ML063380014
| ML063380014 | |
| Person / Time | |
|---|---|
| Site: | Fort Calhoun |
| Issue date: | 12/13/2006 |
| From: | Wang A NRC/NRR/ADRO/DORL/LPLIV |
| To: | Ridenoure R Omaha Public Power District |
| Wang A, NRR/DORL/LPL4, 301-415-1445 | |
| References | |
| TAC MC8093 | |
| Download: ML063380014 (5) | |
Text
December 13, 2006 Mr. R. T. Ridenoure Vice President - Chief Nuclear Officer Omaha Public Power District Fort Calhoun Station FC-2-4 Adm.
Post Office Box 550 Fort Calhoun, NE 68023-0550
SUBJECT:
FORT CALHOUN STATION, UNIT NO. 1 - WITHDRAWAL OF AN AMENDMENT REQUEST (TAC NO. MC8093)
Dear Mr. Ridenoure:
By letter to the Nuclear Regulatory Commission (NRC) dated August 11, 2005, as supplemented by letter dated November 3, 2005, Omaha Public Power District (OPPD/the licensee) applied for an amendment to the Fort Calhoun Station, Unit No. 1 (FCS), Facility Operating License No. DPR-40. The proposed change would have revised the FCSs Technical Specifications (TS) pertaining to the volume of trisodium phosphate (TSP) needed in containment. Specifically, this proposed change would have revised TS Figure 2-3, TSP Volume Required for RCS Critical Boron Concentration (ARO, HZP, No Xenon), and related technical information used for calculating minimum volumes of TSP required for maintaining sump pH equal to or greater than 7.
By amendment request dated August 21, 2006, OPPD requested to change the containment buffering agent from TSP to sodium tetraborate. By letter dated November 13, 2006, the NRC staff approved this change. As a result of this approval, TSP is no longer used in the containment at the FCS. As such the amendment is no longer needed at this time and by letter dated November 30, 2006, OPPD withdrew the amendment request.
The Commission has filed the enclosed Notice of Withdrawal of Application for Amendment to Facility Operating License with the Office of the Federal Register for publication.
Sincerely,
/RA/
Alan B. Wang, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-285
Enclosure:
Notice of Withdrawal cc w/encl: See next page
December 13, 2006 Mr. R. T. Ridenoure Vice President - Chief Nuclear Officer Omaha Public Power District Fort Calhoun Station FC-2-4 Adm.
Post Office Box 550 Fort Calhoun, NE 68023-0550
SUBJECT:
FORT CALHOUN STATION, UNIT NO. 1 - WITHDRAWAL OF AN AMENDMENT REQUEST (TAC NO. MC8093)
Dear Mr. Ridenoure:
By letter to the Nuclear Regulatory Commission (NRC) dated August 11, 2005, as supplemented by letter dated November 3, 2005, Omaha Public Power District (OPPD/the licensee) applied for an amendment to the Fort Calhoun Station, Unit No. 1 (FCS), Facility Operating License No. DPR-40. The proposed change would have revised the FCSs Technical Specifications (TS) pertaining to the volume of trisodium phosphate (TSP) needed in containment. Specifically, this proposed change would have revised TS Figure 2-3, TSP Volume Required for RCS Critical Boron Concentration (ARO, HZP, No Xenon), and related technical information used for calculating minimum volumes of TSP required for maintaining sump pH equal to or greater than 7.
By amendment request dated August 21, 2006, OPPD requested to change the containment buffering agent from TSP to sodium tetraborate. By letter dated November 13, 2006, the NRC staff approved this change. As a result of this approval, TSP is no longer used in the containment at the FCS. As such the amendment is no longer needed at this time and by letter dated November 30, 2006, OPPD withdrew the amendment request.
The Commission has filed the enclosed Notice of Withdrawal of Application for Amendment to Facility Operating License with the Office of the Federal Register for publication.
