TXX-3382, Submits Response Schedule for SER Open Items
| ML20010B186 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 08/05/1981 |
| From: | Schmidt H TEXAS UTILITIES SERVICES, INC. |
| To: | Tedesco R Office of Nuclear Reactor Regulation |
| References | |
| TXX-3382, NUDOCS 8108140196 | |
| Download: ML20010B186 (4) | |
Text
_ _ _ _ _ _ _ _
Log # TXX-3382 TEXAS UTILITIES SERVICES LNC.
File # 10010 2001 HRY AN TOW EH = DALt AM. THXAH 76201 August 5, 1981 Jg b
J-Mr. Robert L. Tedesco AUG 131981* $
Assistant Director for Licensing i 7 Division of Licensing 9
U. S. Nuclear Regulatory Comission-
"* O 7
Washington, D.C.
20555 c3 A
g
SUBJECT:
COMANCHE PEAX STEAM ELECTRIC STATION DOCKET NOS. 50-445 AND 50-446 OPEN ITEMS RESPONSE SCHEDULE
Dear Mr. Tedesco:
4 Pursuant to your request is our schedule for the submittal of responses on the items identified in Section 1.7 (Outstanding Issues) of the CPSES Safety Evaluation Report.
Subject Response Schedule (1) SSI Dam Resistance to Weathering Resolved (2) SSI Monitoring for Sediment 8/14/81 (3) Backfill & Bedding Soil Design Basis for Cyclic-Strength Criteria 8/14/81 (4) Conformance to Regulations 8/14/81 (5) Probability Analysis, Turbine Missiles Response Submitted FSAR Amendment 24 (6) Pipe Break Analysis Outside Containment 9/82 (7) PSI, ISI for Pumps and Valves 6/82 (8) Stress Limits, Chap. 2 & 3 Pipe Bends Meeting to be Scheduled and Elbows Week of 8/17/81 (9) Seismic & Dynamic Qualifications 7/82 4
(10) Environmental Qualification 7/82 (11) Hafnium Neutron Absorber Material 8/14/81 8108140196 810805 O
J li 0, PDR ADOCK 05000445 E
PDR-L
. Subject Response Schedule (12) Low-Temp. Overpressure Protection Meeting to be Scheduled Week of 8/10/81 (13) PSI-ISI for 10CFR50.55a(g)
Response Submitted (14) Fracture Toughness Unit 2 RPV 6/83 (15) Steam Generator Secondary Water Chemistry
.8/21/81 (16) Transfer of ECCS from Injection to.
Meeting to be Scheduled Recirculation Week of 8/10/81 (17) Volume Control Tank - I & C Response Submitted (18) Transfer, Containment Spray from Meeting to be Scheduled Injection to Recirculation Week of 8/10/81 (19) Remote Shutdown Capability Resolved (20) Common Electrical Sources or Malfunctions-Response Submitted Central System Failures (21) Environmental Qualification, High-Energy 9/81 l
Line 8reaks (22) Site Visit, Power System Design Completed 14-17 July 81 (23) Handling of Heavy Loads NUREG-0612 8/14/81 (24) Fire Protection 8/14/81 l
l (25) Additional Storage, #2 Solid Waste 8/14/81 (26) Site Vis:t, Organization & Qualification To be Scheduled (27) Emergency Plan 8/27/81 (28) Security Plan & Training Rerponse Submitted (29) Q-List 8/31/81 l
(30) TMI Action Plan I
(a) Operating & Support Personnel Meeting Scheduled 8/6/81 I.A.1.3 I.B.1.2 1
1.
i
-.___,_,,c.-
3-Sebject Response Schedule (b) Operating Procedures Meeting Scheduled I.C.1 8/6/81 I.C.8 (c) Control Room Design 9/82 I.D.1 (d) Consideration of Degraded Cores 9/15/81 II.B.2 Plant Shielding (e) RCS Relief & Safety Valves Hote 1 II.D.1 (f) I&C II.F.1 8/31/81 II.F.2 1/82 (g) Mitigate LOCA Note 1 II.K.2.13 II.K.2.17 II.K.3.1 II.K.3.2 II.K.3.11 (h) NRC & Licensee Preparedness 8/27/81 III.A.1.1 III.A.1.2 III.A.2 (i) Radiation Protection 8/25/81 III.D.1.1 III.D.3.3 NOTE 1 - These items will be responded to using Westinghouse Owner's Group Generic Information ;dapted for CPSES. An industry wide schedule has been developed to respond to these issues.
If you have any questions, please call.
Sincerely, H. C. Schmidt JSM: tis
.,-mr
--._.c.
,.-m
_.,,.,-_,_-,._c..
...--._,.,,..,,,.y__
...... ~. - -.. -.... -..
(
4,.
1
- i. -
i cc:
J. T. - Merritt
-J.-C.'Kuykendall R. D. Calder.
j-R.~A. Jones ~-
- R.~ E. Ballard i
A.~ T. Parker
[-
N. S. Reynolds v
j' J..B. George-
-B. R. Clements I;
+
i 1
2 1
I l
i
> g i
.~
t-l 1
4 1
h 6
3-I-
i i'
t b
i i
i
+
r a
+
i-
- t i
i u
1 i
i L
,,,-_e._,,,,,,,,,.,~,wn,moymm.,.y_,,,,,-,,.,,,,.,...,,
w-wr%....,m_.
.__..,.,,...--w,.