Category:CORRESPONDENCE-LETTERS
MONTHYEARTXX-9924, Forwards Responses to Questions by NRC Re Application for Amends to Licenses NPF-87 & NPF-89,by Incorporating Changes Increasing RWST low-level Setpoint from Greater than But Equal to 40% to Greater than But Equal to 45% of Span1999-10-22022 October 1999 Forwards Responses to Questions by NRC Re Application for Amends to Licenses NPF-87 & NPF-89,by Incorporating Changes Increasing RWST low-level Setpoint from Greater than But Equal to 40% to Greater than But Equal to 45% of Span ML20217M5711999-10-20020 October 1999 Forwards Insp Repts 50-445/99-15 & 50-446/99-15 on 990822- 1002.Two Severity Level IV Violations of NRC Requirements Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy TXX-9923, Forwards Monthly Operating Repts for Sept 1999 for CPSES, Units 1 & 2,per Plant TS 5.6.4.No Failures of Challenges to PORVs of SV for Units Occurred1999-10-15015 October 1999 Forwards Monthly Operating Repts for Sept 1999 for CPSES, Units 1 & 2,per Plant TS 5.6.4.No Failures of Challenges to PORVs of SV for Units Occurred ML20217E7951999-10-12012 October 1999 Forwards COLR for Unit 1,Cycle 8,per TS 5.6.5 ML20212L2891999-10-0101 October 1999 Discusses Closeout of GL 97-06, Degradation of Steam Generator Internals. Purpose of GL Was to Obtain Info That Would Enable NRC to Verify That Condition of Licensee SG Internals Comply with Current Licensing Bases TXX-9922, Forwards Revised COLR, for Cycle 5 for Unit 21999-10-0101 October 1999 Forwards Revised COLR, for Cycle 5 for Unit 2 ML20216J5571999-10-0101 October 1999 Provides Final Response to GL 98-01,suppl 1, Y2K Readiness of Computer Sys at Npps ML20212G0721999-09-24024 September 1999 Forwards Rev 4 to Augmented Inservice Insp Plan for CPSES, Unit 1. Future Changes & Revs to Unit 1 Augmented Inservice Insp Plan Will Be Available on Site ML20212H0461999-09-24024 September 1999 Forwards Rev 6 to CPSES Glen Rose,Tx ASME Section XI ISI Program Plan for 1st Interval on 990820 ML20212F7481999-09-24024 September 1999 Forwards SER Authorizing Relief from Exam Requirement of 1986 Edition ASME Code,Section XI Pursuant to 10CFR50.55a(a)(3)(ii) for Relief Request A-3 & 10CFR50.55a(g)(6)(i) for Relief Requests B15,16,17 & C-4 ML20212F1041999-09-23023 September 1999 Requests That NRC Be Informed of Any Changes in Scope of Y2K System Deficiencies Listed or Util Projected Completion Schedule for Comanche Peak Steam Electric Station,Units 1 & 2 ML20212E6661999-09-21021 September 1999 Advises That Info Contained in Application & Affidavit, (CAW-99-1342) Re WCAP-15009,Rev 0, Comache Peak Unit 1 Evaluation for Tube Vibration Induced Fatigue, Will Be Withheld from Public Disclosure ML20212D9111999-09-16016 September 1999 Informs That on 990818,NRC Completed Midcycle PPR of CPSES & Did Not Identify Any Areas in Which Performance Warranted Insp Beyond Core Insp Program.Core Insp Plan at Facility Over Next 7 Months.Insp Plan Through March 2000 Encl ML20212A7601999-09-14014 September 1999 Forwards Insp Repts 50-445/99-14 & 50-446/99-14 on 990707-0821.Four Violations Occurred & Being Treated as Ncvs.Conduct of Activities Was Generally Characterized by safety-conscious Operations & Sound Radiological Controls TXX-9921, Suppls 981221 LAR 98-010 to Licenses NPF-87 & NPF-89, Clarfying Conditions of Use Re Analytical Methods Used to Determine Core Operating Limits,Per Telcon with NRC1999-09-10010 September 1999 Suppls 981221 LAR 98-010 to Licenses NPF-87 & NPF-89, Clarfying Conditions of Use Re Analytical Methods Used to Determine Core Operating Limits,Per Telcon with NRC ML20211P3761999-09-0707 September 1999 Ack Receipt of Ltr Dtd 990615,transmitting Rev 30 to Physical Security Plan,Per 10CFR50.54(p).No NRC Approval Is Required ML20211L9871999-09-0303 September 1999 Forwards Rev 31 to Technical Requirements Manual. All Changes Applicable to Plants Have Been Reviewed Under Util 10CFR50.59 Process & Found Not to Include Any USQs TXX-9915, Responds to 990701 & 0825 RAI Telcons Re Spent Fuel Pool Temp,Per LAR 98-008,which Requested Increase in Spent Fuel Storage capacity.Marked-up Page 4-1 of CPSES Fuel Storage Licensing Rept, Encl1999-09-0303 September 1999 Responds to 990701 & 0825 RAI Telcons Re Spent Fuel Pool Temp,Per LAR 98-008,which Requested Increase in Spent Fuel Storage capacity.Marked-up Page 4-1 of CPSES Fuel Storage Licensing Rept, Encl ML20211K2231999-08-31031 August 1999 Forwards Txu Electric Comments of Rvid,Version 2 ML20211J3801999-08-27027 August 1999 Forwards Corrected TS Page 3.8-26 to Amend 66 to Licenses NPF-87 & NPF-89,respectively.Footnote on TS Page 3.8-26 Incorrectly Deleted ML20211G7301999-08-26026 August 1999 Forwards Revs 29 & 30 to CPSES Technical Requirements Manual (Trm). Attachments 1 & 2 Contain Description of Changes for Revs 29 & 30 Respectively ML20211G1081999-08-26026 August 1999 Responds to NRR Staff RAI Re Util Mar 1999 Submittal for NRC Review & Approval of Changes to CPSES Emergency Classification Procedure ML20211G3441999-08-25025 August 1999 Forwards Response to NRC RAI on LAR 98-010 for Cpses,Units 1 & 2.Communication Contains No New Licensing Commitments Re Cpses,Units 1 & 2 ML20211B2861999-08-18018 August 1999 Forwards Insp Repts 50-445/99-13 & 50-446/99-13 on 990720- 23.No Violations Noted.Insp Included Implementation of Licensee Emergency Plan & Procedures During Util Biennial Emergency Preparedness Exercise ML20211C4661999-08-18018 August 1999 Discusses Proprietary Info Re Thermo-Lag.NRC Treated Bisco Test Rept 748-105 as Proprietary & Withheld It from Public Disclosure,Iaw 10CFR2.790 