GO2-06-073, Transmittal of Columbia Generating Station, 2005 Annual Radiological Environmental Operating Report: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:A1 ENERGY NORTHWEST People -Vision -Solutions P.O. Box 968
* Richland, WA o 99352-0968 May 11, 2006 G02-06-073 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 Energy Facility Site Evaluation Council Attn: EFSEC Manager P.O. Box 43172 Olympia, WA 98504-3172
 
==Subject:==
COLUMBIA GENERATING STATION, DOCKET NO. 50-397 INDEPENDENT SPENT FUEL STORAGE INSTALLATION, DOCKET NO. 72-35 2005 ANNUAL RADIOLOGICAL ENVIRONMENTAL OPERATING REPORT 1) Columbia Generating Station Technical Specification 5.6.1 2) Independent Spent Fuel Storage Installation Technical Specification 5.4.b 3) EFSEC Resolution No. 260, January 13, 1992
 
==References:==
 
In accordance with the requirements of References 1-3, the subject report and separate data volume are submitted as enclosures to this letter. There are no commitments being made to the NRC by this letter. If you have questions regarding this information, they may be directed to TJ Southworth at (509) 377-8654.Respectfully, DK Atkinson (Mail Drop PE08)Vice President, Nuclear Generation Enclosures cc (report w/o data volume, except as D McBaugh (WDOH)L Albin (WDOH)(w/data vol)JM Ayres (WDOE-Kenn)
RL Dirke'3 (PNNL)RN Sherman (BPA/399)NRC Sr Resident Inspector (988 noted): BS Mallett (NRC RIV; w/data vol)BJ Benney (NRC NRR)WA Horin (Winston & Strawn)L Vigue (WDFW)Director, SFPO-NRC NMSS 3C; w/data vol)(4mS~(}}

Revision as of 13:50, 11 November 2018

Transmittal of Columbia Generating Station, 2005 Annual Radiological Environmental Operating Report
ML061430030
Person / Time
Site: Columbia  Energy Northwest icon.png
Issue date: 05/11/2006
From: Atkinson D K
Energy Northwest
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GO2-06-073
Download: ML061430030 (1)


Text

A1 ENERGY NORTHWEST People -Vision -Solutions P.O. Box 968

Subject:

COLUMBIA GENERATING STATION, DOCKET NO. 50-397 INDEPENDENT SPENT FUEL STORAGE INSTALLATION, DOCKET NO. 72-35 2005 ANNUAL RADIOLOGICAL ENVIRONMENTAL OPERATING REPORT 1) Columbia Generating Station Technical Specification 5.6.1 2) Independent Spent Fuel Storage Installation Technical Specification 5.4.b 3) EFSEC Resolution No. 260, January 13, 1992

References:

In accordance with the requirements of References 1-3, the subject report and separate data volume are submitted as enclosures to this letter. There are no commitments being made to the NRC by this letter. If you have questions regarding this information, they may be directed to TJ Southworth at (509) 377-8654.Respectfully, DK Atkinson (Mail Drop PE08)Vice President, Nuclear Generation Enclosures cc (report w/o data volume, except as D McBaugh (WDOH)L Albin (WDOH)(w/data vol)JM Ayres (WDOE-Kenn)

RL Dirke'3 (PNNL)RN Sherman (BPA/399)NRC Sr Resident Inspector (988 noted): BS Mallett (NRC RIV; w/data vol)BJ Benney (NRC NRR)WA Horin (Winston & Strawn)L Vigue (WDFW)Director, SFPO-NRC NMSS 3C; w/data vol)(4mS~(