TAC:MB1402
From kanterella
(Redirected from TAC:MB2872)
Jump to navigation
Jump to search
Request for: Open | |
Questions Answers Results
Other: L-PI-03-016, Response to Opportunity for Comment on Task Interface Agreement (TIA) 2001-10, Design Basis Assumptions for Ability of Prairie Island, Unit 2, Emergency Diesel Generators to Meet Single-Failure Criteria for External Events, ML013480323, ML020020074, ML020020108, ML020030002, ML020410002, ML020570514, ML021060641, ML021070317, ML021140405, ML021140426, ML021610096, ML021990405, ML022140006, ML022600292, ML023290377, ML023640310, ML031010026, ML032040412, ML050900176, ML051030051 | |
| From | Millstone | [Open (634)] | [Closed (494)] Dresden | [Open (357)] | [Closed (241)] Browns Ferry | [Open (399)] | [Closed (279)] Perry | [Open (225)] | [Closed (163)] Indian Point | [Open (380)] | [Closed (186)] Arkansas Nuclear | [Open (444)] | [Closed (284)] Susquehanna | [Open (267)] | [Closed (213)] Prairie Island | [Open (330)] | [Closed (196)] Cook | [Open (303)] | [Closed (231)] Quad Cities | [Open (344)] | [Closed (223)] LaSalle | [Open (291)] | [Closed (196)] |
[list all from site]The following query condition could not be considered due to this wiki's restrictions on query size or depth: <code> [[:05000237]] OR [[:05000247]] OR [[:05000249]] OR [[:05000254]] OR [[:05000259]] OR [[:05000260]] OR [[:05000265]] OR [[:05000282]] OR [[:05000296]] OR [[:05000306]] OR [[:05000313]] OR [[:05000315]] OR [[:05000316]] OR [[:05000373]] OR [[:05000374]] OR [[:05000387]] OR [[:05000388]] OR [[:05000423]] OR [[:05000440]] OR [[:05000441]] </code>. | |
MONTHYEARML0134803232002-01-0404 January 2002
[table view]Task Interface Agreement 2000-18, Design-Basis Assumptions for Non-Seismic Piping Failures at the Perry Plant ML0200201082002-01-16016 January 2002 Opportunity for Comment on TIA 2001-04, Design-Basis Reliance on Non-Seismic and Non-Safety Related Equipment ML0200300022002-01-16016 January 2002 Opportunity for Comment on TIA 2001-10, Design Basis Assumptions for Ability of Prairie Island, Units 2, Emergency Diesel Generators to Meet Single Failure Criteria for External Events ML0200200742002-01-18018 January 2002 Opportunity for Comment on TIA 2001-02, Design Basis Assumptions for Non-Seismic Piping Failure ML0204100022002-02-11011 February 2002 Report on the Status of Open TIAs Assigned to NRR ML0208702382002-03-13013 March 2002 Response to Request for Additional Information (RAI) Regarding Technical Specification (TS) Change 01-10, One-Time Frequency Extension for Type a Test (Containment Integrated Leak Rate Test (Cilrt)) ML0208003112002-03-18018 March 2002 Day Response to Order for Interim Safeguards Security Compensatory Measures ML0210100662002-04-0909 April 2002 TSC 01-10 - TVA Response to RAI ML0211404052002-04-11011 April 2002 Additional Information for Technical Specification (TS) Change 01-10, One-Time Frequency Extension for Type a Test (Containment Integrated Leak Rate Test (Cilrt)) ML0210703172002-04-17017 April 2002 Memo to Raghavan from Manoly, Response to Task Interface Agreement (TIA 2001-15) for D. C. Cook, Units 1 and 2 ML0210606412002-05-0101 May 2002 Task Interface Agreement (TIA) 2001-07 from Region III Regarding Quad Cities Maintenance Rule (MR) Issues ML0205705142002-05-0606 May 2002 Response to Task Interface Agreement - TIA 2001-12, Licensing Bases for the Standby Liquid Control System ML0212904652002-05-10010 May 2002 Meeting with Nuclear Management Company, LLC to Discuss the Aspects of Security Orders ML0215504192002-05-10010 May 2002 Response to Draft NRR Position on TIA 2001-04, Design Basis Reliance on Non-Seismic and Non-Safety Related Equipment ML0215504132002-05-10010 May 2002 Response to Draft NRR Position on TIA 2001-02, Design Basis Assumptions for Non-Seismic Piping Failure ML0211404262002-05-24024 May 2002 Memo Re Response to Task Interface Agreement 2001-009 Regarding Potential Unisolable Reactor Coolant Leak Outside Containment ML0509001762002-05-28028 May 2002 Fire Hazard Analysis for Fire Zone 98-J, Emergency Diesel Generator Corridor and Fire Zone 99-M, North Electrical Switchgear Room, Arkansas Nuclear One, Unit 1 ML0214800332002-05-31031 May 2002 DC Cook, Units 1 & 2 - Request for Additional Information Regarding Containment Structure Conformance to Design-Basis Requirements ML0216100962002-06-11011 June 2002 Information Sent & Received by Electronic Mail Concerning Heavy Loads Request for Additional Infomration 05000237/LER-2002-003, Manual Valve Failures Prevent the Cooling Water Flow to Control Room Refrigeration Condensing Unit2002-07-0808 July 2002 Manual Valve Failures Prevent the Cooling Water Flow to