ML20210U3981999-08-17017 August 1999 Forwards Monthly Operating Repts for July 1999 for CPSES, Units 1 & 2,per TS 6.9.1.5.No Failures or Challenges to PORVs or SVs for Plant Occurred ML20211C0991999-08-17017 August 1999 Forwards Rev 3 to ASME Section XI ISI Program Plan,Unit 2 - 1st Interval, Replacing Rev 2 in Entirety ML20211C4571999-08-16016 August 1999 Forwards Omitted Subj Page of Contractor TER TXX-9919, Forwards Relief Request A-3,Rev 1 to Unit 1 ISI Program,Per Conversations Between NRC & Txu Electric on 9908021999-08-16016 August 1999 Forwards Relief Request A-3,Rev 1 to Unit 1 ISI Program,Per Conversations Between NRC & Txu Electric on 990802 ML20210R6561999-08-13013 August 1999 Forwards Response to NRR 990805 Telcon RAI Re License Amend Request 98-010,to Increase Power for Operation of CPSES Unit 2 to 3445 Mwth & Incorporating Addl Changes Into Units 1 & 2 TS ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20210S6411999-08-12012 August 1999 Informs That Wg Guldemond,License SOP-43780,is No Longer Performing Licensed Duties.Discontinuation of License Is Requested ML20210R2221999-08-12012 August 1999 Forwards Insp Repts 50-445/99-10 & 50-446/99-10 on 990510-0628.Violations Noted & Being Treated as Ncvs, Consistent with App C of Enforcement Policy ML20210N1101999-08-0404 August 1999 Provides Supplemental Info to Util 990623 License Amend Request 99-005 Re Bypassing DG Trips.Info Replaces Info Contained in Subject Submittal in Attachment 2,Section II, Description of TS Change Request ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML20210J2301999-08-0202 August 1999 Forwards Amend 96 to CPSES Ufsar.Replacement of FSAR Figures with Plant Process Flow Diagrams Meets Intent & Requirements of NRC Reg Guide 1.70,Rev 2 ML20210J6071999-08-0202 August 1999 Forwards line-by-line Descriptions of Changes in Amend 96 to CPSES UFSAR Transmitted by Util Ltr TXX-99166,dtd 990802. Replacment of FSAR Figures with Plant Process Flow Diagrams Meets Intent & Requirements of NRC Reg Guide 1.70,rev 2 TXX-9916, Notifies NRC That CPSES Units 1 & 2,improved TS Implemented on 9907271999-08-0202 August 1999 Notifies NRC That CPSES Units 1 & 2,improved TS Implemented on 990727 TXX-9918, Forwards CPSES 10CFR50.59 Evaluation Summary Rept 0008,for 970802-990201 & CPSES Commitment Matl Change Evaluation Rept 0003,for 970802-9906301999-08-0202 August 1999 Forwards CPSES 10CFR50.59 Evaluation Summary Rept 0008,for 970802-990201 & CPSES Commitment Matl Change Evaluation Rept 0003,for 970802-990630 ML20210K2321999-07-29029 July 1999 Forwards Insp Repts 50-445/99-12 & 50-446/99-12 on 990530-0710.No Violations Noted ML20210G5861999-07-29029 July 1999 Forwards fitness-for-duty Program Performance Data for Six Month Period of Jan-June 1999 ML20210J0121999-07-27027 July 1999 Forwards Summary of Methodology for Determination of NDE Measurement Uncertainty,In Response to Recent Discussions with NRC Re LAR 98-006 Concerning Rev to SG Tube Plugging Criteria TXX-9917, Provides Info Re Augmented Inservice Insp Plan,Which Requires Periodic Insp of Rv Head & Internals Lifting Devices at CPSES1999-07-26026 July 1999 Provides Info Re Augmented Inservice Insp Plan,Which Requires Periodic Insp of Rv Head & Internals Lifting Devices at CPSES ML20210F3121999-07-26026 July 1999 Responds to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal, ML20210D8231999-07-23023 July 1999 Forwards Safety Evaluation of Relief Requests Re Use of 1998 Edition of Subsections IWE & Iwl of ASME Code for Containment Insp ML20210D3211999-07-21021 July 1999 Provides List of Estimates of Licensing Actions,In Response to Administrative Ltr 99-02,dtd 990603 ML20210C2931999-07-21021 July 1999 Supplements 880323 Response to NRC Bulletin 88-02, Rapidly Propagating...Sg Tubes, Non-proprietary WCAP-15010 & Proprietary Rev 0 to WCAP-15009, CP Unit 1 Evaluation for Tube Vibration... Encl.Proprietary Rept Withheld ML20209H0111999-07-16016 July 1999 Forwards Relief Request C-4 to CPSES Unit 2 ISI Program for Approval ML20210C3331999-07-16016 July 1999 Forwards Exam Repts 50-445/99-301 & 50-446/99-301 on 990618- 24.Exam Included Evaluation of Six Applicants for Senior Operator Licenses ML20209H2551999-07-16016 July 1999 Forwards ISI Summary Rept for Fourth Refueling Outage of CPSES Unit 2 & Containment ISI Summary Rept for Fourth Refueling Outage of CPSES Unit 2,per ASME Boiler & Pressure Vessel Code,Section Xi,Paragraph IWA-6230 1999-09-07
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARTXX-9924, Forwards Responses to Questions by NRC Re Application for Amends to Licenses NPF-87 & NPF-89,by Incorporating Changes Increasing RWST low-level Setpoint from Greater than But Equal to 40% to Greater than But Equal to 45% of Span1999-10-22022 October 1999 Forwards Responses to Questions by NRC Re Application for Amends to Licenses NPF-87 & NPF-89,by Incorporating Changes Increasing RWST low-level Setpoint from Greater than But Equal to 40% to Greater than But Equal to 45% of Span TXX-9923, Forwards Monthly Operating Repts for Sept 1999 for CPSES, Units 1 & 2,per Plant TS 5.6.4.No Failures of Challenges to PORVs of SV for Units Occurred1999-10-15015 October 1999 Forwards Monthly Operating Repts for Sept 1999 for CPSES, Units 1 & 2,per Plant TS 5.6.4.No Failures of Challenges to PORVs of SV for Units Occurred ML20217E7951999-10-12012 October 1999 Forwards COLR for Unit 1,Cycle 8,per TS 5.6.5 ML20216J5571999-10-0101 October 1999 Provides Final Response to GL 98-01,suppl 1, Y2K Readiness of Computer Sys at Npps TXX-9922, Forwards Revised COLR, for Cycle 5 for Unit 