MONTHYEARW3F1-2007-0037, License Amendment Request NPF-38-271 to Support Next Generation Fuel2007-08-0202 August 2007 License Amendment Request NPF-38-271 to Support Next Generation Fuel Project stage: Request W3F1-2007-0038, Emergency Core Cooling System Performance Analysis2007-08-0909 August 2007 Emergency Core Cooling System Performance Analysis Project stage: Request W3F1-2007-0045, Supplement to the ECCS Performance Analysis Submittal in Support of Next Generation Fuel - 1999 EM Optional Steam Cooling Model Justification2007-10-0404 October 2007 Supplement to the ECCS Performance Analysis Submittal in Support of Next Generation Fuel - 1999 EM Optional Steam Cooling Model Justification Project stage: Request W3F1-2008-0004, Supplement to Amendment Request NPF-38-271 to Support Next Generation Fuel2008-01-17017 January 2008 Supplement to Amendment Request NPF-38-271 to Support Next Generation Fuel Project stage: Supplement ML0801802842008-01-22022 January 2008 Request for Additional Information on the Revised Emergency Core Cooling System Performance Analysis Supporting the Next Generation Fuel Project stage: RAI ML0801600592008-02-0707 February 2008 Request for Additional Information Regarding Review of Supplemental Information to ECCS Performance Analysis in Support of Next Generation Fuel, Optional Spacer Grid Steam Cooling Transfer Model Project stage: RAI ML0803804332008-02-12012 February 2008 Request for Additional Information License Amendment Request to Modify TS 6.9.1.11.1, Core Operating Limits, TS 3.5.1, Safety Injection Tanks, & TS 3.6.1.5, Containment Air Temperature to Support Next Generation Fuel Project stage: RAI W3F1-2008-0021, Supplement 2 RAI Response to Amendment Request NPF-38-271 to Support Next Generation Fuel2008-03-10010 March 2008 Supplement 2 RAI Response to Amendment Request NPF-38-271 to Support Next Generation Fuel Project stage: Supplement ML0808404842008-03-24024 March 2008 E-mail from Ronald L. Williams, Entergy, to N. Kalyanam, NRC, RAI Response to On-Going Processes to Support Next Generation Fuel. Project stage: Other ML0810003322008-04-0303 April 2008 Drawing Lr 1-30-1, Rev. 5, River Water System. Project stage: Other L-08-123, Drawing Lr 1-46-2, Rev. 5, Post DBA Hydrogen Analyzer System.2008-04-0303 April 2008 Drawing Lr 1-46-2, Rev. 5, Post DBA Hydrogen Analyzer System. Project stage: Other ML0808800142008-04-15015 April 2008 License Amendment 214, Request to Support Next Generation Fuel; Review and Approval of ECCS Performance Analysis; and Review and Approval of Supplement to ECCS Performance Analysis Project stage: Approval ML0808800152008-04-15015 April 2008 Tech Spec Pages for Amendment 214, Request to Support Next Generation Fuel; Review and Approval of ECCS Performance Analysis; and Review and Approval of Supplement to ECCS Performance Analysis Project stage: Other ML0812700362008-05-0909 May 2008 Tech Spec Page for Correction to Amendment 214 Request to Support Next Generation Fuel; Review & Approval of Revised ECCS Performance Analysis; & Review & Approval of Supplement to ECCS Performance Analysis Project stage: Other ML0812605352008-05-0909 May 2008 Correction to Amendment 214 Request to Support Next Generation Fuel; Review & Approval of Revised ECCS Performance Analysis; & Review & Approval of Supplement to ECCS Performance Analysis (Tac Nos. MD6299, MD6363, & MD6954) Project stage: Other ML21148A0522021-06-0808 June 2021 Correction to License Amendment 214 Request to Support Next Generation Fuel; Review and Approval of Revised ECCS Performance Analysis; and Review and Approval of Supplement to the ECCS Performance Analysis Project stage: Approval 2008-02-07
[Table View] |
|
---|
Category:Letter type:W
