U-600817, Application for Amend to License NPF-55,providing Addl Changes to Clarify & Enhance Tech Specs Which Will Accompany Full Power OL for Plant.No Amend of Present Low Power License Requested.Changes Consistent W/Fsar as Amended
| ML20210A951 | |
| Person / Time | |
|---|---|
| Site: | Clinton |
| Issue date: | 02/04/1987 |
| From: | Hall D ILLINOIS POWER CO. |
| To: | Harold Denton Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20210A955 | List: |
| References | |
| U-600817, NUDOCS 8702090046 | |
| Download: ML20210A951 (4) | |
Text
I U-600817 L30- 87 ( 02-04 )-t 8E 110
/LL/NO/S POWER OOMPANY CLINTON POWER STATION P.O. BOX 678. CLINTON. ILLINOIS 61727 FEB 4 1937 Docket No. 50-461 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, D.C.
20555
Subject:
Clinton Power Station Technical Specifications for Full Power Operating License
Dear Mr. Denton:
This letter supplements Illinois Power Company's (IP) letter dated January 8, 1987 (U-600785) and provides additional changes that IP requests be included in the Technical Specifications (CPS-TS) which will accompany the full-power operating license for the Clinton Power Station.
These changes represent clarification and enhancements to the Technical Specifications.
The justifications and the proposed marked-up pages are attached.
None of these changes affect IP's ability to safely operate the Clinton Power Station under its current license.
Thus, no amendment of the present low-power license is being requanted.
These changes to the CPS-TS have been reviewed and are in all material aspects with the FSAR as amended, consistent the Safety Evaluation Report and its Supplements No. 1-7 and the as-built plant.
An affidavit relating to this certification accompanies this letter.
If you have any questions or require additional I
information, please contact me.
S el, ours, l
D. P.
all Vice President l
RFP/bsa Attachment i
f 8702090046 870204 V [ d) #
yDR ADOCK 05000461 PDR f
f U-600817 L30-87(02-04)-L
/
\\
8E.110 cc:
B. L. Siegel, NRC Clinton Licensing Project Manager NRC Regional Office Regional Administrator, Region III, USNRC Illinois Department of Nuclear Safety 4
i l
l
f n
STATE OF ILLINOIS COUNTY OF DEWITT DONALD P. HALL, Being first duly sworn, deposes and says:
That he is Vice President of Illinois Power Company; that the provided information to certify that these changes to the Clinton Power Station (CPS) Technical Specifications are consistent with the CPS - Final Safety Analysis Report, the NRC Safety Evaluation Report and the as-built facility, has been prepared under his supervision and direction; that he knows the contents thereof; and that to the best of his knowledge and belief said request and the facts contained therein are true and correct.
Y DATED:
This [
day of Febru Signed:
Donald P.
Hall Subscribed and sworn to before me this day of February 1987.
blb&tAs
~b/A_W Notary Public My commission expires:
_____. 6 _ _
kMMNM My commenen Egses 10/1/90
/
Description of Change
~
Table 1.2, page 1-11 Change Table 1.2 Notations
- .to delete the word "recoupled" and insert the word " moved".
Justification The purpose of this note is to allow for testing to determine operability in accordance with Specifications 3/4.1.3.2 and 3/4.1.3.4.
In addition, this change is consistent with changes made to other BWR Technical Specifications (LaSalle, River Bend, Perry, and Hope Creek),
i
+
I 3
- - - - -.. --