21999-10-0101 October 1999 Forwards Revised COLR, for Cycle 5 for Unit 2 ML20212G0721999-09-24024 September 1999 Forwards Rev 4 to Augmented Inservice Insp Plan for CPSES, Unit 1. Future Changes & Revs to Unit 1 Augmented Inservice Insp Plan Will Be Available on Site ML20212H0461999-09-24024 September 1999 Forwards Rev 6 to CPSES Glen Rose,Tx ASME Section XI ISI Program Plan for 1st Interval on 990820 TXX-9921, Suppls 981221 LAR 98-010 to Licenses NPF-87 & NPF-89, Clarfying Conditions of Use Re Analytical Methods Used to Determine Core Operating Limits,Per Telcon with NRC1999-09-10010 September 1999 Suppls 981221 LAR 98-010 to Licenses NPF-87 & NPF-89, Clarfying Conditions of Use Re Analytical Methods Used to Determine Core Operating Limits,Per Telcon with NRC ML20211L9871999-09-0303 September 1999 Forwards Rev 31 to Technical Requirements Manual. All Changes Applicable to Plants Have Been Reviewed Under Util 10CFR50.59 Process & Found Not to Include Any USQs TXX-9915, Responds to 990701 & 0825 RAI Telcons Re Spent Fuel Pool Temp,Per LAR 98-008,which Requested Increase in Spent Fuel Storage capacity.Marked-up Page 4-1 of CPSES Fuel Storage Licensing Rept, Encl1999-09-0303 September 1999 Responds to 990701 & 0825 RAI Telcons Re Spent Fuel Pool Temp,Per LAR 98-008,which Requested Increase in Spent Fuel Storage capacity.Marked-up Page 4-1 of CPSES Fuel Storage Licensing Rept, Encl ML20211K2231999-08-31031 August 1999 Forwards Txu Electric Comments of Rvid,Version 2 ML20211G1081999-08-26026 August 1999 Responds to NRR Staff RAI Re Util Mar 1999 Submittal for NRC Review & Approval of Changes to CPSES Emergency Classification Procedure ML20211G7301999-08-26026 August 1999 Forwards Revs 29 & 30 to CPSES Technical Requirements Manual (Trm). Attachments 1 & 2 Contain Description of Changes for Revs 29 & 30 Respectively ML20211G3441999-08-25025 August 1999 Forwards Response to NRC RAI on LAR 98-010 for Cpses,Units 1 & 2.Communication Contains No New Licensing Commitments Re Cpses,Units 1 & 2 ML20210U3981999-08-17017 August 1999 Forwards Monthly Operating Repts for July 1999 for CPSES, Units 1 & 2,per TS 6.9.1.5.No Failures or Challenges to PORVs or SVs for Plant Occurred ML20211C0991999-08-17017 August 1999 Forwards Rev 3 to ASME Section XI ISI Program Plan,Unit 2 - 1st Interval, Replacing Rev 2 in Entirety TXX-9919, Forwards Relief Request A-3,Rev 1 to Unit 1 ISI Program,Per Conversations Between NRC & Txu Electric on 9908021999-08-16016 August 1999 Forwards Relief Request A-3,Rev 1 to Unit 1 ISI Program,Per Conversations Between NRC & Txu Electric on 990802 ML20210R6561999-08-13013 August 1999 Forwards Response to NRR 990805 Telcon RAI Re License Amend Request 98-010,to Increase Power for Operation of CPSES Unit 2 to 3445 Mwth & Incorporating Addl Changes Into Units 1 & 2 TS ML20210S6411999-08-12012 August 1999 Informs That Wg Guldemond,License SOP-43780,is No Longer Performing Licensed Duties.Discontinuation of License Is Requested ML20210N1101999-08-0404 August 1999 Provides Supplemental Info to Util 990623 License Amend Request 99-005 Re Bypassing DG Trips.Info Replaces Info Contained in Subject Submittal in Attachment 2,Section II, Description of TS Change Request TXX-9918, Forwards CPSES 10CFR50.59 Evaluation Summary Rept 0008,for 970802-990201 & CPSES Commitment Matl Change Evaluation Rept 0003,for 970802-9906301999-08-0202 August 1999 Forwards CPSES 10CFR50.59 Evaluation Summary Rept 0008,for 970802-990201 & CPSES Commitment Matl Change Evaluation Rept 0003,for 970802-990630 ML20210J2301999-08-0202 August 1999 Forwards Amend 96 to CPSES Ufsar.Replacement of FSAR Figures with Plant Process Flow Diagrams Meets Intent & Requirements of NRC Reg Guide 1.70,Rev 2 ML20210J6071999-08-0202 August 1999 Forwards line-by-line Descriptions of Changes in Amend 96 to CPSES UFSAR Transmitted by Util Ltr TXX-99166,dtd 990802. Replacment of FSAR Figures with Plant Process Flow Diagrams Meets Intent & Requirements of NRC Reg Guide 1.70,rev 2 TXX-9916, Notifies NRC That CPSES Units 1 & 2,improved TS Implemented on 9907271999-08-0202 August 1999 Notifies NRC That CPSES Units 1 & 2,improved TS Implemented on 990727 ML20210G5861999-07-29029 July 1999 Forwards fitness-for-duty Program Performance Data for Six Month Period of Jan-June 1999 ML20210J0121999-07-27027 July 1999 Forwards Summary of Methodology for Determination of NDE Measurement Uncertainty,In Response to Recent Discussions with NRC Re LAR 98-006 Concerning Rev to SG Tube Plugging Criteria TXX-9917, Provides Info Re Augmented Inservice Insp Plan,Which Requires Periodic Insp of Rv Head & Internals Lifting Devices at CPSES1999-07-26026 July 1999 Provides Info Re Augmented Inservice Insp Plan,Which Requires Periodic Insp of Rv Head & Internals Lifting Devices at CPSES ML20210F3121999-07-26026 July 1999 Responds to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal, ML20210C2931999-07-21021 July 1999 Supplements 880323 Response to NRC Bulletin 88-02, Rapidly Propagating...Sg Tubes, Non-proprietary WCAP-15010 & Proprietary Rev 0 to WCAP-15009, CP Unit 1 Evaluation for Tube Vibration... Encl.Proprietary Rept Withheld ML20210D3211999-07-21021 July 1999 Provides List of Estimates of Licensing Actions,In Response to Administrative Ltr 99-02,dtd 990603 ML20209H2551999-07-16016 July 1999 Forwards ISI Summary Rept for Fourth Refueling Outage of CPSES Unit 2 & Containment ISI Summary Rept for Fourth Refueling Outage of CPSES Unit 2,per ASME Boiler & Pressure Vessel Code,Section Xi,Paragraph IWA-6230 ML20209H0111999-07-16016 July 1999 Forwards Relief Request C-4 to