MONTHYEARW3F1-2023-0056, Owner'S Activity Report Form for Inservice Inspection Performed During Operating Cycle 24 / Refuel 242023-12-19019 December 2023 Owner'S Activity Report Form for Inservice Inspection Performed During Operating Cycle 24 / Refuel 24 W3F1-2023-0055, Reply to a Notice of Violation2023-12-14014 December 2023 Reply to a Notice of Violation W3F1-2023-0052, Core Operating Limits Report (COLR) - Cycle 26, Revision O2023-11-0707 November 2023 Core Operating Limits Report (COLR) - Cycle 26, Revision O W3F1-2023-0049, Revise Technical Specification 3/4.3.2 to Remove Exemption from Testing Certain Relays at Power to Support Elimination of Potential Single Point Vulnerability - Withdrawal2023-09-28028 September 2023 Revise Technical Specification 3/4.3.2 to Remove Exemption from Testing Certain Relays at Power to Support Elimination of Potential Single Point Vulnerability - Withdrawal W3F1-2023-0048, Special Report SR 2023-004-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days2023-09-25025 September 2023 Special Report SR 2023-004-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days W3F1-2023-0035, Application for Technical Specification Change to Revise Surveillance Requirements Included in the Surveillance Frequency Control Program2023-07-26026 July 2023 Application for Technical Specification Change to Revise Surveillance Requirements Included in the Surveillance Frequency Control Program W3F1-2023-0036, Special Report SR-2023-003-01 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days2023-05-0404 May 2023 Special Report SR-2023-003-01 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days W3F1-2023-0032, Annual Radioactive Effluent Release Report (ARERR) 20222023-04-27027 April 2023 Annual Radioactive Effluent Release Report (ARERR) 2022 W3F1-2023-0033, Submittal of Annual Radiological Environmental Operating Report - 20222023-04-27027 April 2023 Submittal of Annual Radiological Environmental Operating Report - 2022 W3F1-2023-0025, Annual Report of Individual Monitoring of Radiation Exposure for 2022 Per 10 CFR 20.22062023-04-11011 April 2023 Annual Report of Individual Monitoring of Radiation Exposure for 2022 Per 10 CFR 20.2206 W3F1-2023-0018, Updated Final Supplemental Response to NRC Generic Letter 2004-022023-03-30030 March 2023 Updated Final Supplemental Response to NRC Generic Letter 2004-02 W3F1-2023-0022, Registration of Dry Fuel Storage Cask Use2023-03-22022 March 2023 Registration of Dry Fuel Storage Cask Use W3F1-2023-0021, Submittal of Special Report SR 2023-003-00 Radiation Monitor Inoperable Greater than 7 Days2023-03-17017 March 2023 Submittal of Special Report SR 2023-003-00 Radiation Monitor Inoperable Greater than 7 Days W3F1-2023-0016, Registration of Dry Fuel Storage Cask Use2023-03-0303 March 2023 Registration of Dry Fuel Storage Cask Use W3F1-2023-0014, Reply to a Notice of Violation; EA-22-1192023-02-20020 February 2023 Reply to a Notice of Violation; EA-22-119 W3F1-2023-0013, Notification of Readiness for Supplemental Inspection2023-02-15015 February 2023 Notification of Readiness for Supplemental Inspection W3F1-2023-0007, Registration of Dry Fuel Storage Cask Use2023-02-0606 February 2023 Registration of Dry Fuel Storage Cask Use W3F1-2023-0010, Special Report SR 2023-002-00, Radiation Monitor Inoperable Greater than 7 Days2023-01-25025 January 2023 Special Report SR 2023-002-00, Radiation Monitor Inoperable Greater than 7 Days W3F1-2023-0002, SR 2023-001-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 30 Days2023-01-0505 January 2023 SR 2023-001-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 30 Days W3F1-2022-0067, Commitment Change Notification for Generic Safety Issue 191 and Generic Letter 2004-022022-12-20020 December 2022 Commitment Change Notification for Generic Safety Issue 191 and Generic Letter 2004-02 W3F1-2022-0054, Revise Technical Specification 3/4.3.2 to Remove Exemption from Testing Certain Relays at Power to Support Elimination of Potential Single Point Vulnerability2022-11-0101 November 2022 Revise Technical