| facility = Paducah Gaseous Diffusion Plant
| facility = Paducah Gaseous Diffusion Plant
| Organization =  
| Organization =  
| license number = Gdp-1
| license number = GDP-1
| region = 2
| region = 2
| state = Kentucky
| state = Kentucky
Line 16: Line 16:
| event date = 12/06/2007 20:44 CST
| event date = 12/06/2007 20:44 CST
| last update date = 12/07/2007
| last update date = 12/07/2007
| title = Unplanned Safety System Actuation And Contamination Event
| title = Unplanned Safety System Actuation and Contamination Event
| event text = On 12/06/2007 at 2042 [CST] C-337 unit 5 cell 5 was being charged and placed on stream and had just gone above atmospheric pressure. At 2044 hours two PGLD (process gas leak detection) heads in the C-337 unit 5 cell 5 actuated and would not clear indicating a potential UF6 release. To stop the release the cell was immediately taken back below atmospheric pressure. Investigation revealed that a UF6 release had occurred causing the PGLD actuation. The amount of material released has not yet been determined.
| event text = On 12/06/2007 at 2042 [CST] C-337 unit 5 cell 5 was being charged and placed on stream and had just gone above atmospheric pressure. At 2044 hours two PGLD (process gas leak detection) heads in the C-337 unit 5 cell 5 actuated and would not clear indicating a potential UF6 release. To stop the release the cell was immediately taken back below atmospheric pressure. Investigation revealed that a UF6 release had occurred causing the PGLD actuation. The amount of material released has not yet been determined.
The PGLD heads are Q safety system components. At the time of the incident the cell was operating in a mode which required the system to be operational. This is being reported based on SAR 6.9 Table 1, J2 (unplanned actuation of a Q safety system) and 10 CFR 76.120 (c) (1) (i) (unplanned contamination event).
The PGLD heads are Q safety system components. At the time of the incident the cell was operating in a mode which required the system to be operational. This is being reported based on SAR 6.9 Table 1, J2 (unplanned actuation of a Q safety system) and 10 CFR 76.120 (c) (1) (i) (unplanned contamination event).

Latest revision as of 19:30, 24 November 2018

ENS 43829 +/-
Where
Paducah Gaseous Diffusion Plant
Paducah, Kentucky (NRC Region 2)
License number: GDP-1
Reporting
10 CFR 76.120(c)(1)

Other Unspec Reqmnt
Time - Person (Reporting Time:+13.05 h0.544 days <br />0.0777 weeks <br />0.0179 months <br />)
Opened: Billy Wallace
15:47 Dec 7, 2007
NRC Officer: Howie Crouch
Last Updated: Dec 7, 2007
43829 - NRC Website