CPSES Unit 2 ISI Program for Approval ML20209G0721999-07-13013 July 1999 Forwards Monthly Operating Repts for June 1999 for CPSES, Units 1 & 2,per TS 6.9.1.5.No Failures or Challenges to PORVs of SV Occurred During Reporting Period ML20209F0681999-07-0909 July 1999 Informs That Effective 990514,TU Electric Formally Changed Name to Txu Electric.Change All Refs of TU Electric to Txu Electric on Correspondence Distribution Lists ML20209E0421999-07-0909 July 1999 Forwards Response to NRC Request for Addl Info on LAR 98-010.Attachment 1 Is Affidavit for Info Supporting LAR 98-010 ML20209B6021999-06-30030 June 1999 Submits Second Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Npps. Readiness Disclosure for Reporting Status of Facility Y2K Readiness Encl ML20195J6981999-06-15015 June 1999 Provides Addl Info Related to Open Issue,Discussed in 990610 Conference Call with D Jaffe Re ISI Program Relief Request L-1 Submitted by Util on 980220 ML20196A4921999-06-15015 June 1999 Forwards Rev 30 to Physical Security Plan.Rev Withheld,Per 10CFR73.21 ML20195J0491999-06-14014 June 1999 Submits Response to RAI Re Implementation of 1.0 Volt Repair Criteria ML20195J0651999-06-14014 June 1999 Submits Response to RAI Re GL 95-07, Pressure Locking & Thermal Binding of Safety Related Power Operated Gate Valves 05000445/LER-1999-001, Forwards LER 99-001-00, Some Electrical Contacts for RCS Pressure Relief Valves Were Not Included in Surveillance Testing Procedures. New Licensing Commitments Identified in Attachment 11999-06-0808 June 1999 Forwards LER 99-001-00, Some Electrical Contacts for RCS Pressure Relief Valves Were Not Included in Surveillance Testing Procedures. New Licensing Commitments Identified in Attachment 1 ML20195F0091999-06-0808 June 1999 Forwards Response to RAI Re Units 1 & 2 ISI Program for Relief Requests E-1 & L-1.Communication Contains No New Licensing Basis Commitments Re Cpses,Units 1 & 2 ML20207E1921999-05-28028 May 1999 Submits Updated Request for NRC Staff to Review & Approve Certain Changes to CPSES Emergency Plan Submitted in 981015 & s Prior to Changes Being Implemented at CPSES ML20207E1711999-05-28028 May 1999 Supplements 990526 LAR 99-004 as TU Electric Believes Extingency Exists in That Proposed Amend Was Result of NOED Granted to Prevent Shudown of CPSES Unit 1 ML20207D9841999-05-26026 May 1999 Requests That NRC Exercise Enforcement Discretion to Allow Cpses,Unit 1 to Remain in Mode 1,power Operation,Without Having Performed Svc Test,Per SR 4.8.2.1d on Unit 1 Battery BT1ED2 ML20195B6351999-05-25025 May 1999 Submits Response to RAI Re GL 95-07, Pressure Locking & Thermal Binding of Safety Related Power Operated Gate Valves TXX-9912, Forwards Txu Electric (Formerly TU Electric) CPSES Emergency Preparedness Exercise Scenario Manual for 990721-22,Graded Exercise1999-05-21021 May 1999 Forwards Txu Electric (Formerly TU Electric) CPSES Emergency Preparedness Exercise Scenario Manual for 990721-22,Graded Exercise ML20206U1981999-05-20020 May 1999 Forwards Form 10K Annual Rept,Per 10CFR50.71(b). Communication Contains No New Licensing Basis Commitments Re Cpses,Units 1 & 2 ML20196L1931999-05-20020 May 1999 Forwards MOR for Apr 1999 for Cpses,Units 1 & 2.During Reporting Period There Have Been No Failures or Challenges to Power Operated Relief Valves or Safety Valves TXX-9911, Forwards non-proprietary & Proprietary Responses to RAI Re LAR 98-010 by Incorporating Attached Changes Into CPSES Unit 2 OL NPF-89 & CPSES Units 1,OL NPF-87 & 2 TS to Increase Licensed Power.W & Caldon Proprietary Responses Withheld1999-05-14014 May 1999 Forwards non-proprietary & Proprietary Responses to RAI Re LAR 98-010 by Incorporating Attached Changes Into CPSES Unit 2 OL NPF-89 & CPSES Units 1,OL NPF-87 & 2 TS to Increase Licensed Power.W & Caldon Proprietary Responses Withheld 1999-09-03
[Table view] Category:UTILITY TO NRC
MONTHYEARML20059K6141990-09-17017 September 1990 Submits Documentation of 900906 Telcon Re Addl Util Candidate for Licensed Operator Generic Fundamentals Exam Section ML20059G8761990-09-10010 September 1990 Forwards Rev 8 to Physical Security Plan.Rev Withheld (Ref 10CFR73.21) ML20059F8461990-09-0404 September 1990 Responds to NRC Re Violations Noted in Insp Repts 50-445/90-22 & 50-446/90-22 on 900606-0705.Corrective action:OPT-467A Changed to Provide Addl Prerequisite Info Re Solid State Protection Sys Switch Lineup During Testing ML20059E4981990-08-31031 August 1990 Forwards Revised Radial Peaking Factor Limit Rept for Cycle 1 Per Tech Specs Through Amend 1 & ML20059E4201990-08-30030 August 1990 Forwards Objectives & Guidelines for 1990 Emergency Preparedness Exercise Scheduled for 901113 ML20028G8281990-08-29029 August 1990 Forwards Comanche Peak Unit 1 Semiannual Radioactive Effluent Release Rept,900403-0630 & ODCM TXX-9030, Forwards Endorsements 40 & 4 to Nelia Policy NF-274 & Maelu Policy M-90,respectively & Endorsements 10,11,12,13,14 & 15 to Maelu Policy MF-1311990-08-27027 August 1990 Forwards Endorsements 40 & 4 to Nelia Policy NF-274 & Maelu Policy M-90,respectively & Endorsements 10,11,12,13,14 & 15 to Maelu Policy MF-131 ML20059F4381990-08-23023 August 1990 Forwards Public Version of Revised Emergency Plan & Corporate Emergency Response Procedures,Consisting of Rev 1 to EPP-313,Rev 7 to CERP-101,Rev 7 to CERP-102 & Revised Forms.W/Dh Grimsley 900906 Release Memo TXX-9029, Responds to NRC Re Violations Noted in Insp Repts 50-445/89-57 & 50-446/89-57.Corrective Actions:Storage Facilities for Instrumentation & Control Work Packages Improved to Provide Acceptable Protection for