Specification 3/4.3.2 to Remove Exemption from Testing Certain Relays at Power to Support Elimination of Potential Single Point Vulnerability W3F1-2022-0063, Submittal of Emergency Preparedness Documents. Includes EP-001-001, Revision 372022-10-27027 October 2022 Submittal of Emergency Preparedness Documents. Includes EP-001-001, Revision 37 W3F1-2022-0059, Response to Clarification Questions Concerning Supplement to License Amendment Request to Adopt TSTF-5052022-10-13013 October 2022 Response to Clarification Questions Concerning Supplement to License Amendment Request to Adopt TSTF-505 W3F1-2022-0058, Reply to a Notice of Violation; EA-22-0332022-10-12012 October 2022 Reply to a Notice of Violation; EA-22-033 W3F1-2022-0049, Response to Request for Additional Information Regarding License Amendment Requests to Adopt 10 CFR 50.69 and TSTF-5052022-08-19019 August 2022 Response to Request for Additional Information Regarding License Amendment Requests to Adopt 10 CFR 50.69 and TSTF-505 W3F1-2022-0037, Submittal of Owner'S Activity Report Form for Inservice Inspection Performed During Operating Cycle 24 / Refuel 242022-08-0808 August 2022 Submittal of Owner'S Activity Report Form for Inservice Inspection Performed During Operating Cycle 24 / Refuel 24 W3F1-2022-0044, SR-2022-004-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days2022-07-0606 July 2022 SR-2022-004-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days W3F1-2022-0042, SR-22-003-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days2022-06-27027 June 2022 SR-22-003-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days W3F1-2022-0015, Response to Request for Additional Information to License Amendment Request to Revise Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk Informed Extended Completion Times - Ritstf.2022-05-16016 May 2022 Response to Request for Additional Information to License Amendment Request to Revise Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk Informed Extended Completion Times - Ritstf. W3F1-2022-0026, Report of Facility Changes, Tests, and Experiments and Commitment Changes for Two Year Period Ending April 28, 20222022-04-28028 April 2022 Report of Facility Changes, Tests, and Experiments and Commitment Changes for Two Year Period Ending April 28, 2022 W3F1-2022-0028, Annual Radiological Environmental Operating Report - 20212022-04-26026 April 2022 Annual Radiological Environmental Operating Report - 2021 W3F1-2022-0029, Annual Report of Individual Monitoring of Radiation Exposure for 2021 Per 10 CFR 20.22062022-04-26026 April 2022 Annual Report of Individual Monitoring of Radiation Exposure for 2021 Per 10 CFR 20.2206 W3F1-2022-0009, Supplement to Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components (Sscs) for Nuclear Power Reactors2022-04-25025 April 2022 Supplement to Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components (Sscs) for Nuclear Power Reactors W3F1-2022-0031, Proposed Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule to Reflect Location of Standby Capsules 3/W-104 and 6/W-2842022-04-25025 April 2022 Proposed Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule to Reflect Location of Standby Capsules 3/W-104 and 6/W-284 W3F1-2022-0020, Review of Preliminary Accident Sequence Precursor Report2022-04-11011 April 2022 Review of Preliminary Accident Sequence Precursor Report W3F1-2022-0017, Annual Report on Westinghouse Electric Company LLC Combustion Engineering Emergency Core Cooling System Performance Evaluation Models for Calendar Year 20212022-04-0707 April 2022 Annual Report on Westinghouse Electric Company LLC Combustion Engineering Emergency Core Cooling System Performance Evaluation Models for Calendar Year 2021 W3F1-2022-0019, WAT-2022-02 Post Exam Analysis2022-03-0909 March 2022 WAT-2022-02 Post Exam Analysis W3F1-2022-0011, Special Report