Technical Specifications Task Force: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) No edit summary |
StriderTol (talk | contribs) m (StriderTol moved page PROJ0753 to Technical Specifications Task Force) |
(No difference)
|
Revision as of 15:25, 11 September 2018
Technical Specifications Task Force docket
Start date | Title | |
---|---|---|
ML24303A237 | 29 October 2024 | Forthcoming Public Meeting Between the U. S. Nuclear Regulatory Commission and the Technical Specifications Task Force (TSTF) |
ML24303A171 | 29 October 2024 | Forthcoming Quarterly Public Meeting Between the U. S. Nuclear Regulatory Commission and the Technical Specifications Task Force |
ML24268A327 | 24 September 2024 | Forthcoming PRE-SUBMITTAL Teleconference with the Technical Specifications Task Force (TSTF) Regarding Draft Traveler TSTF-604, Revise Ventilation System Actions |
ML24264A023 | 20 September 2024 | RAI TSTF-600, Rev. 0, Revise the Reactor Coolant System (RCS) Pressure Isolation Valve (PIV) Leakage Testing Frequency |
ML24262A113 | 18 September 2024 | TSTF-596 Rev 1 Expand the Applicability of the Surveillance Frequency Control Program (SFCP) Additional Corrections Needed |
TSTF-24-07, PRM-50-126 - Petition for Rulemaking to Amend 10 CFR 50.36, Technical Specifications from Brian D. Mann on Behalf of the Technical Specifications Task Force | 13 September 2024 | PRM-50-126 - Petition for Rulemaking to Amend 10 CFR 50.36, Technical Specifications from Brian D. Mann on Behalf of the Technical Specifications Task Force |
ML24249A148 | 11 September 2024 | Cover Letter for Final Traveler SE of TSTF 576, Revision 3, Revise Safety/Relief Valve Requirements |
ML24249A145 | 11 September 2024 | Final Traveler SE of TSTF 576, Revision 3, Revise Safety/Relief Valve Requirements |
ML24247A134 | 6 September 2024 | Final Model SE of Traveler TSTF 592, Revision 2, Revise Automatic Depressurization System (ADS) Instrumentation Requirements |
ML24247A316 | 6 September 2024 | Cover Letter for Final Model SE of Traveler TSTF 592, Rev 2, Revise Automatic Depressurization System (ADS) Instrumentation Requirements |
EPID:L-2024-PMP-0011 | 14 August 2024 | TSTF-602 |
ML24222A400 | 14 August 2024 | TSTF-602, Revise the Ventilation Filter Testing Program to Permit Alternate Challenge Agents, Acceptance Review Letter |
ML24289A034 | 8 August 2024 | Discussion of NRC Staff Comments on Draft TSTF-585, Revision 3, Revise LCO 3.0.3 to Require Managing Risk |
ML24053A102 | 1 August 2024 | Draft Traveler Safety Evaluation of TSTF-576, Revise Safety/Relief Valve Requirements |
ML24106A276 | 1 August 2024 | Draft Safety Evaluation of Technical Specifications Task Force Traveler TSTF-576, Revision 3, Revise Safety/Relief Valve Requirements (EPID L -2019-PMP-0207) |
ML24204A271 | 1 August 2024 | TSTF-576 Safety Evaluation Supplement |
ML24207A182 | 25 July 2024 | TSTF-601, Extend Shield Building Completion Time After Refueling, Acceptance Review Letter |
ML24207A146 | 25 July 2024 | Forthcoming Quarterly Public Meeting Between the U. S. Nuclear Regulatory Commission and the Technical Specifications Task Force |
ML24207A159 | 25 July 2024 | Forthcoming Public Meeting Between the U. S. Nuclear Regulatory Commission and the Technical Specifications Task Force (TSTF) |
EPID:L-2024-PMP-0007 | 25 July 2024 | TSTF-601 |
ML24172A054 | 20 June 2024 | TSTF-600 Acceptance Review Letter TSTF-600, Revise the Reactor Coolant System (RCS) Pressure Isolation Valve (PIV) Leakage Testing Frequency |