Documents1990-08-20020 August 1990 Responds to NRC Re Violations Noted in Insp Repts 50-445/89-57 & 50-446/89-57.Corrective Actions:Storage Facilities for Instrumentation & Control Work Packages Improved to Provide Acceptable Protection for Documents ML20058P0571990-08-13013 August 1990 Forwards, Comanche Peak Steam Electric Station Unit 1 Control Room Simulator 10CFR55 Certification Initial Rept ML20058N2311990-08-0909 August 1990 Forwards First Half 1990 fitness-for-duty Program Performance Data,Per 10CFR26.71(d).Point of Contact for Personnel,Random Testing Program Results & Confirmed Positive Tests Summary & Mgt Summary Included in Data ML20059A5831990-08-0404 August 1990 Responds to Info Request Made During 900802 Meeting Re Inadvertent Safety Injections on 900726 & 30 & Results of 100% Power Plateau Testing TXX-9024, Provides Status of Exam Activity & Revised Completion Schedule for Portion of Exam.Util Deferred Preoperational Testing of Facility Spent Fuel Pool Cooling & Cleanup Sys Until Prior to First Off Loading of Spent Fuel1990-08-0303 August 1990 Provides Status of Exam Activity & Revised Completion Schedule for Portion of Exam.Util Deferred Preoperational Testing of Facility Spent Fuel Pool Cooling & Cleanup Sys Until Prior to First Off Loading of Spent Fuel TXX-9022, Forwards Detailed Descriptions of Changes in Amend 79 to FSAR for Comanche Peak Steam Electric Station1990-07-31031 July 1990 Forwards Detailed Descriptions of Changes in Amend 79 to FSAR for Comanche Peak Steam Electric Station TXX-9027, Responds to NRC Re Violations Noted in Insp Repts 50-445/90-19 & 50-446/90-19.Corrective Action:Specific Activity within Tech Spec Limits.No Further Corrective Action Required1990-07-30030 July 1990 Responds to NRC Re Violations Noted in Insp Repts 50-445/90-19 & 50-446/90-19.Corrective Action:Specific Activity within Tech Spec Limits.No Further Corrective Action Required ML20055J1571990-07-27027 July 1990 Submits Info Re Replacement of Borg-Warner/Intl Pump,Inc Check Valve Swing Arms,Per .Swing Arms in ASME Code Class 2 Check Valves Will Be Replaced During First Refueling Outage ML20056A0461990-07-24024 July 1990 Requests Regional Waiver of Compliance for Containment Pressure Transmitter 1-PT-934 During Coming Outage TXX-9023, Responds to NRC Bulletin 90-001, Loss of Fill-Oil in Transmitters Mfg by Rosemount. No Subj Transmitters in Existence at Facility1990-07-18018 July 1990 Responds to NRC Bulletin 90-001, Loss of Fill-Oil in Transmitters Mfg by Rosemount. No Subj Transmitters in Existence at Facility ML20055G6351990-07-17017 July 1990 Submits Results of Remote Shutdown Panel Environ Survey ML20055F9391990-07-13013 July 1990 Advises That Operators Have Gained Significant Experience in Operating Plant Under Wide Range of Conditions & Have Demonstrated Necessary Proficiency to Safely Operate Unit ML20055F9371990-07-13013 July 1990 Submits Info Re Revised Acceptance Criteria for THERMO-LAG Fire Barrier,Per 900705 Telcon.On Exposure to Heat Flux at Surface of Barrier,Listed Mechanisms Activated.Fire Testing Demonstrates That Panels Qualified W/Variation in Thickness ML20044A7001990-06-26026 June 1990 Responds to Generic Ltr 90-04, Request for Info on Status of Licensee Implementation of Generic Safety Issues Resolved W/Imposition of Requirements or Corrective Actions. Util Will Implement for Unit 2 Activities Performed for Unit 1 ML20044A1411990-06-20020 June 1990 Forwards Endorsements 4 & 5 to Nelia Certificate N-90, Endorsements 5 & 6 to Maelu Certificate M-90 & Endorsements 34,35,36,37,38 & 39 to Nelia Policy NF-274 ML20043H7031990-06-18018 June 1990 Discusses Mod/Rework to Auxiliary Feedwater Sys Check Valves Mfg by Bw/Ip Intl,Inc.All But One Affected Check Valve modified.Motor-driven Auxiliary Feedwater Pump Discharge Valve Check Valve Body Replaced ML20043H2181990-06-15015 June 1990 Forwards Response to 900515 Request for Addl Info on Emergency Preparedness.Ongoing Emergency Preparedness Programs Address Concerns Raised by Citizens for Fair Util Regulation ML20043G3131990-06-15015 June 1990 Forwards Addl Info Re Pressurizer Surge Line Thermal Stratification & leak-before-break Evaluation & Nonproprietary Suppl 3 to WCAP-12247, Supplementary Assessment... & Proprietary Suppl 3 to WCAP-12248 ML20043C5671990-06-0101 June 1990 Discusses Identification of Slave Relays Tested Using Alternative Methodology,Per 900402 Commitment.Encl Tabulation Identifies Test Type,Applicable Procedures & Equipment & Impact of Improper Documentation ML20043E7131990-06-0101 June 1990 Responds to NRC 900517 Notice of Violation & Imposition of Civil Penalty in Amount of $25,000.Corrective Action:Qc Mgt Counseled Level III Inspector & QC Supervisor on Importance of Good Communications W/Receipt Inspectors ML20043C4501990-05-31031 May 1990 Advises That Util Revised FSAR Section 15.1.2 & Question/ Response 32.108,per 10CFR50.59 ML20043B5471990-05-25025 May 1990 Provides Status of Facility Design & Const Activities,Per Request.Detailed Design Work Will Resume in June 1990.Const Activities Expected to Increase Signficantly by Jan 1991 ML20043B5481990-05-23023 May 1990 Provides Clarification of 890710 Commitment Re Power Ascension Program.Cooldown Portion of Remote Shutdown Test Performed During Preoperational Testing,Per FSAR & Reg Guide 1.68.2 ML20043D1711990-05-21021 May 1990 Forwards Public Version of Revised Emergency Plan Procedures,Including Rev 8 to EPP-109,Rev 7 to EPP-112,Rev 4 to EPP-116 & Rev 6 to EPP-121.W/DH Grimsley 900604 Release Memo TXX-9018, Advises of Completion of Implementation of