SR-22-002-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days2022-02-0808 February 2022 Special Report SR-22-002-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days W3F1-2022-0008, SR-22-001-00, Waterford Steam Electric Station, Unit 3, Radiation Monitors Inoperable Greater than 7 Days2022-02-0101 February 2022 SR-22-001-00, Waterford Steam Electric Station, Unit 3, Radiation Monitors Inoperable Greater than 7 Days W3F1-2021-0074, Commitment Change Notification for Generic Safety Issue - 191 and Generic Letter 2004-022021-12-16016 December 2021 Commitment Change Notification for Generic Safety Issue - 191 and Generic Letter 2004-02 W3F1-2021-0064, Proposed Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule to Support Relocation of Capsules 104 and 2842021-11-30030 November 2021 Proposed Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule to Support Relocation of Capsules 104 and 284 W3F1-2021-0061, Supplement to License Amendment Request to Relocate Chemical Detection Systems Technical Specifications to Technical Requirements Manual2021-10-14014 October 2021 Supplement to License Amendment Request to Relocate Chemical Detection Systems Technical Specifications to Technical Requirements Manual W3F1-2021-0063, Request for One-Time Exemption from 10 CFR 50, Appendix E Biennial Emergency Preparedness Evaluated Exercise Requirements Due to Severe Storm Recovery2021-10-12012 October 2021 Request for One-Time Exemption from 10 CFR 50, Appendix E Biennial Emergency Preparedness Evaluated Exercise Requirements Due to Severe Storm Recovery W3F1-2021-0050, Response to U. S. Nuclear Regulatory Commission Request for Additional Information Regarding License Amendment Request to Adopt2021-10-0101 October 2021 Response to U. S. Nuclear Regulatory Commission Request for Additional Information Regarding License Amendment Request to Adopt W3F1-2021-0060, Response to Request for Additional Information Regarding License Amendment Request to Relocate Chemical Detection Systems Technical Specifications to Technical Requirements Manual2021-09-30030 September 2021 Response to Request for Additional Information Regarding License Amendment Request to Relocate Chemical Detection Systems Technical Specifications to Technical Requirements Manual W3F1-2021-0039, Application for Technical Specification Change to Revise Pressure/Temperature and Low Temperature Overpressure Protection for 55 Effective Full Power Years2021-08-25025 August 2021 Application for Technical Specification Change to Revise Pressure/Temperature and Low Temperature Overpressure Protection for 55 Effective Full Power Years W3F1-2021-0055, Supplement to License Amendment Request to Relocate Boration Systems Technical Specifications to the Technical Requirements Manual2021-08-20020 August 2021 Supplement to License Amendment Request to Relocate Boration Systems Technical Specifications to the Technical Requirements Manual W3F1-2021-0057, (Waterford 3) - Emergency Plan Revision 0522021-08-18018 August 2021 (Waterford 3) - Emergency Plan Revision 052 W3F1-2021-0054, License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator (CPC) System and Control Element Assembly Calculator (Ceac) System, Dated July 23, 20202021-07-29029 July 2021 License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator (CPC) System and Control Element Assembly Calculator (Ceac) System, Dated July 23, 2020 W3F1-2021-0051, Revised Licensing Technical Report for the Common Q Core Protection Calculator System - License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator System and Control Element Assembly Calculator2021-07-19019 July 2021 Revised Licensing Technical Report for the Common Q Core Protection Calculator System - License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator System and Control Element Assembly Calculator 2023-09-28
[Table view] |
Text
Entergy Nuclear South Entergy Operations, Inc.