Sincerely,
/RA/
Alan B. Wang, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-285
Enclosure:
Notice of Withdrawal cc w/encl: See next page DISTRIBUTION:
PUBLIC RidsNrrDorlDpr RidsNrrPMAWang LPLIV Reading RidsOgcRp RidsAcrsAcnwMailCenter RidsNrrDorlLpl4 (DTerao)
RidsRgn4MailCenter RidsNrrLALFeizollahi ADAMS Accession Number: ML063380014 OFFICE NRR/LPL4/PM NRR/LPL4/LA NRR/LPL4/BC NAME AWang LFeizollahi DTerao DATE 12/13/06 12/13/06 12/13/06 OFFICIAL RECORD COPY
7590-01-P UNITED STATES NUCLEAR REGULATORY COMMISSION OMAHA PUBLIC POWER DISTRICT DOCKET NO. 50-285 NOTICE OF WITHDRAWAL OF APPLICATION FOR AMENDMENT TO FACILITY OPERATING LICENSE The U.S. Nuclear Regulatory Commission (NRC/the Commission) has granted the request of Omaha Public Power District (OPPD, the licensee) to withdraw its August 11, 2005, application for proposed amendment to Facility Operating License No. DPR-40 for the Fort Calhoun Station, Unit No. 1, located in Washington County, Nebraska.
The proposed amendment would have revised the Technical Specifications (TSs) pertaining to the volume of trisodium phosphate (TSP) needed in containment. Specifically, this proposed change would have revised TS Figure 2-3, TSP Volume Required for RCS [Reactor Coolant System] Critical Boron Concentration (ARO [All Rods Out], HZP [Hot Zero Power], No Xenon), and related technical information used for calculating minimum volumes of TSP required for maintaining sump pH equal to or greater than 7. The amendment was necessary to account for the increase in the RCS volume as result of the planned replacement of the steam generators and pressurizer. The amendment is no longer needed since the NRC staff has approved the OPPD amendment dated August 21, 2006, to remove the TSP and replace it with sodium tetraborate.
The Commission had previously issued a Notice of Consideration of Issuance of Amendment published in the FEDERAL REGISTER on September 27, 2005 (70 FR 56502).
However, by letter dated November 30, 2006, the licensee withdrew the proposed change.
For further details with respect to this action, see the application for amendment dated August 11, 2005, as supplemented by letter dated November 3, 2005, and the licensee's letter dated November 30, 2006, which withdrew the application for license amendment. Documents may be examined, and/or copied for a fee, at the NRCs Public Document Room (PDR), located at One White Flint North, Public File Area O1 F21, 11555 Rockville Pike (first floor), Rockville, Maryland. Publicly available records will be accessible electronically from the Agencywide Documents Access and Management Systems (ADAMS) Public Electronic Reading Room on the internet at the NRC Web site, http://www.nrc.gov/reading-rm.html. Persons who do not have access to ADAMS or who encounter problems in accessing the documents located in ADAMS should contact the NRC PDR Reference staff by telephone at 1-800-397-4209, or 301-415-4737 or by email to pdr@nrc.gov.
Dated at Rockville, Maryland, this 13th day of December 2006.
FOR THE NUCLEAR REGULATORY COMMISSION
/RA/
Alan B. Wang, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
April 2006 Ft. Calhoun Station, Unit 1 cc:
Winston & Strawn ATTN: James R. Curtiss, Esq.
1700 K Street, N.W.
Washington, DC 20006-3817 Chairman Washington County Board of Supervisors P.O. Box 466 Blair, NE 68008 Mr. John Hanna, Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 310 Fort Calhoun, NE 68023 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-4005 Ms. Julia Schmitt, Manager Radiation Control Program Nebraska Health & Human Services R & L Public Health Assurance 301 Centennial Mall, South P.O. Box 95007 Lincoln, NE 68509-5007 Mr. David J. Bannister, Manager Fort Calhoun Station Omaha Public Power District Fort Calhoun Station FC-1-1 Plant P.O. Box 550 Fort Calhoun, NE 68023-0550 Mr. Joe L. McManis Manager - Nuclear Licensing Omaha Public Power District Fort Calhoun Station FC-2-4 Adm.
P.O. Box 550 Fort Calhoun, NE 68023-0550 Mr. Daniel K. McGhee Bureau of Radiological Health Iowa Department of Public Health Lucas State Office Building, 5th Floor 321 East 12th Street Des Moines, IA 50319