W3F1-2004-0081, Revision to Security Plan, T&Q Plan and Safeguards Contingency Plan Incorporating RAI Responses

From kanterella
(Redirected from W3F1-2004-0081)
Jump to navigation Jump to search
Revision to Security Plan, T&Q Plan and Safeguards Contingency Plan Incorporating RAI Responses
ML042590024
Person / Time
Site: Waterford Entergy icon.png
Issue date: 09/09/2004
From: Venable J
Entergy Nuclear South, Entergy Operations
To:
Document Control Desk, Office of Nuclear Security and Incident Response
References
W3F1-2004-0081
Download: ML042590024 (3)


Text

Entergy Nuclear South Ak Entergy Operations, Inc.

17265 River Road Killona, LA 70066 Tel 504 739 6660 OX Fax 5G4 739 6678 jvenabl~entergy.com Joseph E. Venable SAFEGUARDS INFORMATION Vice President. Operations Waterford 3 W3F1 -2004-0081 September 9, 2004 Via Overnight Delivery U. S. Nuclear Regulatory Commission Attention: Document Control Desk One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738

SUBJECT:

Revision to Security Plan, T&Q Plan and Safeguards Contingency Plan Incorporating RAI Responses Waterford 3 Steam Electric Station Docket No. 50-382 License No. NPF-38

REFERENCES:

1. August 26, 2004 letter to Document Control Desk, Entergy Nuclear South Miscellaneous Supplemental Responses and Updated Combined Responses for Contingency Plan Requests for Additional Information Nos. 5 and 9 (CNRO 2004-00058)
2. August 17, 2004 letter to Document Control Desk, Entergy Nuclear South Miscellaneous Supplemental Responses and Combined Responses for Section 9.4.1 and Contingency Plan Requests for Additional Information Nos.

5 and 9 (CNRO 2004-00052)

3. August 9, 2004 letter to Document Control Desk, Entergy Nuclear South Supplemental Responses and Combined Responses for Section 9.4.1 and Contingency Plan Requests for Additional Information (CNRO 2004-00048)
4. July 26, 2004 letter to Document Control Desk, Entergy Nuclear South Training and Qualification Plan Requests for Additional Information (CNRO 2004-00046)
5. July 19, 2004 letter to Document Control Desk, Entergy Nuclear South Combined Response to Security Plan Sections 1-9 Requests for Additional Information (CNRO 2004-00044)
6. July 1, 2004 letter to Document Control Desk, Entergy Combined Response to Security Plan Sections 10-19 Requests for Additional Information (CNRO 2004-00042)
7. April 29, 2004 Supplemental Response to April 29, 2003 Order to Entergy NOTICE:

Enclosure contains "Safeguards Information."

Upon separation of the Enclosure, this letter and the Attachment become "DECONTROLLED" SAFEGUARDS INFORMATION

SAFEGUARDS INFORMATION W3Fl -2004-0081 Page 2 of 3

8. Entergy letter from Gary J. Taylor, CEO, to Document Control Desk dated June 3, 2003, Entergy Operations, Inc., Entergy Nuclear Operations, Inc -

Response to Issuance of Orders to Modify License for Revised Design Basis Threat and Compensatory Measures Related to Security Force Training and Fitness-For-Duty (CNRO-2003-00025).

Dear Sir or Madam:

Entergy's above referenced letters CNRO-2004-00042, 00044, 00046, 00048, 00052 and 00058 (references 1-6) provided Entergy's combined responses to the NRC's requests for additional information regarding the Waterford 3, April 29, 2004 Security Plan submittal required by Order EA-03-086 (reference 7). As committed in each of those submittals, this letter and CD ROM provide the proposed revised Security Plan documents for your review and approval.

In order to standardize our fleet approach with the NRC-approved industry approach, Entergy's responses to Order EA-03-086 and requests for additional information were strictly based on NEI-03-12, "Template for the Security Plan, Training and Qualification Plan, Safeguards Contingency Plan' Revision 1 and subsequent guidance provided by NEI and approved by the staff.

Changes were made during this update to sections 9.4.1 and 10.1 as discussed with M. Chernoff on August 31 and September 1, 2004, and other editorial corrections were made that were consistent with NRC guidance dated August 12, 2004.

This letter includes no new commitments. If you have any problems with the CD ROM or require additional information, please contact Gregory Scott at 504-739-6703.

I declare under penalty of perjury that the foregoing is true and correct. Executed on September 9, 2004.

Sincerely, J.E. Venable Vice President Operations, Waterford 3 JEV/GCS/cbh Enclosure -"001 RevisiontoSecrTrngandContingencyPlansforWaterford 3.pdf' NOTICE:

Enclosure contains "Safeguards Information."

Upon separation of the Enclosure, this letter and any Attachments become "DECONTROLLED" SAFEGUARDS INFORMATION

SAFEGUARDS INFORMATION W3F1 -2004-0081 Page 3 of 3 cc:

Mr. Bruce S. Mallett Regional Administrator U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 NRC Senior Resident Inspector Waterford Steam Electric Station Unit 3 P.O. Box 822 Killona, LA 70066-0751 U. S. Nuclear Regulatory Commission Attn: Mr. N. Kalyanam Mail Stop O-07D1 Washington, DC 20555-0001 Wise, Carter, Child & Caraway ATTN: J. Smith P.O. Box 651 Jackson, MS 39205 Winston & Strawn ATTN: N.S. Reynolds 1400 L Street, NW Washington, DC 20005-3502 U. S. Nuclear Regulatory Commission Attn: Ms. M.H. Chernoff Mail Stop 8 G9A NRR Project Manager, SPRT NOTICE:

Enclosure contains "Safeguards Information."

Upon separation of the Enclosure, this letter and any Attachments become "DECONTROLLED" SAFEGUARDS INFORMATION