17265 River Road Killona, LA 70057-3093 Tel 504 739 6247 Fax 504 739 6698 kcook@entergy.com Kimberly S. Cook Director, Nuclear Safety Assurance Nuclear Safety Assurance Waterford 3 W3F1-2008-0004 January 17, 2008 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555
SUBJECT:
Supplement to Amendment Request NPF-38-271 to Support Next Generation Fuel Waterford Steam Electric Station, Unit 3 Docket No. 50-382 License No. NPF-38
REFERENCES:
- 1. Entergy letter dated August 2, 2007, "License Amendment Request NPF-38-271 to Support Next Generation Fuel" (W3F1-2007-0037)
Dear Sir or Madam:
By letter (Reference 1), Entergy Operations, Inc. (Entergy) proposed a change to the Waterford Steam Electric Station, Unit 3 (Waterford 3) Technical Specifications (TSs) 6.9.1.11.1, Core Operating Limits; TS 3.5.1, Safety Injection Tanks; and TS 3.6.1.5, Containment Air Temperature. The proposed changes would add new analytical methods and would modify the containment average air temperature and safety injection tank level to support the implementation of Next Generation Fuel.
On January 3, 2008, Entergy received an NRC Staff email regarding whether an additional action should be included in the proposed TS change to address the existing TS ACTION with containment temperature below 90 0 F. On January 9, 2008, Entergy and the NRC staff held a call to confirm that a supplement to the TS change will be submitted to add the ACTION for a containment average temperature below 90OF and take the opportunity to insert the word "limit" into ACTION 'a' phrase "...or reduce the peak linearheat generation rate limit." The insertion word "limit" is requested to provide greater operator clarity when consideration is required whether to reduce the peak linear heat generation rate limit contained within the Core Operating Limits Report (COLR). These changes are considered non-technical.
Changes to TS 3.6.1.5, page 3/4 6-13, which were originally submitted in Reference 1, are proposed. The revised mark-up is included in Attachment 1, and the changes are indicated by revision bars in the right-hand margin. Note, the marked up insertion page 2 of 2 for TS
W3F1-2008-0004 Page 2 of 3 3.6.1.5 in Attachment 1 replaces page 4 of 4 provided in Attachment 2 of Reference 1 in its entirety.
There are no technical changes proposed. The conclusions of the original no significant hazards consideration included in Reference 1 are not affected by any information contained in the supplemental letter. There are no new commitments contained in this letter.
If you have any questions or require additional information, please contact Ron Williams at (504) 739-6255.
I declare under penalty of perjury that the foregoing is true and correct. Executed on January 17, 2008.
Sincerely-,
ASC/RLW/
Attachment:
Revised Markup of Technical Specification 3.6.1.5 Page
W3F1-2008-0004 Page 3 of 3 cc: Mr. Elmo E. Collins, Jr.
Regional Administrator U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 NRC Senior Resident Inspector Waterford Steam Electric Station Unit 3 P.O. Box 822 Killona, LA 70066-0751 U.S. Nuclear Regulatory Commission Attn: Mr. N. Kalyanam Mail Stop O-07D1 Washington, DC 20555-0001 Wise, Carter, Child & Caraway ATTN: J. Smith P.O. Box 651 Jackson, MS 39205 Winston & Strawn ATTN: N.S. Reynolds 1700 K Street, NW Washington, DC 20006-3817 Morgan, Lewis & Bockius LLP ATTN: T.C. Poindexter 1111 Pennsylvania Avenue, NW Washington, DC 20004
Attachment 1 W3FI -2008-0004 Revised Markup of Technical Specification 3.6.1.5 Page to W3F1-2008-0004 Page 1 of 2 CONTAINMENT SYSTEMS AIR TEMPERATURE LIMITING CONDITION FOR OPERATION 3.6.1.5 Primary containment average air temperature shall be > and < 120 *F.
APPLICABILITY: MODES 1, 2, 3, and 4.
