ML080460694: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 2: Line 2:
| number = ML080460694
| number = ML080460694
| issue date = 03/27/2008
| issue date = 03/27/2008
| title = Seabrook Station, Unit 1 - Tech Spec Pages for Amendment 117 Setpoint Change for Reactor Trip System Interlock P-9
| title = Tech Spec Pages for Amendment 117 Setpoint Change for Reactor Trip System Interlock P-9
| author name =  
| author name =  
| author affiliation = NRC/NRR/ADRO/DORL/LPLI-2
| author affiliation = NRC/NRR/ADRO/DORL/LPLI-2

Revision as of 05:18, 10 February 2019

Tech Spec Pages for Amendment 117 Setpoint Change for Reactor Trip System Interlock P-9
ML080460694
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 03/27/2008
From:
NRC/NRR/ADRO/DORL/LPLI-2
To:
Miller G, NRR/DORL, 415-2481
Shared Package
ML080460674 List:
References
TAC MD5110
Download: ML080460694 (2)


Text

-3-.(4) P F Energy Seabrook, LLC,_pursuant to the Act and 10QCF 0.,40 nd 70, to receive, possess, and use at any time any byproduct, source, and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required;(5) FPL Energy Seabrook, LLC, pursuant to the Act and 10 CFR 30, 40, and 70, to receive, possess, and use in amounts as required any byproduct, source, or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; (6) FPL Energy Seabrook, LLC, pursuant to the Act and 10 CFR 30, 40, and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility authorized herein; and (7) DELETED C. This license shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I and is subject.to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; is subject to the additional conditions specified or incorporated below: (1) Maximum Power Level FPL Energy Seabrook, LLC, is authorized to operate the facility at reactor core power levels not in excess of 3648 megawatts thermal (100% of rated power).(2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 117*, and the Environmental Protection Plan contained in Appendix B are, incorporated into the Facility License No. NPF-86.FPL Energy Seabrook, LLC shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.(3) License Transfer to FPL Energy Seabrook, LLC a. On the closing date(s) of the transfer of any ownership interests in Seabrook Station covered by the Order approving the transfer, FPL Energy Seabrook, LLC, shall obtain from each respective transferring owner all of the accumulated decommissioning trust funds for the facility, and ensure the deposit of such funds and additional funds, if necessary, into a decommissioning trust or trusts for Seabrook Station established by FPL Energy Seabrook, LLC, such that the amount of such funds deposited meets or exceeds the amount required under 10 CFR 50.75 with respect to the interest in Seabrook Station FPL Energy Seabrook, LLC, acquires on such dates(s).* Implemented AMENDMENT NO. 117 TABLE 2.2-1 (continued)

REACTOR TRIP SYSTEM INSTRUMENTATION TRIP SETPOINTS TOTAL ALLOWANCE (TA)SENSOR ERROR z FUNCTIONAL UNIT 18. Reactor Trip System Interlocks

a. Intermediate Range Neutron Flux, P-6 b. Low Power Reactor Trips Block, P-7 1) P-10 input 2) P-13 input c. Power Range Neutron Flux, P-8 d. Power Range Neutron Flux, P-9 e. Power Range Neutron Flux, P-10 f. Turbine Impulse Chamber Pressure, P-13 19. Reactor Trip Breakers 20. Automatic Trip and Interlock I Logic*RTP = RATED THERMAL POWER SEABROOK -UNIT 1 TRIP SETPOINT ALLOWABLE VAL!.IE N.A.N.A.N.A. 1 x 10-10 amp___6 x 10-1 1 amp N.A.N.A.N.A.N.A.N.A.N.A.N.A.N.A.N.A.N.A.N.A.N.A.N.A. 10% of RTP*N.A. 10% RTP* Turbine Impulse Pressure Equivalent N.A. 50% of RTP*N.A. 45% of RTP*N.A. >_10% of'RTP*N.A. <10% RTP* Turbine Impulse Pressure Equivalent 12.1% of RTP*12.3% of RTP* Turbine Impulse Pressure Equivalent 52.1% of RTP*<45.3% of RTP*>7.9% of RTP*I12.3% RTP* Turb ne Impulse Pressure Equivalent N.A.N.A.N.A.N.A.N.A. N.A.N.A. N.A.N.A.N.A.2-6 Amendment No. 117