Requirements of Generic Ltr 89-13, Svc Water Sys Problems Affecting Safety- Related Equipment1990-05-21021 May 1990 Advises of Completion of Implementation of Requirements of Generic Ltr 89-13, Svc Water Sys Problems Affecting Safety- Related Equipment ML20043B0981990-05-15015 May 1990 Forwards Radial Peaking Factor Limit Rept for Cycle 1, Containing F(Xy) Limits for All Core Planes Containing Bank D Control Rods & All Unrodded Core Planes ML20042F2851990-05-0303 May 1990 Supplemental Response to Generic Ltr 90-01, Request for Voluntary Participation in NRC Regulatory Impact Survey. ML20042F3861990-05-0303 May 1990 Responds to NRC 900410 Ltr Re Violations Noted in Insp Repts 50-445/90-10 & 50-446/90-10 on 900206-07 & 0226-0302. Corrective Action:Memo Issued Emphasizing That Discrepancies Should Be Brought to Attention of Site Organizations ML20042F3021990-05-0202 May 1990 Responds to NRC 900402 Ltr Re Violations Noted in Insp Repts 50-445/89-23 & 50-446/89-23.Util Does Not Believe That Circumstances Described in 900402 Ltr Constitutes Violation of 10CFR50.9(a) ML20042F3051990-05-0202 May 1990 Provides Revised Response to Generic Ltr 88-17 Re Loss of DHR ML20042E4581990-04-12012 April 1990 Responds to Inconsistencies in Terminology & Labelling Identified During NRC 890118 & 19 Audit of Facility Dcrdr. Util Believes Control Room Inventory Requirement of Suppl 1 to NUREG-0737,satisfied ML20042E0701990-04-10010 April 1990 Discusses 900305 Meeting W/Nrc in Rockville,Md Re Offsite Power Availability for Automatic Switch Co Solenoids for MSIV in Event of Nonmechanistic Main Steam Line Crack in Superpipe Region ML20012F5011990-04-0303 April 1990 Forwards Corrections to 891016 Response to Emergency Diesel Generator Engine Requirements.Lengths of Two Pairs of Bolts Above Crankpin Shall Be Measured Ultrasonically Before Detensioning & Disassembly of Bolts ML20012F3221990-04-0202 April 1990 Discusses ESF Sys Slave Relay Alternate Test Methodology. Implementation Schedule for Design Mods to Relay Will Be Submitted by 900601 ML20042D8081990-03-29029 March 1990 Forwards Proposed Change to FSAR Section 13.4 Re Station Operations Review Committee.Similar Change Submitted in 900328 Ltr for Chapter 6 of Facility Tech Specs ML20012F0411990-03-28028 March 1990 Forwards marked-up Pages of Facility Draft Tech Specs & Bases (NUREG-1381) Provided W/Low Power OL ML20012E6051990-03-27027 March 1990 Forwards Endorsements 1-4 to Maelu Certificate M-90, Endorsements 1-9 to Maelu Policy MF-131,Endorsements 29-33 to Nelia Policy NF-274 & Endorsements 1-3 to Nelia Certificate N-90 ML20012E6531990-03-27027 March 1990 Provides Final Response to Reporting Requirement 2 of NRC Bulletin 88-008, Thermal Stresses in Piping Connected to RCS, for Unit.Nde Requirements of Action 2 Not Considered Applicable to Unit ML20012E1911990-03-23023 March 1990 Forwards Comanche Peak Steam Electric Station Unit 1 Cycle 1 Startup Physics Tests Control Rod Worth Predictions Utilizing TU Electric Control Rod Swap Methodology. ML20012E1581990-03-23023 March 1990 Clarifies 880624 Response to NRC Generic Ltr 88-05, Boric Acid Corrosion of Carbon Steel Reactor Pressure Boundary Components in PWR Plants. ML20012D0201990-03-19019 March 1990 Advises That Allegations Provided to NRC by Former Util Employee Unsubstantiated,Based on Investigation by Util Safeteam Organization ML20012E2181990-03-19019 March 1990 Responds to Generic Ltr 89-19 Re USI A-47, Safety Implication of Control Sys in LWR Nuclear Power Plants. Util Determined That Loss of safety-related Inverters 1 or 2 Would Involve Coincidental Opening of Main Feedwater Valves 1990-09-04
[Table view] |
Text
. Log # TXX-5049 File # 10010 TEXAS UTILITIES GENERATING COMPANY SKYWAY TOWER . 400 NORTH OLIVE STREET, IA 51 DALLAS. TEXAS 75301 October 7, 1986 Ec%"dcM.UM, Director of Nuclear Reactor Regulation Attn: Vince S. Noonan, Director Comanche Peak Project Division of Licensing U. S. Nuclear Regulatory Commission Washington, D. C. 20555
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET NOS. 50-445 and 50-446 FSAR AMENDMENT SUPPLEMENTAL INFORMATION
Dear Mr. Noonan:
By letter TXX-5006 dated September 12, 1986, TUGCo transmitted to the NRC staff an advance copy of a future CPSES FSAR amendment which incorporates changes related to the Stone & Webster Engineering Corp (SWEC) piping and pipe support requalification effort. We believe these changes represent a significant improvement to our piping and pipe support analyses and are in l conformance with currently accepted industry practice and NRC staff guidance.
l In the attachment to this letter we provide additional information related to these changes. Each change has been identified and an explanation is provided regarding the bases for the change. The changes are primarily of three types:
clarifications to the existing FSAR text, modifications of existing commitments, and new descriptions (e.g. description of computer codes used by SWEC). There are nine substantive modifications to previous commitments. Five l of these modifications result in analyses which are more conservative than required by our previous commitments. These five modifications are set forth l in the following FSAR pages:
1 I
3.78-58a -- use of methodology described in NUREG/CR 1161 to account for modal contribution above cut-off, 3.78-63 -- torsional effects of eccentric masses, 3.9B-23 -- functional capability, 3.98-32 -- upgrade of fluid transient analysis methods in conformance with Appendix 0 of ASME Section III,and, Table 3.98-1B -- revised to reflect updated loading combinations.