ACTION:
th th' contain ent av age air t nperat e o tsid the limir rest!o, th aver e air te peratu to within Pie limit',iithin 8 or e in a nurs, leak HOTTAND within next 6)hurs ann COLD*HUTDIN w)tin the) flio 1 g 30 urs SURVEILLANCE REQUIREMENTS 4.6.1.5 The primary containment average air temperature shall be the arithmetical average of the temperatures at any three of the following locations and shall be determined at least once per 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />s:
Location
- a. Containment Fan Cooler No. 1A Air Intake
- b. Containment Fan Cooler No. 1B Air Intake
- c. Containment Fan Cooler No. IC Air Intake
- d. Containment Fan Cooler No. ID Air Intake The minimum containment average air temperature limit is only applicable at greater than 70%
RATED THERMAL POWER, WATERFORD - UNIT 3 3/4 6-13 AMENDMErNT NO. 199 to W3F1-2008-0004 Page 2 of 2 [replacement page for Reference. 1 Att. 2 page 4 of 4]
Insert 1
- 15) "CE 16 x 16 Next Generation Fuel Core Reference Report," WCAP-16500-P and Final Safety Evaluation for Westinghouse Electric Company (Westinghouse) Topical Report (TR) WCAP-16500-P, Revision 0, "CE [Combustion Engineering] 16x16 Next Generation Fuel [(NGF)] Core Reference Report," (Methodology for Specification 3.1.1.3 for MTC, 3.2.1 for Linear Heat Rate, 3.2.3 for Azimuthal Power Tilt, 3.2.4.b, 3.2.4.c, and 3.2.4.d for DNBR Margin, and 3.2.7 for ASI).
- 16) "Optimized ZIRLOTM, WCAP-12610-P-A and CENPD-404-P-A Addendum 1-A, (Methodology for Specification 3.1.1.3 for MTC, 3.2.1 for Linear Heat Rate, 3.2.3 for Azimuthal Power Tilt, and 3.2.7 for ASI).
- 17) "Westinghouse Correlations WSSV and WSSV-T for Predicting Critical Heat Flux in Rod Bundles with Side-Supported Mixing Vanes," WCAP-16523-P-A and Final Safety Evaluation for Westinghouse Electric Company (Westinghouse) Topical Report (TR),
WCAP-16523-P, "Westinghouse Correlations WSSV and WSSV-T for Predicting Critical Heat Flux in Rod Bundles with Side-Supported Mixing Vanes," (Methodology for Specification 3.2.4.b, 3.2.4.c, and 3.2.4.d for DNBR Margin).
- 18) "ABB Critical Heat Flux Correlations for PWR Fuel," CENPD-387-P-A (Methodology for Specification 3.2.4.b, 3.2.4.c, and 3.2.4.d for DNBR Margin and 3.2.7 for ASI).
- 19) "Calculative Methods for the CE Nuclear Power Large Break LOCA Evaluation Model
- Improvement to 1999 Large Break LOCA EM Steam Cooling Model for Less Than 1 in/sec Core Reflood" CENPD-1 32, Supplement 4-P-A, Addendum 1-P and Final Safety Evaluation for Westinghouse Electric Company (Westinghouse) Topical Report (TR)
CENPD-132 Supplement 4-P-A, Addendum 1-P, "Calculative Methods for the CE
[Combustion Engineering] Nuclear Power Large Break LOCA Evaluation Model -
Improvement to 1999 Large Break LOCA EM Steam Cooling Model for Less Than 1 in/sec Core Reflood (Methodology for Specification 3.1.1.3 for MTC, 3.2.1 for Linear Heat Rate, 3.2.3 for Azimuthal Power Tilt, and 3.2.7 for ASI).
Insert 2
- a. If the minimum containment average air temperature is less than 95 0 F* but greater than or equal to 90 0 F*, then within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> either restore containment air temperature to greater than or equal to 95 0 F or reduce the peak linear heat generation rate limit in accordance with the COLR. Otherwise, be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />. -
- b. If the minimum containment average air temperature is less than 90 0 F, then restore containment air temperature to greater than or equal to 95 0 F within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
- c. If maximum containment average air temperature is greater than 120 0 F, then restore containment air temperature to less than or equal to 120OF within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.