ULNRC-06970, Attachment 2: Revised TS Pages
Jump to navigation
Jump to search
| ML26027A346 | |
| Person / Time | |
|---|---|
| Site: | Callaway |
| Issue date: | 01/27/2026 |
| From: | Ameren Missouri, Union Electric Co |
| To: | Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML26027A333 | List: |
| References | |
| ULNRC-06970, LDCN 25-0022, TSTF-599-A, Rev 1 | |
| Download: ML26027A346 (0) | |
Text
Attachmment 2 ULNRC - 06970 Page 1 of 2 ATTACHMENT 2 REVISED TS PAGES
AC Sources - Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued)
CALLAWAY PLANT 3.8-17 Amendment No.
SR 3.8.1.20 Not Used SR 3.8.1.21
NOTE -------------------------------
The continuity check may be excluded from the actuation logic test.
Perform ACTUATION LOGIC TEST for each train of the load shedder and emergency load sequencer.
In accordance with the Surveillance Frequency Control Program SURVEILLANCE FREQUENCY Attachmment 2 ULNRC - 06970 Page 2 of 2