1 The remaining four modifications are:
3.78-4a -- use of Code Case N-411 damping values in lieu of R.G.1.61 values, 3.78-58b -- determination of the number of earthquake cycles, 3.9B-4 -- removal of SSE from emergency loading combination, and, y0G885 $$0 5 wu or raus vrnmre er.rcrme mwwv 1
TXX-5049 October 7, 1986 Page 2 3.98-22 -- method of combinir,g dynamic responses.
While these four changes cannot be considered to be more conservative than previous commitments, they all comply with current NRC staff guidance, including the Standard Review Plan (SRP), NUREG-0800. In addition, the modifications are consistent with SWEC practices and have been accepted by the NRC staff on other dockets.
Very truly yours, W. G. Counsil By:, ,~'. -
G.S.'Keeley /
Manager NucleerTdynsing BSD/amb Attachment c - NRC (0 + 40 copies)
C. Trammell l
l l
l l
i l
l TXX-5049 -
i October 7, 1986 Attachment Page.1 FSAR Page (as amended) 3.78-4a Use of Code Case N-411 damping values in lieu of R.G.1.61 values
- _0n a technical basis some damping values from Code Case N-411 are lower and some are higher than R.G.1.61 values. The N-411 damping, which was developed by the Pressure Vessel Research Committee (PVRC), represents an upgrading of nuclear plant qualification technology. This Code Case has been approved for general usage by the NRC in R.G. 1.84 Revision 24 and has been used by more than twenty nuclear plants. A request to use Code Case N-411 was submitted to the NRC by TUGCo letter TXX-4160 dated November 18, 1985 with additional justification provided in TXX-4651 dated December 17, 1985. It was approved for use at CPSES in i
' NRC letter from V.S.Noonan to W.G.Counsil dated March 18, 1986.
The conditions of approval require FSAR documentation of all stress problems using this Code Case. These stress problems will be identified in the FSAR upon the completion of the SWEC requalification effort.
i 3.7B-58a Use of the methodology described in NUREG/CR 1161 to account for modal contribution above cut-off frequency -- The current-FSAR
} states that the number of modes chosen is adequate provided that either, (1) inclusion of additional modes does not result in more than a 10 percent increase in responses, or (2) based upon evaluation of the dynamic participation factors, all significant modes have been included. The NUREG methodology assures participation of high frequency seismic responses in the zero period acceleration (ZPA) region of the spectra. Both methods are technically acceptable, however, the NUREG/CR 1161 methodology is an improvement because it is more direct and efficient. This is a more conservative methodology than is currently in the FSAR.
I 3.7B-58b Determination of the number of earthquake cycles -- This change i
revises the maximum amplitude loading cycles for OBE from 600 ,
cycles to 50 cycles and for SSE from 120 cycles to 10 cycles. It '
also deletes the paragraph which describes how the number of maximum amplitude loading cycles is determined since this was based on Gibbs & Hill methodology and is not appropriate for the SWEC requalification effort. The number of cycles specified by this change is applicable only to Class 2 and 3 piping system components. The number of earthquake cycles is in conformance with regulatory guidance (NUREG-0800, Section 3.7.3, Subsection II.2.b and Section 3.9.2, Subsection II.2.b) and is consistent with SWEC methodology on other dockets.
i l
L 3.78-61 Anchor movements -- This is a clarification. The words " slow movement" were changed to " anchor movement". The word " slow" is not sufficiently descriptive. It is clarified to refer to either L thermal or seismic displacement applied to the piping anchor at L the terminal location.
TXX-5049 -
October 7, 1986 Attachment Page 2 FSAR Page (as amended) 3.78-62b Equation (8) -- Typographical correction.
3.7B-62c Equation (9) -- Typographical correction.
3.78-62d Occasional loads included in emergency load combination -- This clarifies the definition of occasional loads (for the emergency loading combination using the Simplified Design Method as described in FSAR Section 3.78.3.8.1.1) to consist of: jet impingement loads, dynamic emergency events and pipe impact loads.
3.7B-62e Removal of sentence describing the combination of vertical and horizontal loads -- This is a clarification in that the sentence was apparently inadvertently included previously in this location.
Combining of vertical and horizontal loads is discussed in FSAR section 3.78.2.1.2.
3.7B-62f Changed "directly" to " absolutely" -- This is a clarification in that the term " absolutely" is more commonly used to refer to the absolute summation method used in this analysis.
3.78-63 Torsional effects of eccentric masses -- The proposed change differs in two ways from the previous wording. First, the phrase "all six degrees of freedom are taken into account" has been removed for clarity. When an eccentric mass is modeled in the piping analysis, whether or not it may be considered rigid, the mass is excited by the amplified response spectra which act in the l three translational orthogonal directions. Rotational inputs are not provided and, thus, only three degrees of freedom are accounted for directly. However, since the eccentric mass is offset from the pipe centerline, the three rotational degrees of freedom are accounted for indirectly by a force acting at a moment arm from the pipe centerline. The intent reflected in the previous FSAR language is unchanged. Second, as part of the requalification l
effort, all eccentric masses are being considered in piping analyses. In addition to eccentric valves, this approach includes other support mass either resting on the pipe or attached
, integrally to it. Inclusion of this support mass in the piping l analysis responds to external concerns and is more conservative I than what had previously been done.
3.78-71 Additional reference (NUREG/CR-1151) included -- See discussion under item 3.7B-58a.
3.7B(A)-1 References new Appendix 3B for additional computer codes --
Information only. The contents of this appendix are discussed l under Appendix 3B.