ML24170B041 | 18 June 2024 | Draft Model SE of TSTF-592, Revise Automatic Depressurization System (ADS) Instrumentation Requirements |
ML24169A406 | 20 May 2024 | Draft Traveler TSTF-604, Revise Ventilation System Actions |
ML24064A155 | 17 May 2024 | LIC-600, Revision 2, Standard Technical Specifications Change Traveler Review and Adoption Process |
ML24129A066 | 8 May 2024 | 5_8_24 Meeting Handouts - History of Traveler Adoption |
ML24129A067 | 8 May 2024 | 5_8_24 Meeting Handouts - Proposed Change to the PWR ECCS Mode 4 Requirements |
ML24129A065 | 8 May 2024 | 5_8_24 Meeting Handouts - Active Traveler Summary Report and Priorities |
ML24121A243 | 30 April 2024 | Draft TSTF-603, Revise the Risk Informed Completion Time Backstop |
EPID:L-2024-PMP-0000 | 24 April 2024 | TSTF-599 |
EPID:L-2024-PMP-0003 | 24 April 2024 | TSTF-597 |
ML24114A257 | 24 April 2024 | TSTF-599 Acceptance Review Letter |
ML24114A265 | 24 April 2024 | TSTF-597 Acceptance Review Letter |
ML24113A152 | 22 April 2024 | Forthcoming Quarterly Public Teleconference Between the U. S. Nuclear Regulatory Commission and the Technical Specifications Task Force |
EPID:L-2024-PMP-0005 | 22 April 2024 | TSTF-600 |
ML24067A163 | 7 March 2024 | NRC Staff Comments on Draft Revision 3 TSTF-585, Revise LCO 3.0.3 to Require Managing Risk |
ML24044A140 | 8 February 2024 | TSTF Handout for 02/08/2024 Quarterly Meeting |
ML24038A349 | 7 February 2024 | NRC Comments for Pre-submittal Meeting TSTF-600, Revise the Reactor Coolant System (RCS) Pressure Isolation Valve (PIV) Leakage Testing Frequency |
ML24032A469 | 1 February 2024 | Forthcoming Quarterly Public Teleconference Between the U. S. Nuclear Regulatory Commission and the Technical Specifications Task Force |
ML24029A147 | 31 January 2024 | TSTF-592 Cover Letter for Final SE of TSTF-592 |
ML24029A148 | 31 January 2024 | Final Traveler SE of TSTF-592 |
ML24009A263 | 9 January 2024 | Forthcoming PRE-SUBMITTAL Teleconference with the Technical Specifications Task Force (TSTF) Regarding Draft Traveler TSTF-599, Eliminate Periodic Surveillance Test of Simultaneous Start of Redundant Diesel Generators |
ML24009A262 | 9 January 2024 | Forthcoming PRE-SUBMITTAL Teleconference with the Technical Specifications Task Force (TSTF) Regarding Draft Traveler TSTF-600, Revise the Reactor Coolant System (RCS) Pressure Isolation Valve (PIV) Leakage Testing Frequency |
ML23321A125 | 18 December 2023 | Draft Traveler SE of TSTF-592 Revise Automatic Depressurization System (ADS) Instrumentation Requirements |
ML23325A213 | 18 December 2023 | Cover Letter for Final Model SE of TSTF-591, Revise Risk Informed Completion Time (RICT) Program |
ML23325A214 | 18 December 2023 | Final Model SE of TSTF-591, Revise Risk Informed Completion Time (RICT) Program |
ML24016A270 | 12 December 2023 | TSTF-585, Draft Revision 3, Revise LCO 3.0.3 to Require Managing Risk |
ML23299A250 | 26 October 2023 | Forthcoming Quarterly Public Teleconference Between the U. S. Nuclear Regulatory Commission and the Technical Specifications Task Force |
ML23278A117 | 2 October 2023 | Draft TSTF-600, Revise the Reactor Coolant System (RCS) Pressure Isolation Valve (PIV) Leakage Testing Frequency |
ML23269A151 | 26 September 2023 | Draft Model SE of TSTF-591, Revision 0, Revise Risk-Informed Completion Time (RICT) Program |
ML23262B229 | 21 September 2023 | Cover Letter Transmitting Final SE of TSTF-591, Revision 0, Revise Risk-Informed Completion Time (RICT) Program |
... further results |