Technical Specifications Task Force: Difference between revisions

From kanterella
Jump to navigation Jump to search
No edit summary
No edit summary
Line 1: Line 1:
[[Technical Specification Task Force]] docket
[[Technical Specifications Task Force]] docket


{{#ask:[[site::PROJ0753]]
{{#ask:[[site::PROJ0753]]

Revision as of 15:25, 11 September 2018

Technical Specifications Task Force docket

 Start dateTitle
ML24303A23729 October 2024Forthcoming Public Meeting Between the U. S. Nuclear Regulatory Commission and the Technical Specifications Task Force (TSTF)
ML24303A17129 October 2024Forthcoming Quarterly Public Meeting Between the U. S. Nuclear Regulatory Commission and the Technical Specifications Task Force
ML24268A32724 September 2024Forthcoming PRE-SUBMITTAL Teleconference with the Technical Specifications Task Force (TSTF) Regarding Draft Traveler TSTF-604, Revise Ventilation System Actions
ML24264A02320 September 2024RAI TSTF-600, Rev. 0, Revise the Reactor Coolant System (RCS) Pressure Isolation Valve (PIV) Leakage Testing Frequency
ML24262A11318 September 2024TSTF-596 Rev 1 Expand the Applicability of the Surveillance Frequency Control Program (SFCP) Additional Corrections Needed
TSTF-24-07, PRM-50-126 - Petition for Rulemaking to Amend 10 CFR 50.36, Technical Specifications from Brian D. Mann on Behalf of the Technical Specifications Task Force13 September 2024PRM-50-126 - Petition for Rulemaking to Amend 10 CFR 50.36, Technical Specifications from Brian D. Mann on Behalf of the Technical Specifications Task Force
ML24249A14811 September 2024Cover Letter for Final Traveler SE of TSTF 576, Revision 3, Revise Safety/Relief Valve Requirements
ML24249A14511 September 2024Final Traveler SE of TSTF 576, Revision 3, Revise Safety/Relief Valve Requirements
ML24247A1346 September 2024Final Model SE of Traveler TSTF 592, Revision 2, Revise Automatic Depressurization System (ADS) Instrumentation Requirements
ML24247A3166 September 2024Cover Letter for Final Model SE of Traveler TSTF 592, Rev 2, Revise Automatic Depressurization System (ADS) Instrumentation Requirements
EPID:L-2024-PMP-001114 August 2024TSTF-602
ML24222A40014 August 2024TSTF-602, Revise the Ventilation Filter Testing Program to Permit Alternate Challenge Agents, Acceptance Review Letter
ML24289A0348 August 2024Discussion of NRC Staff Comments on Draft TSTF-585, Revision 3, Revise LCO 3.0.3 to Require Managing Risk
ML24053A1021 August 2024Draft Traveler Safety Evaluation of TSTF-576, Revise Safety/Relief Valve Requirements
ML24106A2761 August 2024Draft Safety Evaluation of Technical Specifications Task Force Traveler TSTF-576, Revision 3, Revise Safety/Relief Valve Requirements (EPID L -2019-PMP-0207)
ML24204A2711 August 2024TSTF-576 Safety Evaluation Supplement
ML24207A18225 July 2024TSTF-601, Extend Shield Building Completion Time After Refueling, Acceptance Review Letter
ML24207A14625 July 2024Forthcoming Quarterly Public Meeting Between the U. S. Nuclear Regulatory Commission and the Technical Specifications Task Force
ML24207A15925 July 2024Forthcoming Public Meeting Between the U. S. Nuclear Regulatory Commission and the Technical Specifications Task Force (TSTF)
EPID:L-2024-PMP-000725 July 2024TSTF-601
ML24172A05420 June 2024TSTF-600 Acceptance Review Letter TSTF-600, Revise the Reactor Coolant System (RCS) Pressure Isolation Valve (PIV) Leakage Testing Frequency
ML24170B04118 June 2024Draft Model SE of TSTF-592, Revise Automatic Depressurization System (ADS) Instrumentation Requirements
ML24169A40620 May 2024Draft Traveler TSTF-604, Revise Ventilation System Actions
ML24064A15517 May 2024LIC-600, Revision 2, Standard Technical Specifications Change Traveler Review and Adoption Process
ML24129A0668 May 20245_8_24 Meeting Handouts - History of Traveler Adoption
ML24129A0678 May 20245_8_24 Meeting Handouts - Proposed Change to the PWR ECCS Mode 4 Requirements
ML24129A0658 May 20245_8_24 Meeting Handouts - Active Traveler Summary Report and Priorities
ML24121A24330 April 2024Draft TSTF-603, Revise the Risk Informed Completion Time Backstop
EPID:L-2024-PMP-000024 April 2024TSTF-599
EPID:L-2024-PMP-000324 April 2024TSTF-597
ML24114A25724 April 2024TSTF-599 Acceptance Review Letter
ML24114A26524 April 2024TSTF-597 Acceptance Review Letter
ML24113A15222 April 2024Forthcoming Quarterly Public Teleconference Between the U. S. Nuclear Regulatory Commission and the Technical Specifications Task Force
EPID:L-2024-PMP-000522 April 2024TSTF-600
ML24067A1637 March 2024NRC Staff Comments on Draft Revision 3 TSTF-585, Revise LCO 3.0.3 to Require Managing Risk
ML24044A1408 February 2024TSTF Handout for 02/08/2024 Quarterly Meeting
ML24038A3497 February 2024NRC Comments for Pre-submittal Meeting TSTF-600, Revise the Reactor Coolant System (RCS) Pressure Isolation Valve (PIV) Leakage Testing Frequency
ML24032A4691 February 2024Forthcoming Quarterly Public Teleconference Between the U. S. Nuclear Regulatory Commission and the Technical Specifications Task Force
ML24029A14731 January 2024TSTF-592 Cover Letter for Final SE of TSTF-592
ML24029A14831 January 2024Final Traveler SE of TSTF-592
ML24009A2639 January 2024Forthcoming PRE-SUBMITTAL Teleconference with the Technical Specifications Task Force (TSTF) Regarding Draft Traveler TSTF-599, Eliminate Periodic Surveillance Test of Simultaneous Start of Redundant Diesel Generators
ML24009A2629 January 2024Forthcoming PRE-SUBMITTAL Teleconference with the Technical Specifications Task Force (TSTF) Regarding Draft Traveler TSTF-600, Revise the Reactor Coolant System (RCS) Pressure Isolation Valve (PIV) Leakage Testing Frequency
ML23321A12518 December 2023Draft Traveler SE of TSTF-592 Revise Automatic Depressurization System (ADS) Instrumentation Requirements
ML23325A21318 December 2023Cover Letter for Final Model SE of TSTF-591, Revise Risk Informed Completion Time (RICT) Program
ML23325A21418 December 2023Final Model SE of TSTF-591, Revise Risk Informed Completion Time (RICT) Program
ML24016A27012 December 2023TSTF-585, Draft Revision 3, Revise LCO 3.0.3 to Require Managing Risk
ML23299A25026 October 2023Forthcoming Quarterly Public Teleconference Between the U. S. Nuclear Regulatory Commission and the Technical Specifications Task Force
ML23278A1172 October 2023Draft TSTF-600, Revise the Reactor Coolant System (RCS) Pressure Isolation Valve (PIV) Leakage Testing Frequency
ML23269A15126 September 2023Draft Model SE of TSTF-591, Revision 0, Revise Risk-Informed Completion Time (RICT) Program
ML23262B22921 September 2023Cover Letter Transmitting Final SE of TSTF-591, Revision 0, Revise Risk-Informed Completion Time (RICT) Program
... further results