TXX-5049 -
October 7,1986 Attachment Page 3 FSAR Page (as amended) 3.9B-4 Removal of SSE from emergency loading combination -- This change is being applied to ASME Class 2 and 3 piping systems and components, and to Class 1, 2 and 3 pipe supports. This change is also applicable to all piping and supports analyzed by SWEC for the IE Bulletin 79-14 program. Application of this revision is in compliance with NUREG-0800, Appendix A, and is consistent with the methodology used in CPSES NSSS (Class 1) loading combinations, and with SWEC methodology used on more than eight dockets.
3.98-5 References new Appendix 3B for additional computer codes --
Information only. The contents of the Appendix are discussed under Appendix 3B.
3.9B-11 Removal of FSAR restriction that prevents use of plastic analysis
& 3.98-12 for code components -- This is not a commitment to use plastic analysis. Any specific usage will be in accordance with the ASME Code and will be submitted to the NRC staff for approval as required.
3.98-20 ASME Code Class 2 and 3 Components and Component Supports --
3.9B-21 The proposed change specifies the Code of record for Class 2 and 3 piping systems and supports. It expressly invokes NA-1140 for use of later Code Editions and Addenda and also references the plant specifications for the location of details relating to Editions, Addenda and Cases used for Class 2 and 3 piping systems and supports. These words were added for information to describe existing practice.
3.9B-22 Method of combining dynamic responses -- Substitutes SRSS method for absolute summation method for combining peak dynamic responses of piping systems due to seismic, LOCA, and/or occasional loads.
This change applies to ASME Class 2 and 3 piping and Class 1, 2 and 3 pipe supports. The SRSS combination of SSE and LOCA responses is in accordance with the methodology of NUREG-0484
" Methodology for Combining Dynamic Responses", (May 1980). The SRSS method for combining water hammer events (occasional loads) with earthquakes and plant dynamic events is also an acceptable method in NUREG-1061, " Evaluation of Other Dynamic Loads and Load Combinations", (Volume 4, January 1985). Application of this change is consistent with SWEC methodology used on more than eight dockets and consistent with the methodology used on CPSES NSSS (Class 1) piping. In addition this change improves the overall plant design by eliminating unnecessary pipe supports which will minimize plant maintenance and reduce personnel exposures consistent with ALARA considerations.
.TXX-5049 October 7,1986 Attachment Page 4 FSAR Page (as. amended) 3.98-23 Functional capability -- Additional requirements imposed for analysis of certain essential systems which result in additional conservatism. These requirements are in accordance with NUREG-0800, Section 3.9.3, Appendix A and assure the operability of essential piping systems during and after a plant accident condition.
3.98-31 Pressure relief devices -- editorial change to the title of. this section.
3.9B-32 Upgrade of fluid transient analysis methods for pressure relieving devices in conformance with Appendix 0 of ASME Section III -- R.G. 1.67 (the previous CPSES commitment) was superseded by Appendix 0 of the ASME Code Section III, by NRC letter from Robert Minogue dated April 15, 1983. For open systems, the primary differences are that Appendix 0 mandates that equation (9) of NC (or ND) 3652 of the ASME Code,Section III be satisfied and specifies additional requirements for safety valve arrangement and dimensions.
3.98-33 Closed system -- The proposed revision for closed discharge systems clarifies this Section by providing more detail of the design considerations of a closed system. Two specific changes are of note. First, the previous method for computing the transient hydraulic forces has been revised to more accurately consider the dynamic effects of transient fluid flow. Specifically, forces attributed to these effects, previously accounted for by the factor K', are now computed directly in the SWEC methodology.
Second, the statement that a support will be provided for each straight leg of discharge piping has been eliminated. The need for supports, including those for discharge piping, is determined by analysis. When analysis determines that such a support is required, it is provided. Unnecessary supports have been shown to be detrimental to piping system performance.
3.9B-34 Component Supports --
thru-37 This clarifies the existing section. The clarification includes:
renumbering items in 3.9B.3.4.1; reformatting Section 3.98.3.4 for consistency and ease of locating areas of interest; correcting a referenced Code paragraph from NF-3320 to NF-3230 ; further specifying a referenced Code paragraph from NF-3231 to NF-3231.lb; replacing existing paragraph under linear supports, faulted condition, to more clearly define allowable stresses.
3.98-40 Additional references included -- Information only.
TXX-5049 . -
October 7,1986 Attachment Page 5 FSAR Page (as amended)
Table Removal of SSE from emergency load combination --
3.98-1A See item 3.9B-4 discussion Table Revised to reflect updated loading combinations -- The Normal 3.98-1B condition has been expanded to include Testing; specifically, preoperational Containment Structural Integrity Pressure Test and subsequent Containment Integrated Leak Rate Test. In addition, thermal anchor movements experienced during Normal conditions are now explicitly included. These changes are clarifications to define more precisely the Normal / Test condition. The Upset condition has been revised to explicitly include thermal anchor movements. " Single non-repeated anchor movements due to building settlement" has been deleted since this is not a parameter that is considered significant for piping analyses. The changes to the Upset condition are clarifications to better define the SWEC load combination criteria. The Emergency condition has been revised to delete SSE (see item 3.98-4). The Faulted condition has been expanded to include temperature, thermal anchor movements, containment displacements and SSE anchor movements. These expanded loading combinations apply only to piping systems whose normal function is to prevent or mitigate the consequences of events associated with a plant faulted condition (note 8). Note 8 is a clarification of the previous note 8 to better explain to which systems the lower allowables apply. Notes 10,11 and 12 were also added for clarity. With the exception of deleting SSE from the emergency loading combination, the changes to this table result in more conservative loading combinations.
Table Revised to reflect updated loading combinations -- Adds thermal 3.98-1C and containment pressurization loads to the Testing condition; Deletes SSE from the Emergency condition (see item 3.9B-4);
defines SSE in the Faulted condition; adds containment anchor movement to the Faulted condition; deletes note 1 for clarification and renumbers the remaining notes. The additions make this table consistent with Table 3.9B-1B.
Table Removes reference to Experimental Stress Analysis from types of 3.98-10, analysis performed.--Experimental Stress Analysis is an optional and 3.98-1E analysis allowed by the Code but was never used at CPSES. It was removed from these tables for clarity.
Appendix 3B New appendix describing all computer codes along with their verifications used by SWEC for requalification of Class 2 and 3 piping and Class 1, 2 and 3 pipe supports. All codes listed in this appendix have been used on other dockets by SWEC. All but three codes have been referenced in plant FSARs. The three unreferenced codes are merely utility codes (data processing and/or computational) which are not required to be listed in the FSAR but are listed for completeness.
. .