Control Room Refrigeration Condensing Unit ML0220301902002-07-16016 July 2002 Response to NRC Request for Additional Information Re Containment Structure Conformance to Design Basis Requirements ML0220303702002-07-16016 July 2002 Attachment to Response to NRC Request for Additional Information Re Containment Structure Conformance to Design Basis Requirements. Solvia Verification Manual, Pages A30.1 - A56.4 ML0220304002002-07-16016 July 2002 Attachment to Response to NRC Request for Additional Information Re Containment Structure Conformance to Design Basis Requirements. Solvia Verification Manual, Pages A57.1 - A80.10 ML0220304152002-07-16016 July 2002 Attachment to Response to NRC Request for Additional Information Re Containment Structure Conformance to Design Basis Requirements. Solvia Engineering Report SE 99-5, Attachment 6 to AEP:NRC:2520, Pages 1 - B29.6 ML0220304172002-07-16016 July 2002 Attachment to Response to NRC Request for Additional Information Re Containment Structure Conformance to Design Basis Requirements. Solvia Verification Manual, Pages A81.1 - 1.2 ML0220304462002-07-16016 July 2002 Attachment to Response to NRC Request for Additional Information Re Containment Structure Conformance to Design Basis Requirements. Solvia Verification Manual, Pages B30.1 - B67.6 ML0220304482002-07-16016 July 2002 Attachment to Response to NRC Request for Additional Information Re Containment Structure Conformance to Design Basis Requirements. Solvia Verification Manual, Attachment 6, Pages B68.1 - Attachment 7 ML0220303342002-07-16016 July 2002 Attachment to Response to NRC Request for Additional Information Re Containment Structure Conformance to Design Basis Requirements. Attachment 5, Solvia Engineering Report SE 99-4 ML0219904052002-07-18018 July 2002 Supplemental Fire Modeling for Fire Zone 98-J, Emergency Diesel Generator Corridor & Fire Zone 99-M, North Electrical Switchgear Room, Arkansas Nuclear One, Unit 1 ML0224100432002-08-23023 August 2002 Supplement to Nuclear Regulatory Commission Request for Additional Information Regarding Containment Structure Conformance to Design Basis Requirements ML0223805242002-08-23023 August 2002 License Amendment Request for One-Time Extension of Essential Service Water System Allowed Outage Time-Additional Information ML0221400062002-08-29029 August 2002 Response to Task Interface Agreement (TIA 2001-02) &Tia 2001-04 Evaluation of Service Water System Design Basis Requirements ML0224201372002-09-11011 September 2002 Cover Letter - Draft Response to Task Interface Agreement 2001-13 Concerning the Reactor Building Crane and Heavy Loads ML0226002922002-09-17017 September 2002 Memorandum Regarding Report on the Status of Open TIAs Assigned to NRR ML0231000392002-11-11011 November 2002 Examples of Risk-Informed Licensing Actions for Acrs/Acnw ML0236403102002-12-30030 December 2002 Opportunity for Comment on Task Interface Agreement (TIA) 2001-10, Design-Basis Assumptions for Ability of Prairie Island, Unit 2, Emergency Diesel Generators to Meet Single-Failure Criteria for External Events ML0510300512003-01-13013 January 2003 Response to Task Interface Agreement (TIA 2001 -15) Regarding Evaluation of Containment Structure Conformance to Design-basis Requirements ML0232903772003-01-13013 January 2003 Task Interface Agreement (TIA 2001-15) Evaluation of Containment Structure Conformance to Design-Basis Requirement ML0224200972003-02-21021 February 2003 Draft - NRR Response to TIA 2001-13, Backfitting Requirements for Dresden Units 2 & 3 Reactor Building Crane ML0310100262003-02-21021 February 2003 NRC Response to TIA 2001-13, Backfitting Requirements for Dresden Units 2 & 3 Reactor Building Crane L-PI-03-016, Response to Opportunity for Comment on Task Interface Agreement (TIA) 2001-10, Design Basis Assumptions for Ability of Prairie Island, Unit 2, Emergency Diesel Generators to Meet Single-Failure Criteria for External Events2003-04-21021 April 2003 Response to Opportunity for Comment on Task Interface Agreement (TIA) 2001-10, Design Basis Assumptions for Ability of Prairie Island, Unit 2, Emergency Diesel Generators to Meet Single-Failure Criteria for External Events ML0320404122003-09-0404 September 2003 Response to TIA 2001-10, Design Basis Assumptions for Ability of Emergency Diesel Generators to Meet Single Failure Criteria for External Events ML0411204872004-04-13013 April 2004 License Amendment Request to Use Yield Strength Determined from Measured Material Properties for Reinforcing Bar in Structural Calculations for Control Rod Drive Missile Shields 2002-05-28 | |
Retrieved from "https://kanterella.com/w/index.php?title=TAC:MB1402&oldid=5444044"