPD/the licensee) applied for an amendment to the Fort Calhoun Station, Unit No. 1 (FCS), Facility Operating License No. DPR-40. The proposed change would have revised the FCS's Technical Specifications (TS) pertaining to the volume of trisodium phosphate (TSP) needed in containment. Specifically, this proposed change would have revised TS Figure 2-3, "TSP Volume Required for RCS Critical Boron Concentration (ARO, HZP, No Xenon)," and related technical information used for calculating minimum volumes of TSP required for maintaining sump pH equal to or greater than 7. By amendment request dated August 21, 2006, OPPD requested to change the containmentbuffering agent from TSP to sodium tetraborate. By letter dated November 13, 2006, the NRC staff approved this change. As a result of this approval, TSP is no longer used in the containment at the FCS. As such the amendment is no longer needed at this time and by letter dated November 30, 2006, OPPD withdrew the amendment request. The Commission has filed the enclosed Notice of Withdrawal of Application for Amendment toFacility Operating License with the Office of the Federal Register for publication.Sincerely,/RA/Alan B. Wang, Project ManagerPlant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor RegulationDocket No. 50-285

Enclosure:

Notice of Withdrawal cc w/encl: See next page December 13, 2006Mr. R. T. RidenoureVice President - Chief Nuclear Officer Omaha Public Power District Fort Calhoun Station FC-2-4 Adm.

Post Office Box 550 Fort Calhoun, NE 68023-0550

SUBJECT:

FORT CALHOUN STATION, UNIT NO. 1 - WITHDRAWAL OF ANAMENDMENT REQUEST (TAC NO. MC8093)

Dear Mr. Ridenoure:

By letter to the Nuclear Regulatory Commission (NRC) dated August 11, 2005, assupplemented by letter dated November 3, 2005, Omaha Public Power District (OPPD/the licensee) applied for an amendment to the Fort Calhoun Station, Unit No. 1 (FCS), Facility Operating License No. DPR-40. The proposed change would have revised the FCS's Technical Specifications (TS) pertaining to the volume of trisodium phosphate (TSP) needed in containment. Specifically, this proposed change would have revised TS Figure 2-3, "TSP Volume Required for RCS Critical Boron Concentration (ARO, HZP, No Xenon)," and related technical information used for calculating minimum volumes of TSP required for maintaining sump pH equal to or greater than 7. By amendment request dated August 21, 2006, OPPD requested to change the containmentbuffering agent from TSP to sodium tetraborate. By letter dated November 13, 2006, the NRC staff approved this change. As a result of this approval, TSP is no longer used in the containment at the FCS. As such the amendment is no longer needed at this time and by letter dated November 30, 2006, OPPD withdrew the amendment request. The Commission has filed the enclosed Notice of Withdrawal of Application for Amendment toFacility Operating License with the Office of the Federal Register for publication.Sincerely,/RA/Alan B. Wang, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor RegulationDocket No. 50-285

Enclosure:

Notice of Withdrawal cc w/encl: See next pageDISTRIBUTION

PUBLICRidsNrrDorlDprRidsNrrPMAWang LPLIV ReadingRidsOgcRp RidsAcrsAcnwMailCenter RidsNrrDorlLpl4 (DTerao)RidsRgn4MailCenterRidsNrrLALFeizollahiADAMS Accession Number: ML063380014OFFICENRR/LPL4/PMNRR/LPL4/LANRR/LPL4/BCNAMEAWangLFeizollahiDTeraoDATE12/13/0612/13/0612/13/06OFFICIAL RECORD COPY 7590-01-PUNITED STATES NUCLEAR REGULATORY COMMISSIONOMAHA PUBLIC POWER DISTRICTDOCKET NO. 50-285 NOTICE OF WITHDRAWAL OF APPLICATION FORAMENDMENT TO FACILITY OPERATING LICENSEThe U.S. Nuclear Regulatory Commission (NRC/the Commission) has granted therequest of Omaha Public Power District (OPPD, the licensee) to withdraw its August 11, 2005, application for proposed amendment to Facility Operating License No. DPR-40 for the Fort Calhoun Station, Unit No. 1, located in Washington County, Nebraska. The proposed amendment would have revised the Technical Specifications (TSs)pertaining to the volume of trisodium phosphate (TSP) needed in containment. Specifically, this proposed change would have revised TS Figure 2-3, "TSP Volume Required for RCS [Reactor Coolant System] Critical Boron Concentration (ARO [All Rods Out], HZP [Hot Zero Power], No Xenon)," and related technical information used for calculating minimum volumes of TSP required for maintaining sump pH equal to or greater than 7. The amendment was necessary to account for the increase in the RCS volume as result of the planned replacement of the steam generators and pressurizer. The amendment is no longer needed since the NRC staff has approved the OPPD amendment dated August 21, 2006, to remove the TSP and replace it with sodium tetraborate. The Commission had previously issued a Notice of Consideration of Issuance ofAmendment published in the FEDERAL REGISTER on September 27, 2005 (70 FR 56502).

However, by letter dated November 30, 2006, the licensee withdrew the proposed change.For further details with respect to this action, see the application for amendment datedAugust 11, 2005, as supplemented by letter dated November 3, 2005, and the licensee's letter dated November 30, 2006, which withdrew the application for license amendment. Documentsmay be examined, and/or copied for a fee, at the NRC's Public Document Room (PDR), located at One White Flint North, Public File Area O1 F21, 11555 Rockville Pike (first floor), Rockville, Maryland. Publicly available records will be accessible electronically from the Agencywide Documents Access and Management Systems (ADAMS) Public Electronic Reading Room on the internet at the NRC Web site, http://www.nrc.gov/reading-rm.html. Persons who do nothave access to ADAMS or who encounter problems in accessing the documents located in ADAMS should contact the NRC PDR Reference staff by telephone at 1-800-397-4209, or 301-415-4737 or by email to pdr@nrc.gov.Dated at Rockville, Maryland, this 13th day of December 2006.FOR THE NUCLEAR REGULATORY COMMISSION/RA/Alan B. Wang, Project ManagerPlant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation April 2006Ft. Calhoun Station, Unit 1 cc:Winston & Strawn ATTN: James R. Curtiss, Esq.

1700 K Street, N.W.

Washington, DC 20006-3817ChairmanWashington County Board of Supervisors P.O. Box 466 Blair, NE 68008Mr. John Hanna, Resident InspectorU.S. Nuclear Regulatory Commission P.O. Box 310 Fort Calhoun, NE 68023Regional Administrator, Region IVU.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-4005Ms. Julia Schmitt, Manager Radiation Control Program Nebraska Health & Human Services R & L Public Health Assurance 301 Centennial Mall, South P.O. Box 95007 Lincoln, NE 68509-5007Mr. David J. Bannister, ManagerFort Calhoun Station Omaha Public Power District Fort Calhoun Station FC-1-1 Plant P.O. Box 550 Fort Calhoun, NE 68023-0550Mr. Joe L. McManisManager - Nuclear Licensing Omaha Public Power District Fort Calhoun Station FC-2-4 Adm.