ML26027A345

From kanterella
Jump to navigation Jump to search
Attachment 1: Marked-up TS Pages
ML26027A345
Person / Time
Site: Callaway 
Issue date: 01/27/2026
From:
Ameren Missouri, Union Electric Co
To:
Office of Nuclear Reactor Regulation
Shared Package
ML26027A333 List:
References
ULNRC-06970, LDCN 25-0022, TSTF-599-A, Rev 1
Download: ML26027A345 (0)


Text

ATTACHMENT 1 MARKED-UP TS PAGES ULNRC-06970 Page 1 of 2

AC Sources - Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued)

CALLAWAY PLANT 3.8-17 Amendment No. 202 SR 3.8.1.20


NOTE -------------------------------

All DG starts may be preceded by an engine prelube period.

Verify when started simultaneously from standby condition, each DG achieves, in 12 seconds, voltage 3740 V and 4320 V, and frequency 58.8 Hz and 61.2 Hz.

In accordance with the Surveillance Frequency Control Program SR 3.8.1.21


NOTE -------------------------------

The continuity check may be excluded from the actuation logic test.

Perform ACTUATION LOGIC TEST for each train of the load shedder and emergency load sequencer.

In accordance with the Surveillance Frequency Control Program SURVEILLANCE FREQUENCY ULNRC-06970 Page 